HomeMy Public PortalAboutTappan and Piermont, Water Line, July 15TOWN OF WATERTOWN
DEPARTMENT OF PUBLIC WORKS
124 ORCHARD STREET
WATERTOWN, MASSACHUSETTS 02472
Tel: 617-972-6420
Fax: 617-972-6402
July 12, 2019
IMPORTANT NOTICE FROM THE
DEPARTMENT OF PUBLIC WORKS
Dear Residents and abutters of Tappan Ave. and Piermont Street:
Laboratory testing for water quality of the temporary water system piping has been
completed. The Department is now approving activation of the temporary water line.
A representative from the Town's Engineering Firm, Weston and Sampson and our
contractor, Commonwealth Construction, Inc., will need access to each home to
connect the by-pass water main to each residence. This will utilize a hose connection to
the hose bib on the outside of each structure. Access to the basement will be
required to complete the connection.
Homeowner approval and entry into your property will begin Monday, July 15, 2019
between the hours of 7:00 AM and 4:00 PM. If this time frame is inconvenient, please
contact the contractor's coordinator, Billy DiStefano at 617-909-5404 for an
appointment.
During this time the contractor will be accompanied by a Public Works representative
wearing a lime green safety vest labeled "Public Works" and will have a vehicle labeled
Public Works in very close proximity to the houses being entered.
Upon completion of this task general excavation of the water main will commence. We
would like to thank you in advance for your cooperation.
If you have any questions contact the Public Works Department at (617) 972-6420.
� : � P qe,_-�, I-
- _'4 'r � vw'� � i /�'
Gerald S. Mee, Jr.
Superintendent