HomeMy Public PortalAboutInsituform week of Mar 8-2TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F)617-972-6402 WATERTOWN, MA 02472 Gregory M. St. Louis, PE Superintendent SPECIAL NOTICE Dear Property Owner: This is to notify you that the Department of Public Works through its contractor, Insituform Technologies, will be rehabilitating the sewer mains in your neighborhood. This lining process will provide a new, joint -less sewer pipe for your area that minimizes root and water infiltration problems, improves flow, and provides for a more structurally sound pipe without the need for excavation. During this period your property's sewer service connection will be completely sealed off from the town's mainline in the street. Please limit the use of water going down your drains to a minimum, and do not use washing machines or dishwashers during this time frame. Any sump pumps illegally connected to the sewer system must be disconnected and/or discharged elsewhere; to avoid possible damage to our liner, or backups in your property. Failure to follow these instructions may cause your discharge to backup into your property. The lining is scheduled for one day during the week of March 8'h to March 12'h. You will be notified with another notice similar to this one approximately 24 hours prior to the actual installation in your neighborhood. In order to perform this work, there will be a temporary disruption of sewer service to your residence or business for a period of approximately 10 hours. On residential streets, the set-up of equipment may cause some adjustments in parking and neighborhood driving patterns; however, every effort will be made to make this inconvenience as slight as possible. During certain phases of the operation, you may detect an odor. Odors are most likely to occur in houses or buildings with dry or non-existent traps. In most cases, pouring several gallons of water down your sinks, showers, toilets, etc, and opening your windows can minimize any odors. Please be advised that there is a possibility that some water could come up from your toilets during the installation. Please keep lids closed and covered with a towel as well as some towels around the base of the toilets as a precaution. If you have any questions or concerns regarding this project, please contact one of the following during business hours, Monday — Friday, 8:30 AM — 5:00 PM: Insituform Technologies (508) 248-7624 or Watertown Department of Public Works (617) 972-6420. When calling, please reference CIP Project IA Sanitary Sewer Rehabilitations. See below for a list of streets Insituform will be working on: Riverside Street (Thurston Road to Wheeler Lane ) Spruce Street (Mt. Auburn Street to Lincoln Street), Mt. Auburn Street (Amherst Road to Russell Avenue), Stoneleigh Road (Bailey Road to Stoneleigh Circle), Garfield Street, Washburn Street, Franklin Street, Parker Street, Mangano Court www.watertowndpw.org/205/2019-sewer-im provem en is TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS 124 ORCHARD STREET WATERTOWN, MA 02472 Gregory M. St, Louis, PE Superintendent SPECIAL NOTICE Dear Resident: (P)617-972-6420 (F)617-972-6402 This is to remind you that the Department of Public Works through its contractor, Insituform Technologies, will be reconstructing sewer lines in your neighborhood utilizing a sewer lining process. To accomplish this, there will be a temporary disruption of sewer service to your residence or business for approximately 8 — 10 hours. This interruption in sewer service will be on. Monday March 8th, 2021 from 7 AM- 5PM (approximately) To avoid the possibility of flows backing up into your property during this period, please limit all liquids from going down your drains. DO NOT USE WASHING MACHINES OR DISHWASHERS. PLEASE LIMIT SINK AND SHOWER/BATH USAGE TO THE BARE MINIMUM. During certain phases of the operation, you may detect an odor. Odors are most likely to occur in buildings with dry or non-existent traps. In most cases, any odors can be minimized by pouring one or two gallons of water down your unused plumbing fixtures (sinks, showers, toilets, etc.) and basement floor drains. In the event you detect odors in your home you should notify the crew onsite and open your windows for ventilation. If you have any questions or concerns during our installation period, please do not hesitate to ask for the Site Supervisor or Crew Foreman at the job site. If you have any questions or concerns regarding this project, please contact one of the following during business hours, Monday — Friday, 8:30 AM — 5:00 PM: hisituform Technologies (508) 340-9927 or Watertown Department of Public Works (617) 972-6420. When calling, please reference CIP Project lA Sanitary Sewer Rehabilitations. Construction will be taking place at the locations listed below: • Spruce Street (between Mt. Auburn Street and Lincoln Street) • Mt. Auburn Street (between Amherst Road and Bailey Road) Sincerely, Gregory M. St. Louis, PE Superintendent of Public Works www.NN,atei*towiidpiv.oi-g/205/2019-Scivei--Inil)i-oveiiieiits TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS 124 ORCHARD STREET WATERTOWN, MA 02472 Gregory M. St. Louis, PE Superintendent SPECIAL NOTICE Dear Resident: (P)617-972-6420 (F)617-972-6402 This is to remind you that the Department of Public Works through its contractor, Insituform Technologies, will be reconstructing sewer lines in your neighborhood utilizing a sewer lining process. To accomplish this, there will be a temporary disruption of sewer service to your residence or business for approximately 8 — 10 hours. This interruption in sewer service will be on. Tuesday March 9th, 2021 from 7 AM- 5PM (approximately) To avoid the possibility of flows backing up into your property during this period, please limit all liquids from going down your drains. DO NOT USE WASHING MACHINES OR DISHWASHERS. PLEASE LIMIT SINK AND SHOWER/BATH USAGE TO THE BARE MINIMUM. During certain phases of the operation, you may detect an odor. Odors are most likely to occur in buildings with dry or non-existent traps. In most cases, any odors can be minimized by pouring one or two gallons of water down your unused plumbing fixtures (sinks, showers, toilets, etc.) and basement floor drains. In the event you detect odors in your home you should notify the crew onsite and open your windows for. ventilation. If you have any questions or concerns during our installation period, please do not hesitate to ask for the Site Supervisor or Crew Foreman at the job site. If you have any questions or concerns regarding this project, please contact one of the following during business hours, Monday — Friday, 8:30 AM — 5:00 PM: Insituform Technologies (508) 340-9927 or Watertown Department of Public Works (617) 972-6420. When calling, please reference CIP Project IA Sanitary Sewer Rehabilitations. Construction will be taking place at the locations listed below: • Stoneleigh Road (between Bailey Road and Stoneleigh Circle) • Garfield Street (between Brigham Street and Mt. Auburn Street) Sincerely, Gregory M. St. Louis, PE Superintendent of Public Works ,,nvw.watertowndow.org/205/2019-Sewer-Improvements TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN, MA 02472 Gregory M. St. Louis, PE Superintendent SPECIAL NOTICE Dear Resident: This is to remind you that the Department of Public Works through its contractor, Insituform Technologies, will be reconstructing sewer lines in your neighborhood utilizing a sewer lining process. To accomplish this, there will be a temporary disruption of sewer service to your residence or business for approximately 8 — 10 hours. This interruption in sewer service will be on. Wednesday March loth, 2021 from 7 AM- 5PM (approximately) To avoid the possibility of flows backing up into your property during this period, please limit all liquids from going down your drains. DO NOT USE WASHING MACHINES OR DISHWASHERS. PLEASE LIMIT SINK AND SHOWER/BATHUSAGE TO THE BARE MINIMUM. During certain phases of the operation, you may detect an odor. Odors are most likely to occur in buildings with dry or non-existent traps. In most cases, any odors can be minimized by pouring one or two gallons of water down your unused plumbing fixtures (sinks, showers, toilets, etc.) and basement floor drains. In the event you detect odors in your home you should notify the crew onsite and open your windows for ventilation. If you have any questions or concerns during our installation period, please do not hesitate to ask for the Site Supervisor or Crew Foreman at the job site. If you have any questions or concerns regarding this project, please contact one of the following during business hours, Monday — Friday, 8:30 AM — 5:00 PM: Insituform Technologies (508) 340-9927 or Watertown Department of Public Works (617) 