Project Type
Street Name
Extents
Project Description
Source
a`
Public
Y
Traffic Calming
5th Ave.
At California St.
Install curb extensions across 5th Ave.
Meeting 1
Remove existing asphalt, install concrete panel
sidewalk with granite edge curbing along at
least one side of Acton St. (preferable install
Sidewalk /
Between Rosedale Rd and
sidewalk along both sides.) Install raised speed
Online
Y
lTraffic Calming
Acton St.
Howard St.
table along Acton St.
Survey
Online
Y
Traffic Calming
Aldrich Rd.
Between 58 - 46 Aldrich Rd.
Install speed table.
Survey
Wayfinding
Arlington St + Grove
Near both entrances to Filipello
Install directional / wayfinding signage that
Public
Y
Signage
St.
Park.
directs people toward Filipello Park.
Meeting 1
Stripe 11' travel lanes, evaluate space for
parking and bike lanes. Where space does not
allow for bike lanes, stripe enhanced shared
Y
Lane Striping
Arlington St.
Grove St. to Arsenal St.
lane markings.
Town
Online
Y
Lighting
Arlington St.
Entire extents.
Evaluate need for upgrading street lights.
Survey
From existing cycle track
terminus between Beechwood
Construct cycle track to further the
Online
Y
Cycle Track
Arsenal St.
Ave and Irving St, to Taylor St.
development of the Watertown Linear Path.
Survey
Stripe directional indicator arrows at
intersection approach: coming south on
Intersection
Arlington St. and exiting the Home Depot /
Online
Y
Redesign
Arsenal St.
At Arlington St.
Millers Ale House plaza driveway.
Survey
Wayfinding /
Shared Use
Install wayfinding signage and shared use path
Online
Y
Path
Arsenal St.
At Talcott Ave.
to Charles River.
Survey
Repave the roadway, add granite edge curbing,
Street Repaving
allow enough space between sidewalk and
/ Sidewalks /
curb for future street trees. Restrict parking to
Online
Y
Curbs
Avon Rd.
Entire extents.
one side for the entire year.
Survey
At 89 / 90 Bailey Rd. (North of
Install raised speed table as a traffic calming
Public
Y
Traffic Calming
Bailey Rd.
Stoneleigh Cir.)
device.
Meeting 1
Install new concrete sidewalks and ADA-
From Lexington St. to Edenfield
compliant pedestrian curb ramps and motor
Online
Y
Sidewalk
Bancroft St.
Ave.
vehicle curb cuts.
Survey
Between Edenfield Ave and
Install raised table crossing as a traffic calming
Public
Y
Traffic Calming
Bancroft St.
Westminster Ave.
element.
Meeting 1
Install raised crossing across Bay St as a traffic
Crossing
calming device. OR install highly visible
Public
Y
I Improvements
Bay St.
At Charles River Rd.
crosswalk / upgraded pedestrian curb ramps.
Meeting 1
Online
Y
Beechwood St.
At Arsenal St.
Upgrade signal timing to reduce queueing.
Survey
Crossing
Improvements /
1. At Common St. 2. Between
Install raised crossing. Install ADA-compliant
Public
Y
Traffic Calming
Bellevue Rd.
Russell Ave and Marcia Rd.
pedestrian curb ramps.
Meeting 1
Bike Lane
From Lexington St. to Prospect
Y
Striping
Belmont St.
St. (Waltham border)
Stripe bike lanes along this roadway.
Consultant
At the existing mid -block
crosswalk just west of Duff St, at
the existing crosswalk on
Knowles Rd, at the existing
Crossing
crosswalk at Jonathan St, and at
Install Activated Flashing Beacons to improve
Public
Y
Improvements
Belmont St.
Primmer St.
motorist yield at crossing.
Meeting 1
r_
0
o a
o m
Project Type
Street Name
Extents
Project Description
Source
'o
L
a
Signal Timing
Add left turn arrow for turning left from Belmont
Online
Y
Upgrade
Belmont St.
