HomeMy Public PortalAbout21-9935 Approve Change Order for EAC ConsultingSponsored by: City Manager RESOLUTION NO. 21-9935 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, AUTHORIZING THE CITY MANAGER TO APPROVE A CHANGE ORDER REQUEST FOR EAC CONSULTING, INC. TO CONDUCT ADDITIONAL FLOW MEASUREMENTS AT LIFT STATIONS 4, 5 AND 7 AND CONDUCT AN ADDITIONAL SMOKE TEST OF THE CITY'S EXISTING GRAVITY SEWER MAINS, IN AN AMOUNT NOT TO EXCEED TWENTY-SIX THOUSAND TWENTY-FIVE DOLLARS ($26,025.00); PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE WHEREAS, pursuant to Resolution #20-9794, the City of Opa-Locka Commission ("City Commission") authorized the City Manager to enter into an agreement with EAC Consulting, Inc. for continuing professional architectural and engineering consulting services to perform a Sanitary Sewer Evaluation Survey (Phase III) for Lift Stations 4, 5, 7, and 8, pursuant to RFQ No. 20- 0324200.; and WHEREAS, EAC Consulting, Inc. conducted field measurements and visual inspections for the LS 4, 5 and 7 collection basins within the City in November 2020 and December 2020. Later, Sanitary Sewer Evaluation Survey (SSES) reports were prepared and submitted to the Miami -Dade Department of Environmental Resources Management ("DERM") in March 2021. All three basins were determined to be out of compliance and DERM is now requiring that the recommended wastewater collection system repairs be completed prior to retesting the flow measurements in the wet season, i.e between June 1 and November 30, 2021; and WHEREAS, EAC Consulting, Inc. is prepared to repeat the flow measurements at Lift Stations (LS) 4, 5 and 7 once the City indicates that all the system repairs have been completed. Smoke testing is also required to be performed after the completion of the repairs to the reported defects/deficiencies. In addition, the Consultant will complete the scope of services for LS 8 as agreed in the contract agreement dated December 16, 2020 for Sanitary Sewer Evaluation Survey Phase III for LS 4, 5, 7, & 8. WHEREAS, a change order is necessary and EAC Consulting, Inc. has requested the Change Order, attached hereto in Exhibit "A". The Change Order includes a repeat of flow measurements at Lift Stations 4, 5 and 7 and a repeat of smoke testing in the Resolution No. 21-9935 Veronica J. Williams, Vice Mayor collection basins for LS 4, 5 and 7. The following activities will be performed under this task for each of the three collection basins: 1). Smoke Testing. The EAC team will include a professional vendor for this task. Smoke testing will involve testing the existing gravity sewer mains using a high -volume blower along with smoke canisters or liquid smoke to generate the smoke. Smoke will be non-toxic odorless and non -staining; (2) Night Flow Measurement (3 consecutive nights); (3) Manhole Inspections; (4) Compilation of Inspection Findings and Reports (Phase Ill Report -Addendum 4); and WHEREAS, the City Commission finds it is the best interest of the City to approve the change order. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, THAT: Section 1. Adoption of Representations. The foregoing "Whereas" clauses are hereby ratified and confirmed as being true and the same are hereby made a specific part of this Resolution. Section 2. Approval of Change Order. The City Commission of the City of Opa-Locka hereby authorizes the City Manager to approve a Change Order for EAC Consulting, Inc., to include a repeat of flow measurements at Lift Stations (LS) 4, 5 and 7 and repeat of smoke testing in the collection basins for LS 4, 5 and 7, in an amount not to exceed Twenty -Six Thousand Twenty -Five Dollars, as set forth in Exhibit "A". Section 3. Effective Date. This Resolution shall be effective immediately upon adoption hereof and approval by the Governor of the State of Florida or Governor's designee. PASSED and ADOPTED this 10th day of November 2021. 2 Resolution No. 21-9935 ATTEST: APPROVED AS TO FORM AND LEGAL SUFFICIENCY: nna Flores, City Clerk Burn te Norris -Weeks, P.A. Moved by: Commissioner Davis Seconded by: Commissioner Taylor VOTE: 4-0 Commissioner Bass YES Commissioner Davis YES Commissioner Taylor YES Vice -Mayor Williams ABSENT Mayor Pigatt YES 3 City of Opa-locka Agenda Cover Memo Department Director: Airia Austin Department Director 1.. --Signature: City Manager. John E. Pate CM Signature: • Commission Meeting Date: 11/10/2021 Item Type: (EnterX in box) Resolution 0 ce Other X Fiscal Impact: (Enter Xin box) Yes No Ordinance Reading: (EnterX in box) ist Reading 2nd Reading X Public Hearing: (Enter X in box) Yes No Yes