Loading...
HomeMy Public PortalAboutAddendum No. 2 to Contract No. 155-2016...soc - Consultants for East Main StCONTRACT SUPPLEMENT NO.2 THIS SUPPLEMENTAL AGREEMENT,, made and entered into this J:A6 day of 2019, by and between. RUNDELL ERNSTBERGER .ASSOCIATES, INC, Indianapolis, Indiana, 14reinafter referred- to as the "CONSULTANT", and the City of Richmond, IN, hereinafter- referred to as the "LOCAL PUBLIC AGENCY" or ""LPA" WITNESSETH 4 WHEREAS, on December 22nd, 2016, the LPA entered into a Contract with the CONSULTANT for services required for Construction Engineering Services for the construction of the Richmond Stellar Streets Project, Richmond,'Indiana, INDOT Project Des. No. 138281.0, herein after referred to as the Contract, and WHEREAS, on April I V1, 2019) the LPA and the CONSULTANT agreed to amend the Contract with Contract Supplement No.' 1, and WHEREAS, the LPA and the CONSULTANT have determined that an additional amendment to the the ' Contract is necessary due to an extension of the project construction schedule. Now, THEREFORE, the parties agree that the Contract shall be modified by this Contract Supplement -No. 2 in accordance with the following: I. SECTION III of the Contract shall be modified as follows: "SECTION III TERMS. The term of this Contract, shall be from the date of the last signature affixed to this Contract to the completion of the construction contract which is estimated to be 97 weeks. A schedule for completion of the Services and deliverables is set forth in Appendix "C" which is herein attached to and made an integral part of this Contract. II. SECTION IV of the Contract shall be modified as follows: "SECTION IV COMPENSATION. The LPA shall :pay the CONSULTANT for the Services performed under this Contract as set forth in Appendix "D" which herein attached to and made an integral part of this Contract.. The maximum amount payable under this Contract shall not exceed $7504923.81." III. Appendix C of the Contract shall be modified as follows: Appendix C, . paragraph 4, shall be MODIFIED to read.- "The Inspection budget was based�n the following project scheduler INDOT Contract Letting Date of October 12, 2017. Notice. to Proceed on December 4, 2017 Start of construction onor after February 22, 2018. Substantial Completion date of August 3 0, 2019 Should these schedule dates be reduced or increased or additional man-hours be required, the contract shall be modified- accordingly." IV. Appendix -D of the Contract shall be modified as follows:. Page I of 2 Addendum No.. 2 to Contract -No. 155-2016 f Appendix D, Section A, paragraph 1, shall be .MODIFIED to read: "The CONSULTANT shall receive as payment for the work performed under this Contract the total amount not to exceed $750,923.81, unless a supplement is executed by the parties which increases the maximum amount payable." IN TESTIMONY VMEREOF, the parties hereto have executed this Contract Supplement. CONSULTANT LOCAL PUBLIC AGENCY "Oe* ignature ' Kevin Osburn, President David M. Snow, Tqy7or, (Print -or type name and title) (Print or type name and title) Attest. Signature Carl Kincaid, Vice -President (Print or type name and title) Signature tr Ir� (Print or type name and title) Signature Emily Palmer, Board of Public works, Member (Print or type name and title) ► r Signature Vicki Robinson, Board of Public Works, President (Print or type name -and title) Page 2 of 2 i Additional 2019 Time Justification Road, Pedestrian & Bike facilities; E.Main St, 7th&lOth-St, in Downtown Richmond DES 1382810 Construction Bid $5,883,000.00 Construction. increases $350,000.00 (low estimate) Revised Estimated Construction Cost $6,223.000.00 Construction 2019 estimate Anticipated Start Date 814/19 Estiorrlted Completion Date 3 .9/13/19 Pre -construction 10/12/17 bid Estimated Days Total 40.0 Days Activities Estimated Duration 5.7 Weeks 12/4/17 NTP/start None assummed Utilityrelocations 0.0 Weeks -_ S ut Down (weeks). , _ L 0.07 Weeks: Shut Down ] /1/19 _Shut Total Weeks Construction 5.7 Weeks Estimated '1 ]'119 Down_ USE (full time inspection) 6.0 Weeks a 0.0 weeks Year # 1 2018 work 0.0 weeks } Department : Pre=Construction Preparation 0.0 -hours weeks _ Manager Construction '6.0 hours 5.7 weeks United .Final Construction Record 0.0 hours Year #2 8/4119 2019 - Total_ ---- 6.0, hours - - - 9/13/19 work - 5.7 weeks -_ _ _ - - - - 5.7 ] weeks PE1PS Pre -Construction 0.0 hours -Preparation Construction 1Sh6t Down (assume.8.h6urs/.week).. -0.0..hours Manager 1. Construction 240.0 hours 07. 2018 United. s=OT 108.0 hours" # 100% 2019 Final Construction Record 0.0 hours Total 240.0 hours, aT 108.0 Pre -Construction Preparation 0.0 hours Proj. Mgr. [LA 11)' 11.1 /18 Proj. Mgr. (LA 11) Construction 96.0 hours Time 1 /1 /18 REA Final Construction Record 0.0 hours 0.00 USE Total 96.0_hours 16 hours/week 814/19 5.7f 6 9/13/19 weeks 5.71 ++ Inspector # 1 ] /1 /18 Inspector #1 Pre -Construction Preparation 0.0 hours Time - 1111,18 Constructfon Construction ++ 120.0 hours 0.00 USE Manager U **OT 54.0 • hours ## - United- Final Construction -Record 0.0 hours 8/4/19 3.01 3 Total 120.0 hours 8125/19 OT 54.0 weeks 3.00 J lnspecfor #2 Pre -Construction Preparation; T� D.O h vats + Inspector #2- 7128119 .DBE: Construction + _ - _: 40.0 hours. DBE'-.VS -8/4/19 VS OT 0.0: hours Time -i .00 Final Construction Record - 0.0 hours; o _ - - Total - 40.0 •hours 0.0 - - - _ 111119 ' weeks - 0.00 (3) Per Milestones schedule update 7/16119 # OT estimated at 18 hrs/Week # # OT AA-F 2 hrs/day @ 5 days/Wk= 10 ius/wk + Saturday @ 8 hrs/day =18 hrsAvk OT r N iA a O 4 Q O a w w Q a ao o w M �- aw a Z N a � c w M Q Q Ifs N 2p U w of z � 01 0 �► N G p dd� DIY h OG- N 0 � w w uu a o w a- ro � M W -- .d x a, a I