At Common St.
St onto Common St towards Trapelo Rd.
Survey
Bigelow Ave: entire extents.
Templeton Pkwy: From Mt
Auburn St to Maplewood St +
Bigelow Ave,
from Salisbury Rd to Belmont St.
Stripe enhanced shared lane markings,
Templeton Pkwy,
Salisbury Rd: from Maple St to
directional / wayfinding signage, and Bicycles
Public
Y
Bike Boulevard
Salisbury Rd.
Templeton Pkwy.
May Always Use Full Lane signage.
Meeting 1
Consider additional curb extensions to
compliment existing curb extension at Nichols
Ave, consider re -striping to re -orient roadway
Entire extents, from Mt. Auburn
for diagonal parking, consider bike boulevard
Y
Traffic Calming
Bigelow Ave.
St. to Nichols Ave.
treatment.
Town
Remove and replace damaged concrete
sidewalk panels with new. Reset adjacent
Curb and
existing granite curb edge. Install new
N
Sidewalk Repair
Bigelow Ave.
At 25 Bigelow Ave.
pedestrian curb ramp at existing fire hydrant.
Seniors
Intersection
Online
Y
Redesign
Boylston St.
At Hazel St / Howe St
Install small neighborhood roundabout.
Survey
Intersection
Realign and 7-up" intersection with bump -outs
Y
Redesign
Boylston St.
At Concord St.
and crosswalk enhancements
Town
Crossing
At Locke St, at Fairview Ave, at
Online
Y
Improvements
Bradford St.
Bellevue Rd, at Orchard St.
Install ADA-compliant pedestrian curb ramps.
Survey
Install wayfinding signage to direct bicyclists
and pedestrians to Russo's / Watertown Mews
At Charles River Greenway path
/ Pleasant Pizza AND continuation of the
Wayfinding
intersection (north side of
Charles River Greenway Path (which is on the
Public
Y
Signage
Bridge St.
Charles River).
south side of the river.)
Meeting 1
Traffic Calming
/ Edge Curb
Install granite edge curbing. Install and enforce
Online
Y
Upgrades
Buick St.
Entire extents.
"NO TRUCKS" signage.
Survey
Tighten curb radii with vegetated sidewalk
extensions. Shorten pedestrian crossing
Intersection
distance. Install compliant pedestrian curb
Y
Redesign
California Pk.
At California St.
ramps.
Consultant
Replace asphalt sidewalk with granite.
Formalize by raising driveway crossings to
sidewalk level. Formalize 139 California St.
driveway area. Install granite edge curbing on
Y
Sidewalk
California St.
At 139 California St.
new sidewalk sections.
Consultant
Formalize sidewalk at Enter and Exit driveways
to California St. Raise new concrete sidewalk
to consistent height across driveway areas.
At back of Stop n Shop mall
Include "Enter" and "Exit" signage. Stripe
Public
Y
Sidewalk
California St.
buildings.
directional arrows.
Meeting 1
Travel Lane
Y
Striping
California St.
Entire extents.
Stripe 11' travel lanes
Town
Install granite edge curbing. Install concrete
Online
Y
Center St.
Entire extents.
sidewalks where asphalt sidewalks exist.
Survey
Install raised crossing and "DEAD END"
Online
N
Church Ln.
At Pleasant St.
signage more prominently.
Survey
Install raised crossing OR Activated Flashing
Y
Bike Boulevard
Church St.
At Marshall St.
Beacon
Consultant
Bike Lane
Stripe bike lanes and enhanced shared lane
Online
Y
Striping
Church St.
From Summer St. to Main St.
markings.
Survey
r_
0
o a
o m
Project Type
Street Name
Extents
Project Description
Source
'o
L
a
Re -align crosswalk, potentially introduce curb
extensions, add crosswalk on southern leg of
Crossing
intersection. Investigate potential to add raised
Y
Improvements
Church St.
