Loading...
HomeMy Public PortalAboutWatertown Priority Projects-Cost Estimates_201805111020573281MEMO To: Matt Shuman PE, Town of Watertown From: Phil Goff and Charlie Creagh (Alta Planning + Design) CC: Laura Wiener and Gideon Schreiber, Town of Watertown Date: March 20, 2018 Re: Complete Streets Prioritization Plan — Four Priority Projects Cost Estimates Priority Project Cost Estimates This memorandum includes the descriptions and cost estimates for four high priority projects (out of the 24 projects submitted in the March 16th memo). These four projects were chosen for their ability to be rapidly implemented, and therefore submitted to MassDOT as the first round of projects for 2018 or 2019. These projects require either minimal engineering and design work or the majority of that work has been completed already by the Town. The deadline for Tier 2 submission to MassDOT is Sunday April 15Y, 2018. To meet the deadline, the Prioritization Plan matrix is recommended for submission to MassDOT by Friday, March 301h. The Construction Application for the high priority projects listed below is due May V. The following table describes each of the four projects and includes their estimated cost: I Project Type Street Name Extents Project Description colt"Ro 7 Crossing Improvements Watertown At Theurer Park. Relocate Watertown Street crosswalk —$110,000 St. between Theurer Park and Pond Street to lie at the east side of Theurer Park; include AAA -compliant pedestrian curb ramps, curb extension on the north side and a flush, textured pedestrian refuge island. 12 Crossing Improvements Warren St. Atexisting Cuniff School en- Install raised crosswalk with pedestrian —$90,000 trance mid -block crosswalk activated flashing beacon at existing crosswalk to Cuniff School main entrance opposite 247 Warren St. 13 Shared -Use Path Watertown Winter St to Whites Ave, Widen existing Ywalkway to create a 10' —$105,000 Community through Saltonstall Park wide shared -use path. Path 16 Crossing Improvements Whites Ave. At Watertown Community Path Install raised crosswalk and pedestrian --$75,000 crossing activated flashing beacons at the Com- munity Path crossing of Whites Ave Total: —$380,000 I E