Loading...
HomeMy Public PortalAboutRES-CC-2011-01Resolution #01- 2011 A RESOLUTION SUPPORTING SUBMITTAL OF A COST SHARING PROPOSAL TO THE UTAH DEPARTMENT OF TRANSPORTATION FOR THE US-191 MOAB NORTH CORRIDOR STORM WATER DRAINAGE SYSTEM WHEREAS, the City of Moab has been working with the Utah Department of Transportation UDOT) in a cooperative manner to address storm water drainage issues along US-191 within the north corridor of Moab City limits, and WHEREAS, the City's primary concern in the area in question has been to deal with storm water drainage generated from Stewart Canyon; and WHEREAS, UDOT's primary concern has been to deal with drainage outfalls along US-191 that affect highway construction and enhancements; and WHEREAS, UDOT has been unable to address roadway capacity and design issues in the area in question because the aforementioned drainage issues have not been resolved; and WHEREAS, the City of Moab has studied these issues with UDOT engineers and HW Lochner as consulting engineers for UDOT; and WHEREAS, the parties have determined that a storm water system can be constructed that addresses both UDOT's and City's UDOT's primary concerns, at a lower overall cost than if these concerns were addressed separately; and WHEREAS, this proposed system would involve upsizing the length and size of the lines that UDOT would have constructed to address UDOT's concerns, in order to add the drainage from Stewart Canyon into the drainage system; and WHEREAS, UDOT commonly refers to such upsizing as "betterment"; and WHEREAS, the cost of "betterment" of a UDOT system above and beyond what is required for UDOT's purposes is normally borne by the entity requesting the betterment; and WHEREAS, a diagram and budget analysis of this proposed system are attached to this resolution; and WHEREAS, this proposed system would have the following basic elements: • The capture of drainage from approximately 290 acres of essentially undeveloped area on the east side of US-191 • Extension of a storm water trunk line within the UDOT Right -of -Way from approximately MiVida Drive to Motel 6/Black Oil Resolution #01-2011 Page 1 of 2 " Installation of an outfall pipe from US-191 along the property line of Motel 6/Black Oil to the Nature Conservancy " Trunk line and outfall pipe sizes ranging from 48" to 96" " The capture of drainage from approximately 150 acres in the Stewart Canyon Drainage " The construction of necessary conveyances to bring Stewart Canyon drainage into the storm water trunk line within the UDOT right-of-way along US-191 " Cost sharing for the system allocating the cost of increasing the size and length of the storm water lines to accommodate the Stewart Canyon Drainage to the City of Moab " Construction of the trunk line and outfall as part of UDOT's future phase for roadway improvements along the north corridor of US-191 within Moab city limits NOW THEREFORE, we, the Governing Body of the City of Moab do hereby resolve to submit a cost sharing proposal to UDOT regarding the US-191 Moab North Corridor Storm Water Drainage System as outlined herein and the attachments hereto, and to direct City staff to work with UDOT staff in developing a cost sharing and betterment agreement for the storm water system that addresses mutual concerns. Passed and adopted by action of the Governing Body of the City of Moab in open session this l 1th day of January, 2011. SIGNED: David L. Sakrison, Mayor ATTEST: Rachel Ellison, Recorder Resolution #01-2011 Page 2 of 2