At Marion Rd.
crossing.
Town
Bike Facility
Add a bike box and bike crosswalk (cross
Online
Y
Striping
Church St.
At Main St.
bike).
Survey
Install bike parking (preferably covered) at the
following locations: at the Columbia St
entrance, adjacent to the short flight of stairs
on the right side (as you face the building). At
the north / west edge of the building, adjacent
to the entrance with existing sign "Watertown
Y
Bike Parking
Columbia St.
At Watertown High School
Community Access Center."
Consultant
Crossing
Public
Y
Improvements
Columbia St.
At Robbins Rd intersection.
Install raised table crossing.
Meeting 1
Entire extents, Arsenal St. to Mt.
Stripe 11' travel lanes, evaluate space for
Y
Lane Striping
Coolidge Ave.
Auburn St.
parking and bike lanes
Town
Construct new sidewalk with granite edge
Sidewalk /
curbing on east side of Copeland St. Consider
Raised
From Highland Ave. to
installing raised crossing at Copeland /
Y
Crossing
Copeland St.
Grandview Ave.
Grandview.
Consultant
"T"-up intersection with sidewalk extensions on
Crawford so that the two streets meet at a 90
degree angle. Install stop sign on Crawford St.
Intersection
as well as Cross Traffic Does Not Stop
Online
Y
Redesign
Crawford St.
At Kondazian St.
signage.
Survey
Upgrade Edge
Entire extents: upgrade edge curbing to granite
Curbing /
as needed. Stripe crosswalk at intersection
Improved
Entire extents and at each cross
with Dexter Ave. Stripe crosswalk across
Online
Y
Crossing
Cypress St.
street.
School St. Stripe crosswalk at Walnut St.
Survey
Curb
Install curb extensions at cross -street
Extensions /
Entire extents, from Mt Auburn
intersection locations. Upgrade broken or
Y
Sidewalks
Dexter Ave.
St to School St.
bumpy sidewalks as necessary.
Town
Between Grant Ave and Darch
Install granite edge curbing and upgrade
Online
Y
Sidewalk
Duff St.
Rd.
sidewalks as necessary.
Survey
Striping and
Online
Y
Signage
Edenfield Ave.
Entire extents.
Restrict parking to one side of the street.
Survey
Between Orchard St and Warren
Online
Y
Road Paving
Edenfield Ave.
St.
Repave the road.
Survey
Install speed tables at two locations to
discourage motorist cut -through speeding on
Online
Y
Traffic Calming
Edward Rd.
At 2 locations.
this one-way residential street.
Survey
Replace asphalt curb with granite edge
curbing. Where granite curbs exist, let them
Public
Y
Curbing
Edward Rd.
Entire extents.
remain in place.
Meeting 1
Install raised table crossing to calm cut -through
Online
Y
Traffic Calming
Evans St.
At Acton St.
traffic.
Survey
Install 4 ADA-compliant pedestrian curb ramps
Pedestrian Curb
at this intersection. Include wayfinding signage
Y
Ramps
Fayette St.
At Forest St.
for Watertown Linear Park.
Consultant
Curb and
Remove broken asphalt sidewalk and replace
Sidewalk Repair
with concrete panels at necessary locations.
/ Traffic
Multiple areas along this .5 mile
Consider installing raised crossing or raised
Y
Calming
Fayette St.
street.
speed table.
Seniors
Wayfinding,
Remove low concrete wall barrier to path from
Path Entrance
At intersection with linear park
Forest St. dead-end. Install linear path
Y
Construction
Forest St.
(south side of linear park)
wayfinding signage on Main St. at Forest St.
Consultant
r_
0
o a
o m
Project Type
Street Name
Extents
Project Description
Source
'o
L
a
Intersection
Construct neighborhood roundabout at Y-
Y
lRedesign
Forest St.
At Springfield St.
shaped intersection
Town
Frank St, Louise St,
Beechwood St,
Upgrade asphalt pavement. Upgrade curbs as
Online
N
Street Repaving
Patton St.
