HomeMy Public PortalAboutTAC Meeting 2 PresentationMCCALL MUNICIPAL AIRPORT MASTER PLAN TECHNICAL ADVISORY COMMITTEE MEETING #2 February 18, 2021 PROJECT UPDATE The first 5 chapters have been completed: 1. Introduction 2. Socioeconomic Overview and Background 3. Inventory 4. Forecast –FAA approved on November 18, 2020. 5. Facility Requirements Chapter 6: Development of Alternatives in progress, the purpose of this meeting. FACILITY REQUIREMENTS SUMMARY Deficiencies •402-foot runway extension to the south, future runway length of 6,510 feet. * •Update runway designation to 17/35. * •Increase size of Runway 16 blast pad to standard dimensions. * •Repaint faded runway markings. •Replace and upgrade runway lighting to LED. •Designate Taxiway B as such. * •Upgrade Taxiways B-1 and B-2 to meet current taxiway fillet standards. * •Repurpose general aviation hangar area taxiways as taxilanes and designate them appropriately. * •Remedy nonstandard TOFA between Hangars 211 and 212. •Eliminate wide expanse of pavement at Taxiway B-1 and Runway 16.* FACILITY REQUIREMENTS SUMMARY CONTINUED •Remedy direct runway access at Taxiways A-2 and B-2. * •Replace existing PAPI and VASI with 4-light PAPI system. * •Complete wildlife fencing and/or fill in wildlife fence gaps. * •Remove tree obstructions north of Runway 16 and terrain obstructions in the Part 77 surfaces and instrument departure surface south of Runway 34 and east of the airport. FACILITY REQUIREMENTS SUMMARY CONTINUED Considerations •ASOS relocation options. * •Update Airport Influence Overlay Zones to reflect the updated ALP. •Explore additional hangar options, including T-hangars. * •Upgrade and reconfigure vehicle parking options. •Explore general aviation terminal options. * •Explore snow storage areas. * •Identify additional helicopter parking areas. * •Replace the diagonal taxiway to improve circulation efficiency. * ALTERNATIVE DRAWINGS •ASOS Location •Runway Extension and Designation •Taxiway/Taxilane Configuration oEast-West Taxiway oNomenclature oGeometry •General Aviation Terminal •PAPI Locations •Wildlife Fencing •Blast Pad ALTERNATIVE DRAWINGS CONTINUED •Infield Development Area oPhase 1 oUltimate •Land Acquisition NEXT STEPS •Obtain a letter of recommendation from the TAC. •Hold a public meeting to show the draft alternative drawings and solicit input. •Select a preferred alternative to move forward with. •Create Airport Layout Plan drawings. •Develop an implantation plan. •Initiate agency coordination and complete the Environmental Overview. THANK YOU!