Measure AA Bond
Annual Accountability Report
—————————————————————————————————————————————————————————
JULY 1, 2018 – JUNE 30, 2019
Ana María Ruiz, General Manager
Stefan Jaskulak, Chief Financial Officer
iMeasure AA Bond Annual Accountability Report FY2018-19
Table of Contents
INTRODUCTION————————————————————————————————————————————————————————
Letter from the General Manager ii————————————————————————————————————————————————————————
Letter from the Chief Financial Officer iv ————————————————————————————————————————————————————————
Mission Statement v————————————————————————————————————————————————————————
Measure AA Portfolio Map vi————————————————————————————————————————————————————————
REPORT————————————————————————————————————————————————————————
Executive Summary 1——————————————————————————————————————————————————————
Portfolio Allocation to Expenditure Roll Up 2——————————————————————————————————————————————————————
Portfolio Expenditures to Allocations 2——————————————————————————————————————————————————————
Land Acquisition MAA Expenditures 4————————————————————————————————————————————————————————
Priority Portfolio Actions by Region (from MAA Expenditure Plan) 7 ————————————————————————————————————————————————————————
Portfolio Expenditures (Numerically by Portfolio Number) 14————————————————————————————————————————————————————————
Financial Report by Project 76————————————————————————————————————————————————————————
ATTACHMENTS————————————————————————————————————————————————————————
Exhibit A: Expenditure Plan 84————————————————————————————————————————————————————————
Exhibit B: Tax Rate Statement 91————————————————————————————————————————————————————————
Measure AA Bond Program: Schedule of Program Expenditures 92————————————————————————————————————————————————————————
PHOTO CREDITS
Top: Picchetti Ranch Open Space Preserve by Scott Johnson
Lower Left: Bear Creek Redwoods Open Space Preserve by Alisha Laborico
Lower Middle: Russian Ridge Open Space Preserve by David Henry
Lower Right: Ravenswood Open Space Preserve by Midpen Staff
ii Measure AA Bond Annual Accountability Report FY2018-19
Message from the General Manager
to the Bond Oversight Committee
June 2019 marks five years since local voters voiced their support for protecting, restoring and connecting with
open space by passing the Measure AA general obligation bond. Over this timespan, the Midpeninsula Regional
Open Space District has invested more than $58 million in fulfilling the community’s vision for the future of open
space in our region.
Highlights of our five-year accomplishments across the top 25 Measure AA priorities include: ————————————————————————————————————————————————————————
Preserving an additional 1,947 acres of public open space.————————————————————————————————————————————————————————
Reintroducing conservation grazing to 315 acres to control invasive weeds, reduce fuels, maintain open
grasslands, and support local sustainable agriculture.————————————————————————————————————————————————————————
Opening the Mount Umunhum summit and award-winning Mt. Umunhum Trail at Sierra Azul Open Space
Preserve.————————————————————————————————————————————————————————
Opening Lower La Honda Creek Open Space Preserve with a new parking area and 6 miles of trails.————————————————————————————————————————————————————————
Opening Mindego Hill with 360-degree panoramic views at Russian Ridge Open Space Preserve.————————————————————————————————————————————————————————
Nearing construction of a 0.6-mile trail gap to complete 80 miles of continuous Bay Trail at Ravenswood
Open Space Preserve. ————————————————————————————————————————————————————————
This report details the progress to date across our balanced mission. Achievements for fiscal year 2018-19
(July 1, 2018-June 30, 2019) include:————————————————————————————————————————————————————————
Opening the first phase of public access at Bear Creek Redwoods Open Space Preserve and continuing
invasive species removal.————————————————————————————————————————————————————————
Protecting an additional 190 acres of redwood forest in the Upper San Gregorio Creek watershed.————————————————————————————————————————————————————————
Adding nearly 2 acres to El Sereno Open Space Preserve to enhance trail connections.————————————————————————————————————————————————————————
Completing bayfront habitat restoration through partnerships at Ravenswood Open Space Preserve.————————————————————————————————————————————————————————
Developing a plan to evaluate forest restoration and management priorities for watershed protection in
La Honda Creek Open Space Preserve.————————————————————————————————————————————————————————
Restoring natural flow to areas of Hendrys Creek in Sierra Azul Open Space Preserve.————————————————————————————————————————————————————————
Completing the Oljon Trail and restoring an old steep trail alignment to natural habitat at El Corte de Madera
Creek Open Space Preserve.————————————————————————————————————————————————————————
Completing the second phase of restorative ecology plantings at the Mt. Um summit.————————————————————————————————————————————————————————
Completing the Purisima Uplands property transfer to facilitate a future Purisima-to-the-Sea regional trail
corridor.————————————————————————————————————————————————————————
Advancing plans for the Highway 17 wildlife and trail crossings.————————————————————————————————————————————————————————
Building two new pedestrian bridges along the Stevens Creek Nature Trail at Monte Bello Open Space Preserve.————————————————————————————————————————————————————————
Forming a new Public Access Working Group for the La Honda Creek Parking and Trailhead Access Feasibility
Study and completing rare plant survey and wetlands identification for loop trail planning.————————————————————————————————————————————————————————
Continuing to support the Saratoga-to-the-Sea regional trail connection in partnership with the City of Saratoga.————————————————————————————————————————————————————————
These projects would not be possible without community support to provide the funding necessary to protect
these natural resources, restore damaged habitat and watersheds, and connect the public access to these
treasured landscapes.
We are eager to share this progress and thank the Bond Oversight Committee for your service on behalf of the public
in verifying these MAA expenditures to create the transparency necessary for continued confidence in our work.
Sincerely,
Ana María Ruiz
General Manager
iiiMeasure AA Bond Annual Accountability Report FY2018-19
Rancho San Antonio Open Space Preserve by Zhao Han
iv Measure AA Bond Annual Accountability Report FY2018-19
Bond Oversight Committee:
Midpen is pleased to present our fourth Measure AA Bond Annual Accountability Report. MAA, approved by
voters in 2014, is a $300 million bond measure to accelerate land acquisition, environmental restoration and
public access within the District. We present this report to you to fulfill two key tenets of this legislation—
transparency and accountability—by highlighting MAA project progress and providing an overview of bond
expenditures for FY2018-19.
As committee members, your role is defined and authorized by Midpen board policy, adopted on August 12, 2015,
which states: ————————————————————————————————————————————————————————
The Committee has the following three responsibilities for each of the years the Measure AA general
obligation tax is collected, or revenues expended: ——————————————————————————————————————————————————————
Review Plan expenditures on an annual basis to verify conformity with the Expenditure Plan ——————————————————————————————————————————————————————
Review the District’s Annual Audit and Annual Accountability report and present the Committee’s
findings to the Board at a public meeting ——————————————————————————————————————————————————————
Review any proposed amendments to the Expenditure Plan ——————————————————————————————————————————————————————
The Committee Chair shall report the Committee’s findings at a public meeting of the Board of Directors.
The Committee shall not have authority to recommend, advise, or direct any such matters that may fall
under its responsibility to review. The Committee is not advisory to the Board of Directors and has no power
to determine how General Fund monies are spent. The Board of Directors retains its authority to make such
decisions and determinations. ————————————————————————————————————————————————————————
As of the end of this reporting period, Midpen has spent a life-to-date total of $58.4 million in MAA bond funds.
Midpen spent a total of $10.2 million on MAA projects in FY2018-19, with $48.2 million spent in previous reporting
periods. Through leveraging $3.3 million in grants and partnership funding, along with an additional $2.7 million
in interest income from the bond proceeds, available MAA bond funding has increased to $306 million total.
MAA projects are grouped into 25 portfolios. Projects are completed or underway in 20 of the 25 portfolios, with
progress in the current reporting year spanning 18 portfolios. Additional efforts in support of the MAA portfolios
are also noted in Portfolio Expenditures.
Looking ahead, Midpen continues to invest in projects across the 25 MAA portfolios. The adopted Budget and
Action Plan for fiscal year 2019-20 includes projects in 15 MAA portfolios.
We thank you for your time and service to our community, including the inspection of this accountability report,
which supports the health of the environment we all share.
Sincerely,
Stefan Jaskulak
Chief Financial Officer
Message from the Chief Financial Officer
to the Bond Oversight Committee
Bear Creek Redwoods Open Space Preserve by Alisha Laborico
MISSION The mission of the Midpeninsula Regional Open Space District
is to acquire and preserve a regional greenbelt of open space land in
perpetuity, protect and restore the natural environment, and provide
opportunities for ecologically sensitive public enjoyment and education.
COASTSIDE MISSION To acquire and preserve in perpetuity open
space land and agricultural land of regional significance, protect and
restore the natural environment, preserve rural character, encourage
viable agricultural use of land resources, and provide opportunities for
ecologically sensitive public enjoyment and education.
vMeasure AA Bond Annual Accountability Report FY2018-19
vi Measure AA Bond Annual Accountability Report FY2018-19
Midpeninsula Regional Open Space District
Measure AA Portfolio Map
MAA01 Open Miramontes Ridge
MAA02 New Bayfront Trails
MAA03 Purisima-to-the-Sea Trail
MAA04 Walking, Hiking and Biking Trails at El Corte de Madera
Creek
MAA05 Upper La Honda Creek Preserve
MAA06 New Trails at Windy Hill
MAA07 Driscoll Ranch Area at La Honda Creek
MAA08 Upper San Gregorio Creek Watershed
MAA09 New Trails at Russian Ridge
MAA10 Alpine Road at Coal Creek
MAA11 Welcome Center at Rancho San Antonio
MAA12 Complete Middle Stevens Creek Trail
MAA13 Expand Grazing at Cloverdale Coastal Ranch
MAA14 New Trails throughout the Redwoods
MAA15 Redwood Forest Protection
MAA16 New Access Facilities at Long Ridge
MAA17 Upper Stevens Creek Trail
MAA18 Saratoga to Sea Trail
MAA19 El Sereno Trails to Dogs and Complete Trail
MAA20 Safe Wildlife Corridors Across Highway 17
MAA21 Bear Creek Redwoods
MAA22 Cathedral Oaks at Sierra Azul
MAA23 Mount Umunhum at Sierra Azul
MAA24 Rancho de Guadalupe at Sierra Azul
MAA25 Open Loma Prieta Area at Sierra Azul
1Measure AA Bond Annual Accountability Report FY2018-19
Executive Summary
We are pleased to present Midpen’s fourth Measure AA Bond Annual Accountability Report. This report
reflects MAA expenditures from July 1, 2018 to June 30, 2019. The structure of this document is guided by MAA
ballot language, specifically Priority Portfolio Actions by Region, beginning on page 7.
The MAA expenditure plan with 25 priority actions and project portfolios were the culmination of the vision
planning effort that began in 2002. The public portion of this visioning process spanned 18 months and defines
Midpen’s strategic direction for the next 40 years. In total, the vision plan yielded a list of 54 priority actions. The
top 25 priority actions were subsequently incorporated into a ballot initiative. In 2014, voters approved Measure
AA, a $300 million general obligation bond, designed to fund these top 25 priority actions as described in the MAA
expenditure plan. This MAA accountability report is arranged in parallel with that expenditure plan to facilitate review.
Projects are grouped into 25 key project portfolios organized by geographic area within District boundaries.
No changes in portfolio allocations are proposed for this reporting period. In the future, should a shift in
portfolio allocations be needed, the MAA Bond Oversight Committee will be advised.
Bond Oversight Committee Connection with Budget and Action Plan
In keeping with its role of reviewing retrospective expenditures, this committee is not charged with reviewing the
budget or other prospective information, unless it is provided as part of an explanation of a proposed portfolio
allocation adjustment. There is, of course, a synergy between the budgeted and actual expenditures, and the
following information is provided as context for, and insight into, Midpen’s management of MAA spending.
Each year Midpen embarks upon a priority-setting and budgeting process with the board, allowing for at least a
six-month planning process. The Budget and Action Plan is approved prior to the start of the fiscal year. Within
the budget, there is a Measure AA Projects Budget Overview, which provides a prospective view into the next
year’s planned spending.
Bond Issuance, Size and Look-Back Period
In June 2014, voters approved MAA, a $300 million general obligation bond fund to protect natural open space
lands, open preserves or areas of preserves to public access, construct public access improvements, such as new
trails and staging areas, and restore and enhance open space land, including forests, streams, watersheds and
coastal ranch areas.
In August 2015, Midpen issued its first tranche of $45 million in general obligation bonds to cover three years
of planned project expenses, as well as the legally permitted look-back period of 60 days prior to the board’s
certification of election results.
In February 2018, Midpen issued its second tranche of $50 million in general obligation bonds to cover project
expenses planned for approximately the next three years.
2 Measure AA Bond Annual Accountability Report FY2018-19
Portfolio Allocations and Expenditures
The rollup below shows how much of the total MAA expenditure plan allocation has been used on a
life-to-date basis.
The following chart shows the portfolio allocations approved in the expenditure plan and the life-to-date
expenditures in each portfolio through June 30, 2019. For details, please reference the financial report on page 76,
which contains actual expenditure numbers and remaining allocations.
Portfolio Expenditures to Allocations (in millions)
MAA01
MAA02
MAA03
MAA04
MAA05
MAA06
MAA07
MAA08
MAA09
MAA10
MAA11
MAA12
MAA13
MAA14
MAA15
MAA16
MAA17
MAA18
MAA19
MAA20
MAA21
MAA22
MAA23
MAA24
MAA25
$0.0 $2.5 $5.0 $7.5 $10.0 $12.5 $15.0 $17.5 $20.0 $22.5 $25.0 $27.5 $30.0
Total Life-to-Date Through 6/30/19 Expenditure Plan Remaining
Total Life -To-Date Through 6/30/19
19.48%
Expenditure Plan Remaining
80.52%
Portfolio
Allocation to
Expenditure
Roll Up
MAA15 Portfolio Allocation is $50.73M
3Measure AA Bond Annual Accountability Report FY2018-19
Spending Trends
As of June 30, 2019, $58.4 million has been expended from MAA Funds. The primary spending for the period July 1,
2018-June 30, 2019 was in engineering and construction associated with opening the western part of Bear Creek
Redwoods Preserve (MAA21) to the public. These activities included completing a new parking lot, installing a
new vault-toilet restroom, completing an accessible pathway around Upper Lake, installing a new bridge, and
opening 6 miles of new and improved trails.
Another focus area was completing the remaining site improvements at the Cooley Landing Park next to
Ravenswood Preserve (MAA02), in partnership with the City of East Palo Alto, which include new motion-
activated roadway lighting, a free-standing restroom, an outdoor classroom area, a path around the education
center to complete a loop trail, secondary unpaved trails, and a new entry sign.
Also in this reporting period, we demolished dilapidated structures in the Twin Creeks area of Sierra Azul Preserve
(MAA23) to restore riparian habitat and protect water quality, constructed a new section of the Oljon Trail in El Corte
de Madera Creek Preserve (MAA04), and prepared construction documents for the Ravenswood Bay Trail project.
Midpen actively seeks land acquisition opportunities for conservation and preservation. We added 240 acres to
Purisima Creek Redwoods Preserve (MAA03), 190 acres to La Honda Creek Preserve (MAA05) with the purchase
of the Woodruff Redwoods property, and 1.87 acres to El Sereno Preserve (MAA19), including a portion of the
Acquinos Trail.
In addition to direct spending on MAA projects, Midpen has prioritized key initiatives in support of MAA portfolios,
including land acquisition negotiations, usage surveys, operational infrastructure improvements, environmental
assessments, geotechnical studies and habitat restorations. Although the Bond Oversight Committee review is
primarily focused on actual MAA expenditures, additional accomplishments not funded by MAA but that support
these projects have been included to help provide a sense of the work required to move them forward, which
sometimes involves partnership collaborations. These accomplishments are described in detail in the portfolio
expenditure summary starting on page 14.
Midpen’s annual audited financial statements can be found at openspace.org/financials.
Bear Creek Redwoods Open Space Preserve by Mike Kahn/Midpen
4 Measure AA Bond Annual Accountability Report FY2018-19
Of the $10.3 million expended in this reporting period, $2.2 million was related to land acquisition and related
expenses, which represents 21.6% of all spending for the period. The tables below contain a breakdown of land
acquisition costs by portfolio for the current fiscal year and life-to-date.
Portfolios
with Land
Acquisition
Expenses
Cost Project* Type of Activity
MAA02 $108,273 SFPUC Easement at Ravenswood Trail Easement property right
MAA03 $546,476 Riggs Property Purchase and Site Cleanup/
Remediation, Chamberlain/Lundell Trust
(Lobitos Creek), Giusti Property Rights Transfer
Includes lot line adjustment, Guisti Uplands,
and Lobitos Creek land conservation purchase
MAA05 $1,756,093 Toepfer and Ashworth Property Purchases Land conservation purchases
MAA07 $9,008,773 Apple Orchard and Event Center property and
Cunha Property Purchases
Land conservation purchases
MAA08 $2,153,910 Woodruff Redwoods Property Purchase Land conservation purchase
MAA15 $3,018,550 POST/Alpine Ranch Easement, Conley
Property Purchase
Easement property right and land
conservation purchases
MAA17 $754,552 Lysons Property Purchase Property Expense equals Purchase Price minus
grant income of $740,000
MAA19 $479,527 Gupta/Kahn Property Purchase, Dunham-
Bohlman Easement, Haight-Perry Property
Purchase
Easement property right and land
conservation purchases
MAA22 $540,587 Freudenberg Land Purchase, Hendrys Creek Land conservation purchase, land conservation
easement to Santa Clara Valley Water District
who funded full amount of $1,500,000 for
Hendrys Creek parcel
MAA23 $3,314,084 Meyer Property Purchase, Twin Creeks Land
Purchase
Land conservation purchases
MAA24 $1,591,996 Barth, Petersen, Navid/Gagher, Kahn Land conservation purchases
MAA25 $410,150 Burton Property Purchase Land conservation purchase
Total Land
Acquisition
MAA
Expenditures
$23,682,971
* Pre-acquisition project expenditures were transferred from MAA funding to the general fund for MAA01 Zion Property and MAA24 Morales Property.
Acquisition of these properties are not expected to materialize soon.
Land Acquisition MAA Expenditures (May 11, 2014 - June 30, 2019)
Portfolios
with Land
Acquisition
Expenses
Cost Project Type of Activity
MAA03 $11,558 Giusti Property Rights Transfer Property rights transfer
MAA08 $2,153,910 Woodruff Redwoods Property Purchase Land conservation purchase
MAA19 $52,977 Haight-Perry Property Purchase Land conservation purchase
FY2018-19 Total $2,218,445
Land Acquisition MAA Expenditures (July 1, 2018 - June 30, 2019)
5Measure AA Bond Annual Accountability Report FY2018-19
Anticipated Future Trends
The Bond Oversight Committee primarily reviews retrospective expenses. The following section provides a
high-level glimpse of anticipated expenditures based on the approved fiscal year Budget and Action Plan and
operational workload. This is provided for contextual purposes and to demonstrate the managed progress
Midpen is making toward MAA projects.
Next year’s report, covering FY2019-20, will include the sixth year of MAA funding. Based on the approved FY2019-20
budget, planned life-to-date spending is estimated to exceed $65 million, or approximately 22% of the $300 million
bonding capacity authorized under Measure AA.
The capital program for FY2019-20 continues progress on many phased projects, with a concentrated effort
on expanding public access at Bear Creeks Redwoods Preserve (MAA21) and upper La Honda Creek Preserve
(MAA05), Ravenswood Preserve (MAA02) trail connections, and Mindego Ranch pond restoration at Russian Ridge
Preserve (MAA09).
Finally, portfolio allocations include estimated land acquisition costs. Because purchases are primarily opportunity
driven, estimates are not tied to a specific time frame, as we do not know when properties and/or rights will be
available for purchase. The real property department actively pursues targeted opportunities for land purchases,
as well as the purchase of property rights and easements, so purchase expenses may be realized as future
opportunities become available.