Entire extents.
necessary.
Survey
Install curb extensions at this intersection.
Curb
Prohibit parking on Fuller within 30' of
Y
Extensions
Fuller Rd.
At Orchard St.
intersection to improve sightlines.
Consultant
Install curb extensions at this intersection.
Curb
Prohibit parking on George within 30' of
Y
Extensions
George St.
At Orchard St.
intersection to improve sightlines.
Consultant
Between Duff St and Lexington
Install granite edge curbing and upgrade
Online
Y
Sidewalk
Grant Ave.
St.
sidewalks as necessary.
Survey
Install speed table on Green St, just east of
Public
Y
Traffic Calming
Green St.
At Chestnut St.
Chestnut St.
Meeting 1
Sidewalk /
From 99 Grove St to Coolidge
Construct new sidewalk on east side of street
Y
Cycle Track
Grove St.
Ave.
(adjacent to cemetery.) Stripe 5' bike lanes.
Consultant
Bike Lane
From Coolidge Hill Rd to Calvin
Public
Y
Striping
Grove St.
Rd.
Stripe bike lanes along this stretch of road.
Meeting 1
Crossing
Install raised crossing OR Activated Flashing
Y
Improvements
Highland Ave.
At Copeland St.
Beacon across Highland Ave.
Consultant
Install granite edge curbing where it does not
exist. Upgrade concrete sidewalk panels in the
Sidewalk /
spots where they are broken. Install grass
Curbing / Traffic
strips between sidewalk and curb. Investigate
Online
Y
Calming
Highland Ave.
Entire extents.
best location for raised speed tables.
Survey
Online
Y
Sidewalk
Irving St.
Entire extents.
Upgrade spot issues on sidewalks.
Survey
Investigate and potentially alter signal timing to
allow more through -put of cars queued on
Online
Y
Signal Timing
Irving St.
At each cross street.
Irving.
Survey
Crossing
Stripe crosswalks and install ADA-compliant
Online
Y
Improvements
King St.
At each cross street.
pedestrian curb ramps.
Survey
Traffic Calming
Online
/ Improved
Survey/cons
Y
lCrossing
Kondazian St.
At Grove St.
Install crosswalk and pedestrian refuge island.
ultant
Sidewalk /
crossing
Install concrete sidewalks on one side of Ladd
Online
Y
Improvement
Ladd St.
Entire extents.
St. Stripe crosswalks at both ends.
Survey
Online
N
Traffic Calming
Lawrence St.
At Worcester St.
Install STOP sign on Lawrence St.
Survey
Y
Sidewalk
Lawrence St.
Entire extents.
Install new concrete sidewalk.
Consultant
Speed Table /
Consider installing raised speed tables along
Roadway
Lexington St. Additionally, consider making
Online
Y
Redesign
Lexington St.
Entire extents.
Lexington St one-way.
Survey
Crossing
Stripe crosswalks and install ADA-compliant
Online
Y
Improvements
Madison Ave.
At each cross street.
pedestrian curb ramps.
Survey
Consider the addition of a left -turn arrow for
vehicles traveling southbound on Waverley
Signal Timing
who plan to take a left onto Main towards
Online
Y
lUpgrade
Main St.
At Myrtle St.
Watertown Sq.
Survey
Upgrade signal timing so pedestrians are not
Signal Timing
crossing while motorists have a green left
Online
N
Upgrade
Main St.
Watertown Sq.
arrow.
Survey
Between the Galen Street bridge
/ Mt. Auburn St / Charles River
Install benches. Match existing bench style on
Public
N
Benches
Main St.
Rd. to Waverley Ave.
Main St. at Stellina's.
Meeting 1
Bike Lane
Extend bike lanes from current terminus at
Y
Striping
Main St.
Lexington St. to Town Hall
Lexington St east to Town Hall.
