Loading...
HomeMy Public PortalAbout06-0163 Brass Rail, LLC Phase II_1of3CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 115 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tyb( (912) 786 -4573 - FAX (912) www.cityoftybee.org IZ -I1 -3) -1)( 0, -I 't S (o S 4-- CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 116 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 117 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 118 APPROVED BY: �- P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 119 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 120 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 121 APPROVED BY: _0.7, P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 215 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 216 APPROVED BY: r.7- P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 217 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 218 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 219 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 220 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 221 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 315 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 316 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG/21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 317 APPROVED BY: <- 7-ide/-, P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 318 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 319 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 320 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 12/17/07 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: 060163 PROPOSED USE: NEW RESDL - 1 BLDG /21 UNITS OCCUPANCY TYPE: P CONTACT NAME BRASS RAIL LLC PHASE II CONTACT ADDRESS 1508 BUTLER AVE CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328 PROPERTY ADDRESS 1508 BUTLER AVE UNIT 321 APPROVED BY: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org U.S. DEPARTMENT OF HOMELAND SECURI I Y Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE Important: Read the instructions on pages 1-8. OMB No. 1660-0008 Expires February 28.2009 SECTION A PROPERTY INFORMATION For Insurance Company Use: At Building Owner's Name ROBERT M. CHU Policy Number A2. Building Street Address (Including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. 1508 BUTLER AVENUE Company NAIC Number City TYBEE ISLAND State GA ZIP Code 31328 A3. Property Description (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.) LOT B OF A SUBDIVISION OF THE WESTERN PORTION OF BEACH LOTS 92 & 93, WARD 4, TYBEE ISLAND (KNOWN AS BRASSRAILL VILLAS 2) A4 Building Use (e.g., Residential, Non - Residential, Addition, Accessory, etc.) A5. Latitude /Longitude: Let. 31.99300 Long. 80 84842 A6. Attach at least 2 photographs of the building if the Certificate is being used Al. Building Diagram Number ¢ A8. For a building with a crawl space or enclosure(s), provide a) Square footage of craw! space or enclosure(s) 877 sq ft b) No. of permanent flood openings in the crawl space or enclosure(s) was within 1.0 foot above adjacent grade c) Total net area of flood openings in AB.b RESIDENTIAL Horizontal Datum: ❑ NAD 1927 (g3 NAD 1983 to obtain flood insurance. 1156 sq in A9. For a building with an attached garage, provide: a) Square footage of attached garage b) No. of permanent flood openings in the attached garage walls within 1.0 fool above adjacent grade c) Total net area of flood openings in A9b sq in SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION 81. NFIP Community Name & Community Number TYBEE ISLAND, GEORGIA - 135164 132. County Name CHATHAM B3- State (iA. B4. Map/Panel Number B5. Suffix 136. FIRM Index B7. FIRM Panel B8. Flood 89. Base Flood Elevation(s) (Zone Date Effective/Revised Date Zone(s) AO, use base flood depth) 135164 -0002 C 6/17/86 6/17/86 AB 14 8l0. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered In Item 89. ❑ FIS Profile ® FIRM ❑ Community Determined ❑ Other (Describe) B11. Indicate elevation datum used for BFE in Item 139: ®NGVD 1929 ❑ NAVD 1988 ❑ Other (Describe) B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑yes No Designation Date N/A ❑ CBRS ❑ OPA SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) Cl. Building elevations are based on El Construction Drawings' ® Building Under Construction' ❑ Finished Construction 'A new Elevation Certificate will be required when construction of the building is complete. C2. Elevations -- Zones A1-A30. AE, AH, A (with BFE), VE, V1 -V30, V (with BFE), AR, AR/A, AR/AE, AR/A1 -A30, AR/AH, AR/AO. Complete Items C2.a -g below according to the building diagram specified in Item A7. Benchmark Utilized jsKAL Vertical Datum NGVD 1929 Conversion/Comments NONE a) Top of bottom floor (including basement, crawl space, or enclosure floor)- 11.4¢ b) Top of the next higher floor 19,$§ c) Bottom of the lowest horizontal structural member (V Zones only) NA._ d) Attached garage (top of slab) NONE. e) Lowest elevation of machinery or equipment servicing the building 11.46 f) 9) (Describe type of equipment in Comments) Lowest adjacent (finished) grade (LAG) Highest adjacent (finished) grade (HAG) 10.8 15.2 Check the measurement used. ® feet ❑ meters (Puerto Rico only) ® feet ❑ meters (Puerto Rico only) ® feet ❑ meters (Puerto Rico only) ® feet ❑ meters (Puerto Rico only) ® feet ❑ meters (Puerto Rico only) ® feet ❑ meters (Puerto Rico only) ® feet ❑ meters (Puerto Rico only) SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information. t certify that the information on this Certificate represents my best efforts to interpret the data available. t understand that any false statement may be punishable by tine or imprisonment under 18 tJ.S. Code, Section 1001. ® Check here if comments are provided on back of form. License Number GA 2225 Title PRESIDENT Company Name BERT BARRETT, JR. LAND SURVEYING, P.C. Address 145 RUNNER ROAD City SAVANNAH Signature State GA ZIP Code 31410 Date 10/26/07 Telephone 912 -897-0661 FEMA Form 81 -31, Februa See reverse side for continuation_ Replaces all previous editions IMPORTANT: In these spaces, copy the corresponding Information from Section A. Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Has No. 1506 BUTLER AVENUE City TYBEE ISLAND State GA ZiP Code 31328 For Insurance Company Use: Poky Number Company NAIL Number • SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED) Copy both sides of this Elevation Certificate for (1) community official, (2) insurance agent/company, and (3) buikd"ing owner. Comments 1. GAR MIN ETREX LEGEND OPS UNIT USED FOR LAT/LONG 2. THE ENCLOSED AREA SHOWN i■ A8 a) CONSIST OF (4) ELEVATOR SHAFTS, (4) ELEVATOR EQUIPMENT ROOMS AND (1) LARGE STORAGE ROOM. 3. THE r INERY CALLED • ' IN C2 a) CONSIST OF ELEVATOR EQUIPMENT LOCATED IN THE ELEVATOR EQUIPMENT ROOMS. •;R MACH ERY S LOCATED ON THE NEXT HIGHER FLOOR AT ELEVATION 19.86'. Signature Date 10/26/07 •�:' ❑ Check here If attachments SEC • ' E - BUILDING = _�, TION INFORMATION (SURVEY NOT REQUi RED) FOR ZONE AO AND ZONE A (WITHOUT BFE) For Zones AO and A (without BFE). ..: items E1-E5. N the Certificate is intended to support a LOMA or LOMR -F request, complete Sections A, B, and C. For kerns E1-E4, use natural grade. if available. Check the measurement used. In Puerto Rico or*. enter meters. E1. Provide elevation infomretion for the following and check the appropriate boxes to show whether the elevation is above or below the highest adjacent grade (HAG) and the lowest adjacent grade (LAG). a) Top of bottom floor (including basement. crawl space, or enclosure) is WA. 0 feet ❑ meters ❑ above or ❑ below the HAG. b) Top of bottom floor (including basement, pawl space, or enclosure) is NA. 0 feet ❑ meters ❑ above or ❑ below the LAG. E2. For Bulking Diagrams 6-8 with permanent flood openings provided in Section A Items 8 and/or 9 (see page 8 of Instructions), the next higher floor (elevation C2b in the diagrams) of the building is N.6. ❑ feet ❑ meters ❑ above or U below the HAG. E3. Attached garage (top of slab) is N.A. ❑ feet ❑ meters ❑ above or ❑ below the HAG. E4. Top of platform of rnedtilnery and/or equipment servicing the building is N19. ❑ feet ❑ meters ❑ above or ❑ below the HAG. ES. Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this information in Section G. SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B. and E for Zone A (without a FEMA-Issued or community-Issued BFE) or Zone AO must sign here. The statements In Sections A, 8 and E are correct to the best of my knowledge. Property Owner's or Owner's Authorized Representative's Name N/A Address N/A City N/A State N/ ZIP Code N/A Signature WA Date N/A Telephone WA Comments N/A ❑ Check here if ftaci SECTION G - COMMUNITY INFORMATION (OPTIONAL) The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A, B, C (or E), and G of this Elevation Certificate. Complete the applicable items) and sign below. Check the measurement used in Items 08. and G9. G 1. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who is authorized by law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.) 62. ❑ A community official completed Section E for a building located in Zone A (without a FEMA- Issued or community- Issued BFE) or Zone AO. G3. 