HomeMy Public PortalAboutChange Order No. 19 to Contract No. 148...82810 - Bike Pedestrian facilities-Contract No:R-3.7463 Change order No.: 019 INDIANA Department of -Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -37463 Letting Date:1' 0/1212017 District: GREENFIELD DISTRICT AE:Prather, Michael ,PE/S:Stanley, William Status:Draft Change order Information Change Order No:: 019 EWA: Y o'r Force Acct: N Date Generated: 0413012G19 Date Approved: 00/00/0000 Reason Code: SCOPE CHANGES, Added Quantities'/Items, Description: Installation -of Electrical Outlets Original Contract Amount $ 5,883,000.00 Current Change Order Amount $ 185,223.19 Percent: 3..148 % Total Previous Approved Changes $-20F242.54 Percent: -0.344 % Total Change To -Date $ 164,980.65 Percent: 2304 % Modified -Contract Amount $ 6,047,980.65 Time Extension Information Date Initiated 00/00/0000 Original Contract Time Time Element Description: Current Time Extension Previous Time Approved Revised, Contract Time Date Completed 00/00/0000 SS Completion Date 00/00/0000 or SS CalendarlWork Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) SS Days 0 SP Days 0 SP Days Value $ 0.00 SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ SS Completion Date ' 0010010000 or SS Calendar/Work Days 0 SS Date 00100/0000 or SP Days 0 Contract No:R -37463 INDIANA Department of Transportation Construction Change order and Time Extension Summary Review and Approval Information Required Approval Authority ($.per Change Order) (Days per. Contract) Verbal Approval Required? Total Change To-Date>50/o? Scope/Design Recommendation Required? Change order No.: 019 Page: 2 AE.: M.Prather. DCE: SCE: * DDCM: -LE$250K-}-.LE$750K- LE$2MGT$2M--} 50 SS days j 100 SS days } 200 'SS. Days } GT 200 SS days} rY'1 N If Yr by G•Steins Date Issued 4121201 9 Y l�NI If Y , copy to Program Budget Manager Y PU if Y, Referred to Project Manager(PM) Date to PM Date Returned ,Approval Authority Concurs with -PM? Y / N If Y. Concurrence .by date If N, Resolution:.Approved Disapproved Resolved by Date LPA Signatures -Required? �,Yj ,/ N If Y, Date to LPA 5113119 Date Returned FHWA Signatures Required? Y INN if Y, Date to FHWA Date Returned * Field Engineer -Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments.: Contract No: R--37463 I N D IANA Change Order No:919 Department of Transportation ,Contract: R-37463 Project: 1382810 - State:138281 OOOLC3 Change order Nbr: 019 Change Order. Description: Installation of Electrical Cutlets Reason Code: SCOPE CHANGES, Added Quantities/Items CLN� PC N r rPL'N item Code Unit = Unit Price ._ _- CO Q— - "'Comment ty 0186 1382810 0186 807-02560 LS 185,223.190 1.000 C Item Description: ELECTRICAL WORK Supplemental Descriptionl: INSTALLATION AND RERAIR�OF ELECTRICAL OUTLETS Supplemental Description2: Date:0511312019 Page: 3 .. .r. - _ - _.