No X X Funding Source: Account# : (Enter Fund & Dept) Ex: See Financial Impact Section Advertising Requirement: (EnterX in box) Yes No X Contract/P.O. Required: (EnterX In box) Yes No RFP/RFQ/Bid#: X Strategic Plan Related (EnterX in box) Yes No Strategic Plan Priority Enhance Organizational Bus. & Economic Dev Public Safety Quality of Education QuaL of Life & City Communication Area: Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) X in IN El image • A Sponsor Name City Manager Department: City Manager Short Title: CONTRACT AMENDMENT 1 TO THE SANITARY SEWER EVALUATION SURVEY PHASE III FOR LIFT STATION 4, 5,7&8 'Staff Summary: A resolution of the City commission of the City of Opa-locka, Florida, authorizing the city Manager to Approve a Change Order request for EAC consulting Inc to amend the existing contract for Sanitary Sewer Evaluation Survey (SSES) Phase III for Lift Station Basins 4, 5, 7, and 8. Pursuant to Resolution 20-9794, the City Commission of the City of Opa-locka authorized the City Manger to enter into an agreement with EAC Consulting, Inc for professional architectural and engineering consulting services to perform a Sanitary Sewer Evaluation Survey (SSES) Phase III for Lift Station 4, 5, 7, & 8, pursuant to RFQ 20-0324200. Under the existing agreement for SSES Phase III for PS # 4, 5, 7, & 8, the Consultant conducted field measurements and visual inspections for Lift Stations (LS) 4, 5, & 7 collection basins in November and December 2020. Later in March 2021, prepared and submitted the SSES report to Miami Dade County Department of Environmental Resources Management (DERM). All three basins were determined to be out of compliance, and DERM is now requiring that the recommended wastewater collections system repairs be completed prior to retesting the flow measurements in the wet season, i.e., between June 1 and November 30, 2021. The amendment will allow the Consultant to repeat the flow measurements and the smoke testing in the collection basins for LS 4, 5, & 7 once the City indicates that all the system repairs have been completed. This amendment will also increase the existing project cost by $26,025.00. The Consultant will also resume its original scope to conduct flow measurements, flow testing, and preparation of reports for pump station basin 8. Financial Impact Account Description Available Project Remaining Balance 35-535340 Other Contracted Services $243,000 $26,025 $216,975 ;liCf �winyb:!:k .• Staff recommends that the City Commission authorize the appropriate City official to amend the existing contract for SSES Phase III for LS 4, 5, 7, & 8 to allow the Consultant to repeat the flow measurements, Smoke Testing for LS 4, 5, & 7, resume its original scope for Lift Stations 8, and lastly prepare the Sanitary Sewer Evaluation Reports that need to be submitted to the Department of Environmental Resources Management of Miami Dade County. Attachment: 1. Agenda 2. Proposal provided by EAC Consulting, Inc 3. Resolution 20-9767 Accepting BID proposals in response to RFQ 20-0324200 4. Resolution 20-9794 authorizing the City Manager to enter into an Agreement with EAC Consulting Inc for the project SSES Phase III for PS# 4, 5, 7, & 8 5. Agreement Amendment One to the SSES Phase III - PS# 4, 5, & 7 11Ik 011 EAC Consulting, Inc. September 20, 2021 Mr. Airia Austin, Public Works Director City of Opa-locka 780 Fisherman Street, 4th Floor Opa-Locka, FL 33054 Re: City of Opa-Locka Engineering Consulting Services Agreement Sanitary Sewer Evaluation Survey (SSES) Phase III Scope and Fees for Lift Stations 4, 5, and 7 Amendment No. 1 EAC Project No. 20022.WW01-04 Dear Mr. Austin, EAC Consulting Inc. is submitting the following scope and fees to provide Engineering Consulting Services for Amendment No. 1 of the City of Opa-locka's Sanitary Sewer Evaluation Survey (SSES) Phase III reports for Lift Stations (LS) 4, 5, and 7. Our services on this project will be supported by our subconsultant — • C&I Construction and Design, Inc. - Flow Testing, Smoke test, Manhole inspections and Report • Grace Professional Solutions, LLC — Project Coordination and Report Preparation Sanitary Sewer Evaluation Survey (Phase 111) All sanitary sewer collection and transmission systems are required to complete a Sanitary Sewer Evaluation Survey (SSES) according to the guidelines published in the U.S EPA's Sewer System Infrastructure Analysis and Rehabilitation Handbook (1991), EPA/625/6-91/030. The SSES is carried out in three phases. Phase I is an evaluation of the wastewater collection and transmission system to determine the amount of existing