972-6420. When calling, please reference CIP Project lA Sanitary Sewer Rehabilitations. Construction will be taking place at the locations listed below: • Washburn Street (between Franklin Street and Otis Sheet) • Franklin Street (between Center Street and Washburn Street) • Mt. Auburn Sheet (between Bates Road and Russell Avenue) Sincerely, Gregory M. St. Louis, PE Superintendent of Public Works w,,nv.watertowndpW.org/205/2019-Sewer-Improvements TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN, MA 02472 Gregory M. St. Louis, PE Superintendent SPECIAL NOTICE Dear Resident: This is to remind you that the Department of Public Works through its contractor, Insituform Technologies, will be reconstructing sewer lines in your neighborhood utilizing a sewer lining process. To accomplish this, there will be a temporary disruption of sewer service to your residence or business for approximately 8 — 10 hours. This interruption in sewer service will be on. Thursday March I Ith, 2021 from 7 AM- 5PM (approximately) To avoid the possibility of flows backing up into your property during this period, please limit all liquids from going down your drains. DO NOT USE WASHING MACHINES OR DISHWASHERS. PLEASE LIMIT SINK AND SHOWER/BATH USAGE TO THE BARE MINIMUM. During certain phases of the operation, you may detect an odor. Odors are most likely to occur in buildings with dry or non-existent traps. In most cases, any odors can be minimized by pouring one or two gallons of water down your unused plumbing fixtures (sinks, showers, toilets, etc.) and basement floor drains. In the event you detect odors in your home you should notify the crew onsite and open your windows for ventilation. If you have any questions or concerns during our installation period, please do not hesitate to ask for the Site Supervisor or Crew Foreman at the job site. If you have any questions or concerns regarding this project, please contact one of the following during business hours, Monday — Friday, 8:30 AM — 5:00 PM: Insituform Technologies (508) 340-9927 or Watertown Department of Public Works (617) 972-6420. When calling, please reference CIP Project lA Sanitary Sewer Rehabilitations. Construction will be taking place at the locations listed below: • Parker Street • Mangano Court Sincerely, Gregory M. St. Louis, PE Superintendent of Public Works www.watertowndpw.or¢/20512019-Sewer-Improvements TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS 124 ORCHARD STREET WATERTOWN, MA 02472 Gregory M. St. Louis, PE Superintendent SPECIAL NOTICE Dear Resident: (P)617-972-6420 (F)617-972-6402 This is to remind you that the Department of Public Works through its contractor, Insituform Technologies, will be reconstructing sewer lines in your neighborhood utilizing a sewer lining process. To accomplish this, there will be a temporary disruption of sewer service to your residence or business for approximately 8 — 10 hours. This interruption in sewer service will be on. Friday March 12th, 2021 fiom 7 AM- 5PM (approximately) To avoid the possibility of flows backing up into your property during this period, please limit all liquids from going down your drains. DO NOT USE WASHING MACHINES OR DISHWASHERS. PLEASE LIMIT SINK AND SHOWER/BATH USAGE TO THE BARE MINIMUM.. During certain phases of the operation, you may detect an odor. Odors are most likely to occur in buildings with dry or non-existent traps. In most cases, any odors can be minimized by pouring one or two gallons of water down your unused plumbing fixtures (sinks,'showers, toilets, etc.) and basement floor drains. In the event you detect odors in your home you should notify the crew onsite and open your windows for ventilation. If you have any questions or concerns during our installation period, please do not hesitate to ask for the Site Supervisor or Crew Foreman at the job site. If you have any questions or concerns regarding this project, please contact one of the following during business hours, Monday — Friday, 8:30 AM — 5:00 PM: Insituform Technologies (508) 340-9927 or Watertown Department of Public Works (617) 972-6420. When calling, please reference CIP Project lA Sanitary Sewer Rehabilitations. Construction will be taking place at the locations listed below: • Riverside Street (Thurston Road to Wheeler Lane Sincerely, Gregory M. St. Louis, PE Superintendent of Public Works w-mv.watertowndpw.org/205/2019-Sewer-Improvements