- V _ _ « - - ' -ter A i Amount Change Amount:$ 185,22119 Total Value for Change order 019 = S 185,223.19 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation This change order has been created,to cover the cost of updating, repairing and installing electrical outlets to supply power on Main Street from 5th Street to 7th Street for use by the city of Richmond. This request was made by Greg Steins with the City of Richmond and was agreed to by INDOT Area Engineer Mike Prather per attached e-mail. Milestone will have this work completed by their sub -contractor, James H. Drew. Drew has submitted a lump sum price that includes handhoIes, GPI outlets, schedule 40 PVC conduit, wire priced each comparative to the 2018 1NDOT Unit- Price Summary. They also listed three lump sum and labor items for removing electrical outlets, rewiring. service panel and rewiring the concert disconnect which are existing structures to be reused. Drew has Included a breakdown in cost for the three lump sum tabor items which is attached. A plan,outline for this work. submitted by Drew, is attached. Material used for this additional work is covered by existing material certification submitted by .fames H. Drew for current contract items. Change Order Explanation for'Specifc Line Item •*#**##t#4##!###i####t####*!####!i!M#ii##4!####i#!!r###t#*##►####t###4llAi1R•##ii###########*!!f##!t•####*##!4ri#*#A#*#!f##f# It -is the intent of the parties that this- change :order is full and complete compensation for the work describ Bove. Notification and consent to this change order is hereby acknowledged. Contractor. wlestof a Contr--actors, L.P. Signed By: Date: 05/13/'19 NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -37463 INDIANA Date:05113l2019 .Change order No:019 �##**###!####�f###aa#:1+�#!�###r!#tfa#*f###rf###t#w#i*!###,�+r�r##�r#!##�►f##*f�f##�r###sf�r#fit#�#i##*!fs##i�#�!r#�*+##*###f�##s Department of Transportation page: 4 10 UFO APPROVED FOR LOCAL PUBLIC AGENCY �7 RE) (TITLE) (DATE) 19 (SIGNATURE) •#!!!##############r##!i##t#�#####•!r#w##!#!##�##*##*:#*#!#!###�l#####!###!r######i####!####f#,�sr#+kl:###*##*#aaaf!!##t###*faf (TITLE) (DATE) SUBMITTED FOR CONSIDERATION PSIS APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION Approval Level - -� - - - Name of Approver - - - -- - -Date Status CHANGE ORD.-FORM CONTRACT NO, R-37461 B DATE OF SUBMISSION A ' rEl -24 2 p 079 PROJECT DESCRIPTION 61-KE/PEDESTRIAN FACILITIES 1N RICI MONO, IN, WAYNE.COUNTY (route intersection % bridge nofs).) CHANGE ORDER REQUEST SUMMARY CITY WANTS'POWER OUTLETS FOR LIGHTING IN TREES DESCRIPTION PROPOSED SOLUTION SUMMARY : ADD OUTLETS AT EXISTING TREE LOCA T I'ONS NOTE: 00011 re ues[from Engineer,. enter,detailed description on page 2. ONSET DATE OF CHANGE March 25, 2019 CHANGE ORDER TYPE ? O4.C3 Extra Work PRO OS � _COST- AND TME ADJUST MEN T COST COST INCREASE /'(DECREASE): The cost adjustment small include lump sum and/or estimated- totaled unit -priced item casts. Attach,a separate sheet of unit price items including item: description, unit at measurement. estimated quantity and unit price. CHECK APPROPRIATE BOXES -PER APPROPRIATE BASIS -OF COST CHANGE: 109.03Altered Quantities Yj 109:bS(cl) Agreed Price .