Infiltration and Inflow. (I/1). Phase II is the plan for upgrading the collection system to meet or exceed the minimum I/I standards. Phase I I I is the implementation of the plan developed in Phase II and includes remeasurement to prove that the collection system is operating at an acceptable level with respect to level of infiltration and inflow (1/1). The City desires to continue providing reliable wastewater collection services for new development and to enhance their existing collection system and has requested that EAC perform a Phase I I I SSES which includes manhole inspections, smoke testing, and three consecutive nights of flow testing to determine compliance with 5,000 gallons per day -inch -mile (gpdim) standard for I/I as specified in the Miami Dade County Code. EAC conducted field measurements and visual inspections for the LS 4, 5 and 7 collection basins in November 2020 and December 2020, and the SSES reports were prepared and submitted to Miami -Dade DERM in March 2021. All three basins were determined to be out of compliance and DERM is requiring that the recommended wastewater collection system repairs be completed prior to retesting the flow measurements in the wet season, i.e between June 1 and November 30, 2021. EAC is prepared to repeat the flow measurements at LS 4, 5 and 7 and conduct the flow measurements at LS 8 when the City indicates that all the system repairs have been completed. Smoke testing is also required to be performed after the completion of the repairs to the reported defects/deficiencies. 5959 BLUE LAGOON DRIVE • SUITE 410 • MIAMI, FL 33126 305.265.5400 eacconsult.com This amendment includes repeat of flow measurements at LS 4, 5 and 7 and repeat of smoke testing in the collection basins for LS 4, 5 and 7. The following activities will be performed under this task for each of the three collection basins: A. Smoke Testing. The EAC team will include a professional vendor for this task. Smoke testing will involve testing the existing gravity sewer mains using a high -volume blower along with smoke canisters or liquid smoke to generate the smoke. Smoke will be non-toxic odorless and non- staining. B. Night Flow Measurement (3 consecutive nights). C. Manhole Inspections D. Compilation of Inspection Findings and Reports (Phase III Report —Addendum 4). Please find enclosed the following attachment to this fee proposal letter: Attachment 1 Fee Proposal Attachment 2 Subconsultant's Fee Proposal As part of this, the City is expected to provide access throughout the project for field visit accompaniment. The following information will be required for us to commence engineering services. Written authorization to proceed with services. Please feel free to call me at 305-265-5444 with any questions you may have. Sincerely, EAC Consulting. In Michael Adeife, P.E. Senior Vice President cc: File, Donna Grace, P.E. Page 2 of 4 ATTACHMENT 1 FEE PROPOSAL Page 3 of 4 City of Opa-Iocka Professional General Engineering Services Agreement Project Number: 20022.WW01-04 Sanitary Sewer Evaluation Survey (SSES) Phase III Amendment No. 1 for Lift Stations 4, 5, and 7 Staffhour Estimate and Fee Computation Summary Date: 7/8/2021 Project Name Consultant Name F./1C Consulting, Inc Grace Professional Solutions, LLc C&I Construction and Design, Inc. TOTALS Staff Category/Classification Employee Billing Rates Contac ot A/ Prinrcipalt $325.00 ManagerPrect $250.00 EngineerQ QC $275.00 Project Engineer Admin $165.00 $75.00 Task No. & Description Staff hour. Distribution Hours Fees A rg fime ow 7 easurement - , 5 an. 7 1 2 8 $650.00 $6,300.00 11 $9,095.00 B •hese III Report - LS 4, 5 and 7 2 4 1 12 1 $6,500.00 $6,150.00 20 $16,630.00 I Totals 31 .2 ; i2:i ou 3 I 6 I$6,125.00 I 20 1 I I $7,150.00 $12,450.00 Rslmbursables / Other Subconsultant Services ODC & Printing Reprography $300.00 Grand Total $26,025.00 ATTACHMENT 2 SUB -CONSULTANT'S FEE PROPOSAL Page 4 of 4 CONSTRUCTION AND DESIGN INC. PROPOSAL/CONTRACT General Contractor 14031 SW 143rd Court Unit #6 Miami, Florida 33186 Phone: (305) 255-6067 Fax. :(786) 430-1747 Email: info@cicdinc.com Web: cicdinc.com Proposal Submitted to: Attn: DONNA GRACE, P.E. Senior Project Manager EAC Consulting, Inc. 5100 NW 33 AVENUE • SUITE 243 • FORT LAUDERDALE, FL 33309 Job Name Test Flow Test and Smoke Test Opa-Locka Pump Station 4, 5, 7 Phone: Cell No: Date: 954.714.2000 954.714.2007 6/3/21 Scope of Work: We propose hereby to provide labor and equipment for the following work: Cost Proposal for Flow Test — City of Opa-Locka Pump Station: PS 4, PS 5, PS 7 A Flow Test (Three Nights) Calculation and Conversion D Readings Reports Unit Cost Amount Cost $ 2,100.00 3 $6,300.00 $1,200.00 3 $3,600.00 $850.00 3 $ 2,550.00 Total Cost $ 12,450.00 Exclusion: Re -testing, repairs, corrections of report after repairs, PAYMENT TERMS: Based upon Applications for Payment, submitted to the Owner/Agent by the Contractor, the Owner/Agent shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in this Proposal. Therefore, the Owner/Agent shall make payments to the Contractor as follows: Final retentions of the balance owed are not allowed. Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at the following rate: any balance past thirty (30) days will be subject to 1-2% per month (18% per annual) finance charge with the Owner/Agent paying for all attorneys' fees should collection be necessary. This proposal may be withdrawn by C&I Construction and Design Inc. if not accepted within 30 days. We propose hereby to furnish material and labor complete in accordance with above specifications, for the sum of: $ 12,450.00 (Twelve Thousand Four Hundred Fifty Dollars and 00/100) Authorized Signature: Carlos Maldonado Note: This proposal may be withdrawn by us if not accepted within 30 days. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specification involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's Compensation Insurance. Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature Date of acceptance 1 Grace Professional Solutions, LLC 11009 NW 81st Manor Parkland, FL. 33076 (954) 646-4943 September 20, 2021 Mr. Michael Adeife, PE EAC Consulting, Inc. 5959 Blue Lagoon Drive, Suite 410 Miami, FL. 33126 Re: Fee Proposal for Project Coordination of City of Opa-locka Sanitary Sewer Evaluation Survey (SSES) Phase III Amendment 1 for Lift Stations 4, 5, and 7 GPS Project No. 202000101 Dear Mr. Adeife, Grace Professional Solutions, LLC is submitting this price proposal to EAC Consulting, Inc. to provide Project Coordination for the revisions to the City of Opa- locka's Sanitary Sewer Evaluation Survey (SSES) Phase III reports for Lift Stations (LS) 4, 5, and 7. EAC conducted field measurements and visual inspections for the LS 4, 5 and 7 collection basins in November 2020 and December 2020, and the SSES reports were prepared and submitted to Miami -Dade DERM in March 2021. All three basins were determined to be out of compliance and DERM is requiring that the recommended wastewater collection system repairs be completed prior to retesting the flow measurements in the wet season, i.e between June 1 and November 30, 2021. EAC is prepared to repeat the flow measurements at LS 4, 5 and 7 and conduct the flow measurements at LS 8 when the City indicates that all the system repairs have been completed. Smoke testing is also required to be performed after the completion of the repairs to the reported defects/deficiencies. This amendment includes repeat of flow measurements at LS 4, 5 and 7 and repeat of smoke testing in the collection basins for LS 4, 5 and 7. The following activities will be performed under this task for each of the three collection basins: A. Smoke Testing B. Night Flow Measurement (3 consecutive nights) C. Manhole Inspections D. Compilation of Inspection Findings and Reports (Phase III Report - Addendum 4) Grace Professional Solutions, LLC The services in this price proposal include the following: 1. Coordination of C&I Construction and Design (C&I) services a. Communication with EAC, C&I and the City re the scheduling and coordination of required work b. Provide written documentation (via email) of key action items c. Review outline of investigation report for consistency with Phase III requirements 2. Revisions to the SSES Phase III Report for Basin 4, 5 and 7 based on the inspection findings reported by C&I and the review comments by DERM. a. Review submittal from C&I for general sufficiency and alignment with Phase III requirements. b. Identify any observations that require corrective action The following underlying assumptions apply to the scope of GPS services: 1. C&I will conduct the noted field investigation and compile the results and findings into a written submittal; 2. C&I will conduct its services as a subcontractor to EAC. GPS will facilitate coordination of services and communication. 3. Night-time flow measurements will be completed before November 30, 2021 and Smoke testing will be completed before December 2021. 4. Design and implementation of further corrective actions that may be needed are not included. 