Loading...
HomeMy Public PortalAboutChage Order No. 25 to Contract No. 148-2014 - INDOT Coordination Agreement (R-37463) 1382810 - Bike Pedestrian facilitiesContract No:R -37463 Change Order No.: 025 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -37463 Letting Date:10/12/2017 District:GREENFIELD DISTRICT AE:Prather, Michael PE/S:Miller, Christopher Status:Draft Change Order Information Change Order No.: 025 EWA: Y or Force Acct: N Date Generated: 02/18/2020 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Materials Related Description: Mulched Seeding, U Original Contract Amount $ 5,883,000.00 Current Change Order Amount $-2,155.25 Percent: -0.037 % Total Previous Approved Changes $ 229,986.03 Percent: 3.909 % Total Change To -Date $ 227,830.78 Percent: 3.872 % Modified Contract Amount $ 6,110,830.78 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 'Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 71 Contract No:R -37463 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 025 Page: 2. AE: M. Prather D CE: SCE: * DDCM: (7LE$250K-)(-LE$750K-)(--LE$2M--)(—GT$2M—) (50 SS days) ( 100 SS days) (200 SS Days) (GT 200 SS days) Y /Mlf Y, by Date Issued Y /®If Y, Copy to Program Budget Manager Y / Pn1 If Y,. Referred to Project Manager(PM) Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Q/ N If Y, Date to LPA 2/18/2020 Date Returned FHWA Signatures Required? Y ,® If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments:. 4 Contract NOR -37463 INDIANA Change Order No:025 Department of Transportation Contract: R -37463 Project: 1382810 - State: 138281000LC3 Change Order Nbr: 025 Date:0211812020 Page: 3 Change Order Description: Mulched Seeding, U Reason Code: CHANGED COND, Materials Related CLN PCN PLN Item Code Unit Unit Price Co Qty Comment Amount Change 0065 1382810 0065 621-06575 SYS 6.000-785.000 C Amount:$-4,710.00 Item Description: SODDING, NURSERY Supplemental Descriptions: Supplemental Description2: 0197 1382810 0197 621-06560 SYS 3.540 721.680 C Amount:$ 2,554.74 Item Description: MULCHED SEEDING U Supplemental Description1: Supplemental Descriptlon2: Total Value for Change Order 025 = $-2,155.25 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Due to the limited amount of restoration needed throughout the project site, the City of Richmond requested Mulch Seeding, U to be used in lieu of sod so that. restoration was not limited to sod availability or time of year. Milestone provided the attached change order request on behalf of the city's recommendation. The price submitted falls within the INDOT average unit price summary and is attached for reference. Based on the INDOT price averages and the fact that the change in material saved the project 2155.25 United recommends approving the change order as submitted. Change Order Explanation for Specific Line Item It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change or/der is hereby acknowledged. 46?�W Contractor.t r i Gte`� l� a-7ar'S. Signed By;P& Date: Z /1 NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -37463 Change Order No:025 INDIANA Department of Transportation ai#+wt#+rrrr+rraarr#rrr#arrararraasaaaarra#aaaa#rraaaar+rrraraarrrraar++aaaa.a«aaaaaa+rr+aar+rrrrrxae++a«aaaaa+++rrrrtr+r++a. OR (S 4 RE) APPROVED FOR LOCAL PUBLIC AGENCY (TITLE) '#-IN4111 (TITLE) r}rr###rrxarrrrrrr.rrxarxxa#axaa}aaaaaira#r#}#r},�#}rmr:rrma}a##}}##m##}wrrrr:r#a#aaar4r}}#araraar}aaaaa4raar###r#ra}}a PE/S Christopher Miller SUBMITTED FOR CONSIDERATION (DATE) (DATE) APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION Date:02/18/2020 Page: 4 :ems.