Loading...
HomeMy Public PortalAboutThree Week Look Ahead Watertown Phase 1 and 2ONYX - Three Week Look Ahead 4-6-20 through 4-24-20 Watertown Rehab Phase 1 and 2 CREWS: A. Onyx Crew B. Lazaro Pulverizing and Grading C. Lazaro Paving D. Jemenez Week Of TASK CREW 4/6/20 through 4/10/20 A. Crew: Tree protection, silt sacks A. Onyx Crew 4/13/20 through 4/17/20 A. Crew: Work on Drainage on Chandler St., Burnham St., and Bridgham St. B. Crew: lower castings on Chandleer St., