HomeMy Public PortalAboutWheeler CRiver Water PipingTOWN OF WATERTOWN
DEPARTMENT OF PUBLIC WORKS
124 ORCHARD STREET
WATERTOWN, MASSACHUSETTS 02472
Tel: 617-972-6420
Fax: 617-972-6402
September 26, 2018
IMPORTANT NOTICE FROM THE
DEPARTMENT OF PUBLIC WORKS
Dear Residents and abutters of Wheeler Lane and Charles River Road :
Laboratory testing for water quality of the temporary water system piping has been
completed. The Department is now approving activation of the temporary water line.
A representative from the Town's Engineering Firm, Weston and Sampson and our
contractor, C. Naughton Corp, will need access to each home to connect the by-pass
water main to each residence. This will utilize a hose connection to the hose bib on the
outside of each structure. Access to the basement will be required to complete the
connection.
Homeowner approval and entry into your property will begin tomorrow, Thursday,
September 27, 2018 between the hours of 7:00 AM and 4:00 PM. If this time frame is
inconvenient, please contact the contractor's coordinator, TJ Shea at 781-563-0451 for
an appointment.
During this time the contractor will be accompanied by a Public Works representative
wearing a lime green safety vest labeled "Public Works" and will have a vehicle labeled
Public Works in very close proximity to the houses being entered.
Upon completion of this task general excavation of the water main will commence. We
would like to thank you in advance for your cooperation.
If you have any questions contact the Public Works Department at (617) 972-6420.
Gerald S. Mee, Jr.
Superintendent
KASTREET LETTER - RESIDENTS1FY191House Bypass -Wheeler Lane.doc