HomeMy Public PortalAboutComplete Streets Project List Evaluation_201805111021477028DRAFT Watertown Complete Streets Plan Project Evaluation - Feb. 28. 2018
Evaluation
High
m
Project Type
Street Name
Extents
Project Description
Score: (Max:
Scoring
0
23)
Projects:
a`
(Score >=18)
Implement recommendations of Arsenal
Street corridor study. Include: bike lanes,
Corridor Wide
Louise Street to Greenough
gateway improvements, and transit
1
Improvements
Arsenal St.
Blvd.
improvements.
23
X
Continue to install complete streets
elements, such as curb extensions.
Consider bike facilities. Consider re -
Entire extents, from Mt Auburn
striping to re -orient road for diagonal
2
lTraffic Calming
Bigelow Ave.
St to Nichols Ave.
parking.
16
Improve pedestrian safety and
connectivity to river; install activated
flashing beacons at Fifth Ave. Consider
tightening turning radii at intersections by
3
Traffic Calming
California St.
Entire extents.
installing curb extension(s).
17
Re -align crosswalk with pedestrian path
of travel to Victory Field. Consider curb
Crossing
extensions. Stripe crosswalk on southern
4
lImprovements
Church St.
At Marion Rd.
leg of intersection.
19
X
Install curb extensions at cross -street
Crossing
Entire extents, from Mt Auburn
intersection locations. Upgrade broken or
5
Improvements
Dexter Ave.
St to School St.
bumpy sidewalks as necessary.
15
At intersection with Community
Remove low concrete wall barrier to path
6
1 Shared -Use Path
Forest St.
Path (south side)
from Forest St dead-end road to Main St.
11
Improve pedestrian connection between
Town Hall and Charles River. Consider
7
Traffic Calming
Green St.
Entire extents.
traffic calming elements on Green St.
14
Add shared lane markings. Build raised
cycle track or sidewalk in existing curb
From Coolidge Ave to (future
area adjacent to cemetery. At relocated
relocated) entrance to Filipello
Filipello Park Entrance: Install activated
Park. (Roughly 750 feet from
flashing beacon, stripe crosswalk across
8
Shared -Use Path
Grove St.
Coolidge Ave.)
Grove St.
15
Safe Pedestrian
Install curb and repair sidewalks on this
Access to
important school walking route.
Schools / Traffic
Consider enhanced intersection
9
lCalming
Highland Ave.
Entire extents.
treatments.
19
X
Consider complete streets elements and
continue bicycle facilities towards
Watertown Sq. Consider bump -outs at
side streets. Reconstruct Myrtle
St/Waverley Ave intersection with ADA
compliant ramps and signals; consider
transit signal priority or queue jump lane.
Consider additional safety measures at
mid -block crosswalks. Consider bus
stop consolidation where appropriate.
Between Whites Ave and Chesstnut St:
Relocate Main Street's west crosswalk to
south edge of Whites Ave intersection.
Corridor Wide
Consider installing activated flashing
10
Improvements
Main St.
Bacon St to Church St.
beacons.
20
X
Update and enhance complete streets
treatment to this residential cut -through
11
Traffic Calming
Maplewood St.
Arlington St to School St.
street.
15
Evaluation
High
d
0
Project Type
Street Name
Extents
Project Description
Score: (Max:
Scoring
Projects:
a
23)
(Score >=18)
Provide complete streets treatment to
12
Traffic Calming
Mt Auburn St.
Patten St to Cambridge line.
corridor.
21
X
At Louise St / Paul St: Construct curb
extensions, stripe crosswalk, install
activated flashing beacons. Consider
curb extensions at Beechwood. At Irving
St: Extend bike lane through intersection
(westbound) via green skip lane striping.
At Alfred Rd and N Beacon Ct and Ladd
St and Royal St and Paul St and Palmer
St and Bay St: Extend existing bike lane
Corridor Wide
From Charles River Rd to
east -bound across intersections using
13
lImprovements
N Beacon St.
Main St.
green skip -lane striping.
21
X
Install curb and sidewalks on this
important primary/collector road that
Safe Pedestrian
provides access to the Bigelow Ave.
14
Access to School
Nichols Ave.
Boylston St to Melendy Ave.
business/religious area.
15
Riverside St: Perkins School to
Install curb and repair sidewalks on this
Safe Pedestrian
Riverside St &
Irving St. Irving St: Riverside
important access route for the Perkins
15
Access to School
Irving St.
St to N Beacon St.
School.
20
X
Safe Pedestrian
Mount Auburn St to Columbia
16
Access to School
Russell Ave.
St.
Traffic calming, sidewalk delineation.
17
Wilson Ave: From George St
to Belmont St. George St:
entire extents. Victory Field
Driveway: From Orchard St to
the gate by the tennis courts.