Rancho San Antonio Open Space Preserve by Melinda Hom
6 Measure AA Bond Annual Accountability Report FY2018-19
El Corte de Madera Creek Open Space Preserve by Liv Ames
7Measure AA Bond Annual Accountability Report FY2018-19
Priority Portfolio Actions by Region
(From the Measure AA Expenditure Plan)
South Bay Foothills
(Los Gatos, Monte Sereno,
Saratoga, and Santa Cruz
Mountains)
PORTFOLIO 18
South Bay Foothills—Saratoga-to-the-Sea Trail and Wildlife Corridor————————————————————————————————————————————————————————
Protect wildlife corridor along Highway 9————————————————————————————————————————————————————————
Connect trail to Saratoga-to-the-Sea Trail and Skyline-to-the-Sea Trail————————————————————————————————————————————————————————
Portfolio Allocation: $1,365,000————————————————————————————————————————————————————————
PORTFOLIO 19
El Sereno—Dog Trails and Connections————————————————————————————————————————————————————————
Provide infrastructure to open trails to dogs————————————————————————————————————————————————————————
Develop connections to Skyline, Sanborn County Park and Lexington Reservoir————————————————————————————————————————————————————————
Portfolio Allocation: $2,254,000————————————————————————————————————————————————————————
PORTFOLIO 20
South Bay Foothills—Wildlife Passage and Ridge Trail Improvements————————————————————————————————————————————————————————
Establish safe corridors for mountain lions across Highway 17————————————————————————————————————————————————————————
Establish Bay Area Ridge Trail crossing————————————————————————————————————————————————————————
Portfolio Allocation: $13,966,000————————————————————————————————————————————————————————
PORTFOLIO 21
Bear Creek Redwoods—Public Recreation and Interpretive Projects————————————————————————————————————————————————————————
Open for hiking, equestrian activities————————————————————————————————————————————————————————
Provide parking areas, trails; upgrade stables————————————————————————————————————————————————————————
Restore and protect habitats for various species————————————————————————————————————————————————————————
Repair roads and trails to reduce sediment————————————————————————————————————————————————————————
Rehabilitate Alma College site————————————————————————————————————————————————————————
Portfolio Allocation: $17,478,000————————————————————————————————————————————————————————
Sierra Azul Open Space Preserve by Chris Terry
PORTFOLIO 22
Sierra Azul—Cathedral Oaks Public Access and Conservation Projects————————————————————————————————————————————————————————
Develop multiuse trail and plan future trails as land is available————————————————————————————————————————————————————————
Develop parking————————————————————————————————————————————————————————
Restore plant communities and soils————————————————————————————————————————————————————————
Install trailside amenities————————————————————————————————————————————————————————
Preserve additional open space and complete wildlife corridor in upper Los Gatos Creek watershed————————————————————————————————————————————————————————
Portfolio Allocation: $6,714,000————————————————————————————————————————————————————————
PORTFOLIO 23
Sierra Azul—Mount Umunhum Public Access and Interpretive Projects————————————————————————————————————————————————————————
Open Mount Umunhum for multiuse public access to summit via road and trail————————————————————————————————————————————————————————
Open Bay Area Ridge Trail and nearby trail connections————————————————————————————————————————————————————————
Preserve additional open space and complete wildlife corridor————————————————————————————————————————————————————————
Portfolio Allocation: $27,972,000————————————————————————————————————————————————————————
PORTFOLIO 24
Sierra Azul—Rancho de Guadalupe Family Recreation————————————————————————————————————————————————————————
Open Rancho de Guadalupe to public access————————————————————————————————————————————————————————
Develop accessible multiuse trails with amenities such as parking and family recreation————————————————————————————————————————————————————————
Restore habitat for rare species————————————————————————————————————————————————————————
Protect cultural and natural resources————————————————————————————————————————————————————————
Portfolio Allocation: $10,078,000————————————————————————————————————————————————————————
PORTFOLIO 25
Sierra Azul—Loma Prieta Area Public Access, Regional Trails and Habitat Projects————————————————————————————————————————————————————————
Provide public access and recreation, including small campground————————————————————————————————————————————————————————
Develop, improve and connect regional multiuse trails to Forest of Nisene Marks State Park, protected land
to east, and Mount Umunhum————————————————————————————————————————————————————————
Protect steelhead habitat, rare plants and grasslands, and restore knob cone pine stands————————————————————————————————————————————————————————
Portfolio Allocation: $7,986,000————————————————————————————————————————————————————————
8 Measure AA Bond Annual Accountability Report FY2018-19
9Measure AA Bond Annual Accountability Report FY2018-19
Peninsula Foothills and Bay
(Cupertino, Los Altos, Los Altos Hills,
Sunnyvale, Mountain View, Palo Alto,
East Palo Alto, Menlo Park, Atherton,
Redwood City, San Carlos, Woodside,
Portola Valley, and Skyline)
PORTFOLIO 2
Regional—Bayfront Habitat Protection and Public Access Partnerships————————————————————————————————————————————————————————
Partner to complete gaps in Bay Trail and develop city-to-bay trails————————————————————————————————————————————————————————
Support wetland restoration and associated interpretive facilities————————————————————————————————————————————————————————
Preserve additional bayfront open space————————————————————————————————————————————————————————
Portfolio Allocation: $5,052,000————————————————————————————————————————————————————————
PORTFOLIO 4
El Corte de Madera Creek—Bike Trail and Water Quality Projects————————————————————————————————————————————————————————
Develop single-use biking/hiking trails, complete Ridge Trail gaps and develop trail system leading to
parking area————————————————————————————————————————————————————————
Restore damaged trails to improve water quality————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Portfolio Allocation: $8,376,000————————————————————————————————————————————————————————
PORTFOLIO 5
La Honda Creek—Upper Area Recreation, Habitat Restoration, and Conservation Grazing Projects————————————————————————————————————————————————————————
Open upper half of the preserve to public; provide biking/hiking/equestrian trails, dog access and staging areas————————————————————————————————————————————————————————
Provide loop and connector trails————————————————————————————————————————————————————————
Restore habitat for rare species————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to reintroduce conservation grazing————————————————————————————————————————————————————————
Portfolio Allocation: $11,733,000————————————————————————————————————————————————————————
Ravenswood Open Space Preserve by Madhur Kulkarni
PORTFOLIO 6
Windy Hill—Trail Improvements, Preservation, and Hawthorns Area Historic Partnership————————————————————————————————————————————————————————
Improve trails; complete pond facilities————————————————————————————————————————————————————————
Increase multiuse trails; study possible improvements to increase dog use————————————————————————————————————————————————————————
Open Hawthorns Area; develop trails connecting to Portola Valley and Palo Alto trails————————————————————————————————————————————————————————
Partner to protect, restore and interpret historic buildings————————————————————————————————————————————————————————
Improve habitat conditions in Los Trancos Creek————————————————————————————————————————————————————————
Preserve additional scenic open space as available————————————————————————————————————————————————————————
Portfolio Allocation: $12,740,000————————————————————————————————————————————————————————
PORTFOLIO 8
La Honda Creek and Russian Ridge—Preservation of Upper San Gregorio Watershed and Ridge
Trail Completion————————————————————————————————————————————————————————
Preserve Upper San Gregorio watershed; restore endangered species habitats————————————————————————————————————————————————————————
Support opportunities to provide additional water for fisheries————————————————————————————————————————————————————————
Complete Bay Area Ridge Trail multiuse connections and gaps————————————————————————————————————————————————————————
Provide additional public use facilities————————————————————————————————————————————————————————
Portfolio Allocation: $15,347,000————————————————————————————————————————————————————————
PORTFOLIO 9
Russian Ridge—Public Recreation, Grazing, and Wildlife Protection Projects————————————————————————————————————————————————————————
Open currently closed areas of preserve————————————————————————————————————————————————————————
Construct and extend trails————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to reintroduce conservation grazing————————————————————————————————————————————————————————
Improve habitat for sensitive species; implement pond enhancement projects for garter snakes and
red-legged frogs————————————————————————————————————————————————————————
Portfolio Allocation: $5,560,000————————————————————————————————————————————————————————
PORTFOLIO 10
Coal Creek—Reopen Alpine Road for Trail Use————————————————————————————————————————————————————————
Reopen Alpine Road as trail connection between Portola Valley and Skyline Boulevard————————————————————————————————————————————————————————
Reroute trails to reduce erosion and improve visitor experience————————————————————————————————————————————————————————
Portfolio Allocation: $8,017,000————————————————————————————————————————————————————————
PORTFOLIO 11
Rancho San Antonio—Interpretive Improvements, Refurbishing, and Transit Solutions————————————————————————————————————————————————————————
Add welcome center————————————————————————————————————————————————————————
Refurbish and add interpretive exhibits to Deer Hollow Farm————————————————————————————————————————————————————————
Support of transit improvement options such as bike trails, bike share station, bus service or additional parking————————————————————————————————————————————————————————
Portfolio Allocation: $10,811,000————————————————————————————————————————————————————————
10 Measure AA Bond Annual Accountability Report FY2018-19
11Measure AA Bond Annual Accountability Report FY2018-19
PORTFOLIO 12
Peninsula and South Bay Cities—Partner to Complete Middle Stevens Creek Trail————————————————————————————————————————————————————————
Support work by cities to develop the middle section of the Stevens Creek Trail and enhance neighborhood
connections————————————————————————————————————————————————————————
Support work by partners to complete stream corridor restoration and steelhead habitat enhancement
below dam————————————————————————————————————————————————————————
Develop and install interpretive signage————————————————————————————————————————————————————————
Portfolio Allocation: $1,038,000————————————————————————————————————————————————————————
PORTFOLIO 16
Long Ridge—Trail, Conservation, and Habitat Restoration Projects (Saratoga)————————————————————————————————————————————————————————
Improve roadside parking and provide restrooms————————————————————————————————————————————————————————
Develop new trail connections to Eagle Rock and Devils Canyon————————————————————————————————————————————————————————
Repair trails for year-round, multiuse access————————————————————————————————————————————————————————
Protect watersheds for steelhead————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Implement pond and habitat enhancement restoration projects to benefit rare species————————————————————————————————————————————————————————
Portfolio Allocation: $5,140,000————————————————————————————————————————————————————————
PORTFOLIO 17
Regional—Complete Upper Stevens Creek Trail————————————————————————————————————————————————————————
Complete multiuse connection between the Bay Trail and Bay Area Ridge Trail above the reservoir through
Picchetti Ranch Open Space Preserve and Lower/Upper Stevens Creek County Parks————————————————————————————————————————————————————————
Improve preserve trails and neighborhood connections————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Portfolio Allocation: $7,760,000————————————————————————————————————————————————————————
Russian Ridge Open Space Preserve by Charles Tu
PORTFOLIO 1
Miramontes Ridge—Gateway to the Coast Public Access, Stream Restoration and
Agriculture Enhancement————————————————————————————————————————————————————————
Preserve scenic open space land as available, and establish wildlife corridor————————————————————————————————————————————————————————
Restore fish and red-legged frog habitats in Madonna Creek watershed————————————————————————————————————————————————————————
Partner to enhance water availability for agriculture and fish————————————————————————————————————————————————————————
Develop trail loop system, including Ridge Trail and neighborhood access points————————————————————————————————————————————————————————
Develop staging area; repair bridges————————————————————————————————————————————————————————
Portfolio Allocation: $27,774,000————————————————————————————————————————————————————————
PORTFOLIO 3
Purisima Creek Redwoods—Purisima-to-the-Sea Trail, Watershed Protection
and Conservation Grazing————————————————————————————————————————————————————————
Complete and open multiuse Purisima-to-the-Sea Trail connection between Ridge Trail and Coastal Trail,
and new parking areas————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Remove fish barriers and restore Lobitos Creek————————————————————————————————————————————————————————
Restore ponds for endangered species————————————————————————————————————————————————————————
Portfolio Allocation: $7,608,000————————————————————————————————————————————————————————
PORTFOLIO 7
La Honda Creek—Driscoll Ranch Public Access, Endangered Wildlife Protection and
Conservation Grazing————————————————————————————————————————————————————————
Open Driscoll Ranch area; provide biking/hiking/equestrian trails, limited dog access, parking areas
and interpretive displays————————————————————————————————————————————————————————
Develop loop and connector trails————————————————————————————————————————————————————————
Restore habitat for endangered species————————————————————————————————————————————————————————
Restore La Honda Creek; remove fish migration barriers————————————————————————————————————————————————————————
Portfolio Allocation: $14,825,000————————————————————————————————————————————————————————
12 Measure AA Bond Annual Accountability Report FY2018-19
Coast
(Half Moon Bay, San Gregorio,
Pescadero, and La Honda)
Purisima Creek Redwoods Open Space Preserve by Anda Corlan
13Measure AA Bond Annual Accountability Report FY2018-19
PORTFOLIO 13
Cloverdale Ranch—Wildlife Protection, Grazing and Trail Connections————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to increase conservation grazing and sustain large contiguous
grasslands————————————————————————————————————————————————————————
Restore habitat for endangered species————————————————————————————————————————————————————————
Provide trail connections to nearby state parks————————————————————————————————————————————————————————
Portfolio Allocation: $15,712,000————————————————————————————————————————————————————————
PORTFOLIO 14
Regional—Trail Connections and Campgrounds————————————————————————————————————————————————————————
Develop trails between Butano State Park, Pescadero County Park and Russian Ridge, and between Skyline
Ridge and Portola Redwoods and Big Basin state parks————————————————————————————————————————————————————————
Partner with county and state parks to improve existing campgrounds————————————————————————————————————————————————————————
Portfolio Allocation: $3,966,000————————————————————————————————————————————————————————
PORTFOLIO 15
Regional—Redwood Protection and Salmon Fishery Conservation————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Protect and enhance redwood stands, mountain scenery, various habitats and steelhead————————————————————————————————————————————————————————
Portfolio Allocation: $50,728,000————————————————————————————————————————————————————————
La Honda Creek Open Space Preserve by Frances Freyburg
14 Measure AA Bond Annual Accountability Report FY2018-19
Portfolio Expenditures
Numerically by Portfolio Number
Russian Ridge Open Space Preserve by Brian Washburn
15Measure AA Bond Annual Accountability Report FY2018-19
Preface
The Portfolio Expenditures section includes a description of each of the top 25 MAA portfolios and its allocation,
which was included in the MAA ballot language, under the expenditure plan. This bond funding allocation may
be shifted if needed following the board of director’s approval, however, for this reporting period, no deviation
from the original expenditure plan is proposed.
Portfolio expenditures listed in the description represent all project costs that have been deemed eligible for
MAA reimbursement from inception through June 30, 2019.
Portfolios that have no incurred expenditures are included in this report to keep continuity from year to year.
Additional contextual information is included in notable accomplishments, project challenges and potential next
steps, as well as the tables and charts associated with each portfolio. Although the Bond Oversight Committee
review is primarily focused on actual MAA expenditures, additional accomplishments not funded by MAA but
that support these projects have been included to help provide a sense of the work required to move them
forward, which sometimes involves partnership collaborations. The tables and charts restate information
gleaned from Midpen’s accounting system and provide another graphical way to view the expenditures. Finally,
where available, we have included photographs of the preserves in which the projects occur.
Portfolio Progress Indicators
The following indicators show the progress to date on each element of the portfolio description:————————————————————————————————————————————————————————
Not started, or little progress to report————————————————————————————————————————————————————————
Started and approximately 25% complete————————————————————————————————————————————————————————
Approximately 50% complete————————————————————————————————————————————————————————
Approximately 75% complete————————————————————————————————————————————————————————
Complete————————————————————————————————————————————————————————
Portfolio 1
Miramontes Ridge
Gateway to the Coast
Public Access, Stream
Restoration and
Agriculture Enhancement
DESCRIPTION————————————————————————————————————————————————————————
Preserve scenic open space land as available, and establish wildlife corridor ————————————————————————————————————————————————————————
Restore fish and red-legged frog habitats in Madonna Creek watershed ————————————————————————————————————————————————————————
Partner to enhance water availability for agriculture and fish ————————————————————————————————————————————————————————
Develop trail loop system, including Ridge Trail and neighborhood access points ————————————————————————————————————————————————————————
Develop staging area; repair bridges ————————————————————————————————————————————————————————
Portfolio Allocation: $27,774,000 Portfolio Expenditures Through 6/30/2019: $0 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
In Support of MAA01
Fiscal Year 2018-19————————————————————————————————————————————————————————
Completed botanical study and hydrological study of pond area.————————————————————————————————————————————————————————
Began hazardous materials testing of a former ranch dump/debris site.————————————————————————————————————————————————————————
Worked with the City of Half Moon Bay and the Peninsula Open Space Trust to develop a nonbinding letter
of intent to memorialize the agreement to collaborate and partner on future public trail access.————————————————————————————————————————————————————————
Continued to work with San Mateo County to resolve zoning and Coastal Plan inconsistencies to facilitate
land acquisition.————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Evaluated road/trail access and connections. ————————————————————————————————————————————————————————
Assessed regional trail link to Wavecrest and Coastal Trail with the Peninsula Open Space Trust.————————————————————————————————————————————————————————
Met with City of Half Moon Bay to discuss shared public parking, Highway 1 crossing at south end of
Main Street and trail/bike path along Higgins Road. ————————————————————————————————————————————————————————
Completed California red-legged frog surveys and habitat characterization at Madonna Creek Ranch. ————————————————————————————————————————————————————————
Pursued negotiations and due diligence investigation regarding proposed transfer of 650 acres of POST’s
Johnston Ranch Uplands to public ownership.————————————————————————————————————————————————————————
Participated in the development of a lot line adjustment application for seven parcels, and submitted
the application to the County of San Mateo in June 2018. ————————————————————————————————————————————————————————
16 Measure AA Bond Annual Accountability Report FY2018-19
Miramontes Ridge Open Space Preserve by Midpen Staff
17Measure AA Bond Annual Accountability Report FY2018-19
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Acquisitions on the Coast require a willing seller.————————————————————————————————————————————————————————
Easy access to Johnston Ranch Uplands south of Higgins Canyon Road will require acquisition of permissive
rights through City of Half Moon Bay property. ————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS————————————————————————————————————————————————————————
Continue pursuing a potential new property purchase.————————————————————————————————————————————————————————
Continue discussions with City of Half Moon Bay and POST.————————————————————————————————————————————————————————
Develop dump removal and site remediation plan.————————————————————————————————————————————————————————
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $27,774,000
01-003—Zions Property Purchase*$52,915 ($52,915)$0
Grand Total $27,774,000 $52,915 ($52,915)$0 $27,774,000 0.00%
* Project expenditures were transferred from MAA funding to the general fund since acquisition of this property is not expected to materialize in the near future.
Portfolio 1: Miramontes Ridge—Gateway to the Coast Public Access, Stream Restoration and
Agriculture Enhancement
0.00%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$0
Expenditure Plan Remaining
$27,774,000
Portfolio 2
Regional
Bayfront Habitat Protection
and Public Access Partnerships
DESCRIPTION————————————————————————————————————————————————————————
Partner to complete gaps in Bay Trail and develop city-to-bay trails ————————————————————————————————————————————————————————
Support wetland restoration and associated interpretive facilities ————————————————————————————————————————————————————————
Preserve additional bayfront open space ————————————————————————————————————————————————————————
Portfolio Allocation: $5,052,000 Portfolio Expenditures Through 6/30/2019: $1,386,063 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA02-001 Cooley Landing Interpretive Facilities Design and Implementation
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Funded the completion of design drawings, permitting, and construction of public access improvements
at Cooley Landing Park, consistent with the Cooley Landing Vision Plan.————————————————————————————————————————————————————————
Completed third and final year of plant restoration work in partnership with Grassroots Ecology.
