HomeMy Public PortalAboutChange Order No. 2- Contract No. 83-201...struction - Stellar Façade ProjectTM ocume 2.017 D nt G70-1. fr __ — _ - Chan a _order- -..1 ,. PROJECT: (]Vame and address). CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Richmond Stellar`,Facade Contract For: General Construction Change Order Number: 002 631 East Main Street i` Date: May 23, 2019 .Date: October 9, 2019 706 East` Mann Street . a 720 Ea' Main Street ' Richmond- IN'47374 - OWNER:,(Afgnze'and ARCHITECT: (Name and address} CONTRACTOR: (Xame and address) :City of Riclunnnd LWC Incorporated Pridemark Construction, Inc. r r, i 50 North ,5th -Street . ' .2 712 East Main Street 42-1 S. Walnut -Street Richmdnd,%.IN 473 74 Richmond, IN 47374 Muncie, IN 47305 • i THECONTRACT IS CHANGED A& FOLLOWS: (Insert Ya, detailed -description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments } ath-ibutable to ,executed Construction Change Directives.) r' _ { fEr= Lead paint abatement'far south -'facade of 720 East Main Street. -' 'Consisting ;ofremaval of loose paint and encapsulation of remaining paint including the use of specialized scaffolding to allow q f ` access to existing, business •entry. T I . CCD #061--$42;672.00 Total A.dd,For Change girder - $4Z,672.0Q The original t ntract;.Sum was - - $ 6379423.00 The net -change by previously" authorized Change Orders $ 265,527.92 The Contract Sun' prior to this 'Change Order was $ 6639950.92 The Contract: Sum will be .increased by 'this Change :Order in the amount of $ 42-3672.00 The new Contract Sum including this Change Order will be $ ,706,622.92 The'Contract-Time will be increased by Zero (0) days. The new date of Substantial „Completion will be NOTE: This Change 0rder.does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract . ..Time; that have been -authorized by Construction' Change Directive until the cost and time have been agreed upon by both the 4 Owner and' Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID.,UNTIL SIGNED BY THE ARCHITECT, -CONTRACTOR AND -OWNER. -- LWC Incorporated Pridemark Construction,, Inc. City of Richmond ARCHITECT (Firm ;name) CONT it ame) OWNS (Firm n e) • SONATURE SI N TUR SIGNATURE _ ,... __Kevin lUltQurdy,.AIA- Vicki Robinson, President Public Board of _ - Works PRINTED NAME AND TITLE DATE PRINTED NAME AN6 TITLE Walla DAT PRINTED NAME AND TITLE DATE AIA Document G701 Tm — 2017. Copyright:g -1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document Is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of this AIA' Document, or .� any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:5001 ET on 10110/2019 under Order No. 5859514226 which expires on 08/30/2020, and is not for resale. User Notes: (3139ADA45) Change Order Request Pride ark. DATE: 14-0ct--19 REQUEST #: 1 R OWNER City of Richmond PROJECT Richmond Steller Fagade DESCRIPTION OF ADDITIONAL WORK: This change order request is lead abatement on 720 E main St. This is option # 3: Removal of loose Lead Paint and encapsulate. This also includes scafold to leave the sidewalk open through work. A LABOR & FRINGES HR! Carpenter FM Carpenter. Laborer Operator Total Labor including Fringes B MATERIAL RATE LABOR TOTAL 24 $ 66.82 $ 1,603.66 0 $ 64.80 $ - 0 $ 30.96 $ - 0 $ 67.65 $ - C EQUIPMENT/RENTED EQUIPMENT ❑ SU BTOTAL O F A-C E MARKUP on "D" 10% F SUBCONTRACTOR: NSSC Corp (Sidewalk open) Lead abatement on windows G TOTAL SUBCONTRACTORS H MARK UP on "G" 5% 1 REQUEST FOR CHANGE ORDER (D+E+G+H)- J BOND/INSURANCE COSTS 0.00% K TOTAL CHANGE ORDER REQUEST (I+J) SUBMITTED BY: 5CO& VaAm ACCEPTED BY: $ 1,603.66 $ 1,603.66 $ 160.37 $ 43,710.00 $ (4,750.00) $ 38,960.00 $ 42,672.03 ► � * 6 Scott Baker From: Paul Krick < paul.krick@ nssccorp.com > Sent: Thursday, September 19, 2019 9:51 AM To: Scott Baker Subject: Richmond Facade / Lead -based Paint Work / 720-724 E Main Scott, Please see below the breakdown for costs to abatement the Lead -based paint (LBP) or removed the loose and encapsulate. All numbers include removal of the LBP from the window jams and all work will be done in full containment to. control dust and debris since this project is on an active city street. NESC supervisor and work force training and licensing compliance applicable to scope of work. Option #1— LBP Abatement (Brick and Windows) /OSHA compliant scaffold to leave sidewalk open $71,P900800 • Construction of OSHA compliant scaffold to keep the sidewalk open to public a Includes all labor and components o Initial 28 days of scaffold rental included. o Any permitting and approval by the city for scaffold to be done by Pridemark Construction • Construction of negative pressure encloser (NPE) on entire scaffold system. ■ Removal of approximately 800 SF of LBP from brick facade • Removal of lead -based paint from 14 windows jams/frames • Disposal of LBP debris in accordance to all local, state, and federal regulations Option #2 — LBP Abatement (Brick and Windows) /Standard scaffold and sidewalk will need to be dosed $69,730m00 ■ Same work as described in Option #1 Option #3 —Removal of loose LBP and encapsulation /OSHA compliant scaffold to leave sidewalk open: $43,710wOO ■ Construction of OSHA compliant scaffold to keep the sidewalk open to public o Includes all labor and components o Initial 28 days of scaffold rental included. o Any permitting and approval by the city for scaffold to' be done by Pridemark Construction • Construction of negative pressure encloser (NPE) on entire scaffold system. • Removal of loose / flaking paint will be removed from the brick facade • Removal of LBP from 14windows jams/frames • Disposal'of LBP debris in accordance to all local, state, and federal regulations 1 Option #4 —Removal of loose LBP and encapsulation /Standard scaffold and sidewalk will need to be dosed. $41,580vOO . 0 Same work as described in option #3. Additional Costs: � OSHA Compliant Scaffold with Pedestrian Sidewalk Access $12,500-200 o Rental period 28 Days • Standard Scaffold /Sidewalk Closed $101700s00 o Rental period 28 days If you have any questions please let me know. Regards, Pau[ Krick Project Manager 'TL ..N A-, National Environmental Services Corp. Cell: (765) 620-8086 Direct: (812). 823-504'1 Email: Paul. KricWnssccormcom Address: 6755 S.Old SR37, Bloomington, 1N 47401 Mail: P.O. Box 300, Clear Greek, IN 47426 Main: (812) 339-9.000 Fax: (812) 331-8235 Web:www.nssccorp.com **CONFIDENTIALITY NOTICE: This electronic mail transmission and any attachments are confidential. They should. be read or retained only by the intended recipient. If you have received this transmission in error, please notify the sender immediately and. delete the transmission from your system. ** 2