Public Works Subcommittee Presentation
February 4, 2016
Outline
' Road Program Goals
' 2015 Road Reconstruction
IV Developing the 2016 Road Reconstruction List
IV Capital Projects and Planning
IV Private Developments and Impacts
IV Pavement Management Program Update
19 Summary
Road Program Goal
Maintenance, Repair & Reconstruction
Provide a variety of maintenance treatments to
prolong the useful life of less deteriorated
roadways
Coordinate road reconstruction activities with
capital planning and utility work
Seek long term planning and alternative funding for
large-scale projects
Improve accessibility and safety for all users by
using "Complete Streets" principles
Road Program Goal
Program Activities
If Maintenance and Repair
' Mill and overlay repairs
' Full depth patch
' Crack sealing
' Sidewalk reconstruction
Road Reconstruction
' Road reclamation
' Mill and overlay
Today's Discussion
Road Program Goals
Key Road Features
It 73 +/- miles of road
10 144 miles of sidewalk
10 3,200 catch basins
IV 1,000 fire hydrants
' 55 miles of residential roads
IV Average width of residential roads is 25 feet
2015 Road Reconstruction
Work Planned and Completed
Waltham Street
Included Green River Way and Stanley Avenue
Project substantially complete
Evans Street
11 Raised table rehabilitation
In progress
10 Fifield Street
Water services and drainage repairs complete
Spring construction
Lowell Avenue
Gas main replacement complete
Spring construction
Raised tables on Church Street
• Drainage structures complete
• Additional signage added
Spring construction
2015 Road Reconstruction
Complete Streets Elements
0
�y ;� R--
LA LI d-
T LAi
Bicycle accommodations
If
ADA compliant sidewalks
' New or upgraded accessible ramps
IV Lane delineation and pavement markings
2015 Road Reconstruction
Complete Streets Elements
I
10
10
V.7,LP"-"7
W Va.
Reduced driveway opening widths
Reduced crosswalk lengths
9 Sidewalk protection
2015 Road Reconstruction
Complete Streets Elements
IV
"Bump outs"
Reduced corner radii
i
2015 Road Reconstruction
Complete Streets Elements
r
V Reduced road width
Reclaimed green space
' Street trees
2015 Road Reconstruction
Working with National Grid
0 National Grid completed 3.86 miles of gas main
replacement in CY 2015
' Main Street gas regulator pit replacement under
construction
If Additional 0.78 miles in progress or planned
' Currently discussing 2016 replacement work
' DPW oversight includes project management,
utility markouts, inspection of pavement repairs
2015 Road Reconstruction
Other Infrastructure Improvements
It Edenfield Avenue water main
19 Hovey Street water main (early 2016)
IV Knowles Road sewer and drain repairs
IV Orchard Street Ext. sewer and drain repairs
IV Watertown Square
2016 Road Reconstruction List
Developing a "Universe of Projects"
9 2012 Pavement Management Inventory
Windshield surveys
' Maintenance records
It Capital projects (proposed and completed)
I* Resident input
2016 Road Reconstruction List
Developing the List
9 Prepare detailed cost estimates of high priority
streets
' Develop a program that fits within funding
constraints
9 Prioritize streets in greatest state of disrepair
' Consider alternative funding sources
' Consider geographic equity
2016 Road Reconstruction List
Proposed Streets
10 Edenfield Ave. (Main to Warren)
' Hillside Road (Belmont Street to Hillcrest Circle)
10 Hillcrest Circle
Grenville Road
Merrill Road
Purvis Street
2016 Road Reconstruction List
�s. 3
I
y'll,: Ed e n fi e l d Ave.
Purvis Street
oar x,
Merrill Road
2016 Road Reconstruction List
Grenville Road
-nr
4L
Hillside Road
[a
Hillcrest Circle
2016 Road Reconstruction List
Upcoming infrastructure repairs & needs*
' Priest Road
Water main
Chester Street replacements planned
Bates Road or completed
Everett Ave. neighborhood
Chandler/Burnham Streets neighborhood
Hovey Street
Taylor Street
Nichols Ave.
* Not the complete list!
