Loading...
HomeMy Public PortalAboutCurbing and sidewalk Lorusso Aug 24Gregory M. St. Louis, PE Superintendent August 20, 2021 TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN MA 02472 CURBING AND SIDEWALK INSTALLATION Dear Resident/Abutters: Our contractor, Lorusso Corporation, will begin then installation of granite curbing, concrete sidewalks and concrete driveway aprons starting Tuesday, August 24, 2021. • Granite curbing at driveways will be laid out and installed in accordance with zoning requirements. Properties requiring driveway opening modifications have previously received letters from the Zoning Enforcement Office noting the deficiencies and proposed remedies. DPW will not make modifications to driveway openings unless approved by the Zoning Enforcement Agent. • Please do not park your car next to any areas marked in front of your residence during construction. • You will be notified by the Contractor prior to any work that affects access to your driveway. Driveways may remain closed up to three days to permit the concrete to cure. • Please note that there may be lapses in time between curbing installation, sidewalk excavation, installing wood sidewalk forms, and final concrete work. • Adjustments necessary to make sidewalks and driveways ADA compliant may require minor regrading of areas beyond the back of sidewalk, such as landscaping, driveways, or walkways. The Department will match existing materials and finishes to the maximum extent possible. Additional information is available at: https://www.watertowndpw.org/209/Upper-Waverley-Ave Should you have any questions, please e-mail dpwdept(c�watertown-ma.gov or you may call Ed Baptista, Highway Supervisor, at 617-972.6420. Sincerely, Gregory St. Louis, P.E. Superintendent of Public Works