HomeMy Public PortalAbout06-0136 AdkinsInspection Report
City of Tybee Island
403 Butler Avenue
P.C. Box 2749
Tybee Island, GA 31328
Phone: 786 -4573 extensions 104, 107, or 114
Fax: 786 -9539
Permit No. 0(0- .)I 3 (o Date Requested: 0 3- 114- O (D
Owner's Name: Date Needed: (33 — I c - o
Gen. Contractor: - d d. ,: o r d. Subcontractor:
Contact Number: Lkiir /'tC� I�.ns 'i g �F, — k L-)_l
Location:
Date of Inspection: 3 5 N
Comments:
Inspector:
AJ€_).
Type of Inspection:
Time of Inspection:
DATE ISSUED: 03 -7 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPLACE EXISTING STAIRWAY
1107 JONES AVENUE
ROBERT ADKINS
PO BOX 1601
TYBEE ISLAND GA 313281601
HORACE J. BODDIFORD
1316 VENETIAN DRIVE
TYBEE ISLAND GA 31328
P
$ 25.00
$ 500.00
PERMIT #: 060136
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
O(oI3cc?
Location: ((6 7 ,C9
NAME
ADDRE
PIN #
Owner
lec4- --r
if-,../i4 «.,
H - 2 f -14, (19,x; t C� (
- - -
za hr ti
Architect
orgmeer
� I uilding
Contractor
'or (
Gait Y./
l 3 / t Uz ,te ftZ- - PA-, 7.1e-
?e5-6' 5-77 k
(Check all that apply)
❑ New Construction
❑ Duplex
❑ Residential
❑ Footprint Changes
El Other
i 0�,
❑ Renovation
❑ Single Family
Commercial
Repairs
Sreptrw a� .
t rimated cost of Construction: $ . q'C-
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(Enter appropriate number)
(4) Masonry
(5) Steel & Masonry
❑ Minor Addition
❑ Substantial Addition
❑ Multi- Family
❑ Demolition
(6) Other (please specify)
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street
Trees locat
Access:
Driveway
Setbacks: Front
# Bedrooms
Living space (total sq. ft.)
With culvert?
Rear
# Stories
grade of the build'
units, ventilation du
# Bathrooms
With swale?
Sides (L) (R)
Vertical distance measured from the average adjacent
gh point of the building, exclusive of chimneys, heating
ring units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through,
On -site waste and debris containers will be provided by (4--
Construction debris will be disposed by at by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitt - . construction.
signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site r
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Signature Date
03 -o7-0
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
REQUIRED FOR: Building Permits
Relocation Permits
Sign Permits
Demolition Permits
Land Clearing, Disturbance or Excavation Permits
Tree Removal Permits
Relocation Permits
Special Review Permits
Site Plan Approval
Subdivision of Land
Sketch Plan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision Plat Approval
In addition to specific requirements for the above permits and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storm Water Management
requirements as outlined in Chapter 5 -4, Code of Ordinances.
Section 5 -4 -9 Prohibition provides, in part, as follows:
(4.) It is unlawful for any person to cause or permit any storm water to flow from their
property onto the property of another person, unless such storm water naturally
flowed thereon prior to any development activity.
(5.) It is unlawful for any person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process applicants must illustrate how these storm water
management prohibitions will be met, including a showing of how storm water naturally flowed
on the affected property (prior to any development activity), and what changes in storm water
flow have occurred or are expected to occur, as attachments to this form. The City's approval or
permit does not guarantee that the applicant's plans will result in meeting requirements. The final
product must actually meet the City Ordinance requirements.
#= cam?` c--
Applicant name:
Project I.D.:
Attachments approved by: Date:
v 1 -
C
/ ler
/f'07 e 5
3 to, 6 c.v..
, t,
ROBERT C. ADithNS
P. 0. BOX 1601
TYBEE ISLAND, GA, 31328