————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Provided technical assistance to City of East Palo Alto staff in final design and bidding for public access site
improvements at Cooley Landing Park. ————————————————————————————————————————————————————————
Obtained board approval for $1.25M in MAA funding for remaining project elements at Cooley Landing Park.
Amended partnership agreement to include MAA funding and coordinated reimbursement of eligible city expenses. ————————————————————————————————————————————————————————
MAA02-002 Ravenswood Bay Trail Design and Implementation
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed construction documents. ————————————————————————————————————————————————————————
Recorded trail easement from Caltrans.————————————————————————————————————————————————————————
Received approval of a memorandum of understanding with City of East Palo Alto from the city council
addressing a) patrol and emergency response, b) site security and c) future community trail access. ————————————————————————————————————————————————————————
Received two grants: $300,000 from Facebook and $1,055,328 from the California Natural Resources Agency-
Urban Greening Program.
————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Negotiated proposed exchange agreement and public trail easement with the City and County of San
Francisco and City of East Palo Alto. ————————————————————————————————————————————————————————
Concluded negotiations with the City and County of San Francisco, which resulted in the city’s board
of supervisors approving a 0.6-mile Ravenswood Bay Trail easement over San Francisco Public Utilities
Commission lands. This agreement will close a gap within a segment of the SF Bay Trail that connects
80 miles of continuous trail within the 500-mile route along the shoreline of the nine Bay Area counties. ————————————————————————————————————————————————————————
18 Measure AA Bond Annual Accountability Report FY2018-19
Cooley Landing by Midpen Staff
19Measure AA Bond Annual Accountability Report FY2018-19
————————————————————————————————————————————————————————
Completed geotechnical investigations and developed 65% plan set for construction of the 0.6-mile
Ravenswood Bay Trail connection. Submitted a joint aquatic resource permit application. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
MAA02-001 Cooley Landing Interpretive Facilities Design and Implementation
————————————————————————————————————————————————————————
Interagency coordination between Midpen and City of East Palo Alto.
————————————————————————————————————————————————————————
Current city project team lacks familiarity with project history; more Midpen involvement is necessary.————————————————————————————————————————————————————————
MAA02-002 Ravenswood Bay Trail Design and Implementation
————————————————————————————————————————————————————————
Requires extensive, multiple agency coordination and permits, including coordination between cities,
Association of Bay Area Governments, SFPUC and other governmental and regulatory entities.
————————————————————————————————————————————————————————
Limited construction season due to sensitive species (Sept. through Jan.) may extend or delay construction. ————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
MAA02-001 Cooley Landing Interpretive Facilities Design and Implementation
————————————————————————————————————————————————————————
Comply with land use covenant for operations and maintenance of soil cap related to 2014 site remediation work.
————————————————————————————————————————————————————————
Formalize separate agreements/easements (Midpen, City of East Palo Alto, Regional Water Quality Control
Board, Menlo Fire) to meet operations and maintenance requirements.————————————————————————————————————————————————————————
MAA02-002 Ravenswood Bay Trail Design and Implementation
————————————————————————————————————————————————————————
Secure final licenses and permits to implement project.
————————————————————————————————————————————————————————
Complete construction of new trail. ————————————————————————————————————————————————————————
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $5,052,000
02-001—Cooley Landing
Interpretive Facilities Design
and Implementation
$200,686 $973,076 $1,173,762
02-002—Ravenswood Bay Trail
Design and Implementation
$518,977 $353,932 $872,909
Subtotal $5,052,000 $719,663 $1,327,008 $2,046,671 $3,005,329 40.51%
02-002—Ravenswood Bay Trail
Design and Implementation
Grant Income
($229,621)($430,987)($660,608)
Grand Total $5,052,000 $490,042 $896,021 $1,386,063 $3,665,937 27.44%
Portfolio 2: Regional—Bayfront Habitat Protection and Public Access Partnerships
27.44%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$1,386,063
Expenditure Plan Remaining
$3,665,937
Portfolio 3
Purisima Creek Redwoods
Purisima-to-the-Sea Trail,
Watershed Protection and
Conservation Grazing
DESCRIPTION————————————————————————————————————————————————————————
Complete and open multiuse Purisima-to-the-Sea Trail connection between Ridge Trail and Coastal Trail,
and new parking areas ————————————————————————————————————————————————————————
Preserve additional open space as available ————————————————————————————————————————————————————————
Remove fish barriers and restore Lobitos Creek ————————————————————————————————————————————————————————
Restore ponds for endangered species ————————————————————————————————————————————————————————
Portfolio Allocation: $7,608,000 Portfolio Expenditures Through 6/30/2019: $1,270,676 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA03-001 Purisima Uplands Lot Line Adjustment and Property Transfer
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Received board approval to finalize lot line adjustment documents with the County of San Mateo and
transfer of the 240-acre Purisima Uplands property to Midpen, which completes the assemblage of public
lands for the future Purisima-to-the-Sea Trail. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Purchased the 40.2-acre Riggs property, helping to protect the Lobitos Creek watershed and spawning
habitat for coho salmon and steelhead.————————————————————————————————————————————————————————
Received two redwood parcel gifts totaling 0.5 acres as additions to Purisima Creek Redwoods Preserve. ————————————————————————————————————————————————————————
Received a gift of two separate parcels totaling 0.34 acres within the Redwood Estates paper subdivision as
an addition to Purisima Creek Redwoods Preserve for the purposes of watershed, open space and redwood
forest preservation. ————————————————————————————————————————————————————————
MAA03-002 Purisima Uplands Site Cleanup and Soil Remediation Assessment
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed phase I environmental site assessment for a remnant structure on the property (hunting cabin).————————————————————————————————————————————————————————
Prepared right of entry for Midpen use of farm roads for site cleanup and restoration of oil facilities, and
hunting cabin assessment.————————————————————————————————————————————————————————
20 Measure AA Bond Annual Accountability Report FY2018-19
Purisima Creek Redwoods Open Space Preserve by Vivian Lou
Prior Years————————————————————————————————————————————————————————
Completed Purisima Uplands lead and asbestos abatement for the cabin to inform future demolition work.————————————————————————————————————————————————————————
Completed corral demolition, water system installation and fence installation for Bluebrush Ranch at
Purisima Creek Redwoods Preserve. ————————————————————————————————————————————————————————
Completed phase II oil tank and facilities assessment, including site cleanup and restoration cost estimates
to address site safety issues as part of the property land transfer.————————————————————————————————————————————————————————
Completed road erosion assessment for farm roads on Purisima Uplands property and private farm roads
providing access to the property to inform condition of property assets (roads) and need for future repairs.————————————————————————————————————————————————————————
MAA03-003 Purisima Creek Fence Construction
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed installation of fencing along riparian areas to keep cattle out of Purisima Creek. ————————————————————————————————————————————————————————
MAA03-004 Harkins Bridge Replacement
Prior Years————————————————————————————————————————————————————————
Completed the Harkins Bridge installation project. Project secures long-term vehicle and pedestrian access. ————————————————————————————————————————————————————————
MAA03-005 Purisima Uplands Parking Area and Trail Connections
Prior Years————————————————————————————————————————————————————————
Purchased a 45-acre riparian conservation and public access easement over private property along Lobitos
Creek for protection of significant scenic, open space, riparian and natural wildlife habitat values. The
easement also contains provisions for a possible future public trail through the area. ————————————————————————————————————————————————————————
In Support of MAA03
Fiscal Year 2018-19
————————————————————————————————————————————————————————
Completed design and construction of double vault restroom to replace existing single vault. Obtained County
of San Mateo building permit. Project improves public facilities at Purisima Creek Redwoods Preserve. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Collaborated with the United States Geological Survey to install fog collection experimental stations at
Purisima Creek Redwoods Preserve to conduct research on the viability of fog water harvesting to support
agricultural uses and/or improve water availability for wildlife.————————————————————————————————————————————————————————
Completed mowing projects at October Farm to control brush encroachment and at Bluebrush Canyon to
control invasive species and reduce wildfire fuels. ————————————————————————————————————————————————————————
Attended real property department site tour with POST and property owner to discuss parking and access
opportunities related to the Purisima-to-the-Sea Trail.————————————————————————————————————————————————————————
21Measure AA Bond Annual Accountability Report FY2018-19
PROJECT CHALLENGES
Purisima-to-the-Sea
————————————————————————————————————————————————————————
Completing transfer agreement with owner, resolving conservation easement inconsistencies with POST,
and County of San Mateo process for completing a lot line adjustment. ————————————————————————————————————————————————————————
Parking Area and Trail Connection
————————————————————————————————————————————————————————
Ongoing discussions and negotiations with property owners.
————————————————————————————————————————————————————————
Uncertainty as to where to locate a parking area for Purisima-to-the-Sea Trail. ————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS————————————————————————————————————————————————————————
Record conservation easement amendment with POST over the Purisima Uplands property. ————————————————————————————————————————————————————————
22 Measure AA Bond Annual Accountability Report FY2018-19
Purisima Creek Redwoods Open Space Preserve by Stephen McNally
23Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $7,608,000
03-001—Purisima Uplands Lot
Line Adjustment and Property
Transfer
$409,711 $11,558 $421,269
03-002—Purisima Uplands Site
Cleanup and Soil Remediation
Assessment
$69,155 $21,704 $90,859
03-003—Purisima Creek Fence
Construction
$85,501 $85,501
03-004—Harkins Bridge
Replacement
$475,374 $41,543 $516,917
03-005—Purisima Uplands
Parking Area and Trail
Connections
$156,130 $156,130
Grand Total $7,608,000 $1,110,370 $160,306 $1,270,676 $6,337,324 16.70%
Portfolio 3: Purisima Creek Redwoods—Purisima-to-the-Sea Trail, Watershed Protection and
Conservation Grazing
16.70%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$1,270,676
Expenditure Plan Remaining
$6,337,324
Portfolio 4
El Corte de Madera Creek
Bike Trail and Water
Quality Projects
DESCRIPTION————————————————————————————————————————————————————————
Develop single-use biking/hiking trails, complete Ridge Trail gaps and develop trail system leading to
parking area ————————————————————————————————————————————————————————
Restore damaged trails to improve water quality ————————————————————————————————————————————————————————
Preserve additional open space as available ————————————————————————————————————————————————————————
Portfolio Allocation: $8,376,000 Portfolio Expenditures Through 6/30/2019: $886,868 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA04-002 El Corte de Madera Creek Watershed Protection Final Phase
Prior Years————————————————————————————————————————————————————————
Completed watershed protection program. ————————————————————————————————————————————————————————
MAA04-003 El Corte de Madera Creek Watershed Protection Reassessment
Prior Years————————————————————————————————————————————————————————
Trails reassessment and reprioritization of erosional sites. ————————————————————————————————————————————————————————
MAA04-004 El Corte de Madera Oljon Trail Implementation
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed Oljon Trail construction, which included bridge construction, puncheon installation, road-to-trail
conversion and trail construction to open additional public recreational opportunities within El Corte de
Madera Creek Preserve.————————————————————————————————————————————————————————
Completed majority of closure and restoration of upper segment of the Steam Donkey Trail.————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Removed and restored existing deteriorating roads and trails to eliminate potential sources of sedimentation
within the watershed. ————————————————————————————————————————————————————————
24 Measure AA Bond Annual Accountability Report FY2018-19
El Corte de Madera Creek Open Space Preserve by David Medeiros
In Support of MAA04
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed first year of sediment and stream monitoring and data collection. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Pursued completion of Ridge Trail gaps between El Corte de Madera Creek and La Honda Creek preserves by
working with partners and meeting with land owners to convey interest in possible land or trail easement
purchases. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Land acquisition to complete gaps in the Bay Area Ridge Trail requires willing seller.————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Complete second year of sediment and stream monitoring and data collection. Analyze data and publish
results and/or present at professional conference.————————————————————————————————————————————————————————
25Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $8,376,000
04-002—El Corte de Madera
Creek Watershed Protection
Final Phase
$235,934 $235,934
04-003—El Corte de Madera
Creek Watershed Protection
Reassessment
$83,956 $83,956
04-004—El Corte de Madera
Creek Oljon Trail Implementation
$260,068 $306,910 $566,978
Grand Total $8,376,000 $579,958 $306,910 $886,868 $7,489,132 10.59%
Portfolio 4: El Corte de Madera Creek—Bike Trail and Water Quality Projects
10.59%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$886,868
Expenditure Plan Remaining
$7,489,132
Portfolio 5
La Honda Creek
Upper Area Recreation, Habitat
Restoration and Conservation
Grazing Projects
DESCRIPTION————————————————————————————————————————————————————————
Open upper half of the preserve to public; provide biking/hiking/equestrian trails, dog access and
staging areas ————————————————————————————————————————————————————————
Provide loop and connector trails ————————————————————————————————————————————————————————
Restore habitat for rare species ————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to reintroduce conservation grazing ————————————————————————————————————————————————————————
Portfolio Allocation: $11,733,000 Portfolio Expenditures Through 6/30/2019: $2,428,759 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA05-001 La Honda Creek Land Conservation Opportunities
Prior Years————————————————————————————————————————————————————————
Purchased the 38.14-acre Toepfer property to facilitate a future Ridge Trail opportunity between
La Honda Creek Preserve (LHC) and El Corte de Madera Creek Preserve (ECDM). ————————————————————————————————————————————————————————
Purchased the 5-acre Ashworth property to facilitate a future Ridge Trail extension opportunity between
LHC and ECDM. ————————————————————————————————————————————————————————
MAA05-002 Upper La Honda Creek Grazing Infrastructure
Prior Years————————————————————————————————————————————————————————
Installed riparian protection fencing to resume conservation grazing, as well as water pipe and new water
troughs at Lone Madrone (formerly McDonald) Ranch. ————————————————————————————————————————————————————————
26 Measure AA Bond Annual Accountability Report FY2018-19
La Honda Creek Open Space Preserve by Frances Freyburg
MAA05-005 La Honda Creek Red Barn Parking Area and Easy-Access Trail
Prior Years————————————————————————————————————————————————————————
Began feasibility studies for the Red Barn site plan, including conducting traffic counts, site evaluations of a
new driveway for a new parking lot and the evaluation of historic features to ensure new improvements do
not impact the historic landscape of the site.————————————————————————————————————————————————————————
Completed nine preliminary technical site investigation studies and conducted an iterative design
development process resulting in two conceptual parking and staging area design alternatives. ————————————————————————————————————————————————————————
Conducted focused stakeholder outreach to support concept design development. Held Planning and
Natural Resources Committee meeting and community open house to solicit public input on the Red Barn
public access area concept design alternatives. ————————————————————————————————————————————————————————
Conducted preliminary trail scouting from the proposed new parking location.————————————————————————————————————————————————————————
Completed a third design alternative based on public input received in May 2017. Presented design alternative
and additional technical information at three public meetings. On June 12, 2018, the board of directors directed
staff to propose a process to form an advisory committee and assess alternative locations for a new parking
area that meets project goals and objectives. ————————————————————————————————————————————————————————
27Measure AA Bond Annual Accountability Report FY2018-19
La Honda Creek Open Space Preserve by Emily Tucker
MAA05-008 La Honda Creek White Barn Structural Rehabilitation
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Started the design and additional assessment for the La Honda Creek White Barn project.————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Completed historic and structural assessments for the La Honda Creek White Barn. ————————————————————————————————————————————————————————
MAA05-009 La Honda Creek Redwood Cabin Stabilization and Assessment
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Started the design and assessment for the La Honda Creek Redwood Cabin project.————————————————————————————————————————————————————————
In Support of MAA05
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed preliminary site investigations of Sears Ranch Road parking lot and Driscoll Ranch parking area. ————————————————————————————————————————————————————————
Developed process for and formation of a new Public Access Working Group for the La Honda Creek Parking
and Trailhead Access Feasibility Study. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Pursued trail connections to La Honda Creek Preserve’s McDonald/Dyer Ranch area by meeting several times
with landowner to convey interest in possible land or trail easement purchases as part of efforts to design
and implement phase II trails of the La Honda Creek Preserve Master Plan. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Acquisition of trail easement requires willing sellers to complete connections. ————————————————————————————————————————————————————————
MAA05-005 La Honda Creek Red Barn Parking Area and Easy-Access Trail
————————————————————————————————————————————————————————
Reevaluation of alternative parking sites to address community concerns regarding traffic safety and
potential visual/historic impacts. ————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Work with the Public Access Working Group to evaluate parking location alternatives and recommend
a preferred parking and trailhead location(s) for Board Committee review and full Board consideration
to incorporate as part of the project description to inform the preparation of schematic designs and
completion of the CEQA review.