0 The following information (Items 04 -G9.) is provided for community floodplaln management purposes. G4. Permit Number N/A 65. Date Permit Issued N/A G6. Date Certificate Of Compliance /Occupancy Issued N/A G7. This permit has been issued for: 0 New Construction ❑ Substantial Improvement G8. Elevation of as -built lowest floor ( Including basement) of the building: NIA. f feet ❑ meters (PR) Datum NA 09. BFE or (in Zone AO) depth of flooding at the building site: NIA. ❑ feet ❑ meters (PR) Datum N1 Local Official's Name N/A Community Name N/A Signature NIA Comments N/A Title N/A Telephone N/A Date N/A ❑ Check here tf attachments FEMA Form 81-31, February 2006 Replaces all previous editions Cw CALCULATIONS CW PRE-DEVELOPED FACTOR IMPERVIOUS AREA = 0.00 AC. PERVIOUS AREA = 0.81 AC TOTAL = 0.81 AC CW PRE - DEVELOPED FACTOR = 0.25 CW POST - DEVELOPED FACTOR IMPERVIOUS AREA = 0.44 AC. PERMEABLE PAVERS = 0.08 PERVIOUS AREA = 0.29 AC TOTAL = 0.81 AC (0.44x0.95) + (0.08x.75) + (0.29 x 0.35) 10.81 = 0.72 CW POST - DEVELOPED FACTOR = 0.72 o. 283 PROFESSIONAL 12- 15--O �'VG II.ICF T -2)raSSra, RECEIVED 0 : . Legend III Runoff • Combined Channel Reach . Diversion lir Pond Route 10 : . Project: BC- BRASS - HYDRO -DETEN TIOR= IBEVA #IVAH.1DF 18 hyd's 12 -12 -2007 hydrtgraph Summary Repot Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 0.92 1 10 555 2 - - -- —_. - - -- BC- BRASS -2 -YR -PRE 2 Rational 2.66 1 10 1,598 2 - --- BC- BRASS -2 -YR -POST 3 Reservoir 0.05 1 20 1,584 2 2 1.06 1,562 4 Rational 1.09 1 10 655 5 - -- - - - -- - - - -- BC- BRASS -5 -YR -PRE 5 Rational 3.14 1 10 1,887 5 -- - -- - - - -- BC- BRASS -5 -YR -POST 6 Reservoir 0.05 1 20 1,870 5 5 1.20 1,848 7 Rational 1.21 1 10 726 10 -- - - - -- BC- BRASS -10 -YR -PRE 8 Rational 3.49 1 10 2,092 10 — - - -- - - -- BC- BRASS- I0- YR -POS 9 Reservoir 0.05 1 20 2,073 10 8 1.29 2,052 10 Rational 1.34 1 10 801 25 -- - - - -- BC- BRASS -25 -YR -PRE 11 Rational 3.85 1 10 2,308 25 - - -- - - - - -- BC- BRASS- 25- YR -POS 12 Reservoir 0.05 1 20 2,285 25 11 1.40 2,265 13 Rational 1.46 1 10 877 50 - -- - - - -- BC- BRASS -50 -YR -PRE 14 Rational 4.21 1 10 2,527 50 - -- - - -- - - - -- BC- BRASS- 50- YR -POS 15 Reservoir 0.06 1 20 2,501 50 14 1.50 2,483 16 Rational 1.55 1 10 933 100 - -- - - - -- - - -- BC- BRASS - 100 -YR -PR 17 Rational 4.48 1 10 2,686 100 - -- - - - -- BC- BRASS - 100 -YR -PO 18 Reservoir 0.06 1 20 2,656 100 17 1.57 2,640 Proj. file: BBC- BRASS - HYDRO -D ETEINTI 3 XAGIRW-I.IDF Run date: 12 -12 -2007 CITY OF TYBEE ISLAND BUILDING PERMIT ENGINEERING REVIEW FEE DATE ISSUED: 12/17/07 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # NEW RESDL - 1 BLDG /21 UNITS 1508 BUTLER AVE BRASS RAIL LLC PHASE II 1508 BUTLER AVE TYBEE ISLAND GA 31328 897 -7795 BOBBY CHU 7726 JOHNNY MERCER BLVD TYBEE ISLAND GA 31328 12410 P $46,646.40 PROJECT VALUATION $1,864,000.00 TOTAL BALANCE DUE: PERMIT #: 060163 • Q' 6 $ 825.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: � C24/4------ P.O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org DAVIS ENGINEERING, INC. 636 Stephenson Avenue, Suite C Savannah, Georgia 31405 Tel. (912) 355 -7262 Fax (912) 352 -7787 davisenginc aObellsouth.net NVOICE December 14, 2007 Diane Otto City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Phone (912) 786 -4573 Fax: (912) 786 -9539 RE: Brass Rail Phase 2 PIN: 4 -0008 - 03 -001D Invoice #20513101 12 -11 -05 1.0 hours Plan review and comment letter (B) 01 -06 -06 1.0 hours Plan review and comment letter (C) 01 -09 -06 0.5 hours Plan review and concurrence letter (D) 12 -07 -07 1.0 hours Asbuilt review and comment letter (E) 12 -12 -07 1.0 hours Pool related issues & plat review 12 -14 -07 1.0 hours Final inspection and revised drainage calc review. 5.5 hours @ $150 /hour = $825 Total Due This Invoice Based on my observations and experience and to the best of my knowledge and belief, this project is in conformance with the approved site plans. Qd � -$p O6-D003 4 o 13, n n r, -1-q �22o- S2 -12o2. DECEIVED Georgia Department of Human Resources PUBLIC SWIMMING POOL INSPECTION RECORD RECEI, Name of Facility 4 J A C S P ,� 1 ( � Address City u County t/f �7 s Q �S Z T �G , jt' �'t'� SATISFACTORY y Certified Pool Operator 6 / p f , /� /t'L /t ill t�0 �J / A/S l�rA� ad A dress City County dJ y. _ _2 / 13r,� A„t„C ill d ✓ r-44. Deficiencies found on the inspection are marked with a (X). A check mark (✓) indicates satisfactory compliance, (NA) means non - applicable, *Indicates a substantial health hazard. Other items may be considered substantial health hazards depending on severity. The pool must be closed until substantial health hazards are corrected. One or more substantial health hazards violated, two or more other items violated or repeated violations will result in an unsatisfactory rating. An unsatisfactory rating may result in enforcement action. UNSATISFACTORY X /,/ Notes: 1. Water supply approved, adequate EN_ EMENT None 2. Depth properly marked V • Permit Suspended • Closed Voluntarily • Re- inspection needed days POOL WATER 3. Overflow facilities adequate ✓ 4. Constant water level ✓ 5. Turnover adequate ✓ within • Hearing Requested/ * 6. Disinfectant residual: ✓ Concentration Recommended Permit No. * 7. pH (7.2 -7.8) ✓ 8.Total Alkalinity ✓ n e to 9. Calcium Hardness ✓ Expiration Date 10. Cyanuric Acid *11. PUMPING FILTRATION AND TREATMENT SYSTEM Clarity *12. Pump operating properly ✓ *13. Filters functioning properly V' Purpose: YR MO DA 1. Routine 14. Hair & lint strainers functioning properly • *15. Skimmers/Gutters maintained & operating properly V *16. Chemical feeders operating properly ✓ '" 2. Follow -up 3. Request 4. Complaint 17. Recirculation and filtration equipment readily accessible 1,7 DECK AND POOL AREA 18. Pool & Decks clean, and in good repair N./ Length Inspection Pool 5. Other 19. Night lighting adequate of Minutes WATER AND FACILITIES 20. Hot & cold water under pressure U 21. Adequate toilet facilities & showers ✓ Type: � Swimming/Pool Spa SEWAGE DISPOSAL 22. Sewage disposal method: 1. Public, 2. Septic Tank, 3. Positive outlet, (approved and functioning properly) I SAFETY PRE- CAUTIONS 23. Life line in place /Separation of wading pool d f ,/ / ' 24. Warning/Safety sign posted in clearview of pool area v • Special Purpose Pool: 25. First aid kits available & properly equipped • Type: 26. Emergency & lifesaving equipment in conspicuous place I ✓ Required Turnover Rate_Z__gprn of Disinfectant CL 27. Emergency phone provided and hard wired V Type Concentration 5+17 28. Gas cylinder precautions adequate NA Required 29. Proper barrier around pool ✓ 30. Main drains properly covered and maintained V OPERATOR AND RECORDS 31. Certified Pool Operator: 1. On -site 2. Contract 0 ��i bb T S Pie f NG Bather Load 32. Lifeguard(s) (if provided) has proper certification V L i Sample 1. None 2. Water 3. Other 33. Trained operator on duty T(01 - A » G f �'�R r,/ 34. Appropriate records on file 35. Pool test kit(s) available and adequate for all necessary tests v I,- Y 0014-i V / U r Reason for Sample: 36. Other _ Remarks: Date of Inspection P Discussed with lure & Title) 1 ` ' cted by (Signature &Title) Page 1 of 1 Dianne Otto From: Dianne Otto Sent: Thursday, December 13, 2007 8:03 AM To: 'lahbos' Subject: FW: Brass Rail 2 See below. Dianne K. Otto Administrative Assistant Building & Zoning dotto @cityoftybee.org Phone: (912) 786 -4573 ext. 114 Fax: (912) 786 -9539 Original Message From: davisenginc @bellsouth.net [mailto :davisenginc @bellsouth.net} Sent: Thursday, December 13, 2007 7:31 AM To: Brannyn G. Allen Cc: Dianne Otto; Joe Wilson Subject: Brass Rail 2 Based on the recombination plat with the recording information "Condo book 2C Pg 439" date stamped 12 -11 -07 12:34pm, it appears Ph 1 and 2 are now on one piece of property. That satisfies my comment #1. 12/13/2007 DAVIS ENGINEERING, INC. 636 Stephenson Avenue, Suite C Savannah, Georgia 31405 Tel. (912) 355 -7262 Fax (912) 352 -7787 davisenginc @bellsouth.net December 7, 2007 Brannyn G. Allen Director or Planning, Zoning and Economic Development City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Phone (912) 786 -4573 Fax: (912) 786 -9539 RE: Brass Rail Phase 2. Dear Ms. Allen: ,n�VED We have reviewed revised asbuilts and base file by Boswell Design Services emailed to me late Wednesday, 12 -5 -07. As I left the island Tuesday morning, this review is a desktop asbuilt review only and I have reviewed the permitted plans or the completed site. For reference I have only the Engineer's base file for the construction plans and not an individual sheet display. A pdf of this is being emailed to you. I did not have the time to figure out the grouping of the Engineer's layers to display the individual sheets. At this time I offer the following comments: 1) I have not seen the recombination plat that: a) Eliminates the building on this site from being served with a building on another property by the same sewer lateral. b) Addresses this building using the same dumpster as Phase 1. The construction base drawing shows a dumpster from Ph 1 in the NE corner of this (Ph 2) site. The asbuilts do not. The plat should address this. c) I do not remember if cross parking was proposed between the phases, particularly as it applies to handicapped parking. 2) The approved construction plans showed an elevation of the drive at the building entrance at 12.65. The asbuilts show around 11.40. In the southeast corner the storm and sanitary connections are around a foot lower. As the entrance to the parking has been also installed lower, I would like to review the extent of the lower installation as compared with the approved plans. For instance, how does this affect the slope of the entrance into the parking garage? 3) It appears the asbuilts show a 12" storm drain in front of the building that does not exist. I believe the grate inlets in the front tie into the subsurface detention storage chambers. 4) Water meters & services have been installed south of the drive. I see no problem with this. 5) The enclosure within the parking lot just south of the rest rooms is not labeled. If it is above ground, it presents a conflict with proposed parking. 6) The construction base drawing does not show the sump pump for the storm system. I need to review permit prints in your office with the asbuilts to complete my review of this. 7) I would like information on the prohibiting of the pervious pavers around the pool. Also, I am unsure of how this affects drainage calculations. Most of the above items are field changes that the project could have received review of through your office prior to this close out period. I will complete my review of these asbuilts in your office using your files and drawings. I would like to do this on Tuesday morning. As always, my review addresses land development activities for development of the site, I have not attempted to duplicate the work of the Planning Commission or City staff with regard to setbacks, density or other zoning or subdivision regulation issues. Please advise if you have any questions on this review. Sincerely, Downer K. Davis, Jr., P.E. President 2051310E 12- 12.0'1 - 'awed oswe.11 r ``-_ -P-axed 0 /gam D-7 1-1 C 1 °�, wo, er Dianne Otto From: davisenginc @bellsouth.net Sent: Friday, December 07, 2007 7:44 AM To: Brannyn G. Allen Cc: Joe Wilson; Dianne Otto Please print and call me upon receipt. 