HomeMy Public PortalAboutChage Oreder No. 15 to Contract No. 148-2014 - INDOT Coordination Agreement (R-37463) 1382810 - Bike Pedestrian facilities1
I
Contract No:R -37463 Change Order No.: 015
INDIANA Department of Transportation Page: 1
Construction Change Order and Time Extension Summary
Contract Information Contract No.: R -37463 Letting Date:10/12/2017
District: GREEN FIELD DISTRICT AE:Prather, Michael PE/S:Stanley, William Status:Draft
Change Order Information Change Order No.: 015 EWA: Y or Force Acct: N
Date Generated: 00/00/0000 Date Approved: 00/00/0000
Reason Code: ERRORS & OMISSIONS, Item Related
Description: Signal Mast Arm Extension
Original Contract Amount $ 5,883,000.00
Current Change Order Amount $ 5,527.48 Percent: 0.094 %
Total Previous Approved Changes $-30,119.55 Percent: -0.512 %
Total Change To -Date $-24,592.07 Percent: -0.418 %
Modified Contract Amount $ 5,858,407.93
Time Extension Information
Date Initiated 00/00/0000 Date Completed 00/00/0000
Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
Time Element Description:
Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00
Previous Time Approved SS Days by AE: DCE: SCE: DDCM:_
SS Days SP Days Value $
Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00/0000 or SP Days 0
Contract No:R -37463
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority
($ per Change Order)
(Days per Contract)
Verbal Approval Required?
Total Change To-Date>5%?
Scope/Design Recommendation
Required?
Change Order No.: 015
Page: 2
AE: M.PrathebCE: SCE: * DDCM:
(-LE$250K-)(-LE$750K-)(--LE$2M--)(--GT$2M--)
( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days)
Y / N If Y, by G.Steins Date Issued 2/5/19
Y / N If Y, Copy to Program Budget Manager
Y / N If Y, Referred to Project Manager(PM)
Date to PM
Approval Authority Concurs with PM? Y / N If Y, Concurrence by
If N,Resolution: Approved
Resolved
Date Returned
Date
Disapproved
Date
LPA Signatures Required? Y / N If Y, Date to' LPA 4/29/19 Date Returned
FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned,
* Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
Contract No:R -37463 INDIANA
Change Order. No:015 Department of Transportation
Contract:. R:-37463 .
Project: 1382810 - State138281000LC3
Change Order Nbr. .015
Change Order.Description: Signal Mast Arm Extension
Reason Code: ERRORS &OMISSIONS, Item Related
Date:04/M2019
Page: 3
CLN PCN .. PLN Item Code Unit Unit Price CO Oty, Comment Amount Change
0181- 1382810 0181 807-04940 EACH 5,527A80 1.000 C Amount:$ 5,527.48
Item Description: MAST ARM
Supplemental Descriptionl: 10 LFT Extension
Supplemental Description2:
Total Value for Change Order 015 = $ 5,527.48
Whereas, the Standard Specifications for:this contract provides for such work to be performed, the, following change is recommended.
General or Standard Change Order Explanation
This change order compensates the contractor for purchase and installation of a 10 LIFT Signal mast arm.extension at North A and 7th. Street.
The designed length did not take into'consideration the additional length need to traverse the designated parking lane. Upon: further review.by the
designer -of record, it was determined that the existing foundation and strain pole are of adequate size to support an extension of the placed mast
arm. Since this.is a common component, the arm extension is readily available and easy, to place: The contractor has already performed this
work and the signal is functioning as intended. INDOT traffic investigations engineer, Nathan'Sturdevant, PE also reviewed the signal. Milestone.
and their subcontractor Drew, provided a cost breakdown summary and change order request for.which is attached to this CO as supporting
documentation.
Change Order Explanation for Specific Line Item
4t11111t•itfffi.ftlftflfff Rfllf•kffflfiNRlttrlt•f1f.t1f.f11tf.t1RlRRit.t•..t..Rttt•.tf.......... rt.ftitf.tr...... tt.......
It is the intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is. hereby acknowledged.
Milestohe Contractors, L.P.
Contractor: Signed B
Date: �'T---3 C): /GO'
faf.utttauf.afR.titfra.t.rf.ef rt.t.rf.lef rrf f f f nftfutfr.ftf.fuau.r• rtfu»R.uu.►u•• r..eaf taa............. ........
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager.system.