————————————————————————————————————————————————————————
Develop phase II trail designs for planned trail connection between central La Honda Creek Preserve and
existing Sears Ranch Road parking lot (lower La Honda).————————————————————————————————————————————————————————
28 Measure AA Bond Annual Accountability Report FY2018-19
29Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $11,733,000
05-001—La Honda Creek Land
Conservation Opportunities
$1,756,093 $1,756,093
05-002—Upper La Honda Creek
Grazing Infrastructure
$209,765 $209,765
05-004—La Honda Creek Sears
Ranch Interim Parking
$5,074 $5,074
05-005—La Honda Creek Red
Barn Parking Area and Easy-
Access Trail
$327,514 $327,514
05-006—La Honda Creek Sears
Ranch Road Repair
$98,559 $98,559
05-008—La Honda Creek White
Barn Structural Rehabilitation
$14,699 $13,834 $28,533
05-009—La Honda Creek
Redwood Cabin Stabilization
and Assessment
$3,221 $3,221
Grand Total $11,733,000 $2,411,704 $17,055 $2,428,759 $9,304,242 20.70%
Portfolio 5: La Honda Creek—Upper Area Recreation, Habitat Restoration and Conservation Grazing
Projects
20.70%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$2,428,759
Expenditure Plan Remaining
$9,304,242
La Honda Creek Open Space Preserve by Frances Freyburg
Portfolio 6
Windy Hill
Trail Improvements,
Preservation and
Hawthorns Area Historic
Partnership
DESCRIPTION————————————————————————————————————————————————————————
Improve trails; complete pond facilities ————————————————————————————————————————————————————————
Increase multiuse trails; study possible improvements to increase dog use ————————————————————————————————————————————————————————
Open Hawthorns Area; develop trails connecting to Portola Valley and Palo Alto trails ————————————————————————————————————————————————————————
Partner to protect, restore and interpret historic buildings ————————————————————————————————————————————————————————
Improve habitat conditions in Los Trancos Creek ————————————————————————————————————————————————————————
Preserve additional scenic open space as available ————————————————————————————————————————————————————————
Portfolio Allocation: $12,740,000 Portfolio Expenditures Through 6/30/2019: $26,602 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA06-001 Hawthorns Parking Lot Concept Design
Prior Years ————————————————————————————————————————————————————————
Conducted initial evaluation of potential public access programming and feasibility for new parking area
and trail. ————————————————————————————————————————————————————————
MAA06-002 Hawthorns Public Access Site Plan and CEQA
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Conducted a parking study to assess site feasibility for a proposed parking area and driveway location. ————————————————————————————————————————————————————————
Completed a cultural resources field survey and assessment report. ————————————————————————————————————————————————————————
Initiated development of public outreach and stakeholder engagement process for site plan project to
review with board committee and Town of Portola Valley.————————————————————————————————————————————————————————
PROJECT CHALLENGES————————————————————————————————————————————————————————
Historic complex of structures, including the main residence and garage, are in significant disrepair. ————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS————————————————————————————————————————————————————————
To facilitate future public access improvements in support of MAA, develop a site-specific plan for new public
access trails and parking area including the town’s request for a realignment of the Alpine Road Trail at the
Hawthorns property, in coordination with the town and stakeholders.————————————————————————————————————————————————————————
30 Measure AA Bond Annual Accountability Report FY2018-19
Windy Hill Open Space Preserve by R. Goldthwaite
31Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $12,740,000
06-001—Hawthorns Parking Lot
Concept Design
$8,490 $8,490
06-002—Hawthorns Public
Access Site Plan and CEQA
$18,112 $18,112
Grand Total $12,740,000 $8,490 $18,112 $26,602 $12,713,398 0.21%
Portfolio 6: Windy Hill—Trail Improvements, Preservation and Hawthorns Area Historic Partnership
0.21%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$26,602
Expenditure Plan Remaining
$12,713,398
Windy Hill Open Space Preserve by Jeffrey Schwegman
Portfolio 7
La Honda Creek
Driscoll Ranch Public
Access, Endangered
Wildlife Protection and
Conservation Grazing
DESCRIPTION————————————————————————————————————————————————————————
Open Driscoll Ranch Area; provide biking/hiking/equestrian trails, limited dog access, parking areas and
interpretive displays ————————————————————————————————————————————————————————
Develop loop and connector trails————————————————————————————————————————————————————————
Restore habitat for endangered species ————————————————————————————————————————————————————————
Restore La Honda Creek; remove fish migration barriers ————————————————————————————————————————————————————————
Portfolio Allocation: $14,825,000 Portfolio Expenditures Through 6/30/2019: $11,930,464 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA07-001 Event Center and Apple Orchard Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 307.64-acre Apple Orchard and Event Center property, as well as a 3-acre conservation
easement from POST to protect and further restore redwood, coho salmon and steelhead habitat along
San Gregorio Creek. ————————————————————————————————————————————————————————
Completed invasive weed control work at the Apple Orchard and Driscoll Ranch properties of La Honda
Creek Preserve. ————————————————————————————————————————————————————————
MAA07-002 Fisheries Restoration, Design and Permitting
Prior Years————————————————————————————————————————————————————————
Project was partially funded by CDFW Fisheries Restoration Grant Program. Completed road and trail upgrades
and drainage improvements along nearly 5 miles of road to address priority erosion control sites to reduce
sediment delivery to San Gregorio Creek and tributaries.————————————————————————————————————————————————————————
MAA07-003 Fisheries Enhancement, Apple Orchard
Prior Years————————————————————————————————————————————————————————
Completed fisheries habitat enhancement project at the Apple Orchard parcel of lower La Honda Creek,
installing 13 in-stream, large woody debris structures, in partnership with the San Mateo Resource
Conservation District and CDFW Fisheries Restoration Grant Program. ————————————————————————————————————————————————————————
32 Measure AA Bond Annual Accountability Report FY2018-19
La Honda Creek Open Space Preserve by Cindy Roessler
MAA07-004 Fisheries Enhancement, Event Center
Prior Years————————————————————————————————————————————————————————
Completed fisheries restoration project at the Event Center, installing large woody debris habitat within
San Gregorio Creek to improve salmonid habitat. ————————————————————————————————————————————————————————
MAA07-005 Grazing and Water Systems Infrastructure
Prior Years————————————————————————————————————————————————————————
Completed pond reconstruction to enhance breeding habitat for California red-legged frog and to improve
the water source as a cattle stock pond. ————————————————————————————————————————————————————————
Constructed a new corral system at the previous site of the Wool Ranch house to support the conservation
grazing program. ————————————————————————————————————————————————————————
Installed riparian protection fencing, water pipe and new water troughs at Driscoll Ranch to support
conservation grazing.————————————————————————————————————————————————————————
MAA07-006 Cunha Land Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 30-acre Cunha Trust property at the end of Sears Ranch Road to secure ownership of the
private road that now serves as the driveway entrance into the Sears Ranch parking lot. ————————————————————————————————————————————————————————
MAA07-007 Demolitions, Wool Ranch House/Sears Ranch Rd
Prior Years————————————————————————————————————————————————————————
Completed site clean-up and demolition of numerous dilapidated structures, including photography
documentation of the structures prior to demolition, to prepare the preserve for public access. ————————————————————————————————————————————————————————
MAA07-009 Sears Ranch Parking Area
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Finalized deck replacement and installed new rails on the Harrington Creek Bridge, allowing trail users to
safely cross a major creek. ————————————————————————————————————————————————————————
Prior Years ————————————————————————————————————————————————————————
Constructed the new Sears Ranch parking area, providing 22 vehicle spaces, a restroom, signage and the
main trailhead to access the trails in the southern area of the preserve. ————————————————————————————————————————————————————————
Completed phase I trail and road repairs in preparation for the opening of La Honda Creek Preserve,
including installation of signage and self-closing gates.————————————————————————————————————————————————————————
Completed permit-only equestrian parking area and equestrian-only trail segment connecting to the new
Folger Ranch Loop Trail. ————————————————————————————————————————————————————————
MAA07-010 Sears Ranch Road Repair
Prior Years————————————————————————————————————————————————————————
Completed over three miles of ranch road repairs, including culvert replacements, to the main ranch road in
the lower La Honda Creek Preserve. These were critical for opening the roads to public access; maintaining
safe passage for patrol, maintenance and emergency vehicle use; and providing ranch access to support the
ongoing conservation grazing program.————————————————————————————————————————————————————————
33Measure AA Bond Annual Accountability Report FY2018-19
MAA07-011 La Honda Creek Loop Trails
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Submitted County of San Mateo permits.————————————————————————————————————————————————————————
Completed trail design at 90% (contracted with Fall Creek Engineering to design and engineer the LHC Loop Trail).————————————————————————————————————————————————————————
Completed rare plant survey and wetland delineations.————————————————————————————————————————————————————————
In Support of MAA07
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed installation of new water line, storage tank and water trough.————————————————————————————————————————————————————————
Received Board direction to repair an existing housing facility and to designate the residence as Agricultural
Workforce Housing.————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Completed a housing structures assessment for the Driscoll Ranch area of La Honda Creek Preserve and secured
board approval to build/repair agricultural workforce housing in partnership with the County of San Mateo. ————————————————————————————————————————————————————————
Hosted groundbreaking ceremony and grand opening celebration at La Honda Creek Preserve. ————————————————————————————————————————————————————————
PROJECT CHALLENGES————————————————————————————————————————————————————————
No project challenges identified at this time. ————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS————————————————————————————————————————————————————————
Develop plans for and construct phase II roads and trails that will connect the new Sears Ranch Road
parking area (lower La Honda) with the central La Honda area (upper La Honda). ————————————————————————————————————————————————————————
34 Measure AA Bond Annual Accountability Report FY2018-19
La Honda Creek Open Space Preserve by Kimberly Wong
35Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $14,825,000
07-001—Event Center and Apple
Orchard Purchase
$6,007,601 $6,007,601
07-002—Fisheries Restoration,
Design and Permitting
$727,716 $727,716
07-003—Fisheries Enhancement,
Apple Orchard
$16,152 $16,152
07-004—Fisheries Enhancement,
Event Center
$50,000 $50,000
07-005—Grazing and Water
Systems Infrastructure
$189,422 $189,422
07-006—Cunha Land Purchase $3,080,705 $3,080,705
07-007—Demolitions, Wool
Ranch House/Sears Ranch Road
$357,803 $357,803
07-009—Sears Ranch Parking
Areas
$1,124,545 $17,937 $1,142,482
07-010—Sears Ranch Road Repair $458,484 $458,484
07-011—La Honda Creek Loop
Trails
$27,058 $104,012 $131,070
Subtotal $14,825,000 $12,039,486 $121,948 $12,161,434 $2,663,566 82.03%
07-002—Fisheries Restoration,
Design and Permitting Grant
Income
($230,970)($230,970)
Grand Total $14,825,000 $11,808,516 $121,948 $11,930,464 $2,894,536 80.48%
Portfolio 7: La Honda Creek—Driscoll Ranch Public Access, Endangered Wildlife Protection and
Conservation Grazing
80.48%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$11,930,464
Expenditure Plan Remaining
$2,894,536
Portfolio 8
La Honda Creek/
Russian Ridge
Preservation of Upper San
Gregorio Watershed and
Ridge Trail Completion
DESCRIPTION————————————————————————————————————————————————————————
Preserve Upper San Gregorio watershed; restore endangered species habitats ————————————————————————————————————————————————————————
Support opportunities to provide additional water for fisheries————————————————————————————————————————————————————————
Complete Bay Area Ridge Trail multiuse connections and gaps————————————————————————————————————————————————————————
Provide additional public use facilities ————————————————————————————————————————————————————————
Portfolio Allocation: $15,347,000 Portfolio Expenditures Through 6/30/2019: $2,153,910 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA08-001 Folger Property Purchase
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Purchased the 190-acre Woodruff Redwoods property as an addition to La Honda Creek Preserve.————————————————————————————————————————————————————————
PROJECT CHALLENGES————————————————————————————————————————————————————————
No project challenges identified at this time.————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS————————————————————————————————————————————————————————
Continue to pursue opportunities for Bay Area Ridge Trail connection.————————————————————————————————————————————————————————
36 Measure AA Bond Annual Accountability Report FY2018-19
La Honda Creek Open Space Preserve by Karl Gohl
37Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $15,347,000
08-001—Folger Property
Purchase
$2,153,910 $2,153,910
Grand Total $15,347,000 $0 $2,153,910 $2,153,910 $13,193,090 14.03%
Portfolio 8: La Honda Creek/Russian Ridge—Preservation of Upper San Gregorio Watershed and
Ridge Trail Completion
Russian Ridge Open Space Preserve by Matt McLean
14.03%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$2,153,910
Expenditure Plan Remaining
$13,193,090
Portfolio 9
Russian Ridge
Public Recreation, Grazing
and Wildlife Protection
Projects
DESCRIPTION————————————————————————————————————————————————————————
Open currently closed areas of preserve————————————————————————————————————————————————————————
Construct and extend trails ————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to reintroduce conservation grazing————————————————————————————————————————————————————————
Improve habitat for sensitive species; implement pond enhancement projects for garter snakes and
red-legged frogs————————————————————————————————————————————————————————
Portfolio Allocation: $5,560,000 Portfolio Expenditures Through 6/30/2019: $319,467 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA09-001 Russian Ridge Grazing Infrastructure
Prior Years————————————————————————————————————————————————————————
Upgraded corral and water system at Mindego Ranch, installing two 5,000-gallon water storage tanks, 11,000
feet of buried pipe, six water troughs, and solar-powered water pump for storage tanks. Selected grazing
tenant to manage grazing operation.————————————————————————————————————————————————————————
Completed brush management of south pasture at Mindego Ranch. ————————————————————————————————————————————————————————
MAA09-003 Russian Ridge Mindego Pond Improvement
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Selected a design-build firm to improve the ponds to support endangered species’ habitat. Began project
survey, assessment, design and permitting. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Began pre-bid work on the first design-build project to be implemented by Midpen. The project will enhance
and restore habitat for the California red-legged frog and San Francisco garter snake at two ponds at
Mindego Ranch. ————————————————————————————————————————————————————————
MAA09-004 Mindego Hill Trail Construction
Prior Years————————————————————————————————————————————————————————
Constructed and opened an extension of Mindego Hill Trail to the top of the prominent Mindego Hill with
360-degree panoramic views. ————————————————————————————————————————————————————————
Completed remediation of the Mindego Ranch area. ————————————————————————————————————————————————————————
38 Measure AA Bond Annual Accountability Report FY2018-19
Russian Ridge Open Space Preserve by David Henry
In Support of MAA09
Prior Years————————————————————————————————————————————————————————
Completed year four of the San Francisco garter snake field study and ongoing bullfrog eradication work at
Mindego Ranch in Russian Ridge Preserve. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
No project challenges identified at this time.————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Complete Mindego pond improvement projects for California red-legged frog and San Francisco garter snake.————————————————————————————————————————————————————————
39Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $5,560,000
09-001—Russian Ridge Mindego
Grazing Infrastructure
$174,416 $174,416
09-003—Russian Ridge Mindego
Pond Improvement
$136 $77,512 $77,648
09-004—Mindego Hill Trail
Construction
$67,403 $67,403
Grand Total $5,560,000 $241,955 $77,512 $319,467 $5,240,533 5.75%
Portfolio 9: Russian Ridge—Public Recreation, Grazing and Wildlife Protection Projects
5.75%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$319,467
Expenditure Plan Remaining
$5,240,533
Portfolio 10
Coal Creek
Reopen Alpine Road
for Trail Use
DESCRIPTION————————————————————————————————————————————————————————
Reopen Alpine Road as trail connection between Portola Valley and Skyline Boulevard ————————————————————————————————————————————————————————
Reroute trails to reduce erosion and improve visitor experience ————————————————————————————————————————————————————————
Portfolio Allocation: $8,017,000 Portfolio Expenditures Through 6/30/2019: $166,122 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA10-001 Alpine Road Regional Trail, Coal Creek
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Began assessment of trail conditions and developed recommendations/alternatives and cost analysis for
repairs. Developed agreement with the County of San Mateo for long-term repairs. ————————————————————————————————————————————————————————
Prior Years ————————————————————————————————————————————————————————
Updated the road and trail inventory and completed preliminary conceptual design alternatives for two
large failures on Alpine Road. Presented options for repairs and improvements to the board, which selected
the approach of repairing failures to trail width (6-foot-wide standard). Coordinated the project with County
of San Mateo Public Works. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
The County of San Mateo has determined that they are unable to lead the repair due to other higher priority
repair issues stemming from the 2016-17 winter storms; Midpen is now the lead.
————————————————————————————————————————————————————————
Alpine Road Trail is owned in fee and easement by the County of San Mateo; repairs will require careful
coordination and approval from the county.————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Receive and review the road design and third-party cost estimations with the County of San Mateo for
concurrence.
————————————————————————————————————————————————————————
Finalize construction plans.
————————————————————————————————————————————————————————
Secure permits and complete CEQA review.
————————————————————————————————————————————————————————
Enter into negotiations with the County of San Mateo regarding funding contribution and long-term
maintenance. ————————————————————————————————————————————————————————
40 Measure AA Bond Annual Accountability Report FY2018-19
Coal Creek Open Space Preserve by David Smernoff
41Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $8,017,000
10-001—Alpine Road Regional
Trail, Coal Creek
$21,949 $144,173 $166,122
Grand Total $8,017,000 $21,949 $144,173 $166,122 $7,850,878 2.07%
Portfolio 10: Coal Creek—Reopen Alpine Road for Trail Use
2.07%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$166,122
Expenditure Plan Remaining
$7,850,878
Coal Creek Open Space Preserve by Asha Kulkarni
Portfolio 11
Rancho San Antonio
Interpretive Improvements,
Refurbishing and Transit
Solutions
DESCRIPTION————————————————————————————————————————————————————————
Add welcome center————————————————————————————————————————————————————————
Refurbish and add interpretive exhibits to Deer Hollow Farm ————————————————————————————————————————————————————————
Support of transit improvement options such as bike trails, bike share station, bus service or additional
parking————————————————————————————————————————————————————————
Portfolio Allocation: $10,811,000 Portfolio Expenditures Through 6/30/2019: $33,264 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA11-001 New Trails to Connect Quarry Trail to Black Mountain Trail
Prior Years————————————————————————————————————————————————————————
Accepted two trail easements, two rights of first offer and rights of first refusal, and a conditional grant deed
conveyance, to properties adjacent to Monte Bello and Rancho San Antonio preserves. ————————————————————————————————————————————————————————
MAA11-002 Rancho San Antonio, Deer Hollow Farm: White Barn Rehabilitation
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Selected consultant for the design and assessment of the Rancho San Antonio White Barn to improve
building access, structural stability and public safety. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
With MAA and other funding, completed historic and structural assessments for the Deer Hollow Farm White
Barn; obtained Legislative, Funding, And Public Affairs Committee confirmation of partnership agreements
to fund project. ————————————————————————————————————————————————————————
In Support of MAA11
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed draft scope for parking and transportation demand analysis (Multimodal Access Study), and met
with Santa Clara County Parks on project scope review and coordination. ————————————————————————————————————————————————————————
Presented the draft Multimodal Access Study scope and potential short-, medium- and long-term measures
to address parking challenges at Rancho San Antonio Preserve to board committee. Received Board approval
of the Multimodal Access Study scope to proceed with a Request of Proposals, and Board approval to
implement the short-term measures.————————————————————————————————————————————————————————
42 Measure AA Bond Annual Accountability Report FY2018-19
Rancho San Antonio Open Space Preserve by Joseph Ventimiglia
Prior Years————————————————————————————————————————————————————————
Restored the Deer Hollow Farm White Barn milk room at Rancho San Antonio Preserve, facilitating ongoing
environmental interpretation and animal husbandry at the popular farm site. ————————————————————————————————————————————————————————
Completed 69 days of vehicle occupancy counts to understand the parking use patterns at Rancho San
Antonio Preserve. ————————————————————————————————————————————————————————
Initiated stakeholder agency engagement in identifying opportunities for parking and transit improvement
options. ————————————————————————————————————————————————————————
Conducted a one week tabling campaign for mountain lion awareness at Rancho San Antonio Preserve.————————————————————————————————————————————————————————
Coordinated with the City of Mountain View and Friends of Deer Hollow Farm to prepare for a historic and
structural assessment of the White Barn at Rancho San Antonio Preserve that was conducted during fiscal
year 2017-18. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Depending on potential parking solutions, coordination, agreement and co-implementation with other
agencies may be required.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
To facilitate future MAA-eligible improvements, continue to engage stakeholder agencies and community in
evaluating parking and transit improvement options.
————————————————————————————————————————————————————————
Complete Rancho San Antonio Multimodal Access Study, which includes parking and transportation demand
analyses and recommendations to address traffic congestion.
————————————————————————————————————————————————————————
To facilitate future MAA-eligible improvements, continue to collaborate with City of Mountain View and
stakeholders on the rehabilitation of the Deer Hollow Farm White Barn. ————————————————————————————————————————————————————————
43Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $10,811,000
11-001—New Trails to Connect
Quarry Trail to Black Mountain
Trail
$728 $728
11-002—Rancho San Antonio,
Deer Hollow Farm: White Barn
Rehabilitation
$29,511 $3,025 $32,536
Grand Total $10,811,000 $30,239 $3,025 $33,264 $10,777,736 0.31%
Portfolio 11: Rancho San Antonio—Interpretive Improvements, Refurbishing and Transit Solutions
0.31%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$33,264
Expenditure Plan Remaining
$10,777,736
Portfolio 12
Peninsula/South Bay Cities
Partner to Complete
Middle Stevens Creek Trail
DESCRIPTION————————————————————————————————————————————————————————
Support work by cities to develop the middle section of the Stevens Creek Trail and enhance
neighborhood connections ————————————————————————————————————————————————————————
Support work by partners to complete stream corridor restoration and Steelhead habitat enhancement
below dam ————————————————————————————————————————————————————————
Develop and install interpretive signage————————————————————————————————————————————————————————
Portfolio Allocation: $1,038,000 Portfolio Expenditures Through 6/30/2019: $0 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
In Support of MAA12
Prior Years————————————————————————————————————————————————————————
Supported work by partners to complete stream corridor restoration and steelhead habitat enhancement
below Stevens Creek Dam. Coordinated with partners, reviewed technical reports, held site visit to Deep Cliff
site and produced letter of funding support. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
No project challenges identified at this time.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Coordinate with cities, Santa Clara County Parks, Friends of Stevens Creek Trail and other stakeholders on
new signage for the Stevens Creek Trail through preserves, parkland and other jurisdictional lands.————————————————————————————————————————————————————————
44 Measure AA Bond Annual Accountability Report FY2018-19
Los Gatos Creek Trail by Dan Debold
45Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $1,038,000
Grand Total $1,038,000 $0 $0 $0 $1,038,000 0.00%
Portfolio 12: Peninsula/South Bay Cities—Partner to Complete Middle Stevens Creek Trail
0.00%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$0
Expenditure Plan Remaining
$1,038,000
Portfolio 13
Cloverdale Ranch
Wildlife Protection,
Grazing and Trail
Connections
DESCRIPTION————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to increase conservation grazing and sustain large
contiguous grasslands ————————————————————————————————————————————————————————
Restore habitat for endangered species————————————————————————————————————————————————————————
Provide trail connections to nearby state parks————————————————————————————————————————————————————————
Portfolio Allocation: $15,712,000 Portfolio Expenditures Through 6/30/2019: $0 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
In Support of MAA13
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Initiated bimonthly meetings and conducted staff site tours of Cloverdale Ranch with POST. ————————————————————————————————————————————————————————
Prior Years ————————————————————————————————————————————————————————
Conducted ongoing due diligence investigation to evaluate site resources and obligations of a potential
future land purchase and subsequent management of POST’s 6,500-acre Cloverdale Ranch. Worked with
POST to conduct an introductory site tour for board members and key management staff to learn more
about the property. Added Cloverdale Ranch to the Capital Improvement and Action Plan for FY2018-19. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
No project challenges identified at this time.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Collate past site investigations, restoration work, and ongoing ranch management operations by POST into
an existing conditions report.
