Loading...
HomeMy Public PortalAboutSummary of Public Input_201805111020443906Summary of Public Input - February 12, 2018 c 0 o a o 'o Project Type Street Name Extents Project Description Source a` Public Y Traffic Calming 5th Ave. At California St. Install curb extensions across 5th Ave. Meeting 1 Remove existing asphalt, install concrete panel sidewalk with granite edge curbing along at least one side of Acton St. (preferable install Sidewalk / Between Rosedale Rd and sidewalk along both sides.) Install raised speed Online Y lTraffic Calming Acton St. Howard St. table along Acton St. Survey Online Y Traffic Calming Aldrich Rd. Between 58 - 46 Aldrich Rd. Install speed table. Survey Wayfinding Arlington St + Grove Near both entrances to Filipello Install directional / wayfinding signage that Public Y Signage St. Park. directs people toward Filipello Park. Meeting 1 Stripe 11' travel lanes, evaluate space for parking and bike lanes. Where space does not allow for bike lanes, stripe enhanced shared Y Lane Striping Arlington St. Grove St. to Arsenal St. lane markings. Town Online Y Lighting Arlington St. Entire extents. Evaluate need for upgrading street lights. Survey From existing cycle track terminus between Beechwood Construct cycle track to further the Online Y Cycle Track Arsenal St. Ave and Irving St, to Taylor St. development of the Watertown Linear Path. Survey Stripe directional indicator arrows at intersection approach: coming south on Intersection Arlington St. and exiting the Home Depot / Online Y Redesign Arsenal St. At Arlington St. Millers Ale House plaza driveway. Survey Wayfinding / Shared Use Install wayfinding signage and shared use path Online Y Path Arsenal St. At Talcott Ave. to Charles River. Survey Repave the roadway, add granite edge curbing, Street Repaving allow enough space between sidewalk and / Sidewalks / curb for future street trees. Restrict parking to Online Y Curbs Avon Rd. Entire extents. one side for the entire year. Survey At 89 / 90 Bailey Rd. (North of Install raised speed table as a traffic calming Public Y Traffic Calming Bailey Rd. Stoneleigh Cir.) device. Meeting 1 Install new concrete sidewalks and ADA- From Lexington St. to Edenfield compliant pedestrian curb ramps and motor Online Y Sidewalk Bancroft St. Ave. vehicle curb cuts. Survey Between Edenfield Ave and Install raised table crossing as a traffic calming Public Y Traffic Calming Bancroft St. Westminster Ave. element. Meeting 1 Install raised crossing across Bay St as a traffic Crossing calming device. OR install highly visible Public Y I Improvements Bay St. At Charles River Rd. crosswalk / upgraded pedestrian curb ramps. Meeting 1 Online Y Beechwood St. At Arsenal St. Upgrade signal timing to reduce queueing. Survey Crossing Improvements / 1. At Common St. 2. Between Install raised crossing. Install ADA-compliant Public Y Traffic Calming Bellevue Rd. Russell Ave and Marcia Rd. pedestrian curb ramps. Meeting 1 Bike Lane From Lexington St. to Prospect Y Striping Belmont St. St. (Waltham border) Stripe bike lanes along this roadway. Consultant At the existing mid -block crosswalk just west of Duff St, at the existing crosswalk on Knowles Rd, at the existing Crossing crosswalk at Jonathan St, and at Install Activated Flashing Beacons to improve Public Y Improvements Belmont St. Primmer St. motorist yield at crossing. Meeting 1 r_ 0 o a o m Project Type Street Name Extents Project Description Source 'o L a Signal Timing Add left turn arrow for turning left from Belmont Online Y Upgrade Belmont St. At Common St. St onto Common St towards Trapelo Rd. Survey Bigelow Ave: entire extents. Templeton Pkwy: From Mt Auburn St to Maplewood St + Bigelow Ave, from Salisbury Rd to Belmont St. Stripe enhanced shared lane markings, Templeton Pkwy, Salisbury Rd: from Maple St to directional / wayfinding signage, and Bicycles Public Y Bike Boulevard Salisbury