Town
r_
0
o a
o m
Project Type
Street Name
Extents
Project Description
Source
'o
L
a
Install covered bike parking. Potential locations
include adjacent to the existing U-Rack bike
At Watertown Library and at
parking on the Thaxter St. (exit) side of the
N
Bike Parking
Main St.
Town Hall Building.
building.
Town
Crossing
At the intersection with Thaxter
N
Improvements
Main St.
St.
Stripe new highly visible crosswalk.
Town
Crossing
Between Whites Ave and
Relocate crosswalks to south edge of Whites
N
Improvements
Main St.
Chestnut St.
Ave intersection and to Thaxter St.
Town
Crossing
Paint pedestrian refuge in center of roadway for
N
Improvements
Main St.
At Chestnut St.
pedestrian refuge area
Town
Install highly visible crosswalk adjacent to
Nardone Funeral Home parking lot entrance
Crossing
that connects to town -owned easement in
Y
Improvements
Main St.
At the intersection with Bacon St.
parking lot on south side of Halfway Cafe.
Town
At the existing mid -block
Crossing
crossing between Evans St. and
Install Activated Flashing Beacons at this
N
Improvements
Main St.
Wilmot St.
existing mid -block crossing.
Consultant
Intersection
"T-up intersection with sidewalk extensions at
Public
N
Redesign
Maplewood St.
At Edgecliff Rd.
4 Edgecliff Rd.
Meeting 1
Striping and
Clearly define on street parking restrictions in
Public
N
Signage
Maplewood St.
22 - 26 Maplewood St.
front of 22 Maplewood for improved visibility.
Meeting 1
Marion: From the basketball /
tennis courts to the intersection
with Sidney St. Sidney: entire
extents. Marshall: from the
Stripe enhanced shared lane markings and
Marion Rd. + Sidney
Sidney St. intersection to Church
install directional signage that directs bicyclists
Y
Bike Boulevard
St. + Marshall St.
St.
to the Bike Boulevard.
Consultant
Bike Boulevard
/ Contra -Flow
Stripe a contra -flow bike lane along this one-
Y
Bike Lane
Marshall St.
From Spring St to Mt Auburn St.
way portion of Marshall St.
Consultant
Repave roadway and upgrade sidewalks as
needed. Install speed limit feedback signage.
Repaving /
Upgrade curbs: replace asphalt with granite.
Sidewalk
Install highly visible mid -block crosswalk with
Repairs / Traffic
activated flashing beacons. Consider
Online
Y
Calming
Morse St.
Entire extents.
installation of raised crossing or speed table.
Survey
Investigate sidewalk and ROW area to
Between Taylor St and Patten
increase sight lines at the driveway exits at
Online
N
Sidewalk
Mt Auburn St.
St.
both Dunkin Donuts and Starbucks.
Survey
At Patten St, between Franklin
and Otis, near School St, at
Public
N
Transit Shelter
Mt Auburn St.
Marshall St.
Install new bus shelter at this existing bus stop.
Meeting 1
Crossing
Stripe missing crosswalk at eastern edge of
Online
N
Improvement
Mt Auburn St.
At Summer St.
intersection.
Survey
Signal Timing
Examine signal timing and make necessary
Online
N
Upgrade
Mt Auburn St.
At Belmont St.
changes to reduce pedestrian wait times.
Survey
Examine signal timing and make necessary
Signal Timing
changes to reduce driver turning conflict with
N
Upgrade
Mt. Auburn St.
At Main St.
crossing pedestrians.
Consultant
Between Patten St and Auburn
Remove and replace the concrete sidewalk
N
Sidewalk
Mt. Auburn St.
Ct.
panels.
Seniors
Crossing
Improvements /
Upgrade sidewalks as needed. Stripe highly
Online
Y
Sidewalk
Myrtle St.
Entire extents.
visible crosswalk at Myrtle St and Cuba St.
