Loading...
HomeMy Public PortalAboutSidewalk and Driveway Repair 183 School StreetOctober 13, 2021 TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS 124 ORCHARD STREET WATERTOWN, MASSACHUSETTS 02472 Tel: 617-972-6420 Fax: 617-972-6402 SIDEWALK AND DRIVEWAY REPAIRS 183 School Street The Watertown Department of Public Works and our contractor, Century Paving Inc, will be repairing concrete sidewalks and driveway aprons damaged during sewer and drain repairs last year. The work is scheduled to start, WEATHER PERMITTING, Monday, October 18, 2021, and will run for several days thereafter. Typical work hours will be 7 AM to 4 PM. • During the concrete installation process wooden planks will be placed across walkways to access your residence. • Please do not park your car next to any areas marked in front of your residence during construction. • You will be notified by the Contractor prior to any work that affects access to your driveway. Driveways may remain closed up to three days to permit the concrete to cure. • Please note that there may be lapses in time between sidewalk excavation, installing wood sidewalk forms, and final concrete work. • Adjustments necessary to make sidewalks and driveways ADA compliant may require minor regrading of areas beyond the back of sidewalk, such as landscaping, driveways, or walkways. The Department will match existing materials and finishes to the maximum extent possible. • The Watertown Police will be informed of the construction and its effects, including the need for extended on -street parking due to driveway repairs. We apologize for the short notice and understand that the process is noisy, messy, and disruptive and apologize in advance for any inconvenience you may experience. Should you have any questions, please e-mail dpwdept(a)-watertown-ma.gov or you may call Ed Baptista, Highway Supervisor, at 617-972.6420. Sincerely gory St Loui , Superintendent of Public Works