HomeMy Public PortalAboutWeek of 0713 Work PlanAnticioated Work —Week of July 13. 2020 • Common Street o Continue drainage, curb, and sidewalk installation at the Spring Street/Common Street intersection o Adjust castings throughout project area o Top course paving of Orchard Street Extension, Katherine Road, and Columbia Street date to be determined • Road Program o Continue driveway forming and pouring on Chandler Street, Burnham Street and Bridgham Ave. o Continue forming and pouring sidewalks, accessible ramps, and driveways on Piermont Street and Tappan Ave. o As work pace permits, begin stripping sidewalks and curb installation on Bartlett Street • Complete Streets Project o Adjust castings on Watertown Street o Finish installing rumble strip on Watertown Street at Theurer Park o Paving of Watertown Street, Whites Ave. and Linear Park date to be determined • Sewer System Rehabilitation o No work planned • Sidewalk Repair o Continue sidewalk repairs on Spring Street between Summer Street and Palfrey Street and Spring Street at municipal lot and Baptist Walk o As work pace permits, begin sidewalk repairs on Emerson Road • 2020 Water Main Replacement o Chlorination and testing of temporary by-pass system o Test pits to determine soil materials and groundwater elevations at various locations o Replace hydrant on Main Street between Hersom Street and Essex Street (requires shutdown) • National Grid o Continue Irving Street gas main relay o Continue gas main relays on Forest Street o Continue work on Belmont Street at Duff Street o Continue gas relay on Wheeler Lane at Riverside Ave. o Continue work on Templeton Parkway at Mt. Auburn Street o Note: service connections on all main relays on hold due to COVID-19 Note: All work is weather -dependent and subject to change.