Loading...
HomeMy Public PortalAbout06-0132 Ocean Front CottageInspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 786-4573 extensions 104, 107, or 114 Fax: 786-9539 Permit No. 0(0- ( 32- 0c 2a r 1-r 1‘-V Owner's Name: Date Requested: D 3 - I 14 - Date Needed: 0 3 - / - O t„ Gen. Contractor: Subcontractor: M. L . S 1 Oa (PC. . Contact Number: Location: ( 1 0 S Date of Inspection: Comments: Inspector: (0 LC LH 3(0 -. Type of Inspection: )"' EL t n S e Time of Inspection. Inspection Report City of Tybee Island 403 Butler Avenue P.O_ Box 2749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 0132- Permit No. J4,; Date Requested; C 3 - 13- 0 3cea I -r a,-4'' Owner's Name: 2 4- 4 u S Date Needed: 0 3 - 1 44 - O(c- Gen. Contractor: Subcontractor; A IL. .) (,k r E\ e C ---p Contact Number: Q 3 3 , ei Co LO 0" 1.3 Y) Location: 1 1 0 5 C 7c Lei S 'P. Date of Inspection: 3 -/V-°110 Type of Inspection: n 3 4- '-J ‘-? Comments: L) • r- ' () ,. k_c I�- i;to. Et'-- Inspector: 7OO DiuO. (al Time of Inspection• DATE ISSUED: 03 -7 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT WIRE HOT TUB 1105 BAY STREET C OCEAN FRONT COTTAGE dba OCEAN FRONT COTTAGE REN TYBEE ISLAND GA 313281576 M L SLOAN P $ 25.00 $ 1.00 PERMIT #: 060132 TOTAL BALANCE DUE: $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org ����- 0132. Location TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT IImS c ,��'����r Sr. NAME. PIN Owner �� 7 - -- _____ 7/7 Vic y en -Jiaaa JJVL \�� 7 cDsz) Architect or Engineer / Building Contractor .f= e-7/LJ e k) 3502 ON (Check all that apply) New Construction " 'Renovation Minor Addition Duplex Single Family Substantial Addition_. Residential Commercial Multi - Family Footprint Change Repairs Demolition Other fr,(,,;7f.��._J/1 �� �� ACS i & Estimated Cost of Construction: $ Construction Type (Enter Appropriate Number) (1) Wood Frame, (2) Wood & Mas'onry, (3) Brick Veneer, (4) Masonry, (5) Steel & Masonry, (6) Other (Please specify) Proposed Use : Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: Units # Bedrooms Bathrooms Lot Area Living Space (Total SgFt) # Off - street Parking Spaces Trees Located & Listed on Site Plan Access: Driveway (Ft.) With Culvert? With Swale? Setbacks: Front Rear Sides (L) ' (R) # Stories height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators and similar appurtances. During Construction: On -site restroom facilites will be provided through J% % e On -site waste & debris containers t4i11 be provided by :17).Uf/?- > -c?7ip Construction debris will be disposed of byt/zeCrT� at Z( . s-1714._ by means of %Ae14 I understand that I must comply with z oning, flood damage control, building, fire, shore protection & wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be. staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor levels is established. Drainage: I realize that I must ensure. the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date Signature of Applicant Note: A permit normally takes 7 to 10 days to •rocess. Please bring two checks to my fees for new construction. Thank you! The following is to be completed hi city personnel: Zoning Classification NFIP Flood Zone Approved Rezoning /Variance? . Street Address & Number: New Existing . Is it in compliance with city snap? . If not, has street name & /or # been reported to MPC? . EMA Certification' Attached State Energy Code Affidavit Attached Utilities & Public Works: Describe any unusual findings Access to Building Site Distance to Water Main Tan Site Distance to Sewer Stub Site Water Meter Size Storm Drainage Approvals: Signature Zoning Adm.inistrato Code Enforcement 0 Water /Sewer Storm Drainage Fire Chief Inspections City Manager Date Fees: - 03 423--D7-06 Permit c23 Inspections Total G/F Water TaD Sewer Stub Total W/S