Loading...
HomeMy Public PortalAboutPine Essex Nash Oak Borings April 22TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN MA 02472 Gerald S. Mee Jr. Superintendent -IMPORTANT NOTICE - Exploratory Borings PINE ST. ESSEX ST, NASH ST, OAK ST Starting at 7:00 AM on Monday, April 22, 2019 April 18, 2019 Dear Residents of Pine Street, Essex Street, Nash Street and Oak Street: New England Geotech, will be performing exploratory borings beginning on the above date and time. The duration of the soil boring program is expected to be approximately two (2) weekdays (Monday through Friday) during the hours of 7:00 AM to 5:00 PM. The soil boring work will include drilling boreholes, each approximately 2-inches in diameter using a truck mounted drill rig. At the completion of the soil test boring work, each borehole will be backfilled and the ground surface will be restored or a monitoring well installed flush with the ground surface. Each boring will take approximately 1-3 hours and the crew should not be in your area long. Streets and driveways will be kept accessible throughout the duration of the work. Disturbances to residents are anticipated to be minor, but residents may notice elevated short-term noise levels and equipment working. Thank you for your cooperation. If you have any questions or concerns regarding this project, please contact one of the following during business hours, Monday -Friday 8:30 AM - 5:00 PM: Weston & Sampson (978) 532-1900 x2435 or Watertown Department of Public Works (617) 972-6420. When calling, please reference the Soil Borings on Pine Street, Essex Street, Nash Street, and Oak Street. Th ou foperatn. Gerald S. Mee, Jr. Superintendent K:ISTREET LETTER - RES/DENTSIFY191Exploratory Borings-PineEssexNashOak4-22-2019.docx