695 -7262 Downer 1,1( -00( ?2 °"(` e :9y 12/10/2007 Page 1 of 1 R CE WED Page 1 of 7 Dianne Otto From: davisenginc @bellsouth.net Sent: Wednesday, December 12, 2007 12:10 AM To: Brannyn G. Allen Cc: Dianne Otto; Joe Wilson Subject: Brass Rail Phase 2 The asbuilts showed the elimination of the porous pavement around the pool due to the Health Department not allowing it. In the 12 -07 -07 asbuilt review, I noted in comment #7 I wanted more information on the rules prohibiting the porous paving near the pool. This morning I spoke with Chris at the Chatham County Health Department. Chris is the supervisor for the swimming pool inspectors. He referred me to the code I have pasted below. In our conversation he advised that the deck was required to be impervious only for 4' from the edge of the pool. He was unaware of any restriction from using porous material beyond that. I changed the font color to red for the portions I feel are pertinent with the most important underlined. Chris can be contacted at: Savannah District Office 24 Oglethorpe Professional Plaza Blvd Savannah, GA 31416 Phone: (912) 644 -5211 Fax: (912) 644 -5220 Based on this information, it appears there are no regulatory restrictions that prohibit placing the porous pavement beyond the minimum required deck limits. The drainage calculations should be revised to consider the increased area of impervious area. The purpose of this is to verify the installed stormwater storage chambers are adequate as they were sized based on less impervious area. An objection to the porous brick pavers has been raised recently due to the possibility of rocks in the pores sticking to bare feet and being carried into the pool. With the rocks being #89 (3/8 ") this is not likely. However, porous concrete could be used instead of the porous brick pavers if this is a concern. Please advise if you have any questions on this. 290- 5- 57 -.06 Decks and Deck Equipment. 12/12/2007 Page 2 of 7 (1) These requirements shall be for decks and deck equipment and shall apply at the time of construction. (a) Deck(s) shall be designed and installed in accordance with the engineering practices required in the area of installation. This includes the design and quality of subbase when required, concrete mix design, reinforcing, joints, etc. If a concrete deck is selected, in the absence of specific local engineering practices, the work shall be performed in accordance with the recommended practices of the latest edition of American Concrete Institute (ACI) Standard 302.1 R- 80, "Guide for Concrete Floor and Slab Construction." (b) Decks, ramps, coping and similar step surfaces shall be slip- resistant and easily cleanable. (c) Special features in or on deck(s) such as markers or brand insignias shall conform to this Chapter. (d) Risers for steps for the deck shall be uniform and have a minimum height of three and three - fourths inches (3 % ") and a maximum height of seven and one - half inches (7W'). The minimum tread depth shall be ten inches (10 "). (e) Excavation areas shall be adequately compacted when they support the deck (s). (f) The deck, including coping, shall have a minimum of four feet (4') width of continuous, unobstructed walking area maintained at all times. (g) A minimum four feet (4') deck width shall be provided on the sides and rear of all diving equipment. A deck clearance of twenty -four inches (24 ") shall be provided around any other deck equipment that is thirty -six inches (36 ") or less in height above the deck. A deck clearance of thirty -six inches (36 ") shall be provided around all other deck equipment. (h) A four -foot (4') minimum, continuous unobstructed deck, which may include the coping, shall be provided around at least 50 percent or more of a spa. (i) The minimum slope of the deck(s) shall be one - eighth inch per foot (18 ": 1') ver tical to horizontal. (j) The maximum voids between adjoining concrete slabs, and /or between concrete slabs and expansion joint material, shall be three- sixteenths inch (3/16 ") of horizontal clearance with a maximum difference in vertical elevation of one -fourth inch (' /4 "). (k) Construction joints where pool coping meets the deck(s) shall be watertight and shall not allow water to pass to the ground beneath. (1) The areas where the deck(s) join the pool and spa coping shall be designed and installed so as to protect the coping and its mortar bed from damage as a result of reasonable movement of adjoining deck(s). (m) Joints in deck(s) shall be provided to minimize the potential for cracks due to a change in elevations, separation of surfaces or movement of the slab. (n) The areas where the deck(s) join concrete work shall be protected by 12/12/2007 Page 3 of 7 expansion joints to protect the pool adequately from the pressures of relative movements. (o) Deck(s) shall be edged, have a radius, or be otherwise relieved to eliminate sharp corners. (p) Deck(s) shall be sloped to effectively drain either to perimeter areas or to deck drains. Drainage shall remove pool and spa splash water, deck cleaning water and rain water without leaving standing water. (q) Site drainage shall be provided to direct all perimeter deck drainage as well as general site and roof drainage away from the pool. When required, yard drains shall be installed to prevent the accumulation or puddling of site water in the general area of the deck(s) and related improvements. (r) Backwash Sump. If used, an open pit or leaching design for backwash sump purposes shall be located so that it falls completely below adjacent deck(s) and fully outside a line projected 45° downward and away from such deck(s), or shall be designed to accommodate local soil conditions and the volume of backwash. (s) Circulation system piping, other than that integrally included in the manufacture of the pool or spa, shall be subject to an induced static hydraulic pressure test (sealed system) at fifty (50) pounds per square inch (psi) for at least thirty (30) minutes or longer as determined by the local health authority. This test shall be performed before the deck is poured and the pressure shall be maintained through the deck pour. (t) Valves installed in or under any deck shall provide a minimum ten inch (10 ") diameter access cover and valve pit to facilitate servicing. (u) A hose bibb and a vacuum breaker shall be provided for washing down the entire deck area. (v) The deck area will be kept clean of all trash and debris. (2) Entry /Exit. All pools except spas, shall have at least two (2) means of entry/exit located so as to serve both ends of the pool. These shall consist of ladders, stairs or re cessed treads, or a walking entry and may be used in combination. All treads shall have slip- resistant surfaces. (a) Where water depths are twenty -four inches (24 ") or less at the pool wall, such areas shall be considered as providing their own natural mode for entry /exit. (b) For pools or water areas over thirty feet (30') in width, both sides of the deep portions of the pool shall have entries /exits provided. (c) A means of entry/exit for the shallow end shall be located between the shallow end wall and the cross section at Point C, while a means of entry /exit for the deep end shall be between the deep end wall and the cross section at Point B as shown in Rule .05(6). (d) A means of entry/exit shall be provided at a minimum of every seventy -five (75) 12/12/2007 Page 4 of 7 BPKWSH SUMP linear feet of pool wall or fraction thereof. (e) Stairs, ladders and recessed treads shall be located to not interfere with racing lanes if applicable. (3) Pool Stairs. The design and construction of protruding and recessed pool stairs shall conform to the following: (a) Step treads shall have a minimum unobstructed horizontal depth of ten inches (10 ") and a minimum unobstructed surface area of two hundred forty (240) square inches. (b) Risers at the centerline of the treads shall have a maximum uniform height of ten inches (10 "), with the bottom riser height allowed to vary from two inches (2 ") to not more than ten inches (10 "). (c) Each set of stairs shall be provided with at least one (1) handrail to serve all treads and risers. Handrails shall conform to the following standards: 1. Handrail s, if removable, shall be installed in such a way that they cannot be removed without the use of tools. 2. The leading edge of handrails facilitating stairs and pool entry! exit shall be no more than eighteen inches (18 ") plus or minus three inches (± 3 "), horizontally from the vertical plane of the bottom riser (where applicable). 