Loading...
HomeMy Public PortalAboutChange Order No. 4 - Contract No. 83-20...struction - Stellar Façade ProjectTM AIAL Document ------Change Order l S PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: ' Richmond Stellar,Facade Contract For: General Construction Change Order Number: 004 ? ! 631 East Main Street Date: May 23, 2019 Date: October 15, 2019 E , 706 East'Main Street • 720 East Main:Street 820 East Main Street Richmond, IN 47374 ; OWNER:- ov1 me and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) City of Richmond LWC Incorporated Pridemark Construction, Inc. 50 North 5th Street 712 East Main Street- 421. S. Walnut Street ' Richmorid, IN 47374 Richmond, IN 47374 Muncie, IN 47305 THE CGNTRACT:IS CHANGED, AS FOLLOWS: (Insert a`'detaled description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) '820 East Main Street: - Disassembl�-Pf center storefront door and,modification of components to allow door to fit into existing opening and re- welding of.same. Includedlis new insulated glass panel to fit new door size. Total Add For Change Order - $600.00 F f The original Contract Surri was 6373423.00 _ The net change by -previously authorized Change Orders $ 92,912.10 _ The Contract. Su1.m prior to, this -Change Order. was $ 730,335. i0 The. Contract Sum will -be increased by.this Change Order in the amount.of $ 600.00. The new Contract -Sum. including this Change Order will be $ 73 0,93 5.10 The Contract Time will be increased by hero (0) days. The new date -of Substantial Completion Will be -NOTE: this:(` hange Order does Inot include adjustments. to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been :authorized by Construction Change Directive until the cost and time have been agreed upon by .both the - Owner and Contractor; in which case a Change Order is executed to supersede the Construction Change Directive. -NOT VALID -UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. --LWC Incorporated--- .-- Pridemark Construction, Inc. City of Richmond ARCHITECT (Firm name) CON F'r n ie) OW (Firm t2am SIGNATURE SIGNATURE SIGNATURE _ Kevin McCurdy, AIA Vicki Robinson,. President Public Board of ` Works r PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED'NAME AND TITLE DATE DAT DATE AIA Document G70I TM — 2017. Copyright a 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'. Document, or .� any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10.01:53 ET on 10/15/2019 under Order No. 5859514226 which.expires on 08130/2020, and is not for resale. User Notes: (3139ADA4D)