THIS ADDS UM, (Number 1 to Contract No. 153-2019) is made and entered into this
Job � dayof municipal
20 fig, by and between Richmond, Indiana, a municipal
corporation acting through its Board of Public works and Safety with its office at .50 North 5t' Street,
Richmond, Indiana, 47374 (hereinafter referred to as "City"), and Maze Design, Inc,, 124 South 8th
Street, Richmond, Indiana, 47374 (hereinafter referred to as "Contractor").
WHEREAS, City and Contractor entered into Contract No. 153-2019 on September 26, 2019,
which Agreement retains Contractor to provide professional services in connection
with the preparation of design drawing specifications required by the State of Indiana
for the addition of a new P.E. metal building to be located at the Izzy Edelman
Training Facility .for the Fire Department for -the City of Richmond; and
WHEREAS, City wishes to retain Contractor to also provide a geotechni cal soil report for the Fire
Department, ;as set forth within the scope of Contract No. 153--2019.
NOW, THEREFORE, in consideration of the mutual promises and covenants herein contained,
'including the above stated recitals, City and. Contractor hereby agree as follows:
1. The City and Contractor executed and entered into Contract No. 153-2019, on
September 26, 2019, which Agreement is incorporated herein by reference.Pursuant
to Contract No. 153-2019, Section XI (Miscellaneous), the Parties may alter or
amend the Agreement in whole or in part at any time by filing with the Agreement a
written instrument setting forth such changes signed by both Parties. The Parties
agree that Contractor shall also provide a geotechnical soil report as set forth on
Contractor's quote, attached hereto as Exhibit A. Said services shall be performed in
a manner consistent with Contract No. ' 153-2019, which is hereby incorporated by
reference and made a part hereof. Compensation paid to Contractor for services
rendered in accordance with Exhibit A shall not exceed the additional amount of
Three .Thousand Seven. Hundred Forty Dollars and Zero Cents ($3,740.00) which
would result in a new total not to exceed amount payable under Contract No. 153-
2019 as listed within Section III (Compensation) of said Agreement of Fifty-six
Thousand One Hundred Forty Dollars and Zero Cents ($56,140A).
2. City and Contractor expressly 'agree that all other terms, conditions, and' covenants
contained in Contract No. 153-2019, shall be applicable to this Addendum, unless
such term, condition or covenant conflicts with this Addendum Number 1, in which
case this Addendum. Number 1 shall be controlling.
3. Both Parties hereby agree that with the exception of the .additional services at the
agreed -upon increase -pursuant to this Addendum as authorized by Section XI
(Miscellaneous) of said Agreement, Contract No. 153-2019 shall remain intact and
unchanged and in full force and effect.
Addendum No. l to Contract No. 153--2019
Page 1 of 2
a y.
r
4. Both Parties agree that any person executing this Contract in a representative capacity
hereby warrants that he or she has been duly authorized by his or her principal to
execute this Addendum.
IN WITNESS WHEREOF, this Addendum is executed and approved by the undersigned.
representatives of the City and Contractor this day of , 20
"CITY" "CONTRACTOR"
THE CITY OF RICHMOND, MAZE DESIGN, *INC.
INDIANA by and through its 124 South 8th Street
Board of Public works and Safety Richmond, IN 47374
By: • By: •
Vicki Robinson, President David A. Inderstrodt, President
2 o
By: Date:
Lol E ily almer, Member
By:
Matt ans, ember
Approved:
D Sno 0
Date:
-Page 2 of 2
zj*�%
Design, Inc.
i
124 South 8th Street
Riehm wd, IN 4 73 74
-1300
(765)962
rMail; di mazcdc4igninczom
1 Fire Chief Jerry Purcell
Richmond Fire D ep aartment
101 South 5ih Street
Richmond, IN 47374
Date: 10-31-2019
We propose the following scope of services for the new fire training facility:
Geotech soil report as completed by Patriot Engineering,
Proposal attached.
Total fixed fee for reimbursable services outlined above: $3,740.00