Loading...
HomeMy Public PortalAboutPriest Road Sewer Main Replacement Begins September 25th (PDF)TOWN OF WATERTOWN September 22, 2017 DEPARTMENT OF PUBLIC WORKS 124 ORCHARD STREET WATERTOWN, MASSACHUSETTS 02472 Tel: 617-972-6420 Fax: 617-972-6402 IMPORTANT NOTICE Dear Residents and Abutters of Priest Road, The Town of Watertown has contracted the services of Commonwealth Construction and Utilities, Inc. to replace the sewer main on Priest Road. This work is part of ongoing efforts by the Town to improve the sewer system infrastructure throughout Watertown and is scheduled to begin WEATHER PERMITTING on Monday, September 25, 2017. The method of repair will require the Contractor to replace the sewer pipes by excavation methods. Please note that during the construction period there will be no parking allowed on the street and driveway access may be interrupted. The Police Department has been notified of the construction work in the area. The Contractor will attempt to accommodate all residents to minimize the impact during construction. If you have any questions or concerns regarding this project, contact the Watertown Department of Public Works at (617) 972-6420. The Town of Watertown thanks you for your cooperation. Sincerely, Gerald S. Mee, Jr. Superintendent K:ISTREET LETTER - RESIDENTSIFY 20181PriestRd new sewer line 925217.doc