Rd. Templeton Pkwy. May Always Use Full Lane signage. Meeting 1 Consider additional curb extensions to compliment existing curb extension at Nichols Ave, consider re -striping to re -orient roadway Entire extents, from Mt. Auburn for diagonal parking, consider bike boulevard Y Traffic Calming Bigelow Ave. St. to Nichols Ave. treatment. Town Remove and replace damaged concrete sidewalk panels with new. Reset adjacent Curb and existing granite curb edge. Install new N Sidewalk Repair Bigelow Ave. At 25 Bigelow Ave. pedestrian curb ramp at existing fire hydrant. Seniors Intersection Online Y Redesign Boylston St. At Hazel St / Howe St Install small neighborhood roundabout. Survey Intersection Realign and 7-up" intersection with bump -outs Y Redesign Boylston St. At Concord St. and crosswalk enhancements Town Crossing At Locke St, at Fairview Ave, at Online Y Improvements Bradford St. Bellevue Rd, at Orchard St. Install ADA-compliant pedestrian curb ramps. Survey Install wayfinding signage to direct bicyclists and pedestrians to Russo's / Watertown Mews At Charles River Greenway path / Pleasant Pizza AND continuation of the Wayfinding intersection (north side of Charles River Greenway Path (which is on the Public Y Signage Bridge St. Charles River). south side of the river.) Meeting 1 Traffic Calming / Edge Curb Install granite edge curbing. Install and enforce Online Y Upgrades Buick St. Entire extents. "NO TRUCKS" signage. Survey Tighten curb radii with vegetated sidewalk extensions. Shorten pedestrian crossing Intersection distance. Install compliant pedestrian curb Y Redesign California Pk. At California St. ramps. Consultant Replace asphalt sidewalk with granite. Formalize by raising driveway crossings to sidewalk level. Formalize 139 California St. driveway area. Install granite edge curbing on Y Sidewalk California St. At 139 California St. new sidewalk sections. Consultant Formalize sidewalk at Enter and Exit driveways to California St. Raise new concrete sidewalk to consistent height across driveway areas. At back of Stop n Shop mall Include "Enter" and "Exit" signage. Stripe Public Y Sidewalk California St. buildings. directional arrows. Meeting 1 Travel Lane Y Striping California St. Entire extents. Stripe 11' travel lanes Town Install granite edge curbing. Install concrete Online Y Center St. Entire extents. sidewalks where asphalt sidewalks exist. Survey Install raised crossing and "DEAD END" Online N Church Ln. At Pleasant St. signage more prominently. Survey Install raised crossing OR Activated Flashing Y Bike Boulevard Church St. At Marshall St. Beacon Consultant Bike Lane Stripe bike lanes and enhanced shared lane Online Y Striping Church St. From Summer St. to Main St. markings. Survey r_ 0 o a o m Project Type Street Name Extents Project Description Source 'o L a Re -align crosswalk, potentially introduce curb extensions, add crosswalk on southern leg of Crossing intersection. Investigate potential to add raised Y Improvements Church St. At Marion Rd. crossing. Town Bike Facility Add a bike box and bike crosswalk (cross Online Y Striping Church St. At Main St. bike). Survey Install bike parking (preferably covered) at the following locations: at the Columbia St entrance, adjacent to the short flight of stairs on the right side (as you face the building). At the north / west edge of the building, adjacent to the entrance with existing sign "Watertown Y Bike Parking Columbia St. At Watertown High School Community Access Center." Consultant Crossing Public Y Improvements Columbia St. At Robbins Rd intersection. Install raised table crossing. Meeting 1 Entire extents, Arsenal St. to Mt. Stripe 11' travel lanes, evaluate space for Y Lane Striping Coolidge Ave. Auburn St. parking and bike lanes Town Construct new sidewalk with granite edge Sidewalk / curbing on east side of Copeland St. Consider Raised From Highland Ave. to