Loading...
HomeMy Public PortalAboutStormwater Management and Erosion Control Permit ApplicationDPW Site Plan Number: TOWN OF WATERTOWN, MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT APPLICATION Please fill out in full. Incomplete forms will be rejected. Property address: (number) (Street) (Assessor's Info) Owner: (name) (address) (phone) Applicant: (name) (address) (phone) Engineer/Surveyor: (name) (address) (phone) Primary Contact: (name) (phone) (e-mail) Stormwater Management and Erosion Control Permit criteria The proposed project will have the following impacts (check all that apply): o New single family residential construction O New two-family residential construction or residential addition with new unit O New commercial or multi -unit residential construction o Net increase in site impervious surface area by more than 500 square feet o Land disturbance of 5,000 square feet of total area or more (includes driveway and parking lot excavation, reclamation, milling) O Land disturbance of 1 acre or greater (If YES, project additionally requires USEPA Construction General Permit) O Preliminary site investigation activities that will be part of a larger common development plan that will disturb 5,000 square feet of total area or more O Create or modify a direct connection to the MS4 (Town of Watertown Stormwater system) If any of the above criteria is checked, the project requires a Stormwater Management and Erosion Control Permit. A Stormwater Management and Erosion Control Permit does not constitute Zoning approval or a Building Permit. Applicant is hereby advised to consult with other Town Departments to determine if other permits are required. April 2019 Page 1 of 1