Loading...
HomeMy Public PortalAboutEverett Ave Driveway Apron Sept 13 14September 12, 2018 TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS 124 ORCHARD STREET WATERTOWN, MASSACHUSETTS 02472 Tel: 617-972-6420 Fax: 617-972-6402 Concrete driveway apron installation Resident of Everett Ave The Watertown Department of Public Works and our contractor, Newport Construction, will begin the excavation, forming and pouring of concrete sidewalks and driveway aprons. The excavation and form work of driveway aprons is scheduled to start, WEATHER PERMITTING, Thursday September 13, 2018 and concrete installation will be Friday, September 14, 2018. Your vehicles must be removed from the driveway by 7:00 AM. Typical work hours will be 7 AM to 4 PM. • During the concrete installation process wooden planks will be placed across walkways to access your residence. • Please do not park your car next to any areas marked in front of your residence during construction. • Driveways may remain closed up to three days to permit the concrete to cure. • Please note that there may be lapses in time between sidewalk excavation, installing wood sidewalk forms, and final concrete work. • Adjustments necessary to make sidewalks and driveways ADA compliant may require minor regrading of areas beyond the back of sidewalk, such as landscaping, driveways or walkways. The Department will match existing materials and finishes to the maximum extent possible. • The Watertown Police will be informed of the construction and its effects, including the need for extended on -street parking due to driveway repairs. We apologize for the short notice and understand that the process is noisy, messy and disruptive and apologize in advance for any inconvenience you may experience. We know you will enjoy the improved appearance and condition of your sidewalks for many years in the future. Should you have any questions, please e-mail dpwdept@watertown-ma.gov or you may call Ed Baptista, Highway Supervisor, at 617-972.6420. Sincerely, Gerald S. Mee, Jr. Superintendent of Public Works Everett Ave Sidewalk and drive apron installation FY19 9-12-18