installing raised crossing at Copeland / Y Crossing Copeland St. Grandview Ave. Grandview. Consultant "T"-up intersection with sidewalk extensions on Crawford so that the two streets meet at a 90 degree angle. Install stop sign on Crawford St. Intersection as well as Cross Traffic Does Not Stop Online Y Redesign Crawford St. At Kondazian St. signage. Survey Upgrade Edge Entire extents: upgrade edge curbing to granite Curbing / as needed. Stripe crosswalk at intersection Improved Entire extents and at each cross with Dexter Ave. Stripe crosswalk across Online Y Crossing Cypress St. street. School St. Stripe crosswalk at Walnut St. Survey Curb Install curb extensions at cross -street Extensions / Entire extents, from Mt Auburn intersection locations. Upgrade broken or Y Sidewalks Dexter Ave. St to School St. bumpy sidewalks as necessary. Town Between Grant Ave and Darch Install granite edge curbing and upgrade Online Y Sidewalk Duff St. Rd. sidewalks as necessary. Survey Striping and Online Y Signage Edenfield Ave. Entire extents. Restrict parking to one side of the street. Survey Between Orchard St and Warren Online Y Road Paving Edenfield Ave. St. Repave the road. Survey Install speed tables at two locations to discourage motorist cut -through speeding on Online Y Traffic Calming Edward Rd. At 2 locations. this one-way residential street. Survey Replace asphalt curb with granite edge curbing. Where granite curbs exist, let them Public Y Curbing Edward Rd. Entire extents. remain in place. Meeting 1 Install raised table crossing to calm cut -through Online Y Traffic Calming Evans St. At Acton St. traffic. Survey Install 4 ADA-compliant pedestrian curb ramps Pedestrian Curb at this intersection. Include wayfinding signage Y Ramps Fayette St. At Forest St. for Watertown Linear Park. Consultant Curb and Remove broken asphalt sidewalk and replace Sidewalk Repair with concrete panels at necessary locations. / Traffic Multiple areas along this .5 mile Consider installing raised crossing or raised Y Calming Fayette St. street. speed table. Seniors Wayfinding, Remove low concrete wall barrier to path from Path Entrance At intersection with linear park Forest St. dead-end. Install linear path Y Construction Forest St. (south side of linear park) wayfinding signage on Main St. at Forest St. Consultant r_ 0 o a o m Project Type Street Name Extents Project Description Source 'o L a Intersection Construct neighborhood roundabout at Y- Y lRedesign Forest St. At Springfield St. shaped intersection Town Frank St, Louise St, Beechwood St, Upgrade asphalt pavement. Upgrade curbs as Online N Street Repaving Patton St. Entire extents. necessary. Survey Install curb extensions at this intersection. Curb Prohibit parking on Fuller within 30' of Y Extensions Fuller Rd. At Orchard St. intersection to improve sightlines. Consultant Install curb extensions at this intersection. Curb Prohibit parking on George within 30' of Y Extensions George St. At Orchard St. intersection to improve sightlines. Consultant Between Duff St and Lexington Install granite edge curbing and upgrade Online Y Sidewalk Grant Ave. St. sidewalks as necessary. Survey Install speed table on Green St, just east of Public Y Traffic Calming Green St. At Chestnut St. Chestnut St. Meeting 1 Sidewalk / From 99 Grove St to Coolidge Construct new sidewalk on east side of street Y Cycle Track Grove St. Ave. (adjacent to cemetery.) Stripe 5' bike lanes. Consultant Bike Lane From Coolidge Hill Rd to Calvin Public Y Striping Grove St. Rd. Stripe bike lanes along this stretch of road. Meeting 1 Crossing Install raised crossing OR Activated Flashing Y Improvements Highland Ave. At Copeland St. Beacon across Highland Ave. Consultant Install granite edge curbing where it does not exist. Upgrade concrete sidewalk panels in the Sidewalk / spots where they are broken. Install grass Curbing / Traffic strips between