Survey
r_
0
o a
o m
Project Type
Street Name
Extents
Project Description
Source
'o
L
a
Install curbs as needed. Stripe enhanced
shared lane markings. Install signage to / from
Public
Y
Bike Boulevard
Nichols Ave.
Entire extents.
Watertown Linear Path.
Meeting 1
From Charles River Rd to
Upgrade broken sidewalk segments as
Online
Y
Sidewalk
North Beacon St.
Arsenal St.
necessary. Widen sidewalks where possible.
Survey
Signal Timing
At Charles River Rd / School St.
Public
Y
Upgrade
North Beacon St.
(Athena driveway entrance)
Lengthen pedestrian crossing phase.
Meeting 1
Bike Lane
Y
Striping
North Beacon St.
At Irving St.
Review bike lane configuration, add bike box
Town
Stripe 1 V travel lanes, bike lanes, buffers
Bike Lane
between bike lane and parking. Install curb
Y
Striping
North Beacon St.
From Irving St. to School St.
extensions where feasible.
Town
Crossing
Install raised crosswalk across Nyack St,
Public
Y
Improvements
Nyack St.
At Belmont St.
shorten pedestrian crossing distance.
Meeting 1
Traffic Calming
Install granite edge curbing. Fix concrete
/ Pedestrian
sidewalk panels as needed. Investigate if
Online
Y
Comfort
Olney St.
Entire extents.
raised speed table is warranted.
Survey
Bike Lane
From Common St to Lexington
Online
Y
Striping
Orchard St.
St.
Stripe 11' travel lanes and bike lane stencils.
Survey
Bike Boulevard
/ Raised
Victory Field Driveway at
Crossing /
intersection of Orchard St. and
Online
N
Traffic Calming
Orchard St.
Channing Rd.
Install raised crosswalk.
Survey
Between Spring St and Mt
Online
Y
Lighting
Palfrey St.
Auburn St.
Add streetlights to this stretch of Palfrey.
Survey
Online
N
Palfrey St.
Entire extents.
Restrict parking to one side of Palfrey St.
Survey
Restrict parking on the last 30 - 40 feet of
At the intersection with Waverley
Palfrey St. Investigate the potential for curb
N
Traffic Calming
Palfrey St.
Ave.
extensions at this intersection.
Seniors
Install new concrete sidewalks and ADA-
compliant pedestrian curb ramps and motor
vehicle curb cuts. Widen existing sidewalks
where necessary. Install granite curb edge at
Starbucks restaurant. Remove sidewalk
obstructions (encroaching vegetation and utility
Sidewalk /
and sign poles.) Install raised speed table
Online
Y
Traffic Calming
Patten St.
Entire extents.
along Patten St.
Survey
Reorient curb geometry to create a tighter
Intersection
turning radii. Realign and shorten pedestrian
Public
Y
Redesign
Paul St.
At N. Beacon St.
crossing distance.
Meeting 1
Online
Y
Sidewalk
Pearl St.
Entire extents.
Upgrade sidewalks as needed.
Survey
Stripe enhanced shared lane markings and
install direction signage that directs bicyclists to
the Bike Boulevard location. Establish formal
connection from Phillips St. 'dead-end' to
Y
Bike Boulevard
Phillips St.
Entire extents.
Watertown Trail (proposed).
Consultant
Install new high visibility crosswalk. Potentially
include Activated Flashing Beacons. Complete
missing crosswalk leg at driveway. Install
signage adjacent to electrical control box on
westbound pleasant "YIELD TO
Crossing
PEDESTRIANS IN CROSSWALK WHEN
Y
Improvements
Pleasant St.
At Myrtle St.
TURNING"
Consultant
r_
0
o a
o m
Project Type
Street Name
Extents
Project Description
Source
'o
L
a
Crossing
At Paramount PI / Shared -use
Install high visibility crosswalk with Activated
Y
Improvements
Pleasant St.
path terminus
Flashing Beacons.
Consultant
Crossing
Relocate crosswalk at edge of Howard St
N
Improvements
Pleasant St.