3. The outside diameter of handrails shall be between one inch (1") and one and nine - tenths inches (1.9 "). (d) Underwater seats, benches or swimouts may be provided as part of the stairs or recessed treads. (4) Pool Ladders. The design and construction of pool ladder(s) shall conform to the following standards: (a) Pool ladders shall be made entirely of corrosion - resisting materials. (b) Ladders shall provide two (2) handholds or two (2) handrails. (c) Below the water level, there shall be a clearance of not less than three inches (3 ") nor more than six inches (6 ") between any ladder tread edge, measured from the pool wall side of the tread and the pool wall. (d) The clear distance between ladder handrails shall be a minimum of 12/12/2007 Page 5 of 7 seventeen inches (17 ") and a maximum of twenty -four inches (24 "). (e) There shall be a uniform height between ladder treads, with a seven inch (7 ") minimum distance and a twelve inch (12 ") maximum distance. (f) Ladder treads shall have a minimum horizontal depth of one and one -half inches (1W'). (5) Recessed Treads. The design and construction of recessed treads in the pool wall shall conform to the following standards: (a) Recessed treads at the centerline shall have a uniform vertical spacing of twelve inches (12 ") maximum and seven inches (7 ") minimum. (b) The vertical distance between the pool coping edge, deck or step surface and the uppermost recessed tread shall be a maximum of twelve inches (12 "). (c) Recessed treads shall have a minimum depth o f five inches (5 ") and a minimum width of twelve inches (12 "). (d) Recessed treads shall drain into the pool to prevent the accumulation of dirt. (e) Each set of recessed treads shall be provided with a set of handrails!grabrails!handholds to serve all treads and risers. (6) Spa Entry /Exit. Spas shall have a means of entry/exit at a minimum of every fifty feet (50') or portion thereof, where water depths are greater than twenty -four inches (24 "). (a) Rule .06(4) and (5) shall apply to ladders and recessed treads in spas. (b) Spas shall be equipped with at least one handrail (or ladder equivalent) for each fifty feet (50') of perimeter or portion thereof, to designate the point of entry and exit. 1. Handrails shall be installed in such a way that they cannot be removed without the use of tools. 2. The leading edge of a handrail in the spa shall be no more than eighteen inches (18 ") plus or minus three inches (± 3 ") horizontally from the vertical plane of the bottom riser (where applicable). 3. The outside diameter of handrails shall be between one inch (1") and one and n ine- tenths inches (1.9 "). (c) The design and construction of spa steps and seat benches, where used, shall conform to the following standards: 1. Step treads shall have a minimum unobstructed horizontal depth of ten inches (10 ") for a minimum continuous width of twelve inches (12 "). Step treads shall have slip- resistant surfaces. 2. Riser heights shall not be greater than twelve inches (12 "). Where the bottom tread serves as a bench or seat, the bottom riser may be a maximum of fourteen inches (14 ") above the spa floor. 3. The first and last risers need not be uniform but shall comply with riser height requirements as noted above. The first (top) riser is measured from the finished deck. 4. Intermediate risers, those between the first and last risers, shall be 12/12/2007 Page 6 of 7 uniform in height. 5. Each set of steps shall be provided with at least one (1) handrail to serve all treads and risers. 6. The outer two -inch (2 ") edge of each step sha II be painted a contrasting color. (7) Supports for Diving Equipment. Supports, platforms, stairs and ladders for diving equipment shall be designed to carry the anticipated loads. Stairs and ladders shall be of corrosion - resisting material, easily cleanable and with slip - resistant tread. (a) All diving stands higher than twenty -one inches (21") as measured from the deck to the top butt end of the board shall be provided with stairs and /or a ladder. Step treads shall be self- draining. (b) Platforms and diving equipment of one (1) meter or higher shall be protected with guard rails which shall be at least thirty inches (30 ") above the diving board and extend to the edge of the pool wall. All platforms or diving equipment higher than one (1) meter shall have guard rails which are at least thirty -six inches (36 ") above the diving board and extend to the edge of the pool wall. (8) Diving Equipment. Diving equipment shall be designed for swimming pool use and s hall be installed in accordance with the manufacturer's recommendations. (a) Diving equipment manufacturers shall provide installation instructions and specifications with each unit. (b) A label shall be permanently affixed to the diving equipment or jump board and shall include: 1. manufacturer's name and address, 2. board equipment length, 3. identification as to diving or jump board, 4. fulcrum setting specifications (if applicable). (c) Diving equipment shall have slip- resistant tread surfaces. (d) Diving equipment shall be permanently anchored to the pool deck. The edge of the board at the tip end shall be level with the water surface. The tip end of the board over the pool water surface may be higher than the butt end of the board. (e) Maximum board height over the water shall have plus three inches ( +3 ") tolerance. (f) The maximum construction tolerance of the tip of the board from Point A as shown in Rule .05(6) shall be plus or minus three inches (± 3 "). The diving equipment shall be in compliance with Rule .05(5). (9) The requirements of the U.S. Consumer Product Safety Commission (CPSC) Standard for Swimming Pool Slides as published in the Code o f Federal Regulations, 16 CFR Part 1207, shall be used for standards relating to swimming pool slides. Installation and use instructions shall be provided with each unit by the manufacturer. (10) Play structures and other equipment shall be governed by other appropriate authorities such as building codes, U.S. Consumer Product Safety Commission 12/12/2007 Page 7 of 7 (CPSC) standards, and amusement ride regulations. Authority O.C.G.A. Sec. 3 1 -45 -1 et seq. History. Original Rule entitled "Decks and Deck Equipment" adopted. F. Oct. 22, 2001; eff. Nov. 11,2001. 12/12/2007 Dianne Otto From: Joe Wilson Sent: Friday, December 07, 2007 10:31 AM To: davisenginc @bellsouth.net; Brannyn G. Allen Cc: Dianne Otto Subject: RE: The following sites were visited this a.m. with discrepencies or acceptance noted: 1405 Solomon Ave. - Appears to be a retention in the N.E. corner of lot. Need to review overall drainage plan. Brassrail Condos - Catch basins need cleaning, inverts, and pipes cut flush w /wall. Sump pump wiring needs to be incased. 40 AN: 44:2- teal 12 -7-01 1204 Second Ave. - Okay 1010 Hwy 80 - Pipes in catch basin need to be cut flush with wall. The Southside (Marshside) needs soil stabilization. I will recheck this p.m. for compliance. 1408 Fifth Ave. - Okay 403 Tenth St. - Soil needs to be stabilized next to marsh (Westside). Needs deliniation of swale on Eastside. Original Message From: davisenginc @bellsouth.net [mailto :davisenginc @bellsouth.net] Sent: Fri 12/7/2007 7:44 AM To: Brannyn G. Allen Cc: Joe Wilson; Dianne Otto Subject: Please print and call me upon receipt. 695 -7262 Downer Page 1 of 1 Dianne Otto From: Dianne Otto Sent: Thursday, December 06, 2007 1:35 PM To: Joe Wilson; Brannyn G. Allen; 'davisenginc @bellsouth.net' Subject: Brassrail Joe, Brannyn and Downer: Bobby Chu has requested a drainage site visit at the Brassrail project. Dianne K. Otto Administrative Assistant Building & Zoning dotto @cityoftybee.org Phone: (912) 786 -4573 ext. 114 Fax: (912) 786 -9539 12/06/2007 06/0163 Chu / Brass Rail Villas Phase II 1508 Butler Ave. 21 units Mike Deal 272 -3704 04/26/07 FOOTING SLAB UNIT ROUGH ROUGH ROUGH FRAMING INSUL. FIRE TEMP. FINAL FINAL FINAL FINAL FEMA C.O. MECH. PLUMB. BUILD. ELEC. WALL POWER MECH. PLUMB. ELEC. pass all pass all 115 pass pass pass pass pass pass �p a SS .j .�O$ S SS S f 17 116 pass pass pass pass pass pass t 'a pass 117 pass pass pass pass pass pass 118 pass pass pass pass pass pass 119 pass pass pass pass pass pass 120 pass pass pass pass pass pass 121 pass pass pass pass pass pass 215 pass pass pass pass pass pass pg5 pa $ ( pg sf (JO SC 216 pass pass pass pass pass pass 4 217 pass pass pass pass pass pass 218 pass pass pass pass pass pass 219 pass pass pass pass pass pass 220 pass pass pass pass pass pass 221 pass pass pass pass pass pass 315 pass pass pass pass pass pass pass pass pass pass fa ss (IQs! ` )a Dgcs 316 pass pass 317 pass pass pass pass pass pass 318 pass pass pass pass pass pass 319 pass pass pass pass pass pass 320 pass pass pass pass pass pass A 321 pass pass pass pass pass pass pa ss v pa SS j, p d alarm system: jJ' /ik, sprinkler: permit 06- 0466.1 pcttt.l, W' • COASTALDISTRICT Chatham County Health Department Env rental Health Office 420 Mall Boulevard (31406), Yost Office Box 14257 Savannah, GA 31416 -1257 www.gachd.org Phone: 912. 356.2160 Fax: 912. 356 -2969 W. Douglas Skelton, MD District Health Director Islands Engineering, PC 110 Holcomb Street Savannah, GA 31406 Attention: Carl W. Quante August 1, 2007 RECEIVED RE: Brassrail Phase 2, Permit 5378 15th Street & Butler Avenue, Tybee Island, GA The plans and specifications for the above - referenced pool have been reviewed by the Chatham County Health Department. The bather load is 56. Construction approval is hereby given. The following inspections are required during the progress of construction: Dates Inspected 1 0--12 -01. I It -')12. /2 /& o73. D Use (Size A Schedule — Schedule 40) for all piping under hull of pool before proceeding to form the hull of the pool. PRESSURE HELD AT Li 0 LBS. All other piping prior to covering an3proceeding to complete construction of the pool. All piping must be pressurized. Before the pool may be operated, a final inspection will be made to insure that the pool is constructed according to the plans and specifications and that all required equipment, signs, etc., are on hand and available for use. A pool permit will then be issued through our office with a $200 fee due at the time of inspection, if not already paid. PLEASE ADVISE THIS OFFICE OF WHEN THE POOL IS READY FOR EACH OF THE ABOVE INSPECTIONS. There are any questions, please contact me at 912 - 356 -2160. DAH/lgw cc: City of Tybee William W. Robbins, Jr. Sincerely, c \! David A. Houg ft n Environmental Health Specialist III Division of Environmental Health Georgia Department of Human Resources • Division of Public Health Bryan County Camden County Chatham County Effingham County Glynn County Liberty County Long County McIntosh County Inspection Report City of Tyhee Island 403 Butler Ave. P-O. Box ?MO Tybee Island, GA 31_328 Phone: (912) 786-4573 ext. 114 Fax: (912) 786-9539 Permit mil _067 - Owner'.c Nirne S Gen, Contrartnr c"\_.HA . contact timber K 70'4 tocation /57) Date Requested Date Needed Stiftrontrw-for Inspector of inspection 0- ol iype of Irmpertioli CE r EAA 4 /Idol s Is o/v Fail I-IVA C._ 6,( / -/L 0 4- r V., A 0 p /17 v / , Pass E Inspection Report City of Tybee Island 403 Butler Ave. P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786 -4573 ext. 114 Fax: (912) 786 -4539 Permit No 06, — 0 /6 3 Date Requested n Date Needed • t � ?CCU g Owner's Name .BPASS i / Gen. Contractor Contact Number Location Inspector C' Au Type of Inspection Subcontractor ee JD-ea - _3 70 /550 &, T /t`'E —A e (5 "-e5 1„1/ (02 ur):4 J . Date of Inspection F"ia, a //c Pecs L, S��F1"7- Pass Fail (). Inspection Report City ot Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786-4573 extension 114 Fax: (912) 786-9539 Permit No- 06—C2/63 Date Requested Owner's Name eR/Ls_s / Date Needed /VDV, ZOO Gen. Contractor Subcontractor Contact Number r\A't f3-• q location L5O 8 Eic.k.