❑ 109.05'(b) Force Account . L7 149.(35..0� Dela _Y Costs PROPOSED COST -CHANGE INCLUDES: ❑ Labor D Material ❑ Equipment ❑ Lease Agreement 9 Subcontractor TIME ADJUSTMENT INCREASE (DECREASE'): (work days) 0 CHECK APPROPRIATE BOXES PER APPROPRIATE- BASIS OF TIME CHANGE: Z 108.08(a) Excusable; Non-Conipensable ❑ 108.08(b)_ Excusable, Compensable NOTE:[ompensabfe, Qttoch-detajts based on 109.051(a) Allovlable Delay Costs. ..SURRL,EM NT L~- NFO.RNTATION Additional information. CHANGEORDER ORIGINATION: Z INDO T J LPG C] Con- tractor DOCUMENTSAFFEUED: -Contract Specifications (ref. doc name/no.) : n . � 0 -Contract. Plans (fef. doc name/no.) - - ►:. r CHANGE ORDER REQUEST FORM CHANGE ORDER AFFECTS DOE- PARTICIPATION: ❑yes no (if yesattach detail;) . CONTRACT NO, R-37463�B UP.0N'WR1'r--1*EN R\EQUEST.FRO, M'THE:'F_,NG`11qEEF,, PkbviDr: ADDIT'JOr-4AL-OETAIL DATE RECEIVED REQUEST'FOR' SUBMITTAL DATE OF ADDITIONAL DETAIL Select Dad ADDITIONAL. DETAIL Date] DETAILED' DESCRIP T ION / JUSTIFICATION: (include lava }an(s), actions of cvnsac r. a vner, and other stokehafders, key events and related causes discoveries, discussions, meetings,- and effect on the, Contract if rxo action -is takers. Also include references to key documents attached. or available to support.this;change order ..request. j Request for work was, generated by'thRe.City of Richmond. ,PROPOSED SOLUTION.— ADDI-TI-ONAL DETAILS: 1ticlude proposed scope,of work, rneans & methods,. rnawials, ,equiprTten�, atili[y retacQtiorr required, subcontracted - scope and the effect on' the contract,schedule. Also include references to ottoched documents including, but not limited to, sketches, colculations, photos, moterial informotionf and submittals anti meeting min * utes.) Additional. electrical receptacles priced 1 N TUR Cohtractor - , 1� - Name: (print) Scott . Hester T Wgnauj e- 4 24/19 NOTE. � h� Cor��r��;��� s�rQurd re[ai►� a stoned copy of this documeR� for record. CHANGE ORDER REQUEST FORM CONTRACT. NO. RW374. 3-B-' ATTACHMENT: UNIT PRIGEATEMS DETAIL Removal of Existing Outlets 1 LS S0.G50..55� for Rewire' Service Panel 1 LS @ 5.2,597.03 — Electrical Handholes-, 173'x30*' 1.1 Ea-S933.33 = S10,266.63 GFl Outlet on Post '38 Ea S529.00 = S20,102.ao Remove & Reinstall Exist Dedicated Outs.e# Boxes 4 Ea. S1,014.01=-$A,050.04 zI PVC 5ch. 40 7000 LF S5.91 = S41370.00 2" PVC- Sch. 40 1000 LF S5,53 = $6,530.00 3/4R PVC Sch. 40 1200 LF @ $5.44 = S5,528.00 - #5 Wire 27.000 LF a@ S2.20 = S81,020:00. 