————————————————————————————————————————————————————————
Conduct additional field trips for staff to become familiar with site.
————————————————————————————————————————————————————————
Identify additional site investigations to be conducted.————————————————————————————————————————————————————————
46 Measure AA Bond Annual Accountability Report FY2018-19
Cloverdale Ranch by Carol Daniels
47Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $15,712,000
Grand Total $15,712,000 $0 $0 $0 $15,712,000 0.00%
Portfolio 13: Cloverdale Ranch—Wildlife Protection, Grazing and Trail Connections
0.00%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$0
Expenditure Plan Remaining
$15,712,000
Portfolio 14
Regional
Trail Connections
and Campgrounds
DESCRIPTION————————————————————————————————————————————————————————
Develop trails between Butano, Pescadero County Park and Russian Ridge, and between Skyline, Portola
Redwoods and Big Basin State Park ————————————————————————————————————————————————————————
Partner with county and state parks to improve existing campgrounds ————————————————————————————————————————————————————————
Portfolio Allocation: $3,966,000 Portfolio Expenditures Through 6/30/2019: $0 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
In Support of MAA14
Prior Years ————————————————————————————————————————————————————————
Acquired a conservation easement from POST covering the 353-acre Alpine Ranch property to protect
redwood forests, watershed and habitat values (expensed in MAA15 portfolio). Supports MAA14 for future
trail connections and campgrounds to San Mateo County’s Pescadero Creek Park Complex. ————————————————————————————————————————————————————————
48 Measure AA Bond Annual Accountability Report FY2018-19
Russian Ridge Open Space Preserve by Strether Smith
49Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $3,966,000
Grand Total $3,966,000 $0 $0 $0 $3,966,000 0.00%
Portfolio 14: Regional—Trail Connections and Campgrounds
0.00%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$0
Expenditure Plan Remaining
$3,966,000
Skyline Ridge Open Space Preserve by Charles Tu
Portfolio 15
Regional
Redwood Protection and
Salmon Fishery Conservation
DESCRIPTION————————————————————————————————————————————————————————
Preserve additional open space as available ————————————————————————————————————————————————————————
Protect and enhance redwood stands, mountain scenery, various habitats and steelhead ————————————————————————————————————————————————————————
Portfolio Allocation: $50,728,000 Portfolio Expenditures Through 6/30/2019: $3,033,050 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA15-001 Conservation Easement Upper Alpine Ranch Area
Prior Years————————————————————————————————————————————————————————
Acquired a conservation easement from POST covering the 353-acre Alpine Ranch property to protect
redwood forests, watershed and habitat values. ————————————————————————————————————————————————————————
MAA15-002 Conley Property Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 191-acre Conley property from POST as an addition to Long Ridge Preserve to protect
redwood forest and the upper Pescadero Creek watershed. ————————————————————————————————————————————————————————
MAA15-003 Long Ridge Property Addition
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Appraisal and offer made. Offer was rejected. Negotiations may continue. ————————————————————————————————————————————————————————
In Support of MAA15 and other MAA Portfolios
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Purchased 190-acre Woodruff Redwoods property as an addition to La Honda Creek Preserve (expensed in MAA08
portfolio); purchase includes 51 acres of old-growth redwood forest that support MAA15 priority actions.————————————————————————————————————————————————————————
Contracted with consulting professionals to develop the La Honda forest management plan to evaluate
restoration and management priorities in the watershed.————————————————————————————————————————————————————————
Real property staff and executive staff held several meetings with SJWC executive staff concerning the
potential purchase of their CPUC regulated utility lands in addition to the potential purchase of their
182-acre non-CPUC regulated property near El Sereno Preserve.————————————————————————————————————————————————————————
50 Measure AA Bond Annual Accountability Report FY2018-19
Long Ridge Open Space Preserve by Deane Little
Prior Years————————————————————————————————————————————————————————
After state legislation created the opportunity to purchase land governed by the California Public Utility
Commission, pursued watershed protection opportunities at Sierra Azul and El Sereno preserves. Established
initial contact with site owners, toured the property with site managers and Midpen board members, and
conveyed Midpen goals for a working partnership to negotiate a mutually beneficial transaction. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Land acquisition requires willing seller.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Real property is continuing to communicate and work towards the purchase of SJWC’s utility property, but
the deal is contingent on a willing seller. ————————————————————————————————————————————————————————
51Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $50,728,000
15-001—Conservation Easement
Upper Alpine Ranch Area
$2,508,695 $2,508,695
15-002—Conley Property
Purchase
$509,855 $509,855
15-003—Long Ridge Property
Addition
$14,500 $14,500
Grand Total $50,728,000 $3,018,550 $14,500 $3,033,050 $47,694,950 5.98%
Portfolio 15: Regional—Redwood Protection and Salmon Fishery Conservation
5.98%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$3,033,050
Expenditure Plan Remaining
$47,694,950
Portfolio 16
Long Ridge
Trail, Conservation and
Habitat Restoration
Projects (Saratoga)
DESCRIPTION————————————————————————————————————————————————————————
Improve roadside parking and provide restrooms ————————————————————————————————————————————————————————
Develop new trail connections to Eagle Rock and Devils Canyon————————————————————————————————————————————————————————
Repair trails for year-round, multiuse access————————————————————————————————————————————————————————
Protect watersheds for steelhead————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Implement pond and habitat enhancement restoration projects to benefit rare species————————————————————————————————————————————————————————
Portfolio Allocation: $5,140,000 Portfolio Expenditures Through 6/30/2019: $0 ————————————————————————————————————————————————————————
MAA funds have not been expended on this portfolio through the reporting period, therefore there are no funds
in this portfolio for the Bond Oversight Committee to validate at this time.
This does not necessarily mean that work is not underway in this portfolio. If there is work in process, other
funding sources are being utilized and either the scope is not what was contemplated as part of this MAA
portfolio, or the scope is not currently eligible for MAA funding.
52 Measure AA Bond Annual Accountability Report FY2018-19
Long Ridge Open Space Preserve by Denise Lawrence
53Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $5,140,000
Grand Total $5,140,000 $0 $0 $0 $5,140,000 0.00%
Portfolio 16: Long Ridge—Trail, Conservation and Habitat Restoration Projects (Saratoga)
0.00%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$0
Expenditure Plan Remaining
$5,140,000
Long Ridge Open Space Preserve by Charles Tu
Portfolio 17
Regional
Complete Upper
Stevens Creek Trail
DESCRIPTION————————————————————————————————————————————————————————
Complete multiuse connection between the Bay Trail and Bay Area Ridge Trail above the reservoir
through Picchetti Ranch Open Space Preserve and Lower/Upper Stevens Creek County parks ————————————————————————————————————————————————————————
Improve preserve trails and neighborhood connections ————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Portfolio Allocation: $7,760,000 Portfolio Expenditures Through 6/30/2019: $1,315,333 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA17-001 Land Conservation: Last Piece Upper Stevens Creek
Prior Years————————————————————————————————————————————————————————
Purchased the 60-acre Lysons property, securing land to facilitate the Upper Stevens Creek regional trail.
Leveraged partnership funds to match the MAA funds expended for this purchase. ————————————————————————————————————————————————————————
MAA17-002 Demolition & Restoration: Lobner/Lysons
Fiscal Year 2018-19————————————————————————————————————————————————————————
Completed design and contractor bidding process to demolish existing structures for site restoration and
future public access. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Evaluated the Lysons property for demolition and restoration. ————————————————————————————————————————————————————————
MAA17-004 Stevens Creek Nature Trail Bridges, Monte Bello
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Constructed two new pedestrian bridges on the Stevens Creek Nature Trail and removed one old bridge. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Coordination with Santa Clara County Parks to consider multiuse trail designation for Upper Stevens Creek Trail.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Prepare demolition bid package and permits for Lysons property structures demolition and site restoration.
————————————————————————————————————————————————————————
Continue to coordinate with Santa Clara County Parks regarding consideration of multiuse trail designation.————————————————————————————————————————————————————————
54 Measure AA Bond Annual Accountability Report FY2018-19
Pichetti Ranch Open Space Preserve by Kristi Corely
55Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $7,760,000
17-001—Land Conservation:
Last Piece Upper Stevens Creek
$1,494,552 $1,494,552
17-002—Demolition &
Restoration: Lobner/Lysons
$138,060 $9,869 $147,929
17-004—Stevens Creek Nature
Trail Bridges, Monte Bello
$147,635 $265,218 $412,853
Subtotal $7,760,000 $1,780,247 $275,086 $2,055,333 $5,704,667 26.49%
17-002—Lysons Property
Purchase Grant Income
(50% of purchase price)
($740,000)($740,000)
Grand Total $7,760,000 $1,040,247 $275,086 $1,315,333 $6,444,667 16.95%
Portfolio 17: Regional—Complete Upper Stevens Creek Trail
16.95%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$1,315,333
Expenditure Plan Remaining
$6,444,667
Pichetti Ranch Open Space Preserve by Curt Bianchi
Portfolio 18
South Bay Foothills
Saratoga-to-the-Sea Trail
and Wildlife Corridor
DESCRIPTION————————————————————————————————————————————————————————
Protect wildlife corridor along Highway 9 ————————————————————————————————————————————————————————
Connect trail to Saratoga-to-the-Sea Trail and Skyline-to-the-Sea Trail ————————————————————————————————————————————————————————
Portfolio Allocation: $1,365,000 Portfolio Expenditures Through 6/30/2019: $3,850 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
In Support of MAA18
Fiscal Year 2018-19————————————————————————————————————————————————————————
City of Saratoga completed engineering design and environmental review and initiated permitting for
the proposed Saratoga-to-the-Sea regional trail connection within city’s easement area on San Jose Water
Company lands. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Finalized partnership agreement with the City of Saratoga and obtained board approval for a funding
contribution of the final design and environmental review for the Saratoga-to-the-Sea Trail. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
No project challenges identified at this time.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Provide additional partnership funding and/or technical staff support to City of Saratoga to complete the
trail design plans, environmental review and permitting of the approximately 3-mile Saratoga-to-the-Sea
Trail connection from Saratoga Quarry Park and Sanborn County Park. ————————————————————————————————————————————————————————
56 Measure AA Bond Annual Accountability Report FY2018-19
Saratoga Gap Open Space Preserve by Midpen Staff
57Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $1,365,000
18-001—San Jose Water Land
Purchase
$3,850 $3,850
Grand Total $1,365,000 $0 $3,850 $3,850 $1,361,150 0.28%
Portfolio 18: South Bay Foothills—Saratoga-to-the-Sea Trail and Wildlife Corridor
Total Life-to-Date Through 6/30/19
$3,850
Expenditure Plan Remaining
$1,361,150
0.28%
OF FUNDS
USED
Portfolio 19
El Sereno
Dog Trails and Connections
DESCRIPTION————————————————————————————————————————————————————————
Provide infrastructure to open trails to dogs ————————————————————————————————————————————————————————
Develop connections to Skyline, Sanborn County Park and Lexington Reservoir ————————————————————————————————————————————————————————
Portfolio Allocation: $2,254,000 Portfolio Expenditures Through 6/30/2019: $480,242 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA19-001 Gupta/Khan Property Purchase
Prior Years————————————————————————————————————————————————————————
Purchased a 9.37-acre fee property and a 1.97-acre floating trail easement from Gupta-Khan to improve
opportunities for wildlife corridor and trail connectivity. ————————————————————————————————————————————————————————
MAA19-002 Dunham-Bohlman Easement
Prior Years————————————————————————————————————————————————————————
Purchased a 0.33-acre public trail and patrol easement from a private land owner ($15,000 purchase).
These purchases fill a gap in the Bay Area Ridge Trail between El Sereno Preserve and Sanborn County Park
(one property acquisition remains). ————————————————————————————————————————————————————————
MAA19-003 Haight-Peery LV Land Acquisition
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Purchased the 1.87-acre Haight-Peery property, including a portion of the Aquinas Trail, as an addition to
El Sereno Preserve.————————————————————————————————————————————————————————
In Support of MAA19
Prior Years————————————————————————————————————————————————————————
Completed CEQA review and a use and management plan amendment for board approval to open existing
trails to dogs on-leash and added on-leash dog use to 6 miles of existing trail. ————————————————————————————————————————————————————————
To facilitate future MAA trail projects, initiated site investigations for regional trail connections between
Sanborn County Park, El Sereno Preserve and a potential Highway 17 Bay Area Ridge Trail crossing. ————————————————————————————————————————————————————————
58 Measure AA Bond Annual Accountability Report FY2018-19
El Sereno Open Space Preserve by Claire Dawkins
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Need to secure additional property rights to provide contiguous access through El Sereno Preserve to the
adjacent Sanborn County Park.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Continue seeking property rights required for a trail connection from Highway 17 through El Sereno
Preserve to Sanborn County Park.
————————————————————————————————————————————————————————
Continue analysis of regional trail connections between Sanborn County Park, El Sereno Preserve and a
potential Highway 17 Bay Area Ridge Trail crossing.————————————————————————————————————————————————————————
59Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $2,254,000
$715 $715
19-001—Gupta/Khan Property
Purchase
$406,553 $406,553
19-002—Dunham-Bohlman
Easement
$19,997 $19,997
19-003—Haight-Perry LV Land
Acquisition
$52,977 $52,977
Grand Total $2,254,000 $427,265 $52,977 $480,242 $1,773,759 21.31%
Portfolio 19: El Sereno—Dog Trails and Connections
21.31%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$480,242
Expenditure Plan Remaining
$1,773,759
Portfolio 20
South Bay Foothills
Wildlife Passage
and Ridge Trail
Improvements
DESCRIPTION————————————————————————————————————————————————————————
Establish safe corridors for mountain lions across Highway 17 ————————————————————————————————————————————————————————
Establish Bay Area Ridge Trail crossing ————————————————————————————————————————————————————————
Portfolio Allocation: $13,966,000 Portfolio Expenditures Through 6/30/2019: $390,203 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA20-001 Wildlife Corridor: Highway 17 Crossing and
MAA20-002 Bay Area Ridge Trail: Highway 17 Crossing
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Draft project study report submitted to Caltrans and initial comments received. Held additional meetings
with project partners and stakeholders (Caltrans, SJWC, CGF, NWF), as well as a second public meeting to
continue to advance a proposed wildlife crossing.————————————————————————————————————————————————————————
Conducted preplanning, trail scouting and preliminary conceptual-level design and cost estimates for a proposed
regional trail crossing over Highway 17. Completed a pre-permitting coordination meeting with Caltrans. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
In coordination with a consultant team, completed a draft project preliminary alternatives report for both
the wildlife corridor and regional trails crossing at Highway 17 for agency review. ————————————————————————————————————————————————————————
Engaged public and stakeholders for input on proposed draft alternatives and received agency comments
on draft report. ————————————————————————————————————————————————————————
Released draft recommended alternatives report for both the wildlife corridor and regional trails crossing
at Highway 17 and received agency comments. ————————————————————————————————————————————————————————
Developed a cooperative agreement with Caltrans and developed a Caltrans project initiation document. ————————————————————————————————————————————————————————
Continued evaluation of the Highway 17 wildlife crossing and regional trail crossing through identification
and analysis of additional crossing alternatives in response to partner, stakeholder and public comment on
initial drafts.————————————————————————————————————————————————————————
Collaborated with partner agencies (Santa Clara County Parks, Valley Water, Ridge Trail, etc.) to identify best
opportunities for a public access crossing at Highway 17, including trail connections. Crossing will close a
major gap in the regionwide trail system and connect open space areas for multiple regional trails. ————————————————————————————————————————————————————————
60 Measure AA Bond Annual Accountability Report FY2018-19
Russian Ridge Open Space Preserve by Midpen Staff
In Support of MAA20
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed preplanning and site investigations to identify potential trail routes to connect trail crossings.
Worked with consultants to develop preliminary trail design and completed draft trail connections report.
Shared draft report with stakeholders (Caltrans, SJWC, Santa Clara County Parks, etc.) for review prior to
public presentations. Scheduled public informational meeting on trail connections. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Conducted numerous field investigations and trail route evaluations for a potential future regional trail
crossing over Highway 17 that would become part of the Bay Area Ridge Trail near the El Sereno, St. Joseph’s
Hill and Bear Creek Redwoods preserves. ————————————————————————————————————————————————————————
Co-hosted with POST a free screening of “The Cat that Saved America” and panel discussion on wildlife
corridors and the Highway 17 wildlife crossing attended by 325 guests on April 7, 2018. ————————————————————————————————————————————————————————
Conducted additional ground-truthing and analysis on potential trail alignments that support the potential
trail crossing locations to include in a feasibility study. Identified eight trail alignments to include in the
project study report for Caltrans. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Complex Caltrans process and coordination with numerous project partners and stakeholders with Midpen as
the project lead despite not owning or managing any of the underlying land or immediate trail connections.
————————————————————————————————————————————————————————
Additional studies and coordination needed to identify feasible trail connections linking to a regional trail
crossing at Highway 17, evaluating multiple scenarios for trail connections on either side of Highway 17.
————————————————————————————————————————————————————————
Requires negotiations with multiple property owners to secure property rights.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Complete recommended alternatives report.
————————————————————————————————————————————————————————
Complete project study report with Caltrans.
