HomeMy Public PortalAboutChange Order No. 2 to Contract No. 50-2... Improvement for Training FacilityRFD Change Order #2
Smarrelli General Contractors
Contract #50-2019
Document #1 Dated 5--22--2019
Due to the discovery of additional pockets of fly ash in the excavation for the
driveway, addition excavation, (removal of fly ash), additional crushed concrete
fill, and additional riprap material required. This need has been confirmed by the
cities engineering department.
Additional cost up to:
RFD Change order #2 in an amount
not to exceed:
Signed Dealer Representative
President Richmond Board of Works
q�A
Board o Works Member
$ 12,001.28
$12,1001.28
Date
Date
(?�. �e. /
Date
Board of works Member Date
f SMARRELLI GENERAL CONTRACTOR, INC.
136S2 ND
RICHMOND, IN 47374
Tel: 765-962-1378 Fax: 765-962-3034
July 31, 2019
City of Richmond
Fire Department
RE: TRAINING CENTER 1740 S 8TH
Request for Charge order_ 2
Removal of fly ash and unsuitable soil
86.5 hours @ $95.00 ..... 06644084's sees* Nemeses 90500*96 ........................ $81217.50
Install riprap material
336.92 tons @ $36.00 ................................................................................................ $12,129.12
Extra excavation
18 hours track hoe a@$150.00............................................................... $21700.00
Deratering............................................................................................. a .... ... 1 500.00
$245546.62
+ 10% Profit 201 4.66
Deduct change order #1
Total Change Order #2
Submitted By: Steve Shute, General Manager
TOTAL $273001w28
($15;000.00�
$V,001.28