HomeMy Public PortalAboutWatertown Phase 1 and 2 Three week look aheadONYX - Three Week Look Ahead 9-25-20 through 10-9-20
Watertown Rehab Phase 1 and 2
CREWS:
A. Onyx Crew B. Onyx Crew C. Onyx Crew
B. Lazaro Pulverizing and Grading
C. Lazaro Paving
D. Jimenez
E. DaPonte
F. F & C Concrete
Week Of
TASK
CREW
9/21 /20
through
9/25/20
A.
Onyx Crew:
Continue to install curb and sidewalk on Bellevue St.
A. Onyx Crew
B. Onyx Crew: Continue to install curb and sidewalk Kimball St.
B. Onyx Crew
C. Onyx Crew: Continue removing panels and replacing them on Everett St.
C. Onyx Crew
9/28/20
through
10/2/20
A. Onyx Crew:
Continue to install curb and sidewalk on Bellevue St.
A. Onyx Crew
B. Onyx Crew: Continue to install curb and sidewalk Kimball St.
B. Onyx Crew
C. Onyx Crew: Finish removing panels and replacing them on Everett St.
C. Onyx Crew
10/5/20
through
through
A.
Onyx Crew:
Continue to install curb and sidewalk on Bellevue St.
A. Onyx Crew
B. Onyx Crew: Continue to install curb and sidewalk Kimball St.
B. Onyx Crew