————————————————————————————————————————————————————————
Continue to secure permission to access private properties for studies and to negotiate for property rights.————————————————————————————————————————————————————————
61Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $13,966,000
20-001—Wildlife Corridor:
Highway 17 Crossing
$196,519 $129,262 $325,781
20-002—Bay Area Ridge Trail:
Highway 17 Crossing
$317 $64,105 $64,422
Grand Total $13,966,000 $196,836 $193,367 $390,203 $13,575,798 2.79%
Portfolio 20: South Bay Foothills—Wildlife Passage and Ridge Trail Improvements
2.79%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$390,203
Expenditure Plan Remaining
$13,575,798
Portfolio 21
Bear Creek Redwoods
Public Recreation and
Interpretation Projects
DESCRIPTION————————————————————————————————————————————————————————
Open for hiking, equestrian activities ————————————————————————————————————————————————————————
Provide parking areas, trails; upgrade stables ————————————————————————————————————————————————————————
Restore and protect habitats for various species————————————————————————————————————————————————————————
Repair roads and trails to reduce sediment————————————————————————————————————————————————————————
Rehabilitate Alma College site————————————————————————————————————————————————————————
Portfolio Allocation: $17,478,000 Portfolio Expenditures Through 6/30/2019: $7,978,762 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA21-003 Bear Creek Redwoods Water System
Prior Years————————————————————————————————————————————————————————
Completed an assessment of water source options and associated cost estimates for the preserve, concluding
that the most cost effective and secure option is execute an agreement with SJWC to complete the water line
installation from their main line as the new source of water for the preserve and Bear Creek Stables. ————————————————————————————————————————————————————————
Established and filed pre-1914 water rights for the preserve, installed meters, and completed required
annual reporting.————————————————————————————————————————————————————————
Started the design of water main extension at gate BC01 to provide water access to staff and provide initial
connection to water system for stables. ————————————————————————————————————————————————————————
MAA21-004 Bear Creek Stables Site Plan Implementation
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Met with Santa Clara County planning staff and fire marshal office to discuss the type of repair and
maintenance work that would be permissible under the existing legal, nonconforming use.————————————————————————————————————————————————————————
Completed a fundraising pre-feasibility assessment.————————————————————————————————————————————————————————
The board directed staff to move forward with maintenance and repairs in the near-term and the Stables
site plan as a long-term solution.————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Developed the stables site plan alternatives and secured board selection of the preferred alternative for
CEQA review purposes. ————————————————————————————————————————————————————————
62 Measure AA Bond Annual Accountability Report FY2018-19
Bear Creek Redwoods Open Space Preserve by Mike Kahn/Midpen
MAA21-005 Bear Creek Redwoods Public Access
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed construction of a new parking lot, bridge, retaining wall improvements, vault toilet restroom,
ADA pathway, and road/trail improvements, opening 6 miles of new trail to public access.————————————————————————————————————————————————————————
Completed second (final) year of cultural resource evaluations for 19 sites within the preserve. Final report
completed. Provided archaeological monitoring for parking lot and trail construction. ————————————————————————————————————————————————————————
Completed installation of two interpretive signs for the new main parking area at Upper Lake. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Completed an archaeological resources curation guidelines report.————————————————————————————————————————————————————————
Completed archaeological studies in advance of ground disturbance activities.————————————————————————————————————————————————————————
Conducted an engineering feasibility study to identify the preferred location for a Bear Creek Road trail
undercrossing as an option for connecting visitors between the new parking area and the western area of
the preserve.————————————————————————————————————————————————————————
Completed geologic assessment, geotechnical drilling and fault trenching. Completed regulatory/code
assessment.————————————————————————————————————————————————————————
Completed cultural resource assessments. Prepared RFPQ, selected and contracted with consultant to
complete a final survey/ assessment reports for 10 sites, parking lot area and Mud Lake improvements. ————————————————————————————————————————————————————————
Completed phase I public access road and trail construction, upgrades, and drainage improvement,
including constructing two segments of new trail to complete the westside loop.————————————————————————————————————————————————————————
Investigated a legacy landfill at BCR to determine size and potential constituents of concern. Scoped project,
prepared RFPQ, and selected consultant.————————————————————————————————————————————————————————
MAA21-006 Bear Creek Redwoods Alma College Cleanup and Stabilization
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Presented Alma College cultural landscape plan to Santa Clara County Historic Heritage Commission for a
landmark alteration permit. Santa Clara County planning department issued a landmark alteration permit
for the rehabilitation project.————————————————————————————————————————————————————————
Completed 90% of plans and specifications and prepared permit package for submission to the County of
Santa Clara Department of Planning and Development. Completed conversion of mansion ruins to bat habitat.————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Conducted a recreation planning analysis for potential reuse of the Alma College chapel. ————————————————————————————————————————————————————————
Completed an earthquake fault rupture hazard study to determine if the Alma College chapel could be occupied. ————————————————————————————————————————————————————————
Constructed two structures to provide alternative bat roosting habitat in anticipation of demolition work at
Alma College.————————————————————————————————————————————————————————
MAA21-007 Bear Creek Redwoods Preserve Plan Invasive Weed Treatment
Fiscal Year 2018-19————————————————————————————————————————————————————————
Completed treatments as planned and selected contractor for final two years of project through RFP process. ————————————————————————————————————————————————————————
Completed all work under a task order with Valley Water for the implementation of grant-funded invasive
species work.
————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Implemented the first year of a targeted invasive species treatment to restore native habitat throughout the
preserve. ————————————————————————————————————————————————————————
Received a grant from Valley Water for $200,000 per year for five years with a possible five-year extension for
another $1 million.
————————————————————————————————————————————————————————
63Measure AA Bond Annual Accountability Report FY2018-19
MAA21-008 Bear Creek Redwoods Ponds Restoration and Water Rights
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed construction documents and began the permitting process to improve drainage from Mud Lake to
Briggs Creek.————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Completed a pond assessment and management plan to determine the water needs for wildlife and habitat
values at aquatic sites. ————————————————————————————————————————————————————————
Began the first year of the western pond turtle population study and developed a western pond turtle
management plan. ————————————————————————————————————————————————————————
Completed the Mud Lake drainage improvement project plans to 60%, which allowed for pre-permitting meetings
to be held with the U.S. Army Corp of Engineers, RWQCB and CDFW to determine the permit and review timeframe
required before construction. The project will improve the stormwater drainage system for Mud Lake.————————————————————————————————————————————————————————
MAA21-009 Bear Creek Redwoods Webb Creek Bridge
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed the removal of an existing bridge and installation of a new bridge to provide safe public access
and patrol route.————————————————————————————————————————————————————————
Prior Years
————————————————————————————————————————————————————————
Designed the Webb Creek Bridge replacement foundation.
————————————————————————————————————————————————————————
Submitted CDFW and RWQCB permits for the Webb Creek Bridge replacement. ————————————————————————————————————————————————————————
MAA21-010 Bear Creek Redwoods Landfill Characterization and Remediation
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed a landfill characterization and developed the project remedial approach.————————————————————————————————————————————————————————
In Support of MAA21
Fiscal Year 2018-19
————————————————————————————————————————————————————————
Completed the Bear Creek Redwoods online story map.
————————————————————————————————————————————————————————
Celebrated completion of phase I public access improvements and progress on natural resources restoration
projects with partner ribbon-cutting and tours, media outreach and open weekends public educational
outreach.
————————————————————————————————————————————————————————
Hired a consultant for feasibility studies, design engineering, and permitting to implement the phase II trails.————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Received board approval of the Bear Creek Redwoods Preserve Plan and certification of the accompanying EIR. ————————————————————————————————————————————————————————
Hosted a groundbreaking for the preserve parking area project on May 1, 2018.————————————————————————————————————————————————————————
Completed construction of Alma College site fencing in April 2018 to improve site safety and security.————————————————————————————————————————————————————————
PROJECT CHALLENGES————————————————————————————————————————————————————————
MAA21-004: Stable’s legal nonconforming status raises concerns regarding use permit requirements and
code upgrades that may raise costs substantially.————————————————————————————————————————————————————————
MAA21-008: Permitting agencies unexpectedly asked that Upper and Mud Lake projects be combined,
requiring staff to pull two consultant teams together to complete permit applications. ————————————————————————————————————————————————————————
Land acquisition requires a willing seller. ————————————————————————————————————————————————————————
64 Measure AA Bond Annual Accountability Report FY2018-19
POTENTIAL NEXT STEPS————————————————————————————————————————————————————————
Continue design development of allowable repairs of existing stables site within legal, nonconforming status.————————————————————————————————————————————————————————
Continue integrated pest management implementation on roads and trails, and in shaded fuel break.————————————————————————————————————————————————————————
Complete permitting and construction of pond improvement projects.————————————————————————————————————————————————————————
65Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $17,478,000
21-001—Moody Gulch Fence &
Gate Improvements
$847 $847
21-002—Bear Creek Redwoods
Preserve Plan
($12,954)($1,415)($14,369)
21-003—Bear Creek Redwoods
Stables Water System
$191,149 $794 $191,943
21-004—Bear Creek Stables Site
Plan Implementation
$282,075 $2,270 $284,345
21-005—Bear Creek Redwoods
Public Access
$1,505,935 $3,748,293 $5,254,228
21-006—Bear Creek Redwoods
Alma College Cleanup and
Stabilization
$692,822 $332,396 $1,025,218
21-007—Bear Creek Redwoods
Preserve Plan Invasive Weed
Treatment
$501,679 $319,050 $820,729
21-008—Bear Creek Redwoods
Ponds Restoration and Water
Rights
$126,676 $62,201 $188,877
21-009—Bear Creek Redwoods
Webb Creek Bridge
$138,876 $348,616 $487,492
21-010—Bear Creek Redwoods
Landfill Characterization and
Remediation
$36,375 $36,375
Subtotal $17,478,000 $3,427,105 $4,848,581 $8,275,686 $9,202,314 47.35%
21-007—Bear Creek Redwoods
Preserve Plan Invasive Weed
Treatment Grant Income
($107,042)($189,882)($296,924)
Grand Total $17,478,000 $3,320,063 $4,658,699 $7,978,762 $9,499,238 45.65%
Portfolio 21: Bear Creek Redwoods—Public Recreation and Interpretive Projects
45.65%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$7,978,762
Expenditure Plan Remaining
$9,499,238
Portfolio 22
Sierra Azul
Cathedral Oaks Public
Access and Conservation
Projects
DESCRIPTION————————————————————————————————————————————————————————
Develop multiuse trail and plan future trails as land is available ————————————————————————————————————————————————————————
Develop parking————————————————————————————————————————————————————————
Restore plant communities and soils ————————————————————————————————————————————————————————
Install trailside amenities————————————————————————————————————————————————————————
Preserve additional open space and complete wildlife corridor in upper Los Gatos Creek watershed ————————————————————————————————————————————————————————
Portfolio Allocation: $6,714,000 Portfolio Expenditures Through 6/30/2019: $1,010,784 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA22-001 Hendrys Creek Property Land Restoration
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Removed culverts that impeded the creek and restored natural creek flow.————————————————————————————————————————————————————————
Completed annual monitoring and submitted annual report to Valley Water and CDFW, as required by the
long-term management plan and CDFW permit conditions. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Received partnership funds to purchase the 117-acre Hendrys Creek property to protect wildlife corridors
and watershed lands. No MAA funds were used on this purchase.————————————————————————————————————————————————————————
Completed fifth year of the coordinated monitoring effort to reduce mercury within the Guadalupe River
watershed. ————————————————————————————————————————————————————————
Completed first phase of invasive plant removal and developed a partnership with the San Jose Conservation
Corps for the Hendrys Creek watershed restoration effort. ————————————————————————————————————————————————————————
Negotiated with resource agencies, including CDFW, RWQCB and USACE to finalize permits to perform
the Hendrys Creek restoration project. Rare opportunity to perform environmental restoration to benefit
wildlife and water quality. ————————————————————————————————————————————————————————
66 Measure AA Bond Annual Accountability Report FY2018-19
Sierra Azul Open Space Preserve by Tian Lin
MAA22-003 Freudenberg Land Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 24.41-acre Freudenberg property to protect wildlife and watershed lands. ————————————————————————————————————————————————————————
MAA22-004 Beatty Parking Area and Trail Connections
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Issued RFPs and selected consultants for site surveys, traffic, hazardous material assessments and
environmental and biological services to support the implementation of the Beatty Parking Area. ————————————————————————————————————————————————————————
Initiated traffic counts and line of sight analysis, phase I environmental assessments, and completed
topographic surveys. Initiated conceptual parking area design.————————————————————————————————————————————————————————
Awarded a $149,906 grant from Valley Water for the Beatty Trail connection project (grant income will be
included in FY2019-20).————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Permit monitoring requires up to 10 years of tracking and reporting, which is cumulative for every project
requiring a resource agency permit.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Complete Hendrys Creek land restoration and project mitigation. Continue monitoring for up to 10 years. ————————————————————————————————————————————————————————
67Measure AA Bond Annual Accountability Report FY2018-19
Portfolio 22: Sierra Azul—Cathedral Oaks Public Access and Conservation Projects
15.05%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$1,010,784
Expenditure Plan Remaining
$5,703,216
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $6,714,000
22-001—Hendrys Creek Property
Land Restoration
$168,316 $304,668 $472,984
22-003—Freudenberg Land
Purchase
$540,587 $540,587
22-004—Beatty Parking Area
and Trail Connections
$64,325 $64,325
Subtotal $6,714,000 $708,903 $368,992 $1,077,895 $5,636,105 16.05%
22-001—Hendrys Creek Property
Land Restoration Grant Income
($67,111)($67,111)
Grand Total $6,714,000 $641,792 $368,992 $1,010,784 $5,703,216 15.05%
Portfolio 23
Sierra Azul
Mount Umunhum
Public Access and
Interpretation Projects
DESCRIPTION————————————————————————————————————————————————————————
Open Mount Umunhum for multiuse public access to summit via road and trail ————————————————————————————————————————————————————————
Open Bay Area Ridge Trail and nearby trail connections————————————————————————————————————————————————————————
Preserve additional open space and complete wildlife corridor ————————————————————————————————————————————————————————
Portfolio Allocation: $27,972,000 Portfolio Expenditures Through 6/30/2019: $21,614,442 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA23-001 Mt. Um Road and Trail Property Rights
Prior Years————————————————————————————————————————————————————————
Purchased the 38.97-acre Meyer/Connolly property to protect additional open space and wildlife corridors.————————————————————————————————————————————————————————
In support of MAA improvements, purchased the 28-acre Rossetta property to secure public access rights
along Mt. Umunhum Road and the Woods Trail in the Mount Umunhum area of Sierra Azul Preserve. ————————————————————————————————————————————————————————
MAA23-002 Mt. Um Trail
Prior Years————————————————————————————————————————————————————————
Completed nearly 4 miles of the new Mt. Umunhum Trail to connect people to the summit. ————————————————————————————————————————————————————————
Completed major construction milestones on the Mt. Umunhum Trail, including the construction of an
additional 0.5-mile trail segment, the narrowing of old, abandoned road cuts into a trail, and the installation
of three new pedestrian bridges and signage. ————————————————————————————————————————————————————————
Completed final preparations for opening Mount Umunhum, installing fencing, signs, horse trough, trail
construction and new bridges.————————————————————————————————————————————————————————
68 Measure AA Bond Annual Accountability Report FY2018-19
Sierra Azul Open Space Preserve by Erin Ashford
MAA23-004 Mt. Um Summit Restoration, Parking and Landing Zone
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed phase II plant restoration and sign installation. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Created a new contract with Grassroots Ecology Native Plant Nursery to grow approximately 1,900 native
plants and 5 pounds of native grass and forb seed for phase I of the Mount Umunhum revegetation project. ————————————————————————————————————————————————————————
Developed a habitat restoration plan for the Mount Umunhum summit to enhance the native plant
recolonization of the restored mountaintop, incorporating input from the Amah Mutsun tribal group on
Native American restoration techniques. ————————————————————————————————————————————————————————
Surveyed and mapped rare plant populations and collected native plant seeds in support of the restoration
planting plan. ————————————————————————————————————————————————————————
Completed the construction of the Mount Umunhum summit restoration project, including a new parking
lot, summit shelters, turnaround area, ceremonial circle, ADA pathways, stairs, trail steps and other site
amenities. Project opened Mount Umunhum summit area to the public in September 2017. ————————————————————————————————————————————————————————
Developed and created broad interpretive displays for the Mount Umunhum summit project, providing
visitors with a substantially greater understanding of the site’s rich history.————————————————————————————————————————————————————————
Continued restoration planting at Mount Umunhum to restore native vegetation at the summit.————————————————————————————————————————————————————————
MAA23-005 Mt. Um Guadalupe Creek Overlook and Bridges
Prior Years————————————————————————————————————————————————————————
Completed the design, permitting and construction for the Guadalupe Creek overlook (a featured overlook
along Mount Umunhum Trail), including permitting and construction of three new trail bridges along the trail.————————————————————————————————————————————————————————
Installed the Guadalupe Creek overlook railings and mitigation planting, and removed trail debris to open
the Woods Trail to the public. ————————————————————————————————————————————————————————
MAA23-006 Mt. Um Road Design/Permitting/Construction
Prior Years————————————————————————————————————————————————————————
Completed the construction of the Mt. Umunhum Road improvement project, including the installation of
new culverts, asphalt concrete paving, drainage structures, gabion retaining walls, guardrail, mass grading
and off haul, striping and other road safety improvements. Completion of the project opened public
vehicular access to the Mount Umunhum summit area. ————————————————————————————————————————————————————————
MAA23-007 Twin Creeks Land Conservation
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Completed site cleanup and demolition of structures to support land preservation and riparian habitat
restoration. ————————————————————————————————————————————————————————
Prior Years————————————————————————————————————————————————————————
Purchased the 153.59-acre Twin Creeks property providing water quality protection within the Los Alamitos
Creek watershed, continuity of wildlife habitat corridors and the potential for a future trail connection with
Rancho Cañada del Oro Preserve. The Gordon and Betty Moore Foundation provided grant funding in the
amount of $750,000 toward the purchase of $2,800,000.————————————————————————————————————————————————————————
MAA23-008 Twin Creeks Restoration
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Started a botanical survey at the Twin Creeks property. ————————————————————————————————————————————————————————
69Measure AA Bond Annual Accountability Report FY2018-19
In Support of MAA23
Fiscal Year 2018-19 ————————————————————————————————————————————————————————
Selected a consultant to complete a radar tower assessment and develop repair alternatives with costs
estimates that protect public safety and implement the Board’s Retain and Seal decision for the structure.————————————————————————————————————————————————————————
Prior Years ————————————————————————————————————————————————————————
Completed interim repairs on the radar tower to open the Mount Umunhum summit to public access.————————————————————————————————————————————————————————
Finalized and recorded the Mount Umunhum public access easement, drainage easements, fee property
and patrol/maintenance easement to Mount Thayer, ensuring legal access to these areas of the preserve.————————————————————————————————————————————————————————
Continued to respond to wildlife entrapment issues at the Mount Umunhum radar tower. ————————————————————————————————————————————————————————
Submitted an application nominating Mount Umunhum as one of the 2018 Great Places in California, an
award program under the American Planning Association California Chapter in March 2018. The APA Great
Places jury selected Mount Umunhum as one of three Great Places in California for 2018. ————————————————————————————————————————————————————————
Stayed in communication with Mount Umunhum neighbors for the summit and road projects before, during,
and after the grand opening.————————————————————————————————————————————————————————
Produced a “Stories of Mount Umunhum” audio tour app and made it available for free download on iTunes
and Google Play. The app offers a virtual guided tour of the summit. ————————————————————————————————————————————————————————
Held the Mount Umunhum grand opening on September 17, 2017, with extensive media coverage.————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Mount Umunhum summit: potential ongoing wildlife entrapment at the tower.
————————————————————————————————————————————————————————
Twin Creeks: restoration of the creek and banks.
————————————————————————————————————————————————————————
Land acquisition: property rights required from potential unwilling seller.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Continue monitoring for potential entrapped wildlife.
