HomeMy Public PortalAboutChange Order No. 24 to Contract No. 148...82810 - Bike Pedestrian facilitiesContract No:R -37463 Change Order No.: 024 INQIANA Department of Transportation Page: I Construction Change order and Time Extension Summary Contract Information Contract No.: R -37463 Letting Date:10!12I2017 ❑istrict:GREENFIELD DISTRICT AE:Prather, Michael PEIS:Miller, Christopher, Status: Draft • change Order Information Change Order No.: 024 EWA: Y or Force Acct: N Date Generated: 01107/2020 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Environmental Related . Description: 6 inch Extruded Curb for Erosion Control Original Contract Amount $ 5,883,000.00 Current Change Order Amount $ 5,088.00 Percent: 0.087 % Total Previous Approved Changes $ 224,898.03 Percent: 3.823 % Total Change To -Date $ 229,986.03 Percent: 3.910 % Modified Contract Amount '$ 6,112,986.03 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date'00I0010000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days r (SS Standard Specification,- SP w Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Gate 00/00/0000 *or SS Calendar/Wor' k Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -37463 Change Order No.: 024 INDIANA department of Transportation Page: 2 Construction Change order and Time Extension Summary Review and Approval Information Required Approval Authority AE: M•Prather DCE: `SCE: * ❑DCM:. ($per Change Order) (--LE $ 250K-) LE $ 750K LE $ 2 M GT $ 2 M -- } (Days per Contract) 50 SS days 100 SS.days 200 SS Days GT 200 SS days) Verbal Approval Required? pP q � 7Y 1 N if Y, b M • Prather Date issued 8//12019 Y Total Change To-Date>5%? Y /01f Y, Copy to Program Budget Manager - s Scope/Design Recommendation Y /Mlf Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Auth-ority Concurs with PM? Y / N If Y, Concurrence by Date If N, Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? 0/ N If Y, Date to LPA 1/7/2020 Date Returned FHW.A Signatures Requ1r4d? Y ED if Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or bDCM Approval) Field. :Engineer Date Comments: Contract No:R-37463 INDIANA Date:0110712023 Change Order No:024 -Department• of Transportation Page: 3 Contract: R-37463 Project: 1382810 State: 138281 OOOLC3 Change Order Nbr: 024 Change Order Description: 6 inch- Extruded Curb for Erosion Control Reason Code: CHANCED CCND, Environmental Related CLN PCN PLN Stem Code Unit Unit Price Co Qty. Comment Amount Change 0196 1382810 0196 605-06120 LIFT 15.900 320.000 C Amount:$ S,OBS,QQ Item Descrlptlon: CURB CONCRETE Supplemental Descriptlon'i:6 Inch Supplemental Descriplion2: Extruded Total Value for Change order 024 =- $ 5,088.00 Whereas, the Standard Speclflcatlons for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation On ►]uiy 31, 2019 Greg Steins and Mllestone exchanged emalIs requesting a price quota for a 8 inch extruded curb to help address some erosion control concerns between 3rd and 4th street on East Main Street, The curb will be utilized to prevent storm water from entering the large landscape bed at 4th street and erdding the soil the entire length to 3rd street and washing dirt onto the sidewalk and street and Into the storm sewer Inlets. The water runoff In the area i.s also a problem for the plants installed. Milestone quoted Greg a cost of $5,088.00 to perform the work. On August 1, 2019 Greg Steins and Mike Prather exchanged smalls requesting 1NDOT participation which was granted. This Change Order compensates Milestone for the 320 Lft of 6 inch curb installed per the City of Rlchmond's request. Included with this Change Order as supporting documentaflcn Is the contractors official request of Change order form, and a copy of the email correspondences between Milestone, Richmond, and INDOT. Change Order Explanation for Specific Line item - It is the Intent of the parties that this change order 1s full and complete compensation for the work desc b above. Notification and bonsent to this change order Is hereby acknowledged. Contractor.,--Q`�" Sl Signed B 9 By ❑ate: NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. r Contract No:R -374�3 Change Order No:024 I N D IANA Department of Transportation 5 ' Date: g 1107/2020 Page: 4 ,APPROVED FOR LOCAL PUBLIC AGENCY h �. . TORE} (TITLE) (DATE) 'r ;zo f'z I I K E} �'TITL j (DATE) 49 0 SUBMITTED FOR CONSIDERATION PF1S Christopher Miller - APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION Approval Level Status' Name of Approver Date 1 9 i