sidewalk and curb. Investigate Online Y Calming Highland Ave. Entire extents. best location for raised speed tables. Survey Online Y Sidewalk Irving St. Entire extents. Upgrade spot issues on sidewalks. Survey Investigate and potentially alter signal timing to allow more through -put of cars queued on Online Y Signal Timing Irving St. At each cross street. Irving. Survey Crossing Stripe crosswalks and install ADA-compliant Online Y Improvements King St. At each cross street. pedestrian curb ramps. Survey Traffic Calming Online / Improved Survey/cons Y lCrossing Kondazian St. At Grove St. Install crosswalk and pedestrian refuge island. ultant Sidewalk / crossing Install concrete sidewalks on one side of Ladd Online Y Improvement Ladd St. Entire extents. St. Stripe crosswalks at both ends. Survey Online N Traffic Calming Lawrence St. At Worcester St. Install STOP sign on Lawrence St. Survey Y Sidewalk Lawrence St. Entire extents. Install new concrete sidewalk. Consultant Speed Table / Consider installing raised speed tables along Roadway Lexington St. Additionally, consider making Online Y Redesign Lexington St. Entire extents. Lexington St one-way. Survey Crossing Stripe crosswalks and install ADA-compliant Online Y Improvements Madison Ave. At each cross street. pedestrian curb ramps. Survey Consider the addition of a left -turn arrow for vehicles traveling southbound on Waverley Signal Timing who plan to take a left onto Main towards Online Y lUpgrade Main St. At Myrtle St. Watertown Sq. Survey Upgrade signal timing so pedestrians are not Signal Timing crossing while motorists have a green left Online N Upgrade Main St. Watertown Sq. arrow. Survey Between the Galen Street bridge / Mt. Auburn St / Charles River Install benches. Match existing bench style on Public N Benches Main St. Rd. to Waverley Ave. Main St. at Stellina's. Meeting 1 Bike Lane Extend bike lanes from current terminus at Y Striping Main St. Lexington St. to Town Hall Lexington St east to Town Hall. Town r_ 0 o a o m Project Type Street Name Extents Project Description Source 'o L a Install covered bike parking. Potential locations include adjacent to the existing U-Rack bike At Watertown Library and at parking on the Thaxter St. (exit) side of the N Bike Parking Main St. Town Hall Building. building. Town Crossing At the intersection with Thaxter N Improvements Main St. St. Stripe new highly visible crosswalk. Town Crossing Between Whites Ave and Relocate crosswalks to south edge of Whites N Improvements Main St. Chestnut St. Ave intersection and to Thaxter St. Town Crossing Paint pedestrian refuge in center of roadway for N Improvements Main St. At Chestnut St. pedestrian refuge area Town Install highly visible crosswalk adjacent to Nardone Funeral Home parking lot entrance Crossing that connects to town -owned easement in Y Improvements Main St. At the intersection with Bacon St. parking lot on south side of Halfway Cafe. Town At the existing mid -block Crossing crossing between Evans St. and Install Activated Flashing Beacons at this N Improvements Main St. Wilmot St. existing mid -block crossing. Consultant Intersection "T-up intersection with sidewalk extensions at Public N Redesign Maplewood St. At Edgecliff Rd. 4 Edgecliff Rd. Meeting 1 Striping and Clearly define on street parking restrictions in Public N Signage Maplewood St. 22 - 26 Maplewood St. front of 22 Maplewood for improved visibility. Meeting 1 Marion: From the basketball / tennis courts to the intersection with Sidney St. Sidney: entire extents. Marshall: from the Stripe enhanced shared lane markings and Marion Rd. + Sidney Sidney St. intersection to Church install directional signage that directs bicyclists Y Bike Boulevard St. + Marshall St. St. to the Bike Boulevard. Consultant Bike Boulevard / Contra -Flow Stripe a contra -flow bike lane along this one- Y Bike Lane Marshall St. From Spring St to Mt