1 01►11ire 6000 LF cr S0.03 = S5,580:00 Waterproof Terminations 1'34- Ea c7 s15.44 = 52,068.90- 2!0 Wire 4000 LF S4.42 = 517,080- 0 Rewire Concert Disconnect I LS. a 5573.98 5e -Cl ,e_ 8 F%D r 1C1 FORCE ACCOUNT/EXTRA WORK JAMES H.. DREW CORPORATION DREW JOB NO. submitted By PROJECT NO. L - �l DeScn �n p � � _ Chan a Order Cosh Remove Exis6no Planter Outlets and %viring from Electrical Panel to All Outlets.- n Total Outlets and (1rcui s.- 6,140.64 LABOR 109.04 (a) WEEK ENDING: EMPLOYEE CRAFT TOTAL RATE TOTAL ELECTRICIAN ST .0 34.85 - OT 0 52.28 _ DT 0 69.70 10PERATOR ST 8 8 8 8 5 .38 ' 36.80 19398.40 IST OT o 55.2o DT 0 73.00 - TEAMSTER- 8 29.76 .. OT. _ 0 44.64 - DT 0 59.52 - COI4SMTION LABORER ST 0 31.26 - ILABORER OT 4 48.89 , _ DT 0 - 62.52 - ST 8 8 8 8 8 40 24.27 970.80 OT 0 35.41. - DT 0148.541.- TOTAL LABOR 2p389.0 ( . FICA 7.65% X LINE (1) , 181-24 (2) FRINGES ELECTRICIAN%- 0 HRS X - 22.49 LABORERS 40 HRS X 15.91 M 536040 OPERATORS 38 HRS X 18.71 = TEAMSTERS 0 HRS X 16.14 0 H RS X TOTAL FRINGES 1.347.38, WORKMEN'S COMPENSATION 2.84% X LINE (1) 5T.29' (4) BODILY INJURY INSURANCE 4.54%X LIiVE (1 ) 108.61 (5) PROPERTY DAMAGE, INSURANCE 0.85% X LINE (1) 20.14 STATE UNEMPLOYMENT. 8.92°/6 X LIME (1) FE.DERAL UMPLOYMENT _ -4.90% X LINE (1) 21.32 (8) TRAVEL.ALLOWANCE OR SUBSISTENCE (NOTE #3) .(9) -TOTAL LINES It 2, 3141.6, fi, 7v 8. $ 9 4,324.52 J10) 20° .X.LINE'(10) .864.90 = GRAND -TOTAL LABOR LINES (10) + 01) 5,189'.42. (12) .12% X LINE (18) GRAND TOTAL FOR MATERIALS: LINE.(-18) +. (19) EQUIPMENT 109.04 (d) CONTRACTOR OWNED TDTAL RATE -TOTAL 1 �-j TOTAL CONTRACTOR OWNED EQUIPMENT 849.3� �2'13 RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) FUEL, LUBRICANTS AND TRANSPORTATION COSTS (23) -TOT-AL=LINES (21) + (22) + (23) .849.30 (24) 12%'X .SINE (24) 101.92EQUIPMENTGRAND TOTAL, EQUIPMENT LINES (24) +.(25) �. .951.22 (26) Mow - Equipment Rental 109.04 (d) _. w iftem. Description Qty Unft Rate Extension 2 - 3 4 6 Subcontracts 109.04 (d) Rental Total Item Subcontractor Amount 2 -4 5 B 7 -TOTAL. SUBCONTRACT WEEK ENDING � {�7) TOTAL SUBCONTRACT TO DATE � _ _ (28) 10% X LINE (28) S3,000 OR LESS - (29)- 7% X LINE (23) OVER S3400 FALSE (30)- GRAND TOTAL SUBCONTRAC T LINES (28) + (29) + (30) TOTAL LINES (12) (17) (20) (26) & (31-) 61,140.64 (32). (33) 10%.X-LINE (33) _ (34) TOTAL EXTRA WORK LINE (32) + (33) + (34) 6,144.64 (35) IMFORCE ACC NVEXT R%'i -Wb' R JAMES Hi DRE C0��OR1TION sUbmivea By REW JOS �f�. ��.w� �� �c�Af( - PROJECT NO. , De'scription -Chang' Order Cyst Rai ire Soruict� panel: Electrical Panel and Go factors, Pull wire, terminate circdlts in anal and connect timed outlet,circults. to contactors.Extend and terminat ti�dlGatad dutlef to panel and )YPasS contactor ,tor continuously hot -dedicated 60' et boxes.' Extend 2/0 concert cir u' rt and Wire continuously hot, _ 2,464104 LABOR-109.04 {a) WEEK ENDING:., EMPLOYEE.CRAFT TOTAL. RATE TOTAL CLCCTRICIAN ST .8 $. 6 . 5.57,60 OT DT - OPERATOR, ST OT ... 3fi.80 DT I F 55.20 TEAMSTER ST OT 0 9.7 DT CCU BENIATION LLEE ABORER ST 0 59-52 OT 0 31.25 .. oDT �.8� _ LABORER 5T.. 1 6 24.27 38�3.32J.D OT � � T - �. . - 0 48.54 r T OTAL LAIR FICA 7.05%. X LINE {'1 } 72.36(2) FRINGES ELECTRICIANS 1-0 HRS X 22.49 = 35 LABORERS.