At Howard St.
closer to Bacon St.
Consultant
Bike Lane
Install bike lane on the south side of this one-
Y
Striping
Riverside St.
From N. Beacon St to Alfred Rd.
way portion of Riverside Street.
Consultant
Online
Y
Traffic Calming
Rutland St.
Entire extents.
Install 1 (possibly 2) raised speed tables.
Survey
Introduce left green arrow for drivers wishing to
Signal Timing
make a left onto school from Mt Auburn
Online
Y
Upgrade
School St.
At Mt Auburn St.
heading northbound.
Survey
At Walnut St / Dexter St and at
Online
Y
Traffic Control
School St.
Boylston St.
Install 4-way stop.
Survey
Crossing
Stripe crosswalks and install ADA-compliant
Online
Y
Improvements
Sparkill St.
At each cross street.
pedestrian curb ramps.
Survey
Intersection
Replace 2-way stop with 4-way stop OR install
Online
Y
Redesign
Spring St.
At Summer St.
"cross traffic does not stop" signage.
Survey
Between Marlboro Ter and
Online
Y
Traffic Calming
Springfield St.
Forest St.
Install raised speed table.
Survey
Establish formal path connection: Install
wayfinding signage on Waltham St at Stanley
Ave directing bicyclists and pedestrians to use
Stanley Ave. Stripe bike lanes OR enhanced
shared lane markings along Stanley Ave. At
existing sidewalk terminus near JCD School,
stripe a pedestrian lane (due to existing bio-
swale / rain water retention area: sidewalk
infeasible) that directs users to existing asphalt
shared use path. Permanently remove "Do Not
Enter" signage at shared -use path entrance.
Permanently remove metal barrier gates at
shared -use path terminus at Pleasant St.
Install wayfinding signage at shared -use path
Formal Path
Entire extents, and through to
terminus (on Pleasant St, directly opposite
Y
Connection
Stanley Ave.
Pleasant St.
Paramount PI.)
Consultant
Install 4 ADA-compliant Pedestrian Curb
Pedestrian Curb
Ramps at this intersection. Include wayfinding
Y
Ramps
Summer St.
At Forest St.
signage for Watertown Linear Park.
Consultant
Online
Y
iSidewalk
Summer St.
Entire extents.
Upgrade sidewalks as needed.
Survey
Traffic Calming
/ Raised
Install raised crosswalk across Summer St and
Public
Y
Crossing
Summer St.
At Whites Ave.
install a stop sign.
Meeting 1
Online
Y
Road Paving
Sunset Rd.
Entire extents.
Repave the roadway, add granite edge curbing.
Survey
Install new ADA compliant sidewalk and
pedestrian curb ramps along the west side of
Taylor St. Enforce no parking on sidewalks rule
at O'Reilly Auto. Construct new sidewalk on
east side of Taylor St, from existing sidewalk
terminus at Belmont Savings Bank / New York
Diner parking lot exit, to Mt Auburn St.
Formalize sidewalk area by maintaining
consistent width and brining all driveway
Public
N
Sidewalk
Taylor St.
Entire extents.
crossings up to sidewalk level.
Meeting 1
Re -pave the road surface. Add raised speed
Online
Y
Traffic Calming
iTownly Rd.
Entire extents.
tables.
Survey
r_
0
o a
o m
'o
Project Type
Street Name
Extents
Project Description
Source
L
a
Install new concrete sidewalk at curb edge (no
Curb and
space for grass strip) to fill this bumpy
Y
Sidewalk Repair
Townly Rd.
Between 65 and 35 Townly Rd.
segment.
Seniors
Online
N
Street Redesign
Union St.
Entire extents.
Only allow parking on one side of Union St.
Survey
Stripe enhanced shared lane markings and
install directional signage that directs bicyclists
Victory Field
through Victory Field driveway towards Marion
Y
Bike Boulevard
Driveway
At Orchard St. Entrance
Rd and Sidney St.