————————————————————————————————————————————————————————
Continue native plant restoration of summit.————————————————————————————————————————————————————————
70 Measure AA Bond Annual Accountability Report FY2018-19
71Measure AA Bond Annual Accountability Report FY2018-19
Portfolio 23: Sierra Azul—Mount Umunhum Public Access and Interpretation Projects
77.27%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$21,614,442
Expenditure Plan Remaining
$6,357,558
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $27,972,000
23-001—Mt. Um Road and Trail
Property Rights
$1,271,318 $1,271,318
23-002—Mt. Um Trail $959,548 $959,548
23-004—Mt. Um Summit
Restoration, Parking and
Landing Zone
$10,398,273 $29,853 $10,428,126
23-005—Mt. Um Guadalupe
Creek Overlook and Bridges
$259,311 $259,311
23-006—Mt. Um Road Design/
Permitting/Construction
$6,280,251 $6,280,251
23-007—Twin Creeks Land
Conservation
$2,913,372 $812,554 $3,725,926
23-008—Twin Creeks Restoration $9,963 $9,963
Subtotal $27,972,000 $22,082,073 $852,369 $22,934,442 $5,037,558 81.99%
23-004—Mt. Um Summit
Restoration, Parking and
Landing Zone Grant Income
($570,000)($570,000)
23-007—Twin Creeks Land
Conservation Grant Income
($750,000)($750,000)
Grand Total $27,972,000 $20,762,073 $852,369 $21,614,442 $6,357,558 77.27%
Portfolio 24
Sierra Azul
Rancho de Guadalupe
Family Recreation
DESCRIPTION————————————————————————————————————————————————————————
Open Rancho de Guadalupe to public access ————————————————————————————————————————————————————————
Develop accessible multiuse trails with amenities such as parking and family recreation ————————————————————————————————————————————————————————
Restore habitat for rare species ————————————————————————————————————————————————————————
Protect cultural and natural resources————————————————————————————————————————————————————————
Portfolio Allocation: $10,078,000 Portfolio Expenditures Through 6/30/2019: $1,591,996 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA24-001 Barth Property Purchase
Prior Years————————————————————————————————————————————————————————
Purchased 4 acres of the Barth property improving access into the preserve from Hicks Road. ————————————————————————————————————————————————————————
MAA24-002 Petersen Property Acquisition
Prior Years————————————————————————————————————————————————————————
Purchased the 23.41-acre Petersen property to protect grassland habitat and water quality in the Guadalupe
Creek watershed. ————————————————————————————————————————————————————————
MAA24-003 Property Exchange Navid/Bagher
Prior Years————————————————————————————————————————————————————————
Negotiated a property exchange with Navid/Bagher covering 3.42 acres, further improving access from Hicks
Road to the preserve. ————————————————————————————————————————————————————————
MAA24-004 Kahn Property Acquisition
Prior Years————————————————————————————————————————————————————————
Purchased the 24.01-acre Kahn property for open space and watershed protection. ————————————————————————————————————————————————————————
In Support of MAA24
Prior Years————————————————————————————————————————————————————————
Pursued land conservation opportunities by continuing to work with a landowner and consulting with
Santa Clara County planning department about possible lot line adjustments or remainder lot legalization
along Pheasant Creek. ————————————————————————————————————————————————————————
Continued to negotiate with Valley Water about a land exchange to facilitate widening of Hicks Road near
Guadalupe Reservoir and construction of a potential new parking area for the preserve. ————————————————————————————————————————————————————————
72 Measure AA Bond Annual Accountability Report FY2018-19
Sierra Azul Open Space Preserve by Dale Grogan
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Land acquisition requires a willing seller.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
Continue negotiations for potential land acquisition.
————————————————————————————————————————————————————————
Complete western pond turtle studies. ————————————————————————————————————————————————————————
73Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $10,078,000
24-001—Barth Property Purchase $300,035 $300,035
24-002—Petersen Property
Acquisition
$700,603 $700,603
24-003—Property Exchange
Navid/Bagher
$39,184 $39,184
24-004—Kahn Property
Acquisition
$552,174 $552,174
24-005—Morales Property
Acquisition*
$14,900 ($14,900)$0
Grand Total $10,078,000 $1,606,896 ($14,900)$1,591,996 $8,486,004 15.80%
* Project expenditures were transferred from MAA funding to the general fund since acquisition of this property is not expected to materialize in the near future.
Portfolio 24: Sierra Azul—Rancho de Guadalupe Family Recreation
15.80%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$1,591,996
Expenditure Plan Remaining
$8,486,004
Portfolio 25
Sierra Azul
Loma Prieta Area Public
Access, Regional Trails
and Habitat Projects
DESCRIPTION————————————————————————————————————————————————————————
Provide public access and recreation, including small campground ————————————————————————————————————————————————————————
Develop, improve and connect regional multiuse trails to Forest of Nisene Marks State Park, to protected
land to the east, and to Mount Umunhum————————————————————————————————————————————————————————
Protect steelhead habitat, rare plants and grasslands, and restore knob cone pine stands————————————————————————————————————————————————————————
Portfolio Allocation: $7,986,000 Portfolio Expenditures Through 6/30/2019: $410,150 ————————————————————————————————————————————————————————
NOTABLE ACCOMPLISHMENTS
MAA25-001 Land Conservation Opportunities
Prior Years————————————————————————————————————————————————————————
Purchased the 40-acre Burton/Robinson property to protect additional habitat within the Loma Prieta area. ————————————————————————————————————————————————————————
PROJECT CHALLENGES
————————————————————————————————————————————————————————
Land acquisition requires a willing seller.
————————————————————————————————————————————————————————
POTENTIAL NEXT STEPS
————————————————————————————————————————————————————————
No project next steps identified at this time. ————————————————————————————————————————————————————————
74 Measure AA Bond Annual Accountability Report FY2018-19
Sierra Azul Open Space Preserve by Midpen Staff
75Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $7,986,000
25-001—Land Conservation
Opportunities
$410,150 $410,150
Grand Total $7,986,000 $410,150 $0 $410,150 $7,575,850 5.14%
Portfolio 25: Sierra Azul—Loma Prieta Area Public Access, Regional Trails and Habitat Projects
5.14%
OF FUNDS
USED
Total Life-to-Date Through 6/30/19
$410,150
Expenditure Plan Remaining
$7,575,850
Sierra Azul Open Space Preserve by Xun Li
76 Measure AA Bond Annual Accountability Report FY2018-19
Financial Report by Project
Measure AA Expenditures
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 1: Miramontes Ridge—Gateway to the Coast Public Access, Stream Restoration
and Agriculture Enhancement
Total Portfolio Allocation $27,774,000
01-003—Zions Property Purchase $52,915 ($52,915)$0
01 Total $27,774,000 $52,915 ($52,915)$0 $27,774,000 0.00%
Portfolio 2: Regional—Bayfront Habitat Protection and Public Access Partnerships
Total Portfolio Allocation $5,052,000
02-001—Cooley Landing
Interpretive Facilities Design
and Implementation
$200,686 $973,076 $1,173,762
02-002—Ravenswood Bay Trail
Design and Implementation
$518,977 $353,932 $872,909
Subtotal $5,052,000 $719,663 $1,327,008 $2,046,671 $3,005,329 40.51%
02-002—Ravenswood Bay Trail Design
and Implementation Grant Income
($229,621)($430,987) ($660,608)
02 Total $5,052,000 $490,042 $896,021 $1,386,063 $3,665,937 27.44%
Portfolio 3: Purisima Creek Redwoods—Purisima-to-the-Sea Trail, Watershed Protection
and Conservation Grazing
Total Portfolio Allocation $7,608,000
03-001—Purisima Uplands Lot Line
Adjustment and Property Transfer
$409,711 $11,558 $421,269
03-002—Purisima Uplands Site Clean
up and Soil Remediation Assessment
$69,155 $21,704 $90,859
03-003—Purisima Creek Fence
Construction
$85,501 $85,501
03-004—Harkins Bridge Replacement $475,374 $41,543 $516,917
03-005RP—Purisima Uplands
Parking Area and Trail Connections
$156,130 $156,130
03 Total $7,608,000 $1,110,370 $160,306 $1,270,676 $6,337,324 16.70%
77Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 4: El Corte de Madera Creek—Bike Trail and Water Quality Projects
Total Portfolio Allocation $8,376,000
04-002—El Corte de Madera Creek
Watershed Protection Final Phase
$235,934 $235,934
04-003—El Corte de Madera Creek
Watershed Protection Reassessment
$83,956 $83,956
04-004—El Corte de Madera Creek
Oljon Trail Implementation
$260,068 $306,910 $566,978
04 Total $8,376,000 $579,958 $306,910 $886,868 $7,489,132 10.59%
Portfolio 5: La Honda Creek—Upper Area Recreation, Habitat Restoration and Conservation Grazing Projects
Total Portfolio Allocation $11,733,000
05-001—La Honda Creek Land
Conservation Opportunities
$1,756,093 $1,756,093
05-002—Upper La Honda Creek
Grazing Infrastructure
$209,765 $209,765
05-004—La Honda Creek Sears
Ranch Interim Parking
$5,074 $5,074
05-005—La Honda Creek Red Barn
Parking Area and Easy-Access Trail
$327,514 $327,514
05-006—La Honda Creek Sears
Ranch Road Repair
$98,559 $98,559
05-008—La Honda Creek White Barn
Structural Rehabilitation
$14,699 $13,834 $28,533
05-009—La Honda Creek Redwood
Cabin Stabilization and Assessment
$3,221 $3,221
05 Total $11,733,000 $2,411,704 $17,055 $2,428,759 $9,304,242 20.70%
Portfolio 6: Windy Hill—Trail Improvements, Preservation and Hawthorns Area Historic Partnership
Total Portfolio Allocation $12,740,000
06-001 —Hawthorns Parking Lot
Concept Design
$8,490 $8,490
06-002 —Hawthorns Public Access
Site Plan and CEQA
$18,112 $18,112
06 Total $12,740,000 $8,490 $18,112 $26,602 $12,713,398 0.21%
78 Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 7: La Honda Creek—Driscoll Ranch Public Access, Endangered Wildlife Protection
and Conservation Grazing
Total Portfolio Allocation $14,825,000
07-001—Event Center and Apple
Orchard Purchase
$6,007,601 $6,007,601
07-002—Fisheries Restoration,
Design and Permitting
$727,716 $727,716
07-003—Fisheries Enhancement,
Apple Orchard
$16,152 $16,152
07-004—Fisheries Enhancement,
Event Center
$50,000 $50,000
07-005—Grazing and Water Systems
Infrastructure
$189,422 $189,422
07-006—Cunha Land Purchase $3,080,705 $3,080,705
07-007—Demolitions, Wool Ranch
House/Sears Ranch Road
$357,803 $357,803
07-009—Sears Ranch Parking Areas $1,124,545 $17,937 $1,142,482
07-010—Sears Ranch Road Repair $458,484 $458,484
07-011—La Honda Creek Loop Trails $27,058 $104,012 $131,070
Subtotal $14,825,000 $12,039,486 $121,948 $12,161,434 $2,663,566 82.03%
07-002—Fisheries Restoration,
Design and Permitting Grant Income
($230,970)($230,970)
07 Total $14,825,000 $11,808,516 $121,948 $11,930,464 $2,894,536 80.48%
Portfolio 8: La Honda Creek/Russian Ridge—Preservation of Upper San Gregorio Watershed
and Ridge Trail Completion
Total Portfolio Allocation $15,347,000
08-001—Folger Property Purchase $2,153,910 $2,153,910
08 Total $15,347,000 $0 $2,153,910 $2,153,910 $13,193,090 14.03%
Portfolio 9: Russian Ridge—Public Recreation, Grazing and Wildlife Protection Projects
Total Portfolio Allocation $5,560,000
09-001—Russian Ridge Mindego
Grazing Infrastructure
$174,416 $174,416
09-003—Russian Ridge Mindego
Pond Improvement
$136 $77,512 $77,648
09-004—Mindego Hill Trail
Construction
$67,403 $67,403
09 Total $5,560,000 $241,955 $77,512 $319,467 $5,240,533 5.75%
79Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 10: Coal Creek—Reopen Alpine Road for Trail Use
Total Portfolio Allocation $8,017,000
10-001—Alpine Road Regional Trail,
Coal Creek
$21,949 $144,173 $166,122
10 Total $8,017,000 $21,949 $144,173 $166,122 $7,850,878 2.07%
Portfolio 11: Rancho San Antonio—Interpretive Improvements, Refurbishing and Transit Solutions
Total Portfolio Allocation $10,811,000
11-001—New Trails to Connect
Quarry Trail to Black Mountain Trail
$728 $728
11-002—Rancho San Antonio,
Deer Hollow Farm: White Barn
Rehabilitation
$29,511 $3,025 $32,536
11 Total $10,811,000 $30,239 $3,025 $33,264 $10,777,736 0.31%
Portfolio 12: Peninsula/South Bay Cities—Partner to Complete Middle Stevens Creek Trail
Total Portfolio Allocation $1,038,000
12 Total $1,038,000 $0 $0 $0 $1,038,000 0.00%
Portfolio 13: Cloverdale Ranch—Wildlife Protection, Grazing and Trail Connections
Total Portfolio Allocation $15,712,000
13 Total $15,712,000 $0 $0 $0 $15,712,000 0.00%
Portfolio 14: Regional—Trail Connections and Campgrounds
Total Portfolio Allocation $3,966,000
14 Total $3,966,000 $0 $0 $0 $3,966,000 0.00%
Portfolio 15: Regional—Redwood Protection and Salmon Fishery Conservation
Total Portfolio Allocation $50,728,000
15-001—Conservation Easement
Upper Alpine Ranch Area
$2,508,695 $2,508,695
15-002—Conley Property Purchase $509,855 $509,855
15-003—Long Ridge Property
Addition
$14,500 $14,500
15 Total $50,728,000 $3,018,550 $14,500 $3,033,050 $47,694,950 5.98%
Portfolio 16: Long Ridge—Trail, Conservation and Habitat Restoration Projects (Saratoga)
Total Portfolio Allocation $5,140,000
16 Total $5,140,000 $0 $0 $0 $5,140,000 0.00%
80 Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 17: Regional—Complete Upper Stevens Creek Trail
Total Portfolio Allocation $7,760,000
17-001—Land Conservation: Last
Piece Upper Stevens Creek
$1,494,552 $1,494,552
17-002—Demolition & Restoration:
Lobner/Lysons
$138,060 $9,869 $147,929
17-004—Stevens Creek Nature Trail
Bridges, Monte Bello
$147,635 $265,218 $412,853
Subtotal $7,760,000 $1,780,247 $275,086 $2,055,333 $5,704,667 26.49%
17-002—Lysons Property Purchase
Grant Income (50% of purchase price)
($740,000)($740,000)
17 Total $7,760,000 $1,040,247 $275,086 $1,315,333 $6,444,667 16.95%
Portfolio 18: South Bay Foothills—Saratoga-to-the-Sea Trail and Wildlife Corridor
Total Portfolio Allocation $1,365,000
18-001—San Jose Water Land
Purchase
$3,850 $3,850
18 Total $1,365,000 $0 $3,850 $3,850 $1,361,150 0.28%
Portfolio 19: El Sereno—Dog Trails and Connections
Total Portfolio Allocation $2,254,000
$715 $715
19-001—Gupta/Khan Property
Purchase
$406,553 $406,553
19-002—Dunham-Bohlman
Easement
$19,997 $19,997
19-003—Haight-Perry LV Land
Acquisition
$52,977 $52,977
19 Total $2,254,000 $427,265 $52,977 $480,242 $1,773,759 21.31%
Portfolio 20: South Bay Foothills—Wildlife Passage and Ridge Trail Improvements
Total Portfolio Allocation $13,966,000
20-001—Wildlife Corridor: Highway
17 Crossing
$196,519 $129,262 $325,781
20-002—Bay Area Ridge Trail:
Highway 17 Crossing
$317 $64,105 $64,422
20 Total $13,966,000 $196,836 $193,367 $390,203 $13,575,798 2.79%
81Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 21: Bear Creek Redwoods—Public Recreation and Interpretive Projects
Total Portfolio Allocation $17,478,000
21-001—Moody Gulch Fence & Gate
Improvements
$847 $847
21-002—Bear Creek Redwoods
Preserve Plan
($12,954)($1,415)($14,369)
21-003—Bear Creek Redwoods
Stables Water System
$191,149 $794 $191,943
21-004—Bear Creek Stables Site
Plan Implementation
$282,075 $2,270 $284,345
21-005—Bear Creek Redwoods
Public Access
$1,505,935 $3,748,293 $5,254,228
21-006—Bear Creek Redwoods Alma
College Cleanup and Stabilization
$692,822 $332,396 $1,025,218
21-007—Bear Creek Redwoods
Preserve Plan Invasive Weed
Treatment
$501,679 $319,050 $820,729
21-008—Bear Creek Redwoods
Ponds Restoration and Water Rights
$126,676 $62,201 $188,877
21-009—Bear Creek Redwoods
Webb Creek Bridge
$138,876 $348,616 $487,492
21-010—Bear Creek Redwoods
Landfill Characterization and
Remediation
$36,375 $36,375
Subtotal $17,478,000 $3,427,105 $4,848,581 $8,275,686 $9,202,314 47.35%
21-007—Bear Creek Redwoods
Preserve Plan Invasive Weed
Treatment Grant Income
($107,042)($189,882)($296,924)
21 Total $17,478,000 $3,320,063 $4,658,699 $7,978,762 $9,499,238 45.65%
Portfolio 22: Sierra Azul—Cathedral Oaks Public Access and Conservation Projects
Total Portfolio Allocation $6,714,000
22-001—Hendrys Creek Property
Land Restoration
$168,316 $304,668 $472,984
22-003—Freudenberg Land Purchase $540,587 $540,587
22-004—Beatty Parking Area and
Trail Connections
$64,325 $64,325
Subtotal $6,714,000 $708,903 $368,992 $1,077,895 $5,636,105 16.05%
22-001—Hendrys Creek Property
Land Restoration Grant Income
($67,111)($67,111)
22 Total $6,714,000 $641,792 $368,992 $1,010,784 $5,703,216 15.05%
82 Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 23: Sierra Azul—Mount Umunhum Public Access and Interpretation Projects
Total Portfolio Allocation $27,972,000
23-001—Mt. Um Road and Trail
Property Rights
$1,271,318 $1,271,318
23-002—Mt. Um Trail $959,548 $959,548
23-004—Mt. Um Summit Restoration,
Parking and Landing Zone
$10,398,273 $29,853 $10,428,126
23-005—Mt. Um Guadalupe Creek
Overlook and Bridges
$259,311 $259,311
23-006—Mt. Um Road Design/
Permitting/Construction
$6,280,251 $6,280,251
23-007—Twin Creeks Land
Conservation
$2,913,372 $812,554 $3,725,926
23-008—Twin Creeks Restoration $9,963 $9,963
Subtotal $27,972,000 $22,082,073 $852,369 $22,934,442 $5,037,558 81.99%
23-004—Mt. Umunhum Summit
Restoration, Parking and Landing
Zone Grant Income
($570,000)($570,000)
23-007—Twin Creeks Land
Conservation Grant Income
($750,000)($750,000)
23 Total $27,972,000 $20,762,073 $852,369 $21,614,442 $6,357,558 77.27%
Portfolio 24: Sierra Azul—Rancho de Guadalupe Family Recreation
Total Portfolio Allocation $10,078,000
24-001—Barth Property Purchase $300,035 $300,035
24-002—Petersen Property
Acquisition
$700,603 $700,603
24-003—Property Exchange Navid/
Bagher
$39,184 $39,184
24-004—Kahn Property Acquisition $552,174 $552,174
24-005—Morales Property
Acquisition
$14,900 ($14,900)$0
24 Total $10,078,000 $1,606,896 ($14,900)$1,591,996 $8,486,004 15.80%
83Measure AA Bond Annual Accountability Report FY2018-19
Project Expenditure
Plan
Total Through
Prior Period
6/30/18
Current Period
7/1/18 Through
6/30/19
Total Life-to-
Date Through
6/30/19
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 25: Sierra Azul—Loma Prieta Area Public Access, Regional Trails and Habitat Projects
Total Portfolio Allocation $7,986,000
25-001—Land Conservation
Opportunities
$410,150 $410,150
25 Total $7,986,000 $410,150 $0 $410,150 $7,575,850 5.14%
Subtotal $300,000,000 $50,874,754 $10,871,866 $61,746,620 $238,253,380 20.58%
Reimbursements from Grants and
Other Contributions
($2,694,744) ($620,869) ($3,315,613)
GRAND TOTAL $300,000,000 $48,180,010 $10,250,997 $58,431,007 $241,568,993 19.48%
EXHIBIT A
Expenditure Plan
TITLE: To improve access to hiking and biking opportunities, protect and preserve redwood forests, natural
open spaces, the scenic beauty of the region and coastline, critical wildlife habitat, restore creeks to protect
water quality, and reduce forest fire risk.