- - 10 HRS.X 16.91 ' 264.5.6 OPERATORS . 0 HRS X ''I 0.71 = TEAMSTERS a HRS X 5.'i 4 _ 0 HRS x _ TOTAL FRINGES 014A0 (3) WORKMEN'S EN'S.COMPENSATION 2.84 �� X LINE 1 (.} . • .�8.80 (4}. _, BODILY i�JU#�Y flU5tlr�ANCE � . PROPERTY � .. 4.5a �� -X LAVE {� } 42.5� (�y DAMAGE INSURANCE D.Ba°Ia X LAVE ('i). g;0� . 4g�- STATE UNEMPLOYMENT' FEDERAL UMPLOYMENT 8.92%-X'LINE {-�} • 8$.38 T ( � D.94�°�� X LINE '{ TRAVEL ALLOWANCE ' R SUBS' ' .ISTENCE [NOTE #3 TOTAL LINES 1 � 2, 3, 4; 51 01$0 & 9 �0} -7o .20% X LINE {10} �,803.Ud -0-0), GRAND TOTAL .LABOR LINES (1 of + ('11) .. _ 360.09 2j103.05 � �i � }. (12). . NS URAN CE, TAXES 7 09:04 (b) (14). TOTAL LINES ('43) +-{14} 10% X .LINE (15) -GRAND TOTAL FOR INSURANCE, TAXES: LINE y f a f MATERIALS WEEWENDINO See PB e 4 Of A (A-rrACH COPIES OFINVOICES)- TOTAL MATERIALS X LINE (18) 18) GRAND. TOTAL FOR MATERIALS: LINE + (1 9)�U 18 .(la) " ( ) EQUIPMENT `�09.04 (d) CONTRACTOR OWNED TO�I'�1 . L RATE TOTAL DIGGER DERRICK TRUCK 0. 87.55 BUCKET TRUCE 0 3 SERvice TRUCK - I TQ� g 4 ,� 2 ,� 22.3� - 258.20 , TREKLHER,PLoW,HoE 4 como . TRUCK CIS►NE (13 TONS ----------- 0 28.95 - - � V�fII3,GGER 0 123.96 - - AIR COMPRESSOR WITOOLS. $ 0 '� 3:59 - T TRAILER l o roe , 0 4,24 $ POLE TRAILER. 8 TOE 9 . BACKHOE 580 EXTEND -A -HOE 4 09.2 _ DUMP TRUCK 0 CONCRETE SAW. 65 HP 0 31.07 12 LOOP TRUC . fy}, 0 22r36' r i 3 80FU 'O MACHINE 0 T $9.• 4 - 14 Loop SEALANT MOT MELTER 0 30=5 ` TOTAL CONTRACTOR OWNED- EQUIPMENT 268.20 21 } RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES)� FUEL, LUB€ ICANTS AND TRANSPORTATION COSTS ... i22� .�23�- _ .IQ�V TOTAL LINES'(21) + (22) �- =23) . - 8.20 - � � _ 12°ra �C LIFE (2d). GRAND TOTAL EQUIPMENT'LINES ��4} + (25� 3DD._32.�B 38 (2B) �iqUi iment C mental 09.04 (d) item Description Qty unit Rate Extension 3 4 Subcontracs 109.0.4 (d) Rental Total M" anti ter� Sut ntractor Amount. TOTAL SUBCONTRACT WEEK ENDING SUSCONTRACT _ (27) TOTAL TO DATE 10% X. LIME* (28) $3,000 OR LESS - 29 ( ) 7%. X LINE (28) OVER S3,040 FALSE 30 � � GRAND TOTAL SUBCONTRACT LiN�S (28) + (29 + 30 i i ) - (31) TOTAL LINES (1_2) (17). (2-4) (26) a (31 2,4��.�� t3� 10% X LINE (33) ( ) F TOTAL EXTRA WO RK -LINE (32) ¢ (33). + f 34} 2,484.f;4 ���} ICI O.RCE ACCOUNT/EXTRA WORK DAMES H. DREW CORPORATION -submIEied By Q 1,O. - + .�r I i C�6- 1h. PROJECT NO. JS Lrder—Ift Des'diption Change Order Cast Rewire concert Disconnect 617,86 LABOR 109.04 (a) WEED ENDING; EMPLOYEE. CRAFT _' TOTAL RATE TC'IwAL ELECTRIC ' ST 0 3.$5 - OT 0 52.28 - E)T 0 69.70 _ OPERATOR ST 6 6 36.80. '220.80' OT 4 55.26 DT 0 73.60 ' - . - TEAMSTER ST 09w7� - OT _ 9 ".54 - DT 0-- 59.52 COMBINATION LABORER ST 0 3'1 w2�7 OT 0 40.89 - DT 0 .62.52 LA80RER ST 0 24.27 _ OT = 36.41 DT D 48.64 - TOTAL LABOR 220:8i � FICA - -7.65% X LINE (1) {�3 FRINGES ELECTRICIANc.