TASK
Highway 80 Bike Trail
Public Restroom Upgrades
Complete w/s upgrades
Public Safety Building Complete
Upgrade Lighting (buildings, street lights, occupancy sensors)
Review 11 items on existing CIP List
Long range Beach Management Plan
Get county to agree to provide Tybee with $6M in SPLOST 2014
Public restrooms, North Beach (rebuild/restore/increase)
Update the Tybee Island Master Plan
Positive police presence
Follow DPW's paving schedule
Paving of Jones
Certified State level of Police Force
Add dune building to future re-nourishment
Renewable generation (public safety bldg., YMCA, gym, school)
Recycle program north end business
Trash/cigarette butts
Finish median
Swimming Pool
Shallow well beach showers
Find expert to assist w/CRS Points
Loop water lines up S Campbell/N Campbell/Solomon/Hwy 80 @ curve
W/S lines to Lazaretto Creek
Increase number of day of allowable use of private residential parking lots
Review staffing police/fire forces
Funding for future re-nourishment (local, county, state, fed)
Remove derelict structures
Seal building envelopes (insulation/weather-strip, doors, windows and curtains)
Support local/business/shop and dine local
City sponsored events
Update and improve City website
Side of Hwy 80 improvements
Get county/state to spruce up landscaping on Hwy 80
More trash/recycling cans
Butler w/palms
New Pavilion in Memorial Park
Honor System Parking in Memorial Park
Evaluate the 3ft freeboard
Renewable generation (wind)
On-demand solar water heaters
Beach rules enforcement
Communication - Business/City
Showers/Beach
Clean beach (trash)
Noise
Street signs
Spruce up 16th Street Area (re-paint trash cans/rocks around roundabout
Hanging plants on 16th
GROUPING
Recreation
Recreation
Infrastructure
Public Safety
Energy Use Reduction
Public Safety
Beach Re-nourishment Funding
Beach Re-nourishment Funding
Tourism
Quality of Life
Quality of Life
Infrastructure
Infrastructure
Public Safety
Beach Re-nourishment Funding
Energy Use Reduction
Tourism
Tourism
Island's Appearance
Pool Committee
Recreation
Flood Insurance
Infrastructure
Infrastructure
Infrastructure
Public Safety
Beach Re-nourishment Funding
Beach Re-nourishment Funding
Energy Use Reduction
Quality of Life
Quality of Life
Quality of Life
Island's Appearance
Island's Appearance
Island's Appearance
Island's Appearance
Recreation
Recreation
Flood Insurance
Energy Use Reduction
Energy Use Reduction
Tourism
Tourism
Tourism
Quality of Life
Quality of Life
Island's Appearance
Island's Appearance
Island's Appearance
ASSIGNMENT
Infrastructure Comm
Infrastructure Comm
W/S Dept.
BTF
PROJECTED START DATE
PROJECTED FINISH DATE
2015
Due to m/c 7/1/2014
REMARKS
TY - DOT permits. NY complete
On upcoming city council agenda
7/2014 - four more need to be completed
Completed first week in August, ribbon cutting last week of Sept/first week of October
Possible solar panels at YMCA with savings
Completed.
Working with Dan Parrot; talking with Brad Gane; specific dune template needed
Council to send suggestions to Jason
Ongoing
Money in budget. RFP in fall (Rob taking lead)
Ongoing; presence of foot and bike patrols
Ongoing; Veteran's Drive completed
Ongoing; to be completed November 2014
Ongoing; doing background checks
Contact Eric Olsen
Ongoing; CRC responsibility
Location for single stream; possible location behind Huc-a-poos; meet with northend business owners
Ongoing; working with GA Power for placement on their poles
Ongoing
attending the workshop in July to discuss with m/c
combined with w/s
Received state funding in new budget
RATING
4
4
4
4
4
3
3
3
3
3
3
2
2
2
2
2
2
2
2
TASK
Highway 80 Bike Trail
Public Restroom Upgrades
Complete w/s upgrades
Public Safety Building Complete
Upgrade Lighting (buildings, street lights, occupancy sensors)
Review 11 items on existing CIP List
Long range Beach Management Plan
Get county to agree to provide Tybee with $6M in SPLOST 2014
Public restrooms, North Beach (rebuild/restore/increase)
Update the Tybee Island Master Plan
Positive police presence
Follow DPW's paving schedule
Paving of Jones
Certified State level of Police Force
Add dune building to future re-nourishment
Renewable generation (public safety bldg., YMCA, gym, school)
Recycle program north end business
Trash/cigarette butts
Finish median
GROUPING
Recreation
Recreation
Infrastructure
Public Safety
Energy Use Reduction
Public Safety
Beach Re-nourishment Funding
Beach Re-nourishment Funding
Tourism
Quality of Life
Quality of Life
Infrastructure
Infrastructure
Public Safety
Beach Re-nourishment Funding
Energy Use Reduction
Tourism
Tourism
Island's Appearance
ASSIGNMENT
Infrastructure Comm
Infrastructure Comm
W/S Dept.
Public Safety Committee
CRC
BTF
Mayor Buelterman
Infrastructure Comm
Planning Commission
Public Safety Committee
Infrastructure Comm
Infrastructure Comm
Public Safety Committee
BTF
PROJECTED START DATE
PROJECTED FINISH DATE
2015
Due to m/c 7/1/2014
REMARKS
DOT permits are in process. Requires more historic impact study. Variance and Special Review on 9.18.14 CC agenda
RFP for architect for north beach restroom is on 9.18.14 for review. DPW has scheduled upgrades to Memorial Park restroom during the winter months.
Jones water lines in process/#6 & #7 Sewer lines in process.
Completed first week in August - Site Plan in process - Ribbon cutting scheduled for December 11,2014
Possible solar panels at YMCA with savings
Completed.
Working with Dan Parrot; talking with Brad Gane; specific dune template needed
Mayor Buelterman and CM met with county manager, staff and commissioner on 9.3.14
RFP for architect is on 9.18.14 for review by CC.
Money in budget. RFP in fall (Rob taking lead)
Ongoing; presence of foot and bike patrols
Ongoing; Veteran's Drive completed
Ongoing; to be completed Winter 2014/15 - Traffic calming study has also been recommended prior to paving.
Ongoing; doing background checks
Contacted Eric Olsen who directed CM to the COE for assistance with RFP
Ongoing; CRC responsibility
Location for single stream; possible location behind Huc-a-poos - on unopened Laurel Avenue - other locations should be evaluated - Potential locations are to be considered by CC at
the 9.18.14 CC Meeting.
Ongoing; working with GA Power for placement on their poles/Jackie Cary is in contact with a vendor for stainless steel containers.
Approval of plan and additional funding on 9.18.14 CC agenda