Loading...
HomeMy Public PortalAboutChange Order No. 2 to Contract No. 50-2... Improvement for Training FacilityRFD Change Order #2 Smarrelli General Contractors Contract #50-2019 Document #1 Dated 5--22--2019 Due to the discovery of additional pockets of fly ash in the excavation for the driveway, addition excavation, (removal of fly ash), additional crushed concrete fill, and additional riprap material required. This need has been confirmed by the cities engineering department. Additional cost up to: RFD Change order #2 in an amount not to exceed: Signed Dealer Representative President Richmond Board of Works q�A Board o Works Member $ 12,001.28 $12,1001.28 Date Date (?�. �e. / Date Board of works Member Date f SMARRELLI GENERAL CONTRACTOR, INC. 136S2 ND RICHMOND, IN 47374 Tel: 765-962-1378 Fax: 765-962-3034 July 31, 2019 City of Richmond Fire Department RE: TRAINING CENTER 1740 S 8TH Request for Charge order_ 2 Removal of fly ash and unsuitable soil 86.5 hours @ $95.00 ..... 06644084's sees* Nemeses 90500*96 ........................ $81217.50 Install riprap material 336.92 tons @ $36.00 ................................................................................................ $12,129.12 Extra excavation 18 hours track hoe a@$150.00............................................................... $21700.00 Deratering............................................................................................. a .... ... 1 500.00 $245546.62 + 10% Profit 201 4.66 Deduct change order #1 Total Change Order #2 Submitted By: Steve Shute, General Manager TOTAL $273001w28 ($15;000.00� $V,001.28