- -0 HRS-X 22A9, = _ LABORERS 0. HRS X T5.91 _ OPERATORS'' 6 FIRS x 18.71 =- 112.26 TEAMSTERS 0- HRS -X 1614 = 0 HRS X - TOTAL FRI�#OES 112.26- (3) WORKMEN+S COMPENSATION - 2.849/6 X LINE (1) 6.27 4 BODILY INJURY INSURANCE 4.50% X LINE 11 } PROPERTY DAMAGE INSURANCE 0.85% X LINE (1 ) STATE - UNEMPLOYMENT : 8.92°r�C: LINE -(1 } 19.767=7) FEDERAL UMPLOYMENT 0--90% X LINE-�I) 1.9.9 (S) TRAVEL ALLOWANG.E-OR SUBSISTENCE (NOTE #3) - - (9). .TOTAL LINES 1, 213, 41- 516, 718, & 9 389.72 - (10) 20°l% X-LINE.(10): 77.9 �1 1 GRAND TOTAL LABOR LINES (10).+ (11) $. 467.66. 12� [INSURANCE, TAXES •'I09.04 (b) � (13) (14). TOTAL LINES (13) +'(14) �5 � } 10% X LINE (16) GRAND TOTAL FOR INSURANCE,'TAXE8: LINE (15) t (15) 0 7 ) MATERIALS WEEK ENDING, See Page 4 Of 4 (ATTACH COPIES OF INVOICES TOTAL. IEr'IATE R IALS 12% X LINE (18) GRAND TOTAL FOR MATERIALS: LINE (18) + (19) (24). EQUIPMENT 109.04 (d) CONTRACTOR OWNED _ TOTAL RATE TOTAL 1 DIGGER DERRICK TRUCX 0. 2 BUCKET TRUCK 4 61.05 - 3 . SERA CE TkLICK - I TON 6 .22.36 134.10 . TRENCHER,PLWHOE 4 COMBO 0 28.96 - TRUCK CRANE (13 TON) 5 waraGER 4 -123.95 - AIR COMPRESSOR WTr040LG- i' 0 13.59 - - 7 TRALER 10 TON 4 4.24 - 8 POLE TRAILER - 8 TON 0 191 - 9 BACKHOE WO EXTEND-A-HOIEj 0 39.25 - 1 DUMP TRUCK - D 28:99 - 110 11 CONCRETE SAW, 55 HP 17 31-07 .12 LOOP 'TRUCK 0. 22.35 - 'I3 BORING 1AACHIN 0 89.74 - 14 _ - LOOP SEALANT HOT NiELTER 0 30.69 TOTAL CONTRACTOR OWNED EQUIPMENT 134' D (21) RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) (22) :. FUEL, LUBRICANTS AND TRANSPORTATION COSTS : C233 TOTAL LINES (21) +-(22) + (23) 134.10 24) 24Ja X LINE (24) 16.09 (n) GRAND. TOTAL EQUIPMENT LINES (24) } (26) 150.19' (26) mow- Page I .6f.5 Fw: LightS o�rri oW and Electrical Outlets Chris. Miller To: Josh Sherron <Josh.Sherron@ucindy.com�* Josh; This. approvIal goes with the electrical CO 19 Christopher J. Miller. -MBA Field operations Manager 8440 Allison Pointe Boulevard Suite 200 Indianapolis, IN 46250 Office: 317.895.2585 Mobile: 317.509.2245 Email: Lhris.�r filler 5_ucindy.cafn Web: w,. �;, vW6 ndy, coin See what's newat Unified Consulting NEWS ;3 BEST •°- PLACE TO W011K IN INDIA14A r- -tv y� Pr -,:T i�_ � •ei � f From: Greg Stiens <gstlens@richmondindiana.gpv Sent: Tuesday, April,30, 2019 4:45 PM To: Chris Miller <Chris..Miiler@ucindy.corn> Subject: Fw: Lights downtown arid Electrical Outlets. Chris; iNDO` ,will participate: on the. electrical, See.e-mail tram lviike.Pra 'he-jr below. - Greg From: Prather, Michael Sent: Tuesday, April 02, 2019 11:50AM To: Greg.Stiens < stiens rictiniondindtana Yov> Cc:'Dixon, Sha"rn <shaAundPr)-l.corn}; Moore; Skip <SkirN1t rg-1.t niy; price, Jason <Jason.PriLe. l oneto: err 3; Pharr, _Hung -Thai <HPha @.indg't.1N.g0V>;-Beth Fields. <hfi ld-sriLhrnor-dindian�.Q� �?; 5tanle , 8iil ��I :L � �utin���, . a�-n�; Milestone - AA/ayne Jester < Ja -nst ngl .corm Subject:.Re: Lights downtown and'Electrical Outlets https://outlook.office�.corn/mail/inba,x/idfAAQkAGOTIkY:tQ2LTNmNIYin tiNGRlivIioS'i\�lj-.::: 516/20 f Yes; I agree to -participate. Sent from my Who tie Oil Apr ?. 