HomeMy Public PortalAboutStormwater Management and Erosion Control Permit ApplicationDPW Site Plan Number:
TOWN OF WATERTOWN, MASSACHUSETTS
DEPARTMENT OF PUBLIC WORKS
STORMWATER MANAGEMENT AND EROSION CONTROL
PERMIT APPLICATION
Please fill out in full. Incomplete forms will be rejected.
Property address:
(number)
(Street)
(Assessor's Info)
Owner:
(name)
(address)
(phone)
Applicant:
(name)
(address)
(phone)
Engineer/Surveyor:
(name)
(address)
(phone)
Primary Contact:
(name)
(phone)
(e-mail)
Stormwater Management and Erosion Control Permit criteria
The proposed project will have the following impacts (check all that apply):
o New single family residential construction
O New two-family residential construction or residential addition with new unit
O New commercial or multi -unit residential construction
o Net increase in site impervious surface area by more than 500 square feet
o Land disturbance of 5,000 square feet of total area or more (includes driveway and parking lot excavation,
reclamation, milling)
O Land disturbance of 1 acre or greater (If YES, project additionally requires USEPA Construction General
Permit)
O Preliminary site investigation activities that will be part of a larger common development plan that will
disturb 5,000 square feet of total area or more
O Create or modify a direct connection to the MS4 (Town of Watertown Stormwater system)
If any of the above criteria is checked, the project requires a Stormwater Management and Erosion Control Permit.
A Stormwater Management and Erosion Control Permit does not constitute Zoning approval or a Building Permit.
Applicant is hereby advised to consult with other Town Departments to determine if other permits are required.
April 2019 Page 1 of 1