Auburn St. way portion of Marshall St. Consultant Repave roadway and upgrade sidewalks as needed. Install speed limit feedback signage. Repaving / Upgrade curbs: replace asphalt with granite. Sidewalk Install highly visible mid -block crosswalk with Repairs / Traffic activated flashing beacons. Consider Online Y Calming Morse St. Entire extents. installation of raised crossing or speed table. Survey Investigate sidewalk and ROW area to Between Taylor St and Patten increase sight lines at the driveway exits at Online N Sidewalk Mt Auburn St. St. both Dunkin Donuts and Starbucks. Survey At Patten St, between Franklin and Otis, near School St, at Public N Transit Shelter Mt Auburn St. Marshall St. Install new bus shelter at this existing bus stop. Meeting 1 Crossing Stripe missing crosswalk at eastern edge of Online N Improvement Mt Auburn St. At Summer St. intersection. Survey Signal Timing Examine signal timing and make necessary Online N Upgrade Mt Auburn St. At Belmont St. changes to reduce pedestrian wait times. Survey Examine signal timing and make necessary Signal Timing changes to reduce driver turning conflict with N Upgrade Mt. Auburn St. At Main St. crossing pedestrians. Consultant Between Patten St and Auburn Remove and replace the concrete sidewalk N Sidewalk Mt. Auburn St. Ct. panels. Seniors Crossing Improvements / Upgrade sidewalks as needed. Stripe highly Online Y Sidewalk Myrtle St. Entire extents. visible crosswalk at Myrtle St and Cuba St. Survey r_ 0 o a o m Project Type Street Name Extents Project Description Source 'o L a Install curbs as needed. Stripe enhanced shared lane markings. Install signage to / from Public Y Bike Boulevard Nichols Ave. Entire extents. Watertown Linear Path. Meeting 1 From Charles River Rd to Upgrade broken sidewalk segments as Online Y Sidewalk North Beacon St. Arsenal St. necessary. Widen sidewalks where possible. Survey Signal Timing At Charles River Rd / School St. Public Y Upgrade North Beacon St. (Athena driveway entrance) Lengthen pedestrian crossing phase. Meeting 1 Bike Lane Y Striping North Beacon St. At Irving St. Review bike lane configuration, add bike box Town Stripe 1 V travel lanes, bike lanes, buffers Bike Lane between bike lane and parking. Install curb Y Striping North Beacon St. From Irving St. to School St. extensions where feasible. Town Crossing Install raised crosswalk across Nyack St, Public Y Improvements Nyack St. At Belmont St. shorten pedestrian crossing distance. Meeting 1 Traffic Calming Install granite edge curbing. Fix concrete / Pedestrian sidewalk panels as needed. Investigate if Online Y Comfort Olney St. Entire extents. raised speed table is warranted. Survey Bike Lane From Common St to Lexington Online Y Striping Orchard St. St. Stripe 11' travel lanes and bike lane stencils. Survey Bike Boulevard / Raised Victory Field Driveway at Crossing / intersection of Orchard St. and Online N Traffic Calming Orchard St. Channing Rd. Install raised crosswalk. Survey Between Spring St and Mt Online Y Lighting Palfrey St. Auburn St. Add streetlights to this stretch of Palfrey. Survey Online N Palfrey St. Entire extents. Restrict parking to one side of Palfrey St. Survey Restrict parking on the last 30 - 40 feet of At the intersection with Waverley Palfrey St. Investigate the potential for curb N Traffic Calming Palfrey St. Ave. extensions at this intersection. Seniors Install new concrete sidewalks and ADA- compliant pedestrian curb ramps and motor vehicle curb cuts. Widen existing sidewalks where necessary. Install granite curb edge at Starbucks restaurant. Remove sidewalk obstructions (encroaching vegetation and utility Sidewalk / and sign poles.) Install raised speed table Online Y Traffic Calming Patten St. Entire extents. along Patten St. Survey Reorient curb geometry to create a tighter Intersection turning radii. Realign and shorten pedestrian Public Y Redesign Paul St. At N. Beacon St. crossing distance. Meeting 1 Online Y Sidewalk Pearl St. Entire extents. Upgrade sidewalks as needed. Survey Stripe enhanced shared lane markings and install direction signage that directs bicyclists to the Bike Boulevard location. Establish formal connection from Phillips St. 