2.01-9. at 11:39 AM. Grey Stiens < r'c.hi�iondi�:{.'ii�i���� ����_> 'wrote: lei i i�'r: Jason• Price: •will •be -at the rneetir_g and is. awa' re of the-addi-tion.of electrical boxes for ... -Christmas lights. we can do this.as• ,� Change Order. is LUSI She-fing Change Order? Thanks, Greg From: Prather, Michaeln<g (_)V Sent: Tuesday, April 02, 2019 9:04 AM o:TGreg Stiens < iens'richondindiaa,.Pm Vic: 'Dixon, Shawn' <shalyvn i kP-i -.co >_ 'Moore, Skip` �St.i ' Ildi RP-i`.coRi>; 'Price, Jason<Jason.Price.Eey rni1estane12,conp;. Pharr, Hung Thal <HPhdm ndot.IN-zov>;'kate Barber' <l l3a h r� r'ichr-n ndindiarra'..Pov>,• 'Beth Fields' <bfieIds(riehm-ondindiana.gov>; Stanley, Bill 0 I Lt.� Ur~ n,ei$ .c€3r 1?; Milestone -Wayne Jester Subject: RE: Lights downtown and Electrical outlets Greg, 1-would advise to flat- have a niee'ting-with the Prime's sUb-Contf actor without tlhe .r�o� �le # e end con sent o -the Pi ime Co>i�tractar. i `his added wiork rim' neet�s� o be n��de to the Prime so the over-all project schedule c-an be properly rnan' aced. If the Cay wants this work campleted. the. work Will m2ed addressed "n a change order. Michael Fro M:•Greg_5tlens. [marno: tiensricflrnondrndlana.zov] Sent: Monday,- April 01, 2019 7:54 AM To. -'Kate Barber' <kh�ar bi r€akrictT-nondindiana. ,o >;'Beth Fields' {brie#ds; �.r•�,c;l���onclin�i��_r�.�►�� - Cc. `Dixon, Shavtrn`sani����PW_rt�n-��; 'Moore, Skip'tio �-€-Co, Jason` <Jasol pri Prather-, Michael �► �o�� th r. i� +�i.l 1. - - .. Pham, Hung Thai <HPhan� ir�dr:l�►i. ova .. Subject: RE Fights downtown and Electrical Outlets �7;. ��, �iC�i`�;� = r v i a�` Ali F�:u I� �f ��i�t��i.l�rf°1r�,, if� r� � �_��� ltttps:Houtlaok.office.coinlmailliribo idl.AA'QkAGNiOTikYzQ?LTNmYmItiNGRIMio3-�fa... 3/6/2019 Pace 3 of 5 rail' l thave ra rn eting on Wednesday to (.iiscL,s� insrallino, eiectricad outle�5 �rith James H, Greg From: Kate Barber «iaitto:kbarbe, ( richmondindiana. poy] Sent: Friday, 'March 29, 20194:16 PM To; Beth Fields <bfielcAls ri�limc)ndiiiti aila. , i>,-Greg Stiens < stiens 2riciimonditidiana:o-'Ov> Subject:.Fwd: Lights -downtown A fo11oW LIP to MY email regardi na power do%vntown. ---------- Forwarded message_-.....-.-_ FroriI: I3i�-on, Shawn �slja� � ncl cr � Date: Fri, Mar 9, 2019-at 4:00 PNot Subject-: RE: Lights downtown To: Kate Barber -<kblartic rlc/1"Cjj1Tj()rje1IIIIi�:�n��.