Loading...
HomeMy Public PortalAboutAddendum No 1 to Contract No. 155-2016 ...soc - Consultants for East Main StCONTRACT SUPPLEMENT NO.1 71� n THIS SUPPLEMENTAL AGREEMENT, made and entered into this W day of 2019, by and between RUNDELL ERNSTBERGER ASSOCIATES, INC, Indianapolis, Indiana, hereinafter referred to as the "CONSULTANT", and the City of Richmond, IN, hereinafter referred to as the "LOCAL PUBLIC AGENCY" or "LPA" W ITNESSETH WHEREAS, on December 22"d, 2016, the LPA entered into a Contract with the CONSULTANT for services required for Construction Engineering Services for the construction of the Richmond Stellar Streets Project, Richmond, Indiana, INDOT Project Des. No. 13 828 10, herein after referred to as the Contract, and NOW, THEREFORE, the parties agree that the Contract shall be modified by this Contract Supplement No. 1 in accordance with the following: I. SECTION III of the Contract shall be modified as follows: "SECTION III TERMS. The term of this Contract shall be from the date of the last signature affixed to this Contract to the completion of the construction contract which is estimated to be 88 weeks. A schedule for completion of the Services and deliverables is set forth in Appendix "C" which is herein attached to and made an integral part of this Contract. II. SECTION IV of the Contract shall be modified as follows: "SECTION IV COMPENSATION. The LPA shall pay the CONSULTANT for the Services performed under this Contract as set forth in Appendix "D" which herein attached to and made an integral part of this Contract. The maximum amount payable under this Contract shall not exceed $681,323.81." III. Appendix C of the Contract shall be modified as follows: Appendix C, paragraph 4, shall be MODIFIED to read: "The Inspection budget was based on the following project schedule: INDOT Contract Letting Date of October 12, 2017. Notice to Proceed on December 4, 2017 Start of construction on or after February 22, 2018. Substantial Completion date of June 29, 2019 Should these schedule dates be reduced or increased or additional man-hours be required, the contract shall be modified accordingly." IV. Appendix D of the Contract shall be modified as follows: Appendix D, Section A, paragraph 1, shall be MODIFIED to read: "The CONSULTANT shall receive as payment for the work performed under this Contract the total amount not to exceed $681,323.81, unless a supplement is executed by the parties which increases the maximum amount payable" Page 1 of 2 Addendum No. 1 Contract No. 155-2016 IN TESTIMONY WHEREOF, the parties hereto have executed this Contract Supplement. CONSULTANT LOCAL PUBLIC AGENCY 'Signature re Kevin Osbum President David M. Snow, Mayor (Print or type name and title) (Print or type name and title) Signature Attest: Richard Foore Board of Public Works Member (Print or type name and title) Signature Carl Kincaid, Vice -President (Print or type name and title) Signature Emily Palmer, Board of Public Works, Member (Print or type name and title) Signature Vicki Robinson Board of Public Works President (Print or type name and title) Page 2 of 2 ' t y „ail. T tiki b- ---Consulrfng-- 2019 Time Justification Road, Pedestrian & Bike facilities, E.Main St, 7th&1 Oth St, in Downtown Richmond DES 1382810 Construction Bid $5,883,000.00 Construction increases $350,000.00 (low estimate) Revised Estimated Construction Cost $6,223„000.00 .. Construction 2019 estimate Anticipated Start Date 317119 Estfamted Completion Date (31 6/29119 Estimated Days Total 114.0 Days Estimated Duration. 16.3 Weeks Nonomnimmed UtilityrelOCations 0.0 Weeks .Shut Down (weeks) - G_6 Weeks Total Weeks Construction 16.3 Weeks USE (full time inspection( 16.2 Weeks 51clt1nsa Depar irl nt Pre -Construction Preparation - - - - O.p hours'.I - .Manager Construction's, 16.0 hours United Final Construction Record 4.0 hours Total _ _ - _ - _ _ 20.0 hours _ ' PE%PS Pre -Construction Prepaation O.0 hours • 1 Construction CShutDawn.(assume8 hoursLweekJ� 48.0_hours� Managerl. Construction 648.0 Flours I United " • T .0 h # Final Construction Record 246.0 hours Total 936.0 hours .- . QT ... ._ . ._. -200.0 ... ., Pre -Construction PreparaTon 0.0 hours Principal (LA III) Construction 0.0 hours REA Final Construction Record 0.0 hours Total 0.9 hours 1 - Pre -Construction Preparation 0,0 hours Proj. Mgr. (LAJq Construction 236.16-hours ,REA Final Construction Record ' 0.0 hours Total 236.16 hours Pre -Construction Preparation 0.0 hours Project LA (LA 1) Construction 0.0 hours REA Final Construction Record 0.0 hours Total - 0 U Tours Inspector # t Pre -Construction Preparation 0.0 hours , Construction Construction ' ++ 416.0 hours Manager ll T°•T , ## United Final Construction Record 0.0'hours • Total - 416.0 hours I 176.0.. .. _ . Inspeclor.#2 Pre -Construction Preparation 0.0 hours ` - DBE -Construction • + 100.O.hburs VS OT 0.0 hours '� Final Construction Record ` 0.0 hours- _. ` Total - - ." 100.0 hours ...O 0.00 3 Per Mlest0 ichetLlou 01116119 OT�st etld lbhrr/v+eek PaarepSN sail a0®m3/yi94 M9/19-y,10/1901E9ashvk M it 07 f.4F7Mf ®5 Jwk•lOM/wk+Sm •8hrs *16MAvk OT Pre -construction 10/12/17 bid Activities 12 4 17 NTP/start Shut Down 1/19/I9 Shut Estimated 3/6/19 Down - - 6.6 weeks Year#1 2018 work 9__ weeks weeks 16.3 weeks Year#2 317119 2019 _ 6/29/19 work _-113.3 weeks -- - - -- 16.29 weeks 0% 2018 100% 2019 4'/1'4'/19 b/29 19 10.9 weeks use §11119wadca Proj. Mgr. (LA 11) Nov 2018 44.5159 REA Dec 2018 21.1375 Jan 2019 , 29.25 .. Feb 2019 5.25,75 " March 2019 32 - April 20I9 32 23b.16 hours May 2019 40 - weeks June 2019 32 ++ Inspector #1 1/I/18 Time 1/1/18 0.00 USE 4/18/19 10.4 10.4 6/30/19 weeks 10.43 Inspector #2- - 4/18/19 + DBE -'VS ' 6/30/19 - Time - 2.50 I/t/19 weeks 0,00 f g gas Pi ... ...... ..... - -----