Loading...
HomeMy Public PortalAboutChage Oreder No. 14 to Contract No. 148-2014 - INDOT Coordination Agreement (R-37463) 1382810 - Bike Pedestrian facilitiesContract NOR -37463 Change Order No.: 014 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -37463 Letting Date:10/12/2017 District:GREENFIELD DISTRICT AE:Prather, Michael PE/S:Stanley, William Status:Draft Change Order Information Change Order No.: 014 EWA: Y or Force Acct: N Date Generated: 04/29/2019 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Weather Related Description: ITS Addtional Mobilization for Temp Pavement Markings Original Contract Amount $ 5,883,000.00 Current Change Order Amount $ 2,206.16 Percent: 0.038 % Total Previous Approved Changes $-30,119.55 Percent: -0.512 % Total Change To -Date $-27,913.39 Percent: -0.474 % Modified Contract Amount $ 5,855,086.61 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension Previous Time Approved Revised Contract Time SS Days 0 SP Days 0 SP Days Value $ 0.00 SS Days by AE: DCE: SCE: DDCM: SS Days, SP Days Value $ SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -37463 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 014 Page: 2 AE: M.PratheibCE: SCE: * DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M--)(--GT$2M--) ( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days) Y / N If Y, by G.Steins Date Issued 1013/18 Y / N If Y , Copy to Program ,Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Approval Authority Concurs with PM? Y / N If Y, Concurrence by If N,Resolution: Approved LPA Signatures Required? Date Returned Resolved by Y / N If Y, Date to LPA 4/29/19 Date Disapproved Date Date Returned FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract NOR -37463 ..INDIANA Date:04/29/201.9 Change Order No:014 Department of Transportation Page: 3 Contract: R -37463 Project: 1382810 : State: 138281000LC3 Change Order Nbr: 014 Change Order Description: ITS.Addtional Mobilization for Temp Pavement Markings Reason Code: CHANGED COND, Weather Related bCLN T PCId PLN -Item Code v Unit-T UnftPrice COQtyf Comment AmountChange--� »a i 0180 1382810 0180 110-07026 EACH 1;103.080 2.000 C Amount:$ 2.206.16 Item Description: MOBILIZATION AND DEMOBILIZATION Supplemental Descriptionl: Temporay Pavement Markings Supplemental Description2: Winter -Shutdown Total Value for Change Order'014 = $2,206.16 Whereas, the Standard Specifications for this contractprovides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation The costs associated with this change are to compensate Indiana Traffic Services formobiliiation of crews to install temporary pavement markings for the 2018 : 2019 winter shutdown. The mobilizations wererequested by the city to provide safe lane markings throughout the winter .months. The fees were justified to make the project safe for.the traveling public as the project site was opened to traffic. ITS performed the mobilizations on October 3,-2018 and again on November 21,.2018: A copy of the change order request form and breakdown of work performed, and costs associated are attached to this change order as supporting documentation:. Change -Order Explanation for Specific Line Item HRNHRf.RN1fHHHHf►HHMffHftHtftHfflfHHffflRftfitfffffftiHfffNNRRNNNfiNNfifNllttRflllffflNff H1f NN! It is the intent of the parties that this change order is full. and complete compensation for the work describe above. Notification and consent to this change order is -hereby acknowledged. Mnestofie Cohtract034-.L.P. Contractor: Signed B Date: aJ ..tJ"�� iHfffffNlNHilflflfflfiNlHflffiftiNtiifii ttf tf tiRNftffNf fNNlNfffffNf iflfNfflfft NfffHlf...N.Ntllkff.H.Hlf - NOTE: Other required State and FHWA signatures will be obtained. electronically through the SiteManager-system. Contract NOR -37463 INDIANA Date:04/29/2019 Change Order No:014 Department of Transportation Page: 4 **#*#x****#**i*#rt*i#k*#iY#frtt#ft#tfi#t#Yrtx*#*##i#it**#t#YS+Y#i#SxYYYx#*xfit#rt*i***i*##t#t#SYffSHSffk#rt#*k##fitx##**x*#i#**+V-' _-~.H _'�`- - -•-"T•� � -'-" `,` <` ,� APPROVED FOR LOCAL PUBLIC AGENCY TURE) (TITLE) (DATE) (SIGNATURE) (TITLE) (DATE) J �}r SUBMITTED FOR CONSIDERATION PEIS APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION Approval Level Name of Approver Date Status