�c��=� Kate, Jost to follow-up our conversation frorn earlier todai/: diet' streetlights do not have power outie�t' -in ther�t. If t.hzy city wants to have outlets available rio wnto.'vn along Main they will need to make that decision and get '.' hat they need 1 11.Uniber of outlets, Ioc8tions, etc.) added to thy plaf)s.. in my Opinion, it would be ideal if OICY COUld rnake this f4ppen sometirne rye:; Lveek, as Milestone fill be -starting, legir out l`■ londay. t don`t know how long that will tale, boo I'm assuming the new concrete &pavers will be going its sometime in the next lfevi ojeeks. As -far ;I5 wtlo,woulcl iris -call the'Con(Juit and okitlets, I think that is sbmeti ing vibich would i�av4 to be .detar3-nined once_ 'he pl n are Updated. #`eve- agreatdW 51iawn Dixon DI.S- ribu t. on Engineer Richnimid Power fix, Light .2000 U.S. 2-7 south Ric; r o ��t, € 737� P-76S-973-?25� F-765-973-7286 https:lloutlook. office. co' rn/mail/inboxAd/AAQkAGNNIOTikYzQ2LI 1tiiYm1tNGRE%4iO5?V1j... 5/6/2 01.9 Page 4 of 5 From: Kate Barber [niailto:l�barber-2riclirnondinciiaiia.Ro Sent: Monday,, March 25, 2019 12:57 PM To; Dixon, Shawn'<shavw,nci�ZD'RP-rL.C-Ofll> Subject: Re: Lights downtown III< (A JJJ_ .41i i-O-ed, RP& L -alid, its 1) 11,01 Click, op(!I) uts u'liless I V solder-CY11d, know 1he col)(ent 1-� Of course! 765-960-8935 On Moli, Mar 25-,.2019 12:00 PM Dixon, ShaxNm p-Leonl> �JTOte:. -Kate, -n Soundspod- I't .sure lh ve - t already. but viould you mind sending,ni-e your Cell 14 a gd i n J u!; L i ri -ca 5 4e-, 1 d o i Vt? Thanks Shmiew Dixot7 Dish-ibution Eng.mae-r Richilaond Power & Light 200-0-U.So 27-south Richmond, IN 47374- P-7 6 5 - 9 7 -7 2 5 %53 C -765-973-7286. ShawnDP_ rj)-Lconi From: Kate Barber Sent: Monday, March 25,1019 10:50 AM To: Dixon, Shawn <s11qWr1dCCL'o -L.C1Df)1> Subject: Re: Lights downtown 11 r_11-icoili'llik-d AIL i ti -H I' t !-A .1i )1 Ty I I ol, 411)e I I t-41C It I I is v cs-, ()A I 1"V Ic U I'l e V I C tow 01Q. co'n1vif I I-i I J)L Perfect. YOU can always. call my cell with a Iasi minute upddle.- I'd love to get photos of the -pickleball too. On N-40n. Mar 25. 2019. 10.-43 A N10 Dixon. S'ha h 1-Fil %-k Y ,.ci ef i- r-* - c ci n I don't'have a firn-fdate, but I aritic" at-1m. it vvilfbei 10vednesda'y-or Thursday ol diis Week. ilttps:it'outlook.office.com/maiIlinbo,xfid/.i-%AQkAGiN,10TIkYzQ2LTNmYr�ItNTGRIiMiO5iMj.-.. 5/6/2019 d + - - Page 5 of -5- They are doiri .the Iocc .es: �r.tt�e ¢ 1cciE- ail g t rt today; 1"� Asir g get -that o:ng either the eiid of this wet�i; ar earlynext. As soon'as f get snrnc dates, I'll let -you knokv. Have a great'day! Shd'�'n. Dixon - _ Richm6nPowe' & 2000 U.S. 27 South Richmond,; IN 47374. �765-:97".1-7255 - -765R 73-7286 ShayinDOrp-lxotn From: Tate Barber lMailto:l.barb� r.in ovQ mail.,corn]. Sent: Monday,.March 25, 2019 10:36-AM To: Dixon, Shawn. <sha%1jnd,2RP-l.coii1> Subject:, lights downtown .-Its silbs,idioril?s! Opeill aft,01mv,10-S 11ril' s .volll -twofjl-ize lice. sT 33 vvaa e 3'L t } 14i there Shawn. When, are y"all taking the. licylits down? I'd like to get a picture. Thanks. .date Kate -Basher. •Coinmunii�, Development Coordinator Depanment of Infrastructure & Development 76-5-M-7215 kb rbcra 11ttps:lloutlook- of c ' .cor � Y �ail/inbti-i AAQ GN'I0T1kYzQ LTiiiiYmItNGRIiMiI� �I`:..: 3" /61 019