Knowles Road
Edgecliff Road
Upland Road
Waverley Ave. —Orchard St. to Belmont Street
Louise Street & Frank Street ''
Tappan Ave. l -
Capital Projects and Planning
Creating "Shovel Ready" projects
Common Street
Mount Auburn Street
' Main Street corridor
10 Church Street and Summer Street intersection
9 Community Path extension
Capital Projects and Planning
Common Street
It Public Works Sub -committee meeting on May
14,12015
19 Two follow up neighborhood meetings in
June/July
IV Additional discussions with School Committee
�4
i
i t
.,..__
ST-. . Y-____��
_ _COMMON REET COMMON 4
_ - - STREET
ty[�
1
Capital Projects and Planning
Mt. Auburn Street
It Public Works Sub -committee meeting on May
14,12015
10 Representatives from MBTA, MassDOT, and
National Grid attended
19 Seeking state funding for improvements
19 Interim bicycle and pedestrian crossing safety
improvements planned
' Gas main replacements to begin this year, 6
year construction horizon
Private Development and Impacts
Plan reviews, design, and construction oversight
If Arsenal Street corridor
Hanover project
G reysta r project
Arsenal Street hotel
80 Elm Street
480 Arsenal Street
Athena Health
Arsenal Mall
' Coolidge Square neighborhood
480 Arsenal Street
65 Grove Street
CVS
Pleasant Street corridor
Casey -Dupree site
Pavement Management Update
Capital Planning Tool
Windshield survey of all streets
Is Identify curb type, curb reveal, general sidewalk
conditions, number of castings
Develop a "Pavement Condition Index" for all
streets
40 Consider pavement cracking, patching, potholes, utility
cuts, etc.
' Identify strategies for repair
Consider other required improvements
Create preliminary cost estimates
IV GIS database
IV Field work complete; database work ongoing
pavement Management Updcow'
Inspection Form
Street Data '
Acceptance: ACCEPTED Segment Length (FT}7 214
Object ID. k459
Functional Class:
Width (FT): 24
Street: JADAMSSTREET
Manholes: ��
Hydrants:
FD-_�_J Right of Way (FT) ] 4"
Segment Name: ADAMS 5TREET-03
Catch Basins: I`7-71
Pullboxes:
7-7-1
From Street: JARTHURTERRACE
Water Gates: �-1
Driveways:
1'
To Street: INICHOLS AVENUE
- Gas Gates: F---:-:1
Other Utilities:
Inspection Data J
Curb Data
Curb (Ddd Side) None
Inspector 14JS -
PCI: 67
Avg. Reveal (IN):
Pavement Material: BC -
Inspection Date: 1111012015
Curb (Even Side) None
Distress Data
Avg. Reveal (IN):�
Sidewalk Data
Oocurence Extern (%}
Random Cracks:
Law - 20 -
SAME AS
Sidewalk (Odd Side) Concrete
TransversefLangitudinal Cracks;
�
Moderate - �'"'J
PREVIOUS
SEGMENT
Avg. Width (FT): 14
Alligator Cracking:
F-
Condition: IFair -
Potholes:
INone -I �3
Sidewalk (Even Side) Concrete
Raveling:
None - F�
Avg. Width (FT): I4
Rutting, Corrugations or Pushing:
Nan, - F _3
Condition: Fair -
CrossTrenches, Utility Cuts, Other Patches:
Main Line Trenches;
Nane - F _3
Striping Data
in
General Notes: sidewalk heaving in some areas Centerline
Edgeline (Odd Side)
Edgeline (Even Side)
Sharrows
Watertowc wn nork$
Puibl►
tn� an a�our uAT town!,
Summary
Challenges
40 Increased road repair needs as utility improvements are
completed
IV Future street conditions are subject to change
IV Severe weather conditions can lead to higher than
expected levels of deterioration on streets
40 Private development
Impact of enhanced scope of projects on budget
Major sidewalk repairs
Providing adequate staff supervision of contractors
Bidding environment
Summary
2016 Road Reconstruction List
10 Edenfield Ave.
IV Hillside Road (Belmont Street to Hillcrest Circle)
10 Hillcrest Circle
It Grenville Road
9 Merrill Road
IV Purvis Street