¢,�a-•-----�.�.-„��,n.,����..,�_..__;��,,:.,,,.�..__�,;; Approval Level Name of Approver Date Status CHANGE ORDER REQUEST FORM CONTRACT NO. NOTE: Upon request from Engineer, enter detailed description on page 2. DATE OF SUBMISSION fec'�!'^rall,t [vr r -4 lafiyy.r tom. �,rr 14.rE �1 I �'�''- �h 4�'�{'"h ONSET DATE OF CHANGE ,ar AV Usk 1Z 2019 n 9 a CHANGE ORDER TYPE t _ �, t $ i{1043 Ektr WoEjc�,� �a�i, �11''f PROPOSED COST AND TIME ADJUSTMENT COST COST INCREASE / (DECREASE): The cost adjustment shall include lump sum and/or estimated totaled unit -priced item costs. Attach a separate sheet of unit price items including item description, unit of measurement, estimated quantity and unit price. CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE: _.:wnr; • Q_ "x.:.� �•�.2r.��•. -]T^�i"" ^;YTArmrlv. n,T�YT'..;^•!��"?�• Q _t.s709:05 h�,nEac➢ea e:f�l109.03Ateed.Quaireed-Pri.d& PROPOSED COST CHANGE INCLUDES: TIME ADJUSTMENT INCREASE / (DECREASE): .CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE: (work days) Fxcu -a'b[ ''Na tl`sab[e," t ��� rCC. �-� EI.1O8.f18 I Eacct sa e o t e.,r��a f� _. 4i�iLT3{:IX:t:uL.ed:a.aa�.rufu.._au_..c.z.:u...icf�.z:T..=,cTvli.v-rr_.: NOTE: If Compensable, attach details based on 109.05.2(a) Allowable Delay Costs. SUPPLEMENTAL INFORMATION Additional information. ^i, ii3a'1`k CHANGE ORDER ORIGINATION: I` �trr;J1!fYsa�r�t"��u�'ii�ContraLiOC^"I �_,�A.1'�..i �D�� LPA tfi�xul ��t;...alxa7'r r.r��-�,�,.._:��.,.W.�:r:�:��� r• . .� ;.s DOCUMENTS AFFECTED: ElContract Specifications (ref, doc name/no.) EStanl1nn�SrarcSppec�ficat�io1nQ1�rr i7d';.�'WF(;d.�hLrKMr, �"Gtd liI&PIiez��J�}I��a�� q�;' �,�E'�4;��}r �� F ❑ Contract Plans (ref. doc name/no.) ei k� 3� 4 �r r yy �4 124' yyT L3 '.!!.:'1hI3JX'.Yin'.�[GAnn„..I�M1f�.'r� CHANGE ORDER AFFECTS DBE PARTICIPATION: r M•y 'fah �*1a ^'t�l �'.� !a?�f Qyes' ®no(ifyes, details)„` �rMt 'd'r�'E, .d?' attach �`N�,;S�'Y'.•9:, gr t: i14!� t75 r!� ;'?1�.x11':42,��, .�� .tir1.��., i'?sr�;:_!!jr>�ZI .�. >�.�?eY?�.k .�-...!la. ? �r:4 tl l.r"lia�lr4c'k Ver. 10.18.18 CHANGE ORDER REQUEST FORM Click here to enter tem. CONTRACT NO. B-37463-B:. i UPON WRITTEN REQUEST'FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL DATE RECEIVED REQUEST FOR ! February 10, 2020 SUBMITTAL DATE OF (. February 12, 2020 ADDITIONAL DETAIL ADDITIONAL DETAIL DETAILED DESCRIPTION / JUSTIFICATION: (Include location(s), actions of contractor, owner, and other stakeholders, key events and related cause(s), discoveries, discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached or available to support this change order request.) Greg Stiens requested revised pricing PROPOSED SOLUTION — ADDITIONAL DETAILS: (Include proposed scope -of work, means & methods, materials, equipment, utility relocation required, subcontracted scope and the effect on the contract schedule. Also include references to attached documents including, but not limited to, sketches, calculations, photos, material information, and submittals and meeting minutes.) Click here to enter twit. . SIGNATURE Contractor: y� °>\'vYlh i Name: (print) . clL'ir�5 P�'' (signature) Date:li�rC CJ fir' NOTE. The Contractor should retain a signed copy of this document for record. pg. 2 CHANGE ORDER REQUEST FORM CONTRACT NO. ATTACHMENT: UNIT PRICE ITEMS DETAIL Attach or paste a unit price item detail. P9. 