1. SUMMARY
Founded by voters in 1972, the Midpeninsula Regional Open Space District (“District”) has protected, in
perpetuity, 62,000 acres of open space containing 26 preserves and more than 220 miles of trails that serve
Santa Clara, San Mateo, and a portion of Santa Cruz counties. The District’s preserves provide a scenic
backdrop to the region offering residents places for hiking, biking, horseback riding, or simply connecting with
nature, close to home. Throughout its 41-year history the District has used taxpayer dollars wisely, leveraging
funds to bring in state, federal, and private grant money, and providing annual audits in a transparent public
process. The District is governed by a publicly elected board of directors.
Over the years, the number of acres and miles of trails the District owns and maintains have steadily
increased, as have the number of visitors and the cost of land. Expanding public access, restoring sensitive
environments and purchasing land are costly, yet are high priorities for the public.
To reinforce and expand these types of services and resources, the Board of Directors is placing this
funding measure on the June 3, 2014 ballot.
$300 million in General Obligation Bonds will be sold. The bond repayment would be financed by an
annual property tax override based on a tax rate not to exceed $3.18 per $100,000 of assessed value of
property owned per year.
This Expenditure Plan outlines priority actions identified by the public and proposed by the District to be
funded with bond proceeds. Part B describes each priority action and describes what goals it will achieve. Part
C of the Expenditure Plan describes the establishment of an independent Citizen Oversight Committee.
Measure AA Ballot Language, as approved by voters on June 3, 2014 84
2.PRIORITY ACTIONS
The priority actions listed below are the result of a process that combined scientific analysis with broad
public engagement to create a shared vision for the future of the District and the region’s open space. Each
priority action may address one or more of the following as more specifically described in the table Priority
Actions, By Region attached to this Expenditure Plan:
•Improved hiking, biking, and equestrian opportunities
•Protection and preservation of redwoods, natural open spaces, the scenic beauty of the region
and coastline, critical habitats
•Restoration of creeks to protect water quality
•Reduction of forest fire risk
Priority actions are distributed throughout the District as depicted on the map attached to this
Expenditure Plan.
If approved, the bond proceeds would be allocated to fund the capital improvements necessary to
implement the priority actions listed below. Note: the number associated with each priority action does not
denote its priority level, but is only used for identification purposes to correlate with the locations depicted on
the map.
The estimates associated with each priority action are in 2014 dollars. These are estimates only, and
the actual costs may change in implementation.
The District may annually review and propose amendments to the Expenditure Plan to provide for the
use of additional federal, state and local funds, to account for unexpected revenues, or to take into
consideration unforeseen circumstances. The District shall act on no more than one package of amendments
each fiscal year. The District shall establish a process for proposed Expenditure Plan amendment(s) which
ensures that the Citizen Oversight Committee is included in the development. Upon completion of this
process, amendments(s) to the Expenditure Plan must be passed by a two-thirds majority of the District Board
in a publicly noticed meeting.
Measure AA Ballot Language, as approved by voters on June 3, 2014 85
PRIORITY ACTIONS, BY REGION
South Bay Foothills
(Los Gatos, Monte Sereno, Saratoga, and Santa Cruz Mountains)
18 South Bay Foothills: Saratoga-to-Sea Trail and Wildlife Corridor
Protect wildlife corridor along Highway 9. Connect trail to Saratoga-to-Sea Trail and Skyline-to-Sea Trail.
$1,365,000
19 El Sereno: Dog Trails and Connections
Provide infrastructure to open trails to dogs. Develop connections to Skyline, Sanborn County Park, & Lexington
Reservoir. $2,254,000
20 South Bay Foothills: Wildlife Passage and Ridge Trail Improvements
Establish safe corridors for mountain lions across Highway 17. Establish Bay Area Ridge Trail crossing.
$13,966,000
21 Bear Creek Redwoods: Public Recreation and Interpretive Projects
Open for hiking, equestrian activities. Provide parking areas, trails; upgrade stables. Restore & protect habitats
for various species. Repair roads & trails to reduce sediment. Rehabilitate Alma College site. $17,478,000
22 Sierra Azul: Cathedral Oaks Public Access and Conservation Projects
Develop multi-use trail & plan future trails as land is available. Develop parking. Restore plant communities and
soils. Install trailside amenities. Preserve additional open space and complete wildlife corridor in upper Los Gatos
Creek watershed. $6,714,000
23 Sierra Azul: Mt. Umunhum Public Access and Interpretation Projects
Open Mt. Umunhum for multi-use public access to summit via road and trail. Open Bay Area Ridge Trail and
nearby trail connections. Preserve additional open space and complete wildlife corridor. $27,972,000
24 Sierra Azul: Rancho de Guadalupe Family Recreation
Open Rancho de Guadalupe to public access. Develop accessible multi-use trails with amenities such as parking
and family recreation. Restore habitat for rare species. Protect cultural and natural resources. $10,078,000
25 Sierra Azul: Loma Prieta Area Public Access, Regional Trails and Habitat Projects
Provide public access and recreation, including small campground. Develop, improve, connect regional multi-use
trails to Forest of Nisene Marks State Park, to protected land to east, and to Mt. Umunhum. Protect Steelhead
habitat, rare plants and grasslands, restore Knobcone Pine stands. $7,986,000
Measure AA Ballot Language, as approved by voters on June 3, 2014 86
Peninsula Foothills and Bay
(Cupertino, Los Altos, Los Altos Hills, Sunnyvale, Mountain View, Palo Alto, East Palo Alto,
Menlo Park, Atherton, Redwood City, San Carlos, Woodside, Portola Valley, Skyline
2 Regional: Bayfront Habitat Protection and Public Access Partnerships
Partner to complete gaps in Bay Trail and develop city-to-bay trails. Support wetland restoration and associated
interpretive facilities. Preserve additional bayfront open space. $5,052,000
4 El Corte de Madera Creek: Bike Trail and Water Quality Projects
Develop single-use biking/hiking trails, complete Ridge Trail gaps, and develop trail system leading to parking
area. Restore damaged trails to improve water quality. Preserve additional open space as available.
$8,376,000
5 La Honda Creek: Upper Area Recreation, Habitat Restoration and Conservation Grazing
Projects
Open upper half of the preserve to public; provide biking/hiking/equestrian trails, dog access, and staging areas.
Provide loop & connector trails. Restore habitat for rare species. Improve fencing, corrals, and water systems to
reintroduce conservation grazing. $11,733,000
6 Windy Hill: Trail Improvements, Preservation and Hawthorns Area Historic Partnership
Improve trails, complete pond facilities. Increase multi-use trails, study possible improvements to increase dog
use. Open Hawthorns Area; develop trails connecting to Portola Valley and Palo Alto trails. Partner to protect,
restore, and interpret historic buildings. Improve habitat conditions in Los Trancos Creek. Preserve additional
scenic open space as available. $12,740,000
8 La Honda Creek/Russian Ridge: Preservation of Upper San Gregorio Watershed & Ridge Trail
Completion
Preserve upper San Gregorio watershed; restore endangered species habitats. Support opportunities to provide
additional water for fisheries. Complete Bay Area Ridge Trail multi-use connections and gaps. Provide additional
public use facilities. $15,347,000
9 Russian Ridge: Public Recreation, Grazing and Wildlife Protection Projects
Open currently closed areas of preserve. Construct and extend trails. Improve fencing, corrals, and water
systems to reintroduce conservation grazing. Improve habitat for sensitive species, implement pond
enhancement projects for garter snakes and red-legged frogs. $5,560,000
10 Coal Creek: Reopen Alpine Road for Trail Use
Reopen Alpine Road as trail connection between Portola Valley & Skyline Blvd. Reroute trails to reduce erosion
and improve visitor experience. $8,017,000
11 Rancho San Antonio: Interpretive Improvements, Refurbishing, and Transit Solutions
Add welcome center, refurbish and add interpretive exhibits to Deer Hollow Farm. Support of transit improvement
options such as bike trails, bikeshare station, bus service, or additional parking. $10,811,000
12 Peninsula/South Bay Cities: Partner to Complete Middle Stevens Creek Trail
Support work by cities to develop the middle section of the Stevens Creek Trail and enhance neighborhood
connections. Support work by partners to complete stream corridor restoration and steelhead habitat
enhancement below dam. Develop and install interpretive signage. $1,038,000
16 Long Ridge: Trail, Conservation and Habitat Restoration Projects (Saratoga)
Improve roadside parking and provide restrooms. Develop new trail connections to Eagle Rock and Devils
Canyon. Repair trails for year-round multi-use access. Protect watersheds for steelhead. Preserve additional
open space as available. Implement pond and habitat enhancement restoration projects to benefit rare species.
$5,140,000
17 Regional: Complete Upper Stevens Creek Trail
Complete multi-use connection between the Bay Trail & Bay Area Ridge Trail above the reservoir through
Picchetti Ranch Open Space Preserve & Lower/Upper Stevens Creek County Parks. Improve Preserve trails and
neighborhood connections. Preserve additional open space as available. $7,760,000
Measure AA Ballot Language, as approved by voters on June 3, 2014 87
Coast
(Half Moon Bay, San Gregorio, Pescadero, La Honda,)
1 Miramontes Ridge: Gateway to the Coast Public Access, Stream Restoration and Agriculture
Enhancement
Preserve scenic open space land as available, and establish wildlife corridor. Restore fish and red-legged frog
habitats in Madonna Creek watershed. Partner to enhance water availability for agriculture and fish. Develop
trail loop system, including Ridge Trail and neighborhood access points. Develop staging area, repair bridges.
$27,774,000
3 Purisima Creek Redwoods: Purisima-to-Sea Trail, Watershed Protection and Conservation
Grazing
Complete and open multi-use Purisima-to-Sea trail connection between Ridge Trail and Coastal Trail, and new
parking areas. Preserve additional open space as available. Remove fish barriers and restore Lobitos Creek.
Restore ponds for endangered species. $7,608,000
7 La Honda Creek: Driscoll Ranch Public Access, Endangered Wildlife Protection and
Conservation Grazing
Open Driscoll Ranch Area; provide biking/hiking/equestrian trails, limited dog access, parking areas, and
interpretive displays. Develop loop & connector trails. Restore habitat for endangered species. Restore La
Honda Creek; remove fish migration barriers. $14,825,000
13 Cloverdale Ranch: Wildlife Protection, Grazing and Trail Connections
Improve fencing, corrals, and water systems to increase conservation grazing and sustain large contiguous
grasslands. Restore habitat for endangered species. Provide trail connections to nearby State parks.
$15,712,000
14 Regional: Trail Connections and Campgrounds
Develop trails between Butano, Pescadero County Park, Pescadero, Russian Ridge, and between Skyline and
Portola Redwoods, Big Basin State Park. Partner with County and State Parks to improve existing campgrounds.
$3,966,000
15 Regional: Redwood Protection and Salmon Fishery Conservation
Preserve additional open space as available. Protect and enhance redwood stands, mountain scenery, various
habitats and steelhead salmon. $50,728,000
Measure AA Ballot Language, as approved by voters on June 3, 2014 88
Measure AA Ballot Language, as approved by voters on June 3, 2014 89
3.INDEPENDENT CITIZEN OVERSIGHT COMMITTEE
An Independent Citizen Oversight Committee will be formed to verify expenditures of bond proceeds.
The Independent Citizen Oversight Committee will consist of seven at-large members, all of whom shall be
District residents. The Citizen Oversight Committee will be selected by the Board and interviewed and
approved in open session, and will be subject to the conflict of interest constraints of the California Political
Reform Act.
The responsibilities of the Committee include:
•Review Plan expenditures on an annual basis to verify conformity with the Expenditure Plan.
•Review District’s Annual Audit and Annual Accountability report and present the Committee’s findings
to the Board at a public meeting.
•Review any proposed amendments to the Expenditure Plan.
Measure AA Ballot Language, as approved by voters on June 3, 2014 90
EXHIBIT B
TAX RATE STATEMENT
An election will be held in the Midpeninsula Regional Open Space District (the "District") on June 3,
2014, to authorize the sale of up to $300 million in bonds of the District to provide public access and acquire,
restore, and preserve open space throughout the District as described in the ballot measure. If the bonds are
approved, the District expects to sell the bonds in several series over time. Principal and interest on the bonds
will be payable from the proceeds of tax levies made upon the taxable property in the District. The information
contained in numbered paragraphs 1 - 3 below is provided in compliance with sections 9400-9404 of the
Elections Code of the State of California.
1. The best estimate of the tax which would be required to be levied to fund this bond issue during the
first fiscal year after the sale of the first series of bonds, based on estimated assessed valuations available at
the time of filing of this statement, is $1.00 per $100,000 of assessed valuation in fiscal year 2015-16.
2. The best estimate of the tax rate which would be required to be levied to fund this bond issue during
the first fiscal year after the sale of the last series of bonds, based on estimated assessed valuations available
at the time of filing of this statement, is $2.90 per $100,000 of assessed valuation in fiscal year 2044-45.
3. The best estimate of the highest tax rate which would be required to be levied to fund this bond
issue, based on estimated assessed valuations available at the time of filing of this statement, is $3.18 per
$100,000 of assessed valuation in fiscal year 2034-35.
Voters should note that the estimated tax rates are based on the estimated ASSESSED VALUE of
taxable property on the respective County's official tax rolls, not on a property's market value. Property owners
should consult their own property tax bills to determine their property's assessed value and any applicable tax
exemptions.
Attention of all voters is directed to the fact that the foregoing information is based upon the District's
projections and estimates only, which are not binding upon the District. The actual tax rates and the years in
which they will apply may vary from those presently estimated, due to variations from these estimates in the
timing of bond sales, the amount of bonds sold and market interest rates at the time of each sale, and actual
assessed valuations over the term of repayment of the bonds. The dates of sale and the amount of bonds sold
at any given time will be determined by the District based on its needs for funds and other factors. The actual
interest rates at which the bonds will be sold will depend on the bond market at the time of each sale. Actual
future assessed valuation will depend upon the amount and value of taxable property within the District as
determined by the respective County Assessor in the annual property value assessment process.
Dated: _______, 2014.
_________________________
General Manager
Midpeninsula Regional Open Space District
Measure AA Ballot Language, as approved by voters on June 3, 2014 91
Expenditures Expenditures
from from
July 1, 2018 Inception
through through
Project No.Project Description June 30, 2019 June 30, 2019
20005 New Trail Easement - SFPUC, Ravenswood (MAA 2-2)(22,603)$ A -$ -$
20088 POST Hendry's Creek Restoration (MAA 22-1)(41,330) B --
20101 Lysons Property ( 17-1 MAA )(27,059) C --
20102 Lobner Demolition (MAA 17-2)(128,760)C --
20109 Riggs Property Appraisal - (3-1 MAA)(6,500) D --
20110 Purisima Creek Uplands Lot line Adjustment (3-1 MAA)(13,000) D --
20112 Conservation Easement Upper Alpine Ranch Area (15-1 MAA)(8,695) E --
20113 Preservation of Upper Los Gatos Creek Watershed (22-1 MAA)(5,000) B --
20114 Land Conservation Opportunities MAA 25-1 (Burtons )(150)F --
30503 ECDM Trail Improvements (MAA 4-4)(3,930) G --
30904 Mindego Area - Mindego Hill Trail (MAA 9-4)(34,196) H --
31309 Mt Um Bald Mtn Staging to Summit Trail (MAA 23-2)(17,646) I --
31310 Mt Um Summit Restor & Improv (MAA 23-4)(79,491) I --
31311 Mt Um Trail Overlook & Bridges (MAA 23-5)(243)I --
31500 Measure AA Project 11-1 (728)J --
65101 PCR Harkins Bridge Replacement (MAA 3-4)(108,788)D --
65201 Lower Stevens Canyon Hiking Bridge (MAA 17-4)(103,187)C --
80016 ECdM Creek Watershed Protection Program (MAA 4-3)(45,507) G --
80029 Pond DR05 Repair (MAA 7-5)(150,682)K --
80037 Mindego Grazing Infrastructure (MAA 9-1)(135,748)H --
80038 LHC Grazing Infrastructure - McDonald Ranch Fencing (MAA 5-2)(178,850)L --
AA01 Miramontes Ridge - Gateway to San Mateo Coast -(52,915.00)-
AA02 Bayfront Habitat Protection & Public Access Partnerships 22,603 A 1,327,008.00 2,046,671
AA03 Purisima Creek Redwoods: Purisma-to Sea Trail, Watershed/Graze 128,288 D 160,306.00 1,270,676
AA04 El Corte de Madera Creek: Bike Trail & Water Quality 49,437 G 306,910.00 886,868
AA05 La Honda Creek - Upper Recreation Area 178,850 L 17,055.00 2,428,759
AA06 Hawthorn Public Access Improvements -18,112.00 26,602
AA07 Driscoll Ranch Public Access, Wildlife Protection, Grazing 150,682 K 121,948.00 12,161,434
AA08 La Honda/Russian Ridge: Upper San Gregorio Watershed -2,153,910.00 2,153,910
AA09 Russian Ridge: Public Recreation, Grazing & Wildlife Protection 169,944 H 77,512.00 319,467
AA10 Coal Creek: Reopen Alpine Road for Trail Use -144,173.00 166,122
AA11 Rancho San Antonio: Interpretive Improvements, Refurbishing 728 J 3,025.00 33,264
AA15 Regional: Redwood Protection & Salmon Fishery Conservation 8,695 E 14,500.00 3,033,050
AA17 Regional: Complete Upper Stevens Creek Trail 259,006 C 275,086.00 2,055,333
AA18 South Bay Foothills: Saratoga-to-Sea Trail & Wildlife Corridor -3,850.00 3,850
AA19 El Sereno Dog Park & Connections -52,977.00 480,242
AA20 South Bay Foothills: Wildlife Passage/Ridge Trail Improvements -193,367.00 390,203
AA21 CR:Pub Recreation Proj -4,848,581.00 8,275,686
AA22 Cathedral Oaks Public Access & Conservation 46,330 B 368,992.00 1,077,895
AA23 Mt Um Pub Access/Intrep 97,380 I 852,369.00 22,934,442
AA24 Rancho de Guadalupe Family Recreation -(14,900.00)1,591,996
AA25 Loma Prieta Area Public Access 150 F -410,150
Total MAA Bond Project Expenditures -10,871,866 61,746,620
Reimbursements from Grants, Contributions, and Other Funds -(620,869)(3,315,613)
Total MAA Bond Project Expenditures - Net Reimbursements -$ 10,250,997$ 58,431,007$
During fiscal ye ar ending June 30, 2019,the District realigned pre-existing project numbers eligible for Measure AA (MAA)funding with
the Measure AA projects numbers (MAA)for ease of project review.Letters in adjustment column indicate the transfer of expenses
between project numbers.Prior expenditure balances related to appraisals and land surveys in MAA01 "Miramontes Ridge -Gateway to
San Mateo Coast"and MAA24 “Sierra Azul:Rancho de Guadalupe Family Recreation Projects”were removed as the transactions failed to
materialize.
Adjustments
Midpeninsula Regional Open Space District
Measure AA Bond Program
Schedule of Program Expenditures
June 30, 2019
This page is an excerpt from the Consolidated Annual Financial Statement for fiscal year ended June 30, 2019, page 85. Annual audited
financial statements can be found at openspace.org/financials.
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
330 Distel Circle
Los Altos, California 94022-1404
650-691-1200
info@openspace.org
openspace.org
PRINTED ON POST
CONSUMER WASTE PAPER
Sierra Azul Open Space Preserve by C. Schell