Marion Rd: From the
Stripe enhanced shared lane markings
basketball/tennis courts to the
and consider additional traffic calming
intersection with Sidney St.
strategies. Include signage. Establish
Sidney St: entire extents.
formal connection from the end of
Marshall St: from Sidney St to
Phillips St to the (planned) Arsenal St
Mt Auburn St. Phillips St:
cycle track. Install activated flashing
17
lBike Boulevard
See box to right.
entire extents.
beacons on Church St at Marshall St.
15
Improve pedestrian connectivity to this
Forest St: Summer St to
school walking route. Consider
Springfield St. Springfield St:
additional traffic calming elements on
18
Traffic Calming
See box to right.
Forest St to Fitchburg St.
this corridor.
15
At Watertown Library, at Town
Hall, and at Watertown Middle
Install bike parking. Investigate the
19
lBike Facility
See box to right.
School.
feasibility of covered bike parking.
14
Common St: Mt Auburn to
Orchard St. Columbia St:
Common St to Robbins Rd.
Corridor Wide
Spring St: Common St to
20
Improvements
See box to right.
Marion Rd.
Corridor wide improvements underway.
21
X
Establish formal path connection: Stripe
bike lanes OR enhanced shared lane
markings along Stanley Ave. At existing
sidewalk terminus near JCD School,
stripe a pedestrian lane (due to existing
bio-swale / rain water retention area:
sidewalk infeasible) that directs users to
existing asphalt shared use path. At
Pleasant St: (opposite Paramount PI)
Remove metal barrier gates, install
Entire extents, and through to
bollards, stripe high visibility crosswalk,
21
Shared -Use Path
Stanley Ave.
Pleasant St.
install activated flashing beacons.
16
Safe Pedestrian
Install curb and repair sidewalks on this
Access to
primary/collector road. At Forest St:
Schools / Traffic
Install 4 ADA-compliant Pedestrian Curb
22
Calming
Summer St.
Entire extents.
Ramps.
18
X
Evaluation
High
0
Project Type
Street Name
Extents
Project Description
Score: (Max:
Scoring
Projects:
a`
23)
(Score >=18)
Stripe crosswalk across Walnut St.
Crossing
Install new pedestrian curb ramps as
23
Improvements
Walnut St.
At Birch Rd.
needed to improve pedestrian network.
14
Cuniff School to Lexington St,
with focus between Cleveland
Consider traffic calming features
Rd and King St, at existing
throughout entire extents of Warren St.
Crossing
Cuniff School entrance mid-
Install raised crosswalk with Activated
24
JImprovements
Warren St.
block crossing.
Flashing Beacon near Cuniff School.
19
X
Extend Community Path within limits in
Watertown
Arsenal St: Irving St to Taylor
accordance with previous study
25
Shared -Use Path
Community Path
St.
recommendations.
21
X
Between Winter St sharp
Watertown
curve at Saltonstall Park to
Widen existing walkway with a new wider
26
Shared -Use Path
Community Path
Whites Ave.
shared -use path.
19
X
Re -align parking lot and provide facility
for bicycles and pedestrians to safely
In Municipal Parking Lot: From
and comfortably travel east -west along
Watertown
Baptist Walk to Winter St @
Watertown Community Path (further
27
Shared -Use Path
Community Path
Saltonstall Park
study needed)
19
X
Install highly visible crosswalk adjacent
to Nardone Funeral Home parking lot
entrance that connects to town -owned
easement in parking lot on south side of
Halfway Cafe. Construct asphalt shared
At the intersection with Bacon
use path from Main St to Waverley Ave
Watertown
St, extending east to Waverley
at existing vehicle access to Moxley
Crossing
Community Path:
St at existing Watertown
Field (At back edge of Berkachi Barber
28
lImprovements
Main St.
Community Path Crossing.
Shop).
19
X
Watertown
Implement recommendations of
Community Path:
Community Path Study; coordinate with
29
Shared -Use Path
Taylor St.
Taylor St: Entire extents.
Watertown Square improvements.
20
X
Watertown
Install raised crosswalk and activated
Crossing
Community Path:
At Watertown Community Path
flashing beacons at the Community Path
30
Improvements
Whites Ave.
crossing.
crossing.
19
X
Reduce crossing distance, improve bus
stop connections, add bike facilities
Crossing
where necessary, traffic lane delineation
31
Improvements
Watertown Sq.
Entire limits.
and wayfinding signage.
22
X
Consider traffic calming elements on
entire extents of Watertown St. At
existing crosswalk between Morse St
and Belknap Ter, at existing crosswalk
between Pond St and Theurer Pk, and at
existing crosswalk at 95 Watertown St:
Install activated flashing beacons.
Crossing
Consider curb extensions at side streets
32
lImprovements
Watertown St.
See box to right.
and crosswalks.
18
X
From Belmont town line to Orchard St:
Repair existing and construct new
sidewalks on the west side. Stripe bike
lanes or enhanced shared lane
markings. Consider additional traffic
calming strategies from Belmont town
33
ITraffic Calming
lWaverley Ave.
ISee box to right.
I line to Orchard St.
19
X
Total High
19 Scoring