TOWN OF WATERTOWN
DEPARTMENT OF PUBLIC WORKS
124 ORCHARD STREET
WATERTOWN, MASSACHUSETTS 02472
Tel: 617-972-6420
Fax: 617-972-6402
Concrete sidewalk and apron installation
Resident of Templeton Parkway
The Watertown Department of Public Works and our contractor, Newport Construction, will begin the
excavation, forming and pouring of selected concrete sidewalks and driveway aprons.
The installation of sidewalks and driveway aprons is scheduled to start, WEATHER PERMITTING,
Tuesday, April 2, 2019. Typical work hours will be 7 AM to 4 PM.
• During the concrete installation process wooden planks will be placed across walkways to access your
residence.
• Please do not park your car next to any areas marked in front of your residence during construction.
• Driveways may remain closed up to three days to permit the concrete to cure.
• Please note that there may be lapses in time between sidewalk excavation, installing wood sidewalk
forms, and final concrete work.
• Adjustments necessary to make sidewalks and driveways ADA compliant may require minor regrading
of areas beyond the back of sidewalk, such as landscaping, driveways or walkways. The Department
will match existing materials and finishes to the maximum extent possible.
• The Watertown Police will be informed of the construction and its effects, including the need for
extended on -street parking due to driveway repairs.
We apologize for the short notice and understand that the process is noisy, messy and disruptive and
apologize in advance for any inconvenience you may experience. We know you will enjoy the improved
appearance and condition of your sidewalks for many years in the future.
Should you have any questions, please e-mail dpwdept(a_)watertown-ma.gov or you may call Ed Baptista,
Highway Supervisor, at 617-972.6420.
Sincerely,
Gerald S. Mee, Jr.
Superintendent of Public Works
Templeton Parkway Sidewalk and drive apron installation FY19 4-1-19