3 ii Milestone Contractors, L.P. .. Extra Work Pricing Summa Project No: INDOT (R-37463-B) Date Requested: 10/19/18 Date Submitted. Description of Work. Mulched seeding in place of sod Reason for Extra Work: CITY OF RICHMOND REQUESTED 2/4/2020 RESUBMITTED 2/12/2020 Has Work Already Been Completed? YES When: 12-Aug-19 THROUGH 12-Aug-19 MCLP Project No. 184003 Cost Activity Code., 0 Item: Quantity., 722 Units SY Labor. Cost = $0.00 Markup % 20% $ Total $ - Equipment. cost = $0.00 Markup % 12% $ - Total $ - Materials: cost = $0.00 Markup % 12% $ - Total $ - Subcontract: Cost = $ 2,316.00 Markup % 10% $ 231.60 Markup % 7% $ - Total $ 2,547.60 Trucking: Cost = $ - Markup % 12% $ - $ - $ 2,316.00 $ 231.60 $ 2,547.60 Insurance & Bond Cost = $ 6.37 Markup % 12% $ 0.76 Total $ 7.13 Total $ 2,554.73 Unit Price 1 $ 3.54 Extra Days Requested - Mulched Seeding CO. Detaii.xlsx Page 1 Item Selected: 621•a656o Item Desc: Mulched Seeding U Contract No:Ei�� New Item in contract Contract: R 37463 # of Des: 1 Awarded: 10/19/2017 Work Type: Roadside Work, Other Dist: G County: Wayne Award $: $5,883,000.00 Prime Contractor: Milestone' Contractors Lp N = 274 $191.00 $0.30 $3.00 $3.30 Min W Average Median Max *3) Optional: % of Price Range to he included (Default 50%): 50.0% (or: +/--25%from average) from: to: $Z.07 < 50% Range < $3.93 $0.30 < 95% Confid. < $5.71 (9596 or +1--47.5 % from average) Unit: 5V5 *4) New Price: $3.ri4 At 15.2% from average (within 95% range) Filtered Data *2) Enter Range Min Quantity: 2 2 Max Quantity: 210900 1000 Min Award: $66,296 Max Award: $26,765,350 From Year, 2014 2017 Until Yearl 2020 2019 IN: Min: Max: Straight Av.: Weighted Av.: Median Std Dev. 274 $0.30 $191.00 $9.29 $3 30 $22.85 $5.71 95%Limit -25%Range Average New Price +25%Range 95% Limit Unit (Must show on... Optional: Pre Optional. Letting Year SYS L��� IR �l_^_J 2020 2019 20113 2017 L�LQ 2016 2015 2014 Optional: Dist Advanced: Forecasting and Predicting the Price of Specific Quantity (using Same Selected Ranges, without slicers or manual filters) 1) Click On: 2) Select Yes: Selected I... 3) One Unit only: Unit Q ACRE- CFT CYCL - 4) Enter quantity 1000 (2 < q < 210900) Selected Ranges or filters don't match, Check manual filters/optional slicers or Refresh 5) Enter Range: 50% $101 6) Resize Chart $96 Unit Price r Higher Estimate $476.49 C Middle Estimate F $466.10 17Lower Estimate $455.70 Total Amount: $466,100.00 :omments: $91 Advanced: Forecasting and Predicting the Price of Specific Quantity (using Same Selected Ranges, without slicers or manual filters) 1) Click On: 2) Select Yes: Selected I... 3) One Unit only: Unit Q ACRE- CFT CYCL - 4) Enter quantity 1000 (2 < q < 210900) Selected Ranges or filters don't match, Check manual filters/optional slicers or Refresh 5) Enter Range: 50% $101 6) Resize Chart $96 Unit Price r Higher Estimate $476.49 C Middle Estimate F $466.10 17Lower Estimate $455.70 Total Amount: $466,100.00 :omments: $91 $86 $81 $76 37.5 42.5 47.5 52.5 573 62.5 Name: Date: i