---k.sv 4,) e. Inspector Typp of r-Kpertion c/A/ a Ls Date of Inspection r/Ata/ i-It/A 317 SI 8 3)9 2O ■•0•■■•••••••• •••••■••••••••••••••••■■■ •■•••■•••••••••••11 Pass Fail 4 !i,;,:i••.•• „.11: A• ...N../ hrW. `CK •. Inspection Report City of Tybee Island 403 Butler Avenue F.Q. Box 2749 Ty bee Island, GA 31328 phone: (912) 786 -4573 extension 114 Fax: (912) 786 -9539 Permit No, C.:):7 QLY1 - -- Date Requested Owner's Name 3r0SS R 21 I Gen. Contractor Contact Number 150 8. � V E.5Asi Date Needed r. Subcontractor Location Inspector Type of Inspection FIA/ . )8 � /9 • d SE. Date of Inspection aI ECE • PL • I-IdAC Pass Fail Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786 -4573 extension 114 Fax: (912) 786 -9539 Permit No. 0 (i ' /4 ) Date Requested /6/2 , % .;^ i Owner's Name Date Needed / ' ..) - ' , 7 Gen. Contractor Subcontractor Contact Number Location / (. 0, (7 ")//1 '; 1. r Inspector Date of Inspection /(�;' / Type of Inspection /1l Pass Fail Inspection Report City of Tybee Island 403 Butter Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) /86-4573 extension 114 Fax: (912) 786 -9539 Permit No DG ` D(ca 3 Date Requested _ 1 G- 22- 0-7 Owner's Name .) c t'A SS 1 4 ( Date Needed 10-2_3-01 Gen. Contractor Subcontractor Contact Number L\ l<-(2-d 2 -3—? cY+ Location 1 ►J J 4- P..r A\JQ, . Inspector , k Date of Inspection I 0 oL'T Type of Inspection .� 'pool 3 Pass El Fail Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786-4573 extension 114 Fax: (912) 786-9539 Permit No, 06 - 0/k5 Owner's Name are. Ass ika: C,en. Contractor Date Requested Date Needed /0 •/9 — 0 9 Subcontractor /1e/f..5 Contact Number M/14- be c Location /3-0 &, !/'y Inspector Type of Inspection .HO f-00 c oro PL 12.1 Date of Inspection Pass Fail E Inspection Report City of Tybee island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786 -4573 extension Fax: (912) 786 -9539 'r.1)))11L1 114 Permit No. 0/6 3 Date Requested Owner's Name -BrZSS c'% Date Needed (4)e,1. %61 Zoo 9 1 Gen. Contractor LA u Subcontractor Contact Number Nl % �� � , 3704 4 Location 1 50 6 `� .E J e- Inspector Z -te — Date of Inspection Type of Inspection f"' / AJ G/ E L - P L - H Pass Fail ■ Permit No. Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Pbone: (91)) 786-4513 extension 114 Fax: (912) 786-9539 (""'N Owner's Name Gen. Contractor Contact Number - 0 I co 3 Date Requested 09 - 0—/ Date Needed 09-0 c-c)) Subcontractor fl\tkpiTheo Location tCOS ?)J4-1,Q5- Ave-- — Inspector Type of of Inspection Date of Inspection ID 3 EN \ t a trv... - • , ( (7_, op (.3 Pass Fait ,r!:... Inspection Report City of Ty bee Island 403 Butler Avenue P.O. Box 2749 Tyhee Island, GA. 31328 Phone: (912) 785 -4573 extension 114 fax: (912) 786-9539 Permit No. D(0 f 0 3 Date Requested O v 23-0i Owner's Name _ Gen. Contractor Contact Number Location Inspector Clrw Date Needed Q " - 0-7 Subcontractor IV' + L'" �( DO r-` (k(2) O -- i - 3 -7 oq- Date of Inspection Type of Inspection e IM P . n c ,.1 2r' k a-) St. --2 a Pass Fail * * * * * * * * * * * * * ** -COMM. NAL- * * * * * * * * * * * * * * * * * ** DATE AUG- 23 -20C MODE = MEMORY TRANSMISSION FILE NO. =131 STN COMM. NO. + * ** TIME 11:00 * * * * * * ** START = AUG -23 10:59 END = AUG -23 11:00 ONE - TOUCH/ STATION NRME /EMAIL ADDRESS /TELEPHONE NO. PAGES DURATION ABBR NO. 001 OK a 4435073 001/001 00 :00 :19 -CITY OF TYBEE ISL. ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** -CITY OF TYBEE - * * * ** - 912 786 9539- * * * * * * * ** RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND FOR SAVANNAH ELECTRIC. FAX TO: Lynn Brennan 9-12=94aV3S37 Phone 912 -443 -5063 ,4 3 50') 3 D o -o1 e4 Location Address: Type of Release: Electrician: tr / 4L S O.? 's � 44.\ A■M+ • Lot # Release Date: 0?— 2 3-0 / p. p 0 uJ !3- Temporary V Permanent I Subd Name: A. L. 51 o a.v- -} Electrician Phone Number: 352 -on Owner /Builder: T v A : , y Qo r- 4 . Phone Number: o,..7 - -7 o 4 Location Address: Type of Release: Electrician: Owner/Builder: Lot # Release Date: Temporary Permanent Subd Name: Electrician Phone Number: Phone Number: Location Address: Type of Release: Electrician: Owner/Builder: Lot # Release Date: Temporary Permanent Subd Name: Electrician Phone Number: Phone Number: RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND FOR SAVANNAH ELECTRIC. FAX TO: Lynn Brennan 9135 -37 Phone 912 - 443 -5063 �9 444 3 -So93 DCo-01(o4 . ' J :€ „ 4r" Location Address: I 0 3 'g AVRZ. Lot # Release Date: 08-- 2 3-0'? -�-e p. power Type of Release: Temporary /Permanent Subd Name: Electrician: , L . J I 0 GUN-) Electrician Phone Number: 35 2 01) Owner/Builder: o a \,, J Qo n S"� . Phone Number: 2,1 a - 31 O 4 Location Address: Type of Release: Temporary Permanent Subd Name: Electrician: Lot # Release Date: Owner/Builder: Electrician Phone Number: Phone Number: Location Address: Lot # Release Date: Type of Release: Temporary Permanent Subd Name: Electrician: Owner/Builder: Electrician Phone Number: Phone Number: Permit No Owner's Name Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee island, GA 31328 Phone - (91 )) /86-4513 extension 114 NIX: (912) 786-9539 R NA)) (en. Contractor E), C \/1 Contact Number Location )3 OS Bulief- Itispector 7 Tyne of inspection \ S P 320 Date Requested Date ti Peded Subcontractor .5/0a /1 (61,0 SS - 0 / 0 Date of Inspection I. 7 5 ) Pass Fad RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND FOR SAVANNAH ELECTRIC. FAX TO: Lynn Brennan 91:2=9*1=35-37 Phone 912 - 443 -5063 +45 - Sol 3 uw�Ts. 3 /S� 3/6� 3 /7,3/8 3/?, 32oc 3z'. 324 �iaO✓ c 4/aro z Location Address: 1508 Au e Lot # Release Date: f tq ZD Zoo 7 Type of Release: Temporary ✓ Permanent Subd Name: efe 5 & 1 (Pi/2) Electrician: M. L. 610 AA/ Electrician Phone Number: 36 - 01/0 M/KE be41 Owner/Builder: Bobby Cho 00,vs-t: Phone Number: .27,2— 3 %D Location Address: Type of Release: Temporary Permanent Subd Name: Electrician: Lot # Release Date: Owner/Builder: Electrician Phone Number: Phone Number: Location Address: Type of Release: Temporary Permanent Subd Name: Electrician: Lot # Release Date: Owner/Builder: Electrician Phone Number: Phone Number: * * * * * * * * * * * * * ** -COMM. RNRL- * * * * * * * * * * * * * * * * * ** DATE AUG -20 -20 * * ** TIME 08:16 * * * * * * ** MODE = MEMORY TRANSMISSION START= AUG -20 08:15 END = RUG -20 08:16 FILE NO. =122 STN COMM. ONE - TOUCH/ STATION NAME /EMAIL ADDRESS /TELEPHONE NO. PAGES DURATION NO. ABM NO. 001 OK a 4435073 001/001 00 :00 :19 -CITY OF TYBEE ISL. ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** -CITY OF TYBEE - * * * ** - 912 786 9539- * * * * * * * ** RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND FOR SAVANNAH ELECTRIC. FAX TO: Lynn Brennan 9Ha7 Phone 912- 443 -5063 41- '43 -So'13 L4A,,7.s: 3L5' 3/6 3/7,3/83/ , 320 .3Z/- 3,e.6 Location Address: (508 ac. Lei AUe Lot # Release Date :4 /Ze2c )? Type of Release: Temporary ►� Permanent Subd Name: •FMS t% % 66#2, Electrician: M , L. 6 to A,./ Electrician Phone Number; /t Owner /Builder: Boiaby Chet Cp s7 Phone Number: 7a -- 370 Location Address: Lot # Release Date: Type of Release: Temporary Permanent Subd Name: Electrician: Electrician Phone Number: Owner /Builder: Phone Number: Location Address: Lot # Release Date: Type of Release: Temporary — Permanent Subd Name: Electrician: Electrician Phone Number: Owner/Builder: Phone Number: DATE ISSUED: 08/10/07 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND WATER METER PICKUP NEW RESDL - 1 BLDG /21 UNITS 1508 BUTLER AVE 1 HOUSE WATER METER (1 -INCH) BRASS RAIL LLC PHASE II 1508 BUTLER AVE TYBEE ISLAND GA 31328 897 -7795 BOBBY CHU 7726 JOHNNY MERCER BLVD TYBEE ISLAND GA 31328 12410 P $45,821.40 $1,864,000.00 PERMIT #: 060163 TOTAL BALANCE DUE: $2,818.40 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: ,C4cfvt.1,4J P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786-5737 www.cityoftybee.org DATE ISSUED: 08/10/07 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT NEW RESDL - 1 BLDG /21 UNITS 1508 BUTLER AVE 1 HOUSE WATER METER (1 -INCH) BRASS RAIL LLC PHASE II 1508 BUTLER AVE TYBEE ISLAND GA 31328 897 -7795 BOBBY CHU 7726 JOHNNY MERCER BLVD TYBEE ISLAND GA 31328 12410 P $45,821.40 $1,864,000.00 PERMIT #: 060163 TOTAL BALANCE DUE: $2,818.40 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, tire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will he stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT 0_ J_ - (D (c)- olb3 !6ou4 e, . Location: NAME ADDRESS PIN # TELEPHONE Owner 1 Phase_ ?r Architect or Engineer Building Contractor (Check all that apply) ❑ Repair ❑ Residential ❑ Renovation ❑ Single Family ❑ Minor Addition ❑ Duplex ❑ Substantial Addition ❑ Multi - Family ❑ Other ❑ Commercial I- 1 n c_\-■ G.ja-A-e..Y VY\S2–"\-Q.)-- — Details of Project: ❑ Footprint Changes ❑ Discovery ❑ Demolition \r\oJSz Estimated Cost of Construction: $ Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With Swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager FEES Permit Inspections Water Tap -; nch gici?.tio Sewer Stub Aid to Const. TOTAL 2.4o Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) /86-45/3 extension 114 Fax: (912) 786-9539 Permit No. D to •3 ± Lo 3 Requested O - 0 6-3% __O Owner's Name - e- \-\ J Date Needed 0 S- O'7- J% Caen, Contractor O SSrOo I V. I�p5 Subcontractor I • L 5 (oQ r✓ Contact N um ber Location L S ag ✓eJ , Inspector iTT Date of Inspection Type of inspection '"'�• e nv i • Pass Fail 2"c1fL r ■ * * * * * * * * * * * * * ** -COMM. JRNAL- * * * * * * * * * * * * * * * * * ** DATE AUG -07 -2( * * * ** TIME 13:00 * * * * * * ** MODE = MEMORY TRANSMISSION FILE NO. =073 START = AUG -07 12:59 END-AUG-07 13 :00 STN COMM. ONE - TOUCH/ STATION NAME /EMRIL ADDRESS /TELEPHONE NO. PAGES DURATION NO. RBBR NO. 001 OK a 4435073 001/001 00 :00 :19 -CITY OF TYBEE ISL. ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** -CITY OF TYBEE - * * * ** - 912 786 9539- * * * * * * * ** RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND FOR SAVANNAH ELECTRIC. FAX TO: Lynn Brennan 93537 Phone 912- 443 -5063 f43 -5'0'13 O (o -Otko3 -07().":4s- Z IS Location Address: I SO $ 13 At V c.. Lot # Release Date: - 7- Q, /Permanent 4- trnpType of Release: Temporary Subd Name: Electrician: AA. L. `5' I o a v- Electrician Phone Number: 36-2- Q I 1 O Owner/Builder: 13 r0,6s �n.` U.-C Phone Number: 2 1). -3')04 Location Address: Lot # Release Date: Type of Release: Temporary Permanent Subd Name: Electrician: Owner/Builder: Electrician Phone Number: Phone Number: Location Address: Lot # Release Date: Type of Release: Temporary Permanent Subd Name: Electrician: Electrician Phone Number: Owner/Builder: Phone Number: RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND FOR SAVANNAH ELECTRIC. FAX TO: Lynn Brennan 9-1:2444z3537 Phone 912 - 443 -5063 -41=t=gile49 y-,4 3 - Scs 13 O Co - C 7 (ID-J *4- 2. 1 S -0hrJ /2.I ( 1 u r ;#s) Location Address: ( 50 S 13 J#(45- (Av e, . Lot # Release Date: S -1- 0-1 /Permanent -LIN P . u.3 er Type of Release: Temporary Subd Name: Electrician: M . L.. S I o ay, Owner/Builder: f'o,S S I ciA 1...1. -C Electrician Phone Number: 3S 2 - 0110 Phone Number: 2 -1 .2 - 3 7 0 4 Location Address: Lot # Release Date: Type of Release: Temporary Permanent Subd Name: Electrician: Electrician Phone Number: Owner/Builder: Phone Number: Location Address: Lot # Release Date: Type of Release: Temporary Permanent Subd Name: Electrician: Electrician Phone Number: Owner/Builder: Phone Number: DATE ISSUED: 07/30/07 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION 21 WATER METERS (3/4 -INCH) CITY OF TYBEE ISLAND WATER METER PICKUP NEW RESDL - 1 BLDG /21 UNITS 1508 BUTLER AVE BRASS RAIL LLC PHASE II 1508 BUTLER AVE TYBEE ISLAND GA 31328 897 -7795 BOBBY CHU 7726 JOHNNY MERCER BLVD TYBEE ISLAND GA 31328 12410 P $43,003.00 $1,864,000.00 PERMIT #: 060163 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: atvww2) (S),&&) P. O. Box 2749 - 403 Butter Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (91)) 786-4513 extension 114 Fax: (912) 786-9539 Permit No. (03 Owner's Name __ n \r‘ J Gen. Contractor Contact Number OCe0( a, Date Requested 0(0-1 2 01 Date Needed n(0-13-0-7 Subcontractor IA L S (3 a r-N Location \SOS . Inspector A ( Date of Inspection Type of Inspection 0, 0 ? D LA) e-r- S 352-olio Pass Fail * * * * * * * * * * * * * ** -COMM. IRNAL- * * * * * * * * * * * * * * * * * ** DATE JUN -13 -2E MODE = MEMORY TRANSMISSION FILE NO. =802 < * * ** TIME 10:54 * * * * * * ** START= JUN -13 10:53 END = JUN -13 10:54 STN COMM. ONE - TOUCH/ STATION NAME /EMAIL ADDRESS /TELEPHONE NO. PAGES DURATION NO. ABBR NO. 001 OK a 4435073 001/001 00:00 :20 ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** -CITY OF TYBEE -CITY OF TYBEE ISL. - * * * ** - 912 786 9539- * * * * * * * ** RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND FOR SAVANNAH ELECTRIC. FAX TO: Lynn Brennan 91r2=943P35,37 Phone 912 - 443 -5063 +4 Location Address: 'I 2 S Ck42.:44kalvk AVG , Lot # Release Date: 13 -01 Type of Release: Temporary Z Permanent �� Subd Name: Electrician: bp, Owner/Builder: iT i . ' k es„02) Electrician Phone Number: MI )) 313- OgfS Phone Number: 313 1-11 I t Ito- ow) 3 '(J, r,45 tt S t2‘ [ 1 u."4 s) Location Address: \550g -R.1 Ave,. Lot # Release Date: (a . 13- 01 Type of Release: Temporary ✓Perm nc iit (-645— Subd Name: Electrician: AR L 5 00.1^. Owner/Builder: ro sr cr; Electrician Phone Number: 35 2. - C) I RD Phone Number: ,12-3704 Location Address: Lot # Release Date: Type of Release: Temporary Permanent Electrician: Owner/Builder: Subd Name: Electrician Phone Number: Phone Number: Page 1 of 1 Dianne Otto From: Chuck Bargeron Sent: Thursday, April 26, 2007 7:51 AM To: Dianne Otto Subject: FW: Brassrail Condominiums Original Message From: Sharon Marshall Sent: Thursday, April 26, 2007 7:46 AM To: Chuck Bargeron Subject: FW: Brassrail Condominiums Chuck, Please see e-mails below. Sharon Marshall O(p -0I(03 Original Message From: Diane Schleicher Sent: Wednesday, April 25, 2007 6:05 PM To: James W. Price Cc: Chris Case; Sharon Marshall Subject: FW: Brassrail Condominiums Chief Price, Your officers may receive a noise complaint regarding this construction site. I wanted to give you a "heads up ". Diane Schleicher Original Message From: Sharon Marshall Sent: Wednesday, April 25, 2007 12:16 PM To: Diane Schleicher Subject: Brassrail Condominiums Diane: I spoke to Stephanie Light today about the noise level at the Brassrail Condominium site. She said that she can hear the noise inside her home with the windows shut. I stated to her that at no time, even during working hours is the site supposed to exceed 60 decibels. I advised her to call the Police Department and have them take a sound measurement. Also, she wanted me to look at some safety issues at the site, so I am going to pass these along to the City Marshal. Sharon Marshall 04/26/2007 Permit No, . 1 / Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone- (912) /86-4573 extension Fax: (912) 786-9539 Date Requested Owner's r c S S Date Needed • - • ■ ■ Gen Contr;t4 for C - tontact Numbi-ir 1.1 (abort Inspector vpr ctf ins.pectiorr r e 114 Subcontractor Li -23.o1 _PA T)Pal -7-07( - 3m4 1C,35 J4-1c- ;21 ur),45 Date of Inspection -EnZL--(ALL_ (Dv- CG 'Nit\ CL /Nit ) Pass Fail 0 Inspection Report City of Tybee Island 4113 antler Avenue P.O. Box 2749 Tybee Island, GA 31318 Phone: (912) 78b-45/3 extension 114 idX: (912) 786-9539 Permit No.. ((2,:Ot 3 Date RPquested C±L a Owner's Narro- k J Date Needed (")1-1'/(- -2 Gen. C.ontrar to r Subcontractor C.ontat f- Number M Ku) 0 c;.? 7 3 72(4- 1. ocatiort 341J2_7)- A uei. Date of Inspection lype ,t-Ps• cfci.telt nSvin•A-. rTh c tie/ /7 Pass Fait 1:::1 Permit No. Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA. 31328 Phone_ (912) 786 -4513 extension 114 Fax: (912) 786 -9539 Owner's Name (� �' Gen. Contractor Contact Number Location Inspector Date Requested Date Needed Subcontractor AA. C a -) 2 -31o4 7 Type of Inspection Date of Inspection r rr,�� C �7 6 Pass Inspection Report City c4 Tybee Island 403 Butler Avenue P.O. Box 2749 iybee Island, GA 31328 Phone: (912) 286-45/3 extension 114 itlX7 (912) 786-9539 Gen. Contractor Contact Number Location 5 0 Inspector Date RI-quested 04---1 7 0 Date Needed _ Li Subcontractor 60._ (o5g- ra 5-s, Fa Date of Inspection --) Type of Inspection 3 rel -Cta or D J 7)10 ey, 1.r\er-- ut e-N Pass Fail 0 V DATE ISSUED:12 /15/06 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND REINSPECTION FEE NEW RESDL - 1 BLDG /21 UNITS 1508 BUTLER AVE BRASS RAIL LLC PHASE II 1508 BUTLER AVE TYBEE ISLAND GA 31328 BOBBY CHU 7726 JOHNNY MERCER BLVD TYBEE ISLAND GA 31328 12410 P $43,003.00 PROJECT VALUATION $1,864,000.00 REINSPECTION FIREWALL (CEILING LEVEL) TOTAL BALANCE DUE: PERMIT #: 060163 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. if this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided sinless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org Inspection Report City et Jybee Island 403 Butler Avc.fkiie PS). Box 2749 tybee Island, GA 31.328 Phone: (91.)) /86-45/3 extension 114 itiX: (912) 786-95:49 060-0/ (03 t `tilanie *4-* ",--"tt P C 1/tart location Date of Inspection Li( Rr.cytoctpli /c nate Pleecied CIihrirb ntrac tn r 7 Time /,1 - - Inspector ce Type of Inspection 2 -4. I Al it Perms+ No • st: Inspection Report City of Tybee Island 411.4 lintler Avenue P.O. Box 2749 Tybee Isldnd, GA 31328 foltoow (911) /86-4N/3 extension 114 F:dX: (91)) 786-9539 / / tiwn /11 er'c rn ` ltrqZ. t.,c7r ontr7y-t.ir Contact Number Location /...,,4471t,e ( Date 14enite.O.eti Date NeecfPcf 3y, 3/c 7 Rohrontrartn r -1._ h - inspection Report itv of Tybee Islam) 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (91)) 786-4513 extension 114 FdX: (912) 786-9539 Permit No, (GS.S Owner's Name C k f;en, Contractor RI IbrO ntracto r a., Th L.7) c- nate Requested nate Needed 0 3- 0 L0-31 Contact Number Location Date of .Inspe_ction Time i J I Type of inspertvon n•qp,t`471:1) r ' 4 eJJ Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (917) 786-4573 extension 1.14 Fax: (912) 786-9539 Permit No, _3 0t.Le3 Owner's Name COSS --?) Gm. Co ntract r J Contact Number Location Date Requested ° 2:2 - cP Date Needed 0 IQ-7 Subcontrattor 1\1\ \<o) \ 272 37 \605 Date of Inspertion Type of Inspection _SP rv` Q kr, As 7:4 • f? Time _ inspector Permit No- Inspection Report City of Tybee Island 411.3 Butler Avenue P.O. Box 2749 Tybee Island, GA 31318 Phone: (91)) /86-4513 extension 114 Fax: (912) 786-9539 Date Requested 2 -2 -1-3-1 Owner's Nam e cos c i Date Needed Gen. Contractor 0 h U Subcontractor Contact Number NV. kw, --...., J e a 1 1 2 12 — 3 7 4 Location 5 3s ---gu-4- lei- )t\ve) • ( .■ u Date of Inspection Time Inspector _ Type of Inspection 'Ir'k -C( D 0 r --r, f eC)a( ( 6 OS( r • tie; •/-cc/ Inspection Report City of lybee Island 4tH Rutder venue P.O. Box 2749 lybee Island, GA 31328 Phone: (912) /86 -473 extension 114 Fax: (912) 786 -9539 Permit No, n(0 :) i ‘).3 Date Requested 0 - 2 3- (3 3 ) Owner's dame ir as5 .\ Date Needed 0-;-(n-L.-)-1 Gen- Contractor l\ U Subcontractor C. tt t e r s Contact Number t Ciq \ob ___ �ec ,r7)_2 1D4 . , ( Location ' O) C[7 .J •'r\ r J l ea - \ uLA ‘ 5% Date of Inspection 2- %z -(04 2 Time _ Inspector - f) f L� Type of inspection r ,- C 2 , -- 215 2'l0 21� 2.19 220 2221 iln 45 Inspection Report City at Tybee Island 403 Butter Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786-4573 extension 114 Fdx: (912) 786-9539 Ola- I <a Permit Mn. 3 f CS -r.0,1 Owner's Name CGen, Contractor J Date Requested fl)JL( _ i S • J7 Date Needed Subcontractor CO ntac t N tun her ()ction .' -7 -Ts—Ic Date of 1 opeci tan lime - ! 