HomeMy Public PortalAboutWeek of 0831 Work PlanAnticipated Work —Week of August 31, 2020
• Common Street
o Mill transition areas
o Top course paving tentatively scheduled for September 4
• Road Program
o Continue curb and sidewalk installation on Avon Road
o Begin curb and sidewalk installation on Bellevue Road
o Finish drainage/stormwater installations on Frank Street and Louise Street
o Lower castings on Frank Street and Louise Street
o Road reclamation on Downey Street, Kimball Road, Nichols Ave., Frank Street, and
Louise Street
• Complete Streets Project
o Line painting
• Sewer System Rehabilitation
o Insituform is scheduled to install cast -in -place pipe on the following streets:
Frank Street (drain)
York Ave
Riverside Street (between No Beacon St & Alfred Road)
Belmont St (between Hardy Ave & Warwick Road)
Orchard St (between Waverly Ave & Lexington St)
Elmwood Ave (drain)
Porter Street (drain)
No Beacon St (between No Beacon Ct & Ladd St)
Consult street notifications for service impacts
o Replace sewer main on York Ave. at Hamden Ave.
• 2020 Water Main Replacement
o Continue installing water main on Nash Street and Essex Street
o Begin water main installation on Oak Street, including connection points (requires water
main shutdown)
• National Grid
Utility companies are responsible for notifying residents prior to conducting work, but planned
work is listed below:
o Continue Irving Street gas main relay
o Continue gas main relays on Forest Street
o Continue gas relay on Riverside Ave. (note extended work limits to N. Beacon Street and
#50 Riverside Ave.)
o Continue work on Templeton Parkway at Mt. Auburn Street
Note: All work is weather -dependent and subject to change.