'dead-end' to Y Bike Boulevard Phillips St. Entire extents. Watertown Trail (proposed). Consultant Install new high visibility crosswalk. Potentially include Activated Flashing Beacons. Complete missing crosswalk leg at driveway. Install signage adjacent to electrical control box on westbound pleasant "YIELD TO Crossing PEDESTRIANS IN CROSSWALK WHEN Y Improvements Pleasant St. At Myrtle St. TURNING" Consultant r_ 0 o a o m Project Type Street Name Extents Project Description Source 'o L a Crossing At Paramount PI / Shared -use Install high visibility crosswalk with Activated Y Improvements Pleasant St. path terminus Flashing Beacons. Consultant Crossing Relocate crosswalk at edge of Howard St N Improvements Pleasant St. At Howard St. closer to Bacon St. Consultant Bike Lane Install bike lane on the south side of this one- Y Striping Riverside St. From N. Beacon St to Alfred Rd. way portion of Riverside Street. Consultant Online Y Traffic Calming Rutland St. Entire extents. Install 1 (possibly 2) raised speed tables. Survey Introduce left green arrow for drivers wishing to Signal Timing make a left onto school from Mt Auburn Online Y Upgrade School St. At Mt Auburn St. heading northbound. Survey At Walnut St / Dexter St and at Online Y Traffic Control School St. Boylston St. Install 4-way stop. Survey Crossing Stripe crosswalks and install ADA-compliant Online Y Improvements Sparkill St. At each cross street. pedestrian curb ramps. Survey Intersection Replace 2-way stop with 4-way stop OR install Online Y Redesign Spring St. At Summer St. "cross traffic does not stop" signage. Survey Between Marlboro Ter and Online Y Traffic Calming Springfield St. Forest St. Install raised speed table. Survey Establish formal path connection: Install wayfinding signage on Waltham St at Stanley Ave directing bicyclists and pedestrians to use Stanley Ave. Stripe bike lanes OR enhanced shared lane markings along Stanley Ave. At existing sidewalk terminus near JCD School, stripe a pedestrian lane (due to existing bio- swale / rain water retention area: sidewalk infeasible) that directs users to existing asphalt shared use path. Permanently remove "Do Not Enter" signage at shared -use path entrance. Permanently remove metal barrier gates at shared -use path terminus at Pleasant St. Install wayfinding signage at shared -use path Formal Path Entire extents, and through to terminus (on Pleasant St, directly opposite Y Connection Stanley Ave. Pleasant St. Paramount PI.) Consultant Install 4 ADA-compliant Pedestrian Curb Pedestrian Curb Ramps at this intersection. Include wayfinding Y Ramps Summer St. At Forest St. signage for Watertown Linear Park. Consultant Online Y iSidewalk Summer St. Entire extents. Upgrade sidewalks as needed. Survey Traffic Calming / Raised Install raised crosswalk across Summer St and Public Y Crossing Summer St. At Whites Ave. install a stop sign. Meeting 1 Online Y Road Paving Sunset Rd. Entire extents. Repave the roadway, add granite edge curbing. Survey Install new ADA compliant sidewalk and pedestrian curb ramps along the west side of Taylor St. Enforce no parking on sidewalks rule at O'Reilly Auto. Construct new sidewalk on east side of Taylor St, from existing sidewalk terminus at Belmont Savings Bank / New York Diner parking lot exit, to Mt Auburn St. Formalize sidewalk area by maintaining consistent width and brining all driveway Public N Sidewalk Taylor St. Entire extents. crossings up to sidewalk level. Meeting 1 Re -pave the road surface. Add raised speed Online Y Traffic Calming iTownly Rd. Entire extents. tables. Survey r_ 0 o