Consultant
Crossing
Y
Improvements
Walnut St.
At Birch Rd.
Stripe crosswalk across Birch Rd.
Town
Bike Lane
From Gore Estate to Rosedale
Public
Y
Striping
Waltham St.
Rd.
Stripe bike lanes.
Meeting 1
Between Cleveland Rd and
Chapman St, at existing Cuniff
Crossing
School entrance mid -block
Y
Improvements
Warren St.
crossing.
Install raised crosswalk
Town
Crossing
Public
Y
Improvements
Water St.
At Nonantum Rd.
Install Activated Flashing Beacons.
Meeting 1
Install pedestrian -level lighting along the
Watertown Linear
Watertown Linear Path through Saltonstall
Online
Y
Lighting
Path
Through Saltonstall Park.
Park.
Survey
Install wayfinding signage to direct path users
Wayfinding
Watertown Linear
towards the mall area, Arsenal Park, and the
Online
Y
iSignage
Path
Behind Best Buy.
Charles River.
Survey
Intersection
Traffic control device TBD at stop n shop
Online
N
Redesign
Watertown St.
At Theurer Pk.
entrance / Theurer Pk intersection.
Survey
Intersection
Install red-light camera, and/or "DO NOT
Online
Y
Redesign
Watertown St.
At California St.
BLOCK INTERSECTION" signage.
Survey
Crossing
At existing crosswalk between
Install Activated Flashing Beacons at existing
Public
Y
Improvements
Watertown St.
Morse St and Belknap Ter.
crosswalk.
Meeting 1
Crossing
At existing crosswalk between
Install Activated Flashing Beacons at existing
Public
Y
Improvements
Watertown St.
Pond St and Theurer Pk.
crosswalk.
Meeting 1
Repave the roadway. Construct sidewalks on
the west side, south of Lowell St, restripe south
crosswalk leg at Belmont St to Continental
style crosswalk. Stripe bike lanes. Investigate
Y
iTrafficCalming
Waverley Ave.
From Orchard St to Belmont St.
need for a speed table.
Town
Online
N
Signage
Waverley Ave.
At Hilltop St.
Install "NO ENGINE BRAKING" signage.
Survey
Install bike parking (preferably covered) at the
following three locations: On Bemis St, in the
grass area approximately 50' from the
Westminster Ave intersection. Adjacent to the
alcove / main entrance on Waverley. In Moxley
Westminster St. +
Playground, near the mid -block crossing from
N
Bike Parking
Bemis St.
At Watertown Middle School
Watertown Middle School to the playground.
Consultant
Develop a Bike Boulevard along Westminster
St and Whitney. Consider a raised crossing or
raised table intersection at the Bemis Rd
intersection. Stripe enhanced shared lane
Westminster St. +
markings and include branded / wayfinding
Y
Bike Boulevard
Whitney St.
Entire extents.
signage.
Consultant
Install raised crosswalk and activated flashing
Crossing
At Watertown Linear Park path
beacons at busy path crossing to calm motor
Y
Improvements
Whites Ave.
crossing
vehicle traffic.
Town
Online
N
Traffic Calming
Whites Ave.
Entire extents.
Reduce posted speed limit.
Survey
r-
0
o a
o m
Project Type
Street Name
Extents
Project Description
Source
'o
L
a
Crossing
Stripe crosswalk at east sidewalk terminus /
Y
lImprovements
Wilson Ave.
At Fairview Ave.
Fairview Ave intersection.
Consultant
Restrict parking one side of the street. Stripe
enhance shared lane markings throughout.
Wilson Ave. +
Install directional Bike Boulevard signage at
Y
Bike Boulevard
Channing Rd.
Entire extents.
intersections.
Consultant
Entire extents, from Belmont St.
Y
ITrafficCalming
Winsor Ave.
Ito Mt. Auburn St.
I Install curb extensions and stripe bike facility
Town