5. GPS will prepare a draft report for EAC's use. EAC will provide technical review of the draft deliverable and approval of the technical content. Please find enclosed the following attachments to this letter: Attachment 1- Lump Sum Fee Proposal Please feel free to call me at (954) 646-4943 with any questions you may have. Sincerely, Grace Professional Solutions, LLC onna Grace, P.E. Project Manager Page 2 Grace Professional Solutions, LLC ATTACHMENT 1 FEE PROPOSAL GRACE PROFESSIONAL SOLUTIONS, LLC FEE PROPOSAL TO EAC CONSULTING, INC. Sanitary Sewer Evaluation Survey Phase III for LS 4, 5, and 7 Amendment No. 1 Labor Category Project Manager Cost ($) Staff Name Donna Grace, PE Labor Rate $65.00 Multiplier 2.50 Task No Task Title Hours 1 LS Project Coordination with C&I Construction and Design 4 $650.00 2 LS Phase III Report Update 40 $6,500.00 Labor Subtotal 44 $7,150.00 TOTAL (Labor and Reimbursables) $7,150.00 LS Lump Sum NTE Not -to -Exceed PROJECT AGREEMENT FOR DESIGN SERVICES BETWEEN THE CITY OF OPA-LOCKA AND EAC CONSULTING, INC AMENDMENT ONE THIS AMENDMENT (the "Agreement") is made and entered into this day of , 2021 between the CITY OF OPA-LOCKA, FLORIDA, a Florida Municipal Corporation with its principal offices located at 780 Fisherman Street, 4th Floor. Opa-locka FL. 33054 (the "City"), and EAC Consulting, Inc. (the "Consultant"), a Florida corporation authorized to conduct business in the State of Florida, with principal offices located at 5959 Blue Lagoon Drive, Suite 410, Miami, Florida 33124. WITNESSED: WHEREAS, on June 10, 2020, the City approved a pool of Qualified Firms to provide Architectural and Engineering Consulting Services to the City on an as needed basis pursuant to RFQ# 20-0324200 Library of Miscellaneous Professional Consultants; and WHEREAS, the Consultant is a member of the pool under the subcategory of Civil Engineering, Landscape Architectural, Structural Engineering, Traffic Engineering Services, land surveying, construction testing and inspections, utilities engineering services, and general consulting engineering services, and has executed a Continuing Services Agreement; and WHEREAS, the Consultant has entered into an agreement on December 16, 2020 to provide Engineering Consulting Design Services (known as the "Project", the "Services" or the "Scope of Services") to provide Sanitary Sewer Evaluation Survey (SSES) Phase III scope and fees for Lift Station 4, 5, 7, & 8, and the City accepted to compensate the Consultant Forty - Four Thousand Five Hundred Sixty -Five Dollars and 50/100 ($44,565.50) for the scope of services specified in the fee proposal dated July 28, 2020, attached hereto as Exhibit "A"; and WHEREAS, the Consultant has identified some issues that are challenging the original scope and need immediate action, and therefore on November 24, 2021 the City Commission adopted Resolution No. to modify the original scope of services and add the additional fees to repeat the flow measurements at LS 4, 5, & 7 and repeat the smoke testing in the collection basins 4, 5, & 7, attached hereto as Exhibit "B" THIS AMENDMENT ONE is considered a continuation part of the Project Agreement for Design Services between the City of Opa-locka and EAC Consulting, Inc dated December 16, 2020; and all the terms and conditions of said agreement that are not modified on this document shall remain the same and in full effect until the end of the project which is now combined by the original scope of services, attached hereto as Exhibit "A", and the new scope of services, attached here to as Exhibit "B". Page 1 of 4 Civil Engineering Services IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed by their respective duly authorized representatives the day and year written below. FOR CITY: ATTEST: CITY OF OPA-LOCKA Joanna Flores, City Clerk Approved as to form and legal sufficiency for the use of and reliance by the City of Opa-Locka only: City Attorney Burnadette Norris -Weeks, PA By: John Pate City Manager Dated: FOR CONSULTANT: WITNESS: 300 Engineering Group P.A. By: Authorized Representative Print Name Print Name Page 2 of 4 Civil Engineering Services Date Corporate Seal: EXHIBIT "A" Fee Proposal dated July 28, 2020, to provide engineering consulting design services for the Sanitary Sewer Evaluation Survey Phase III for Lift Stations (LS) 4, 5, 7, & 8 for $44,565.50. Page 3 of 4 Civil Engineering Services EXHIBIT "B" Fee Proposal dated September 20, 2021, for the Amendment One of the Sanitary Sewer Evaluation Survey Phase 111 for Lift Station 4, 5, 7, & 8 to repeat the flow measurements at LS 4, 5, & 7 and repeat the smoke testing in the collection basins for LS 4, 5, & 7 for $26,025.00. Page 4 of 4 Civil Engineering Services