Loading...
HomeMy Public PortalAboutMaplewood Saturday WorkAugust 16, 2018 TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS 124 ORCHARD STREET WATERTOWN, MASSACHUSETTS 02472 Tel: 617-972-6420 Fax: 617-972-6402 SATU R DAY WORK Rescheduled from 8/11/18 Due to Weather Dear Residents and Abutters of Maplewood Street, The sewer and drain reconstruction on Maplewood Street is nearly complete. The Town's Contractor, Commonwealth Construction and Utilities, Inc. will install two catch basins that were found to be in compromised condition during construction on Saturday, August 18, 2018. Work will begin at 8 AM. This work will complete the sewer and drain repairs on the street. Currently, the trenches have been paved with a "temporary" pavement to allow for road settlement. After sufficient settlement time, the trenches will be cleaned up, recompacted and repaved with a permanent pavement. Damaged sidewalk panels will also be replaced. The Town is also investigating longer term repairs for the road. If you have any questions or concerns regarding this project, contact the Watertown Department of Public Works at (617) 972-6420. The Town of Watertown thanks you for your cooperation. Sincerely, Gerald S. Mee, Jr. Superintendent C:IUserslMhaleylAppDatalLocallMicrosoftlWindowslTemporary Internet FileslContent.0utlook172QJVZ2XIMaplewood St Drain Repair Saturday 8-18-18.doc