0-tpector lype. cot I n4.1-)Prtinn 1) 1 „ ... c 0 -4 p D Jr\ cj ; • ; Inspection Report City ot Tybee Island 4D3 Butler Avenue P.O. Box 2749 Tybee. Island, GA 31328 Plione7 (91) ) /86-4W:3 extension 114 Fdx: (912) 786-939 Permit N. 3 _ Date. Requested /g//y/e.:, Owner's Nine Needed /2//6 6)6 ion 4' 41W-rat. tor subcontractor /1)Clbeitact- N wither fiCcOtioll e2:4--<:' /1/4/9/1- / ;ewe_ cl) fa is- 04- Date ilt I ns.pprtinvi _ Time _Le) inspector Typo of Inspection (C4J2 Al,rvy Ffi ii - fiC J . I ksy Inspection Report City of tybee Isidnd 493 Buller Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone (91)) 786-4573 extension 114 Fix: (912) 786-9539 Permit ff ir.t_ ‘)6-67/6"3 Owner's Name n. Contractor cA Contact InbPr in/ c .t2e#74. Date RPCPIPCted Date Nee-ded /19 Subcontractor Location ,/,c/.9Ss fri/L A0,5" 113,rz t_K Date of Inspectoo __A--////47_ Ttme // Inspector 4.1.) 1 ype s-kt Inspection (4) ficr,/,,, r (12 "71.L/ Inspection Report City ot Tybee Island 403 nutter Avenue P.O. Box 2749 lybee Island, GA 31328 Phone (912) F86-4573 extension 114 Fax: (912) 786-9539 Permit No. 0(0 - 0 1 ko 3 Date Requested _ I 2 Owner c Name Date Needed L2 - 0 D (.,en. Contractor 4 Subcontractor -r),2 \ - - .1 3 Li Contact Number /11A 2 7 Location Date of incpection /?/C C3 Time 11_/ inspector 7/c) Type of incpection r P (kJ Okl S;‘-- f( 00 - , L Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786 -4573 extension 114 Fax: (912) 786 -9539 Dk ,3 Permit No, - ""F_ Date Requested _ 2 - 07 -U t Owner's WIMP h 172-C S S Q Date Needed I Z (D - O C0 Lien. Contractor Subcontractor Contact N'lather /v, tit) ? JQa .2-7-2.- 310'4 Location I Jr-'D a +tti Jed. (2 i Uo:- S) 2 5106 date of 1 rrcper io n Type of Inspection rime p s�ia- "s) r, T nspecto r ass P� TT Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Pboeec (912) 786-4573 extension 114 Fax: (912) 786 - 3539 Permit No. °(-O " PI Cl 3 - -- Date Requested 1 12 1 ` 0 Owner's Name Date Needed ' I - l Sfr _ 0 Gen. Contractor C Subcontractor Contact Number /'! , V 0 ) e n 1 -1 )- - 3 1 '0/4 Location 15 � � J +i er /ed . (t u ;4-s) Date of Inspection Time Inspfe for Type of kispection cl -Sr QQr-- mush e. ec 4rl e 1 \ rj tt✓t� -C1 I 0 e). 6/55*/ 4.4A Nie Inspection Report 410 City ot Tybee Island 1112 403 Butler Avenue P.O. Box 1749 Tybee Island, GA 31328 Phone: (912) 786-4573 extension 114 Fax: (912) 786-9539 O/6 3 Permit No. - Date Requested Owner's Name VitaS f/ Date Needed (;en. Contractor Subcontractor Contact Number 272 3764 Location /508 ,euWer 41/c Date of Inspection //27h Time. Type of inspection Insp— tor -47-r C- .4:te2.4 4; t, Inspection Report City ot Eybee Island 4113 ttntier Avenue P.O. Box 2749 1Vbee Island, GA 31328 Plump! (912) /86-4573 extension 114 Fd X: (912) 786-9539 Perm it N (C) Date Requested r 5 °miner's Narne--?)r _s n.i Date N eeded - (0- 3 (4, Gen. Contractor contact N umber Location \SD Ts 7s- Date ot nspoction Type of Inspection C k..) (S k 12) . r,„ s I 1//1/0C Time Inspector 20? r IJ +- NOt-■-f2. c 1-.2) L„, c- - 6 ( QQ Inspection Report City of Tybee Island 403 Butler Avenue _ P.O. Box 2749 Tybee Island, GA 31328 Phone.: (917) I86 -4573 extension 114 Fax: (912) 786 -9539 P rmitNo. v" D1 -3 Owner's Nam PTSGSSTjQ Gen. Contractor h J Date Requested li-- jLi' -0�r Date Needed 1 1 - I 3 to_ Subcontractor ___ -- Contact Number A.k.c) —I) e.„--, 1).- -3 '% J 4 NIex1e f Location lS- a 7 J 3r I C', t'_ I U H, 4....5 Date at inspection /1 ! G Time Inspector Type at Inspection all (, o r / / i,,t n . 4',S CI.9r r7 04:4- 5 QrS Pt 1 NOV -8 -206 10:31 FROM:JIMMY BROWN 912 - 786 -5330 TO:7869539 P.1'2 315" 31ia ;(7 313' 3(9 320 3?‘ 1 215 )_iLt, .I•--1 a( _IQi 220 --) 115 ))b 1)7 pi. ))q 1010 1.?) 06/0163 Brass Rail Villas Phase II 1508 Butler Ave. 21 units Mike Deal 272 -3704 NOV -08 -2006 10:46 Hem 912 786 5330 97% P.01 Perm it No. Inspection Report City ot Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912)/86-4573 extension 114 Fax: (912) 786-9'539 01 3 Date litivie47,ted _10 3 - 0 Cc) Owner',c Nart.1.- -graS 5 Ri2 i 1 t- C Date Needed r) ,_ )1,4 313-94?-5- Gen- rm.:trader n „k Subcontractor /11.1-- Contact Plumber lk QJ ---C) P a 4 2.1a- 3 04 cation \ OS P)t,,-k \ -(8- ,A \ie.) ..,--- - ----- - - _ Date of Ingpectiou _ Type of "Inspection Time OJCOrm Pk? Ca \ Inspector - u Inspection Report City of rybee Island 40:3 Butler Avenue P.O. Box 2.749 Tybee Islands GA 31328 (bane: (912) /Bb -45111 extension 114 Fax: (912) 786- -9.539 Permit No. tan- O co 3 7 Owner's Name Br GS '' S Rn,1 LLG Gen. Contractor C h J Contact N um be __ \co )ti ec�1 Date Requested 1 1 • 0 3-0(,, Date Needed I I Do- 0 co Subcontractor I'S - }-� -� r4 0— Location 5 J iu (Qr A,/ eJ . 'S Date of Inspection 11771X _ Inspector Type of Inspection r J JQ 11111?_ Gz' - ! U ✓1= 4-S - j S PQd Permit No. Owner's Name c0R0. LLe, Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786 -4573 extension 114 Fax: (912) 786 -9539 O o O i (43 Gen. Contractor Date Requested Date Needed iJ 13 -i 3 -3(0 Subcontractor Contact N umber Al ` "-"� L)� ( 3 Location `J$ �t ,v H (,t n , -,- S 1� t3-46 Time Date of Inspection Type of Inspection nO.\ O0.--4 (rr Inspector I 16%. Lel V Lel" In..' .3---oce, Inspection Report City of Tybee Island 403 Butler Avenue P.Q. Box 2 749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. Qlp - 01 1/44,3 Date Requested: 10 Co C I - 0 La Owner's Name: 7f (3 S SG . ( Date Needed: P 0 -OS.- O (o Gen. Contractor: Subcontractor: Contact Number: fi k 2-D C Gt 0? ? D- 3 (7 o `f Location: i 50 u+ I €) A i e ) -i=w+' " 171 -. 3 D -7 (t 1,„,i S> Date of Inspection: ‘/4( Type of Inspection: a ` + J-C r-33.c slob Comments: P Inspector: i • .7 Time of Inspection: Permit No, Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 D o of (03 Owner's Name: _ n c 7 s Gen, Contractor: Contact Number: Location: Date Requested: - 2. (o - 0 .o Date Needed: 05-30- O (o Subcontractor: 1 370'4 SVO Date of Inspection: 7 J r' () Comments: t Ave (� I u� 4s) Type of Inspection: S4" n I h al rood SIQ� Inspector: ' Time of Inspection: DATE ISSUED: 05 -26 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT NEW RESDL - 1 BLDG /21 UNITS 1508 BUTLER AVE BRASS RAIL LLC PHASE H 1508 BUTLER AVE TYBEE ISLAND GA 31328 BOBBY CHU 7726 JOHNNY MERCER BLVD TYBEE ISLAND GA 31328 12410 P $42,973.00 $1,864,000.00 PERMIT #: 060163 TOTAL BALANCE DUE: $42,318.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: 786-4573 extensions 104, 107, or 114 Fax: 786-9539 Permit No- Owner's NamP: )7 (1 `< Gen, Contractor: Contact umber: Date of Ins6ection: Comments: Location: Date Requested: Date Needed: Subcontractor: kv, -be 0,1 OS c//i(cov Inspector ij4 "2( OJ-o (,a -oca 2-72-3704 (-21 LiS r‘51' 10L6 Type of Inspection: Time of Insertion; Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: 785 -4573 extensions 104, 107, or 114 Fax: 786-9539 Permit No. Owner's Name: I Date Requested: O S' 1 CD - 0 (o Date Needed: DS- i57-o , Gem Contractor: Subcontractor: /0n Flo( rl i Contact Number: /h .k c Dv a_ 1 -2-72.- 37c g Location: /5-0 R B,) 4 le,r' Ali& • ( 021 (,(ni t S) Date of Inspection: c- - /7 16 Type of Inspection: C:hol -r o� 3rt4 _%av SIa Comments: tosiv;'t, Inspector: 713 Time of Inspection: Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No, 0(o 0/ (03 Owner's Name: S S Rt , Gen, Contractor: Contact Number: /11\ ' K e. -De a( Date Requested: Date Needed: OS - /o- Oc Subcontractor: ?Liar-, 731 d%r S • 272 -37o Location: /6 o 3 Date of Inspection: Comments: Inspector: (31 (An 4s) tl a ie. ;1 ,IQJ7 Type of Inspection: r)1f)\\ Time of Inspection: a Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. a (0 - J i l0 3 Date Requested: J 5 " v -2 - 0 Co Owner's Name:1 r ass IC a: I L LG Date Needed: 0 S` O `i - 0 Gen. Contractor: Subcontractor: Contact Number: /�.k -1)(01 2? 2. 373`71 Location: J g —R,14 12._T' A J Date of Inspection: 5 - V Type of Inspection: 1 / a I fl,Dr s 1 b Comments: Inspector: Time of Inspection: Inspection Report City of Tybee Island 403 Butler Avenue P.U. Box 2 749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No 0(1, - lD I b3 Date Requested: C) LI - p s- C G Owner's Name:R{ ra SS --P-c011 LL0, Date Needed: 0 L ' 2 Co -- C_(,p Gen. Contractor : —g 0 Q).' °kv C-3/%4 Subcontractor: ...-P-Kc-'.- A f s Contact Number: (A . KQ, -R c1.; -1 2 - ----1 D4 Location: I S o -R.) -1- 1,e r- Au e-. Cal LA n S� Date of Inspection: 9 • .L ` Q(.4 Type of Inspection: sl Q ID Comments: \ 2f % GO .c o1' \ EL �I 0 1)5° . 1 lb Inspector: 'Vb0 Time of Inspection: Inspection Report City of Tybee Island 403 Butter Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. O(a - 0 i e 3 Owner's Name: -Brass Q. 1 LL C Gen. Contractor: Phan Contact Number: Date Requested: Date Needed: _ Subcontractor: 2 1a - ? 04 h h' Location: 1 5 O --;04 e� Date of Inspection: 11;10 Comments: Inspector: ,L. C21 v.‘ ) s� Type of Inspection: I - 41 ,, 0r-- 510,6 (3f2e,-'* Time of Inspection: c Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 786-4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. O(a - 01 (o 3 Date Requested: v y - lZ - v b Owner's Name: Sa SS ro , Date Needed; - 1 3- D Gen, Contractor: Subcontractor: Contact Number: /V`.k.e De a 272 - 3 /O i Location: 7 L +IQr- ,4, e . Date of Inspection: 11 - .i ' (�� Type of Inspection: -} r .D + /z Comments: -C 51a� Inspectors Time of Inspection: 0 Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 786-4573 extensions 104, 107, or 114 Fax: 786-9539 Permit No. )(� -c7f (v 3 Owner's Name: arcSS Ra, Gen. Contractor: Date Requested: Date Needed: Subcontractor: I0- o 04- II-o(r) Contact Number: M, k e.i 7J.e 0.1 2-72-370`-i Location: 1S-0 I7(A-+ I e I" AVed. Date of Inspection; Comments: Inspector: y )l-Cgo Type of Inspection; s/6? (J,rir Time of Inspection: 301 — — — 3o1 -0) — — — — 207 101 102- 103 10 105" )IA 107 06/0163 Brass Rail Villas Phase II 1508 Butler Ave. 21 units Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. an- O 1 l0 3 Date Requested: L) 3 - S - 0 -� P+-,0 � Owner's Name: —Bross Ka, Date Needed: 0 3- D.9- 3 Gen. Contractor: Contact Number: N\ , (q) 7-1? o\ 2 7 2. - 31 4 Location: Subcontractor: 15D 4 --RA I..)