a o m 'o Project Type Street Name Extents Project Description Source L a Install new concrete sidewalk at curb edge (no Curb and space for grass strip) to fill this bumpy Y Sidewalk Repair Townly Rd. Between 65 and 35 Townly Rd. segment. Seniors Online N Street Redesign Union St. Entire extents. Only allow parking on one side of Union St. Survey Stripe enhanced shared lane markings and install directional signage that directs bicyclists Victory Field through Victory Field driveway towards Marion Y Bike Boulevard Driveway At Orchard St. Entrance Rd and Sidney St. Consultant Crossing Y Improvements Walnut St. At Birch Rd. Stripe crosswalk across Birch Rd. Town Bike Lane From Gore Estate to Rosedale Public Y Striping Waltham St. Rd. Stripe bike lanes. Meeting 1 Between Cleveland Rd and Chapman St, at existing Cuniff Crossing School entrance mid -block Y Improvements Warren St. crossing. Install raised crosswalk Town Crossing Public Y Improvements Water St. At Nonantum Rd. Install Activated Flashing Beacons. Meeting 1 Install pedestrian -level lighting along the Watertown Linear Watertown Linear Path through Saltonstall Online Y Lighting Path Through Saltonstall Park. Park. Survey Install wayfinding signage to direct path users Wayfinding Watertown Linear towards the mall area, Arsenal Park, and the Online Y iSignage Path Behind Best Buy. Charles River. Survey Intersection Traffic control device TBD at stop n shop Online N Redesign Watertown St. At Theurer Pk. entrance / Theurer Pk intersection. Survey Intersection Install red-light camera, and/or "DO NOT Online Y Redesign Watertown St. At California St. BLOCK INTERSECTION" signage. Survey Crossing At existing crosswalk between Install Activated Flashing Beacons at existing Public Y Improvements Watertown St. Morse St and Belknap Ter. crosswalk. Meeting 1 Crossing At existing crosswalk between Install Activated Flashing Beacons at existing Public Y Improvements Watertown St. Pond St and Theurer Pk. crosswalk. Meeting 1 Repave the roadway. Construct sidewalks on the west side, south of Lowell St, restripe south crosswalk leg at Belmont St to Continental style crosswalk. Stripe bike lanes. Investigate Y iTrafficCalming Waverley Ave. From Orchard St to Belmont St. need for a speed table. Town Online N Signage Waverley Ave. At Hilltop St. Install "NO ENGINE BRAKING" signage. Survey Install bike parking (preferably covered) at the following three locations: On Bemis St, in the grass area approximately 50' from the Westminster Ave intersection. Adjacent to the alcove / main entrance on Waverley. In Moxley Westminster St. + Playground, near the mid -block crossing from N Bike Parking Bemis St. At Watertown Middle School Watertown Middle School to the playground. Consultant Develop a Bike Boulevard along Westminster St and Whitney. Consider a raised crossing or raised table intersection at the Bemis Rd intersection. Stripe enhanced shared lane Westminster St. + markings and include branded / wayfinding Y Bike Boulevard Whitney St. Entire extents. signage. Consultant Install raised crosswalk and activated flashing Crossing At Watertown Linear Park path beacons at busy path crossing to calm motor Y Improvements Whites Ave. crossing vehicle traffic. Town Online N Traffic Calming Whites Ave. Entire extents. Reduce posted speed limit. Survey r- 0 o a o m Project Type Street Name Extents Project Description Source 'o L a Crossing Stripe crosswalk at east sidewalk terminus / Y lImprovements Wilson Ave. At Fairview Ave. Fairview Ave intersection. Consultant Restrict parking one side of the street. Stripe enhance shared lane markings throughout. Wilson Ave. + Install directional Bike Boulevard signage at Y Bike Boulevard Channing Rd. Entire extents. intersections. Consultant Entire extents, from Belmont St. Y ITrafficCalming Winsor Ave. Ito Mt. Auburn St. I Install curb extensions and stripe bike facility Town