Contract NOR -37463 INDIANA Date:04/29/2019
Change Order No:015 Department of Transportation Page: 4
APPROVED FOR LOCAL PUBLIC AGENCY
AP�
(SIGNATURE) (TITLE) (DATE)
- wlaQ
(SIGNATURE)
In in l�2
(TITLE)
SUBMITTED FOR CONSIDERATION
****tiff*t#tt*##t#f+ki#i#f***ifiiY#i**4#*##itt#ttiiY*Yi*#Y*i*xiYYYi*ti+tfiiltiki*iitiitiif*i#it*****iit**it*ii*tit*#i**ti***i
9
(DATE)
-` - C
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION
Approval Level Name of Approver Date Status
CHANGE ORDER REQUEST FORM
CONTRACT NO. R-37463-B
DATE OF SUBMISSION
February 21,
2019
PROJECT DESCRIPTION ENHANCEMENT, BIKE AND PEDESTRIAN FACILITIES, WAYNE
COUNTY, ON E MAIN ST, 7T" ST AND 10T" ST IN THE CITY OF
(route/intersection/bridgeno(s).J RICHMOND, IN
CHANGE ORDER REQUEST SUMMARY
DESCRIPTION
PROPOSED SOLUTION SUMMARY
MAST ARM EXTENSION
JAMES H. DREW TO TO PERFORM WORK TO MAST ARM EXTENSION
NOTE: Upon request from Engineer, enter detailed description on page 2.
ONSET DATE OF CHANGE I January 10, 2019 CHANGE ORDER TYPE 104.03 Extra Work
PROPOSED COST AND TIME ADJUSTMENT
COST COST INCREASE / (DECREASE): $ S,S27.48
The cost adjustment shall include lump sum and estimated totaled unit -priced item costs. Attach a separate sheet of unit price items
including item description, unit of measurement, estimated quantity and unit price.
CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE:
❑ 109.03 Altered Quantities M 109.05(a) Agreed Price ❑ 109.05(b) Force Account ❑ 109.05.02 Delay Costs
PROPOSED COST CHANGE INCLUDES: ❑ Labor ❑ Material ❑ Equipment ❑ Lease Agreement M Subcontractor
TIME ADJUSTMENT
INCREASE / (DECREASE):
CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE:
(work days) 0
❑ 108.08(a) Excusable, Non-Compensable ® 108.08(b) Excusable, Compensable
NOTE: If Compensable, attach details based on 109.05.2(a) Allowable Delay Costs.
SUPPLEMENTAL INFORMATION
Additinnal infnrmatinn may be entered by the rnntrnrtnr_
CHANGE ORDER ORIGINATION:
❑ INDOT / LPA ® Contractor
DOCUMENTS AFFECTED:
❑ Contract Specifications (ref. doc name/no.)
N/A
❑ Contract Plans (ref. doc name/no.)
N/A
CHANGE ORDER AFFECTS DBE PARTICIPATION:
❑ yes ® no (if yes, attach details)
Ver. 10.23.17
CHANGE ORDER REQUEST FORM
CONTRACT NO. R-37463-B
UPON WRITTEN REQUEST FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL
DATE RECEIVED REQUEST FOR
SUBMITTAL DATE OF
ADDITIONAL DETAIL
January 10 2019
ADDITIONAL DETAIL
[Select Date]
DETAILED DESCRIPTION /JUSTIFICATION:
(Include location(s), actions of contractor, owner, and other stakeholders, key events and related cause(s), discoveries,
discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached
or available to support this change order request.)
OWNER REQUESTED TRAFFIC SIGNAL POLE ARM EXTENSION (ACROSS NORTH 'A' AND 7TH ST, US40 WEST)
PROPOSED SOLUTION —.ADDITIONAL DETAILS:
(Include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted
scope and the effect on the contract schedule. Also include references to attached documents including, but not limited
to, sketches, calculations, photos, material information, and submittals and meeting minutes.)
SUBCONTRACTOR, JAMES H DREW, TO PERFORM THE WORK FOR THE MAST ARM EXTENSION AT
LOCATION
SIGNATURES
Contractor:
Name: (print) SCOTT A. HESTER
(signature)
Date: 02/21/19
Project Engineer/Supervisor: (signature is to acknowledge receipt of the document and does not signify agreement of the change order)
Name: (print) Christopher J Miller
Digitally signed by Chris Miller
(signature) C h ri c M a l l Ar _D-N; cn=Chris Miller, o,ou, emall--chrls.mlller@ucindycom, Date:
Date: 2019.042916U6:01 _"00-
NOTE: The Contractor and PE/5 should retain a signed copy of this document for record.
4/29/19
UM
CHANGE ORDER REQUEST FORM
CONTRACT NO. R-37463-B
ATTACHMENT: UNIT PRICE ITEMS DETAIL
Attach or paste a unit price item detail.
MAST ARM EXTENSION
1 LUMP SUM @ $5,527.48 = $5,527.48
WORK TO BE PERFORMED BY JAMES H DREW, SUBCONTRACTOR