-i A 4 t., . Date of Inspection: Type of Inspection: -raD `-: n 3.)'.° i 5 G 1✓ Comments: Inspector: Time of Inspection: / 17pection Report City of Tyb Ilan 3 Butieir l Ayen e O. ox` ,./- Tybee Island, 4 328 Phone: 786 -4573 extensions 104, 107, or 114 / Fax. 786 -9539 Permit No. O tOr DI L03 D'Rte Requested: 0 - 4—� ( Owner's Name: S S -Po .I LLG Date Needed: DE 2 1 - o (o Gen. Contractor: Subcontractor: Contact Number: A, Location: i S D a+ kQ )-' ✓FJ Date of Inspection: Comments: Inspector; 3 Ti--DC. 4,357 Type of Inspection: `P I e VQ 4-0 Time of Inspection: 0 4 O I (0 3 TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT , Location / -2,f`�� ��- Vr✓ NAME PIN; ADDRESS RECEIVED o)-1q-04. Owner G _-5: fe,..9 eZ c%a .- ' --"-/ - -1- '' ✓6 r. 27 Architect or. //,9._�1- Engineer _ ��i�' r -. , / la • Building Contractor el-.44/ 770‘■eY 744, tee- .401/c/4 (4- ti5`; - '/ (Check all that appl New Construction ‘ / •'Renovation Minor Addition Duplex Single Family Substantial Addition Residential Commercial Multi-Family Footprint Repairs D molition other / 6.1,,11" e'0 e ! // �/ ���� c,^f- -' __ Estimate Coost of Construction: $ kg5 $/ "C4-/. ei)„,/C',w/� Construction Type 5 (Enter Appropriate Number) (1) Wood Frame, (2) Wood & Mas'onry, (3) Brick Veneer, (4) Masonry, (5) Steel & Masonry, (4) the (Please specify) Proposed Use: ri /e1 Jr> / a �� " ©N - Gam` _ .✓ Remarks: 6,4i ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction d awings and site plan: 44S Units 2/ F Bedrooms # Bathrooms Lot Area ‘..01.05/0 5.1.4: Living Space (Total SQF t) /Z te) f/c /r' # Off-street Parking Spaces CC��, �� Trees Located & Listed on Site P an • Access: ,s Driveway (Ft.) With Culvert? With Swale? Setbacks: Front c ' Rear /l1' Sides (L) y© (R) it)' Stories — Height—S-71/W) Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators and similar appurtances. During Construction: On -site restroom facilites will be provided through / -' I -(17T-- On -site waste & debris containers Will be provided by -��_ ►V .% J/ ?a.% Construction debris will be disposed of by at by means of I understand that I must comply with zoning, flood damace control, buildinG, fire, shat. protection & wetlands ordinances FVMA regulations and all applicable codes and regulations. I understand that the lot must be. staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure. the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date Signature of Applicant Note: A •ermit normall takes 7 to 10 da s to process. Please bring two checks to .ply fees for new construction. Thank emu! The following is to be completed by city personnel: Zoning Classification Approved Rezoning /Variance? Street Address & Number: New compliance with city map? 0 been reported to MPC ?__ — EMA Certification Attached State Energy Code Affidavit Attached Utilities & Public Works: Describe any unusual findings Access to Building Site Distance to Water Main Tap Site Distance to Sewer Stub Site Water Meter Size Storm Drainage 'fete fl to en Approvals: Signature Zoning Administrator Code Enforcement pfc Water /Sewer Storm Drainage Fire Chief Inspections City Manager NFIP Flood Zone Existing . Is it in . If not, has street name & /or 3 7' 1070. °0 ... 4f3. 17 443. 0.23, o 0 4 /0• a_ 3 S, s' nr.?n-SjQtCif Fees: Permit Inspections Total G/= Water Tao //.5;5"Q, Sewer Stub is 0 Total W/S 3, loo -- ( • (# ,d DA/ F0741.1)y - MJ1 10 3, ---�_00 d, / S " CITY OF TYBEE ISLAND INSPECTIONS DEPARTMENT P.O. BOX 2749 TYBEE ISLAND, GA. 31328 FOR STRUCTURES IN A FLOOD ZONE - FEMA CERTIFICATION OF ELEVATION' IS REQUIRED. NAME: ADDRESS: /- C��iv7'����2 CONTRACTOR: may% ZWJ - -64 c .. PERMIT # - `�� zr'G%�� THIS NOTICE IS TO CONFIRM OUR UNDERSTANDING TEAT ALL UZPMENT SUCH AS A/C COMPRESSORS. WATER HEATERS, FURNACES, ELECTRICAL OUTLETS, METERS ETC... RE NOT PERMITTED BELOW TEE P.F..UIRED " "FINISHED FLOOR ELEVATION. BY ACCEPTING THIS PERMIT, I (OWNER /CONTRACTOR) AGREE TO CONSTRUCT /PLACE THE S��UI?NENT ABOVE OR UP TO THE REQUIRED FINISHED FLOOR E LEVATION WHICH IS STATED BELOW. MSL . ACKNOWLEDGED AND AGREED TO THIS /r DAY OF - ��`'49" ; STATE ENERGY CODE AFFIDAVIT Project Name: Address: / C-6 Permit Number: Owners Name: ,Y This letter is to confirm the understanding of the owner /contractor to the'compliance requirement of the Georgia State Energy Code for Buildings, 1992 Edition. I hereby declare that the design and construction of the referenced project is in compliance with the Georgia State Energy Code for Buildings, 1992 Edition. Compliance has been achieved by one of the three methods of designs indicated'in Chapters 4, 5 or 6 of the code. It is understood and agreed by the undersigned owner of agent and contractor (if applicable) that the approval of the permit does not constitute a privilege to violate the code and that any omission of or misrepresentation of fact with or without intention of the permit issued which was based on the approval of this application. The owner as listed above will be held responsible for insuring that all permits have been obtained and that all required inspections have been made. The owner will be held legally liable for any violations which may occur with or without his knowledge. The owner shall be allowed to request a Certificate of Occupancy when all previous inspections have been approved. Owner and /or Agent /9,"A— Contractor (12/93) Date: / //'/ ; Date: //f Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 786-4573 extensions 104, 107, or 114 Fax: 786-9539 Permit No. CV 6 - o cep 3 Date Requested: tJ 3 - Z I - ;c Owner's Name: r- a 5 S -- o, Date Needed: (� . Gen. Contractor: h . Contact Number: Subcontractor: /f. sec \ 2 -72 -3 -7o Location: J� OH" ���- (y Date of Inspection: 3 'd 3 0 (o Type of Inspectiol). Comments: Trr{- 1.4%°trs... n� • f.-„8.._,/ rvl.L. SI Tir}1t= of Trlcf)nrHr r * * * * * * * * * * * * * ** -COMM. RNAL- * * * * * * * * * * * * * * * * * ** DATE MAR -23 -20 * * ** TIME 12:21 * * * * * * ** MODE = MEMORY TRANSMISSION FILE NO. =032 START = MAR -23 12:20 END = MAR -23 12:21 STN COMM. ONE - TOUCH/ STATION NAME /EMAIL ADDRESS /TELEPHONE NO. PAGES DURATION NO. ABBR NO. 001 OK a 2316641 001/001 00 :00 :19 -CITY OF TYBEE ISL. ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** -CITY OF TYBEE - * * * ** - 912 786 9539- * * * * * * * ** Date: City of Tybee Island BUILDING AND ZONING P.O, Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 (912) 7864573 — FAX (912) 786 -9539 www.cityoftybee.org FAX TRANSMITTAL SHEET �3- 23 —vc, Number of Pages Including Cover Sheet: 1 Company Name: Savannah Electric and Power Company Fax Number: 231 -6641 From: Dianne K. Otto Title: Administrative Assistant Phone Number: (912) 786 -4573 extension 114 ELECTRICAL RELEASE Name of Electrician Permit Number 0 jL Contractor or Owner 6ah G4-r ; G. CaSS a: L,LCI 1haJ l_ Lot No. Subdivision Address ) 5 (] a.1. �- &, Au . Tybee Island, GA 31328 Type of Release: SAW POLE TEMPORARY POWER FINAL OTI -IER Release to SEPCO ? t e a Se- a r 3D (Aa.ylS Chuck Bargcron City of Tybee Island City Marshal Telephone (912) 786 -4573 extension 104 Date: City of Tybee Island BUILDING AND ZONING P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 (912) 786 -4573 — FAX (912) 786 -9539 www.cityoftybee.org FAX TRANSMITTAL SHEET 03-23 -oc Number of Pages Including Cover Sheet: 1 Company Name: Savannah Electric and Power Company Fax Number: 231 -6641 From: Dianne K. Otto Title: Administrative Assistant Phone Number: (912) 786 -4573 extension 114 Name of Electrician Permit Number ELECTRICAL RELEASE .L. Sloa.h Contractor or Owner i (k S 5 Q, LL h a SSP� Lot No. Subdivision Address 15 C) 4 BL,i,4- Av . Tybee Island, GA 31328 Type of Release: SAW POLE ' TEMPORARY POWER FINAL OTHER Release to SEPCO ? I e Q S� re. ` .e . s e- -CD r 3 D c5 Chuck Bargeron City of Tybee Island City Marshal Telephone (912) 786 -4573 extension 104 Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 786-4573 extensions 104, 107, or 114 Fax: 786-9539 Permit No. Date Requested: Owner's Name: ASS N/ / Date Needed: f%%8 cA .2O ZO66 Gen. Contractor: cIC! d�x-5 / ` subcontractor: Contact Number: le, 'lee e D G/ e2 7 2. - 370(/ Location: S 0 L4 B-.+ I `e t� Date of Inspection: 3 f)(,, Type of Inspection: -Co J • n C'i - Comments: // eK kC l Inspector: Time of Inspection: DATE ISSUED: 03 -21 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT FOOTING & FOUNDATION 1504 BUTLER AVE BRASS RAIL LLC PHASE II 1504 BUTLER AVE TYBEE ISLAND GA 31328 BOBBY CHU 7726 JOHNNY MERCER BLVD TYBEE ISLAND GA 31328 12410 P $ 655.00 $80,000.00 PERMIT #: 060163 TOTAL BALANCE DUE: $ 655.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org 'location: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT ZS-0 NAME ADDRESS PIN # TELEPHONE Owner -..'.s ,, / G�� � 7z, dXJ 2 70 4 `%� X,,...... //17errc, e - - .,e4-/e/ <it Architect or Engineer iirding -QoS 4v Z.<_) < ' . -/Y7L Contractor 7226 L%asz,.% 6 - errar,,c W.‘, '- ° : ;d1 - . sf /C) (Check all that apply) ❑ New Construction ❑ Renovation ❑ Duplex ❑ Single Family ❑ Residential ❑ Commercial ❑ Footprint Changes ❑ Repairs ❑ Other Fin ©T 1 t■t Q 5 - Fo u V\ o O r Estimated cost of Construction: $ 0 ®® (Enter appropriate number) (4) Masonry (5) Steel & Masonry Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off-street parking spaces Trees located & listed on s f e plan Access: Driveway (ft.) Setbacks: Front #`Bedrooms Living pace( tal sq. .) # Bathrooms With swale? Sides (L) (R) # Stories Height — Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. 47#-- %an CIV---4040) During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by at by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: //O Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to D FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage NFIP Flood Zone Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager � .gnatur Date API .40‘ 03 -06 FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL