HomeMy Public PortalAbout06-0157 HearnInspection Report
City of Tybee Island
403 Butler Avenue
P.O. Box 2749
Tybee Island, GA 31328
Phone: (912) 786 -4573 extension 114
Fax: (912) 786 -9539
Permit No. C'' "' 0 /57 Date Requested
Owner's Name He (/1 Date Needed &°(/T, /S Zoo 6
Gen. Contractor /1611POGV// )' r Subcontractor
Contact Number a C'c (' 1-40,‘W'
it/ 3/,i - 7799 re c L)
Location 61320 334 A .
Date of Inspection !/' at( Time
Type of Inspection J / ,k/a/6
Heed Go -/,e Pass
mss
4 EMI
•
Inspection Report
City of Tybee Island
403 Butler Avenue
P.O. Box 2 749
Tybee Island, GA 31328
Phone: 786--4573 extensions 104, 107, or 114
Fax: 786 -9539
�; ca C + 5'l
Permit Mo. Zgaegal.23 Date Requested: 01-i-- 2 1- J (c
Owner's Name: ! -4-' 0,r r` Date Needed: CH ,
r-�
Gen. Contractor: Subcontractor: I' (_. e
Contact Number: C\u `j
Location:
Date of Inspection:
Comments:
tboi
`I
Type of Inspection:
■
r-��5h
Time of Inspection
('L9
DATE ISSUED: 04 -12 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
CITY OF TYBEE ISLAND
REINSPECTION FEE
REPAIRS RESIDENTIAL BLDG
SBRC 334 A
C E HEARN
12 DRESCHER
BLOOMINGDALE GA 31302
C E HEARN
12 DRESCHER
BLOOMINGDALE GA 31302
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 155.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $10,000.00
REINSPECTION FEE —
ROUGH MECHANICAL
PERMIT #: 060157
TOTAL BALANCE DUE: $ 30.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butner Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
Inspection Report
City of Tybee Island
403 Butter Avenue
P.O. Box 2 749
Tybee Island, GA 31328
Phone: 786 -4573 extensions 104, 107, or 114
Fax: 786 -9539
Permit No Uc0. 015 7 Date Requested; 0L-f-...11_ 0
Droners Name: 1-1 e 4.T Date Needed: 0.--1 - 12 - o Co
Gen. Contractor: Subcontractor:
Contact Number: '' ^° h
313 - 7 780
Location: TB - C. 3 3 (f A
Date of Inspection: 1".L LX__) I) TyTpe of Inspection;
Comments:
eN 5p, 4. ' 13
e.r.SP1C -)
•
Inspector: 7 Time of Inspection:
13-c) /P��
DATE ISSUED: 03 -16 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
CITY OF TYBEE ISLAND
REINSPECTION FEE
REPAIRS RESIDENTIAL BLDG
SBRC 334 A
C E HEARN
12 DRESCHER
BLOOMINGDALE GA 31302
C E HEARN
12 DRESCHER
BLOOMINGDALE GA 31302
P
$ 125.00
PROJECT VALUATION $10,000.00
REINSPECTION FEE —
ROUGH PLUMBING
PERMIT #: 060157
TOTAL BALANCE DUE: $ 30.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
Inspection Report a 1\ cc
C c''
City of Tybee Island
403 Butter Avenue
P.O. Box 2 749
Tybee Island, GA 31328
Phone: 786 -4573 extensions 104, 107, or 114
Fax: 786 -9539
Permit No 0 Co- 0 (5 / Date Requested: 'pH - (,)-0 (.„
Owner's Mame: )-A e CZr Date Needed: l0 �i - l7-7 - 3
Gen. Contractor: Subcontractor: S
3 2 q5Z
Contact Number: A 1 -, -e. �. n
Location: S�R 3 3
Date of Inspection: Li - 0 L, Type of Inspection:
Comments:
Inspector:
ND
Nt)
S
Time of Inspection:
(Itt
Inspection Report
City of Tybee Island
403 Butler Avenue
P.O. Box 2749
Tybee Island, GA 31328
Phone: 786 -4573 extensions 104, 107, or 114
Fax: 786 -9539
Permit No an -0 (S
Owner's Name: e Q; r
Gen. Contractor:
Contact Number:
Date Requested:
Date Needed:
Subcontractor:
I-� e 313 - "19 9
Location: 3 3 Lt A -5-B-E r cS`iJ
Date of Inspection: a " P 6 Type of Inspection:
Comments:
T nspertn r:
loso
fs 4U< ,' N IyEct4Au/
FAIL
Avo/7 P�
Ayg
— � .SUI. r` ��(( Ps
r`eIS
Time of Inspection:
�..
PdC
Inspection Report
City of Tybee Island
403 Butler Avenue
P.U. Box 2749
Tybee Island, GA 31328
Phone: 786 -4573 extensions 104, 107, or 114
Fax: 786 -9539
Permit No. OL0- Di S-1 Date Requested: _ 3'
Owner's Name: it 7e/( Date Needed: W W. irC k 20) ZOO (o
Gen. Contractor: Arner)GcJvipc Subcontractor:
Contact Number: e-/D)\J /41 0 3/3- 7 71 9 (^k
Location: 6����l fiZ 35 q A S l3 Z C°_ ((- S.-T � r
Date of Inspection:
Comments:
3- a.o -ou
3 C.-VL(A CA_
Ion- -f- 1-4 /3
/?6)14/e;- (
,iwd ej U L� 1
v
p4 64 K c fAo�i pl. tC1 kV
o aGi ?ge-fEcT/6w IN
`" N
�� )C( 0 wo /
bc- (-).t.5-
Inspector: --)0 Time of Inspection:
Type of Inspectio
M
SUL l N [x) /z o ,
IN /`orgy
c
DATE ISSUED: 03 -16 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAIRS RESIDENTIAL BLDG
SBRC 334 A
C E HEARN
12 DRESCHER
BLOOMINGDALE GA 31302
C E HEARN
12 DRESCHER
BLOOMINGDALE GA 31302
P
$ 95.00
$10,000.00
PERMIT #: 060157
TOTAL BALANCE DUE: $ 95.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
000-01r7
Location:
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
NAME
ADDRESS
PIN #
TELEPHONE
Owner
(' /�
/3,` �� a
'771-77/
Architect
o7/Engineer
/ //
/funding
Contractor /0"/(../5
y% 2- �/7 /// e''y LC
,Bl e,4_,/jt -A1''zf
,1f?� — %� Q.
(Check all that apply)
❑ New Construction
❑ Duplex
❑ Residential
❑ Footprint Changes
❑ Other
✓Estimated cost of Construction: $
enovation
Single Family
Commercial
epairs
❑ Minor Addition
❑ Substantial Addition
❑ Multi- Family
❑ Demolition
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Venj `
Proposed use: IC ✓�- d a I d PA..41 . l� iI84_c, N ,6/ 1, 4- Wt U to ► e i,s
Remarks: New --rc. j j Q -R, LCF I
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on sit
Access:
Driveway (ft.)
Setbacks: Front
# Bathrooms
With swale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
unn . construction:
• ite restroom facilities will be provided through
-site waste and debris containers will be , ovjded by
Construction debris will be disposed by �l at by means ofl 7-c:Z.
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
ate: -6 ignature of Applicant:*
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
NFIP Flood Zone
Existing
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Signature Date
95
03 -14,- Di,
FEES oc)
Permit b Si ")
Inspections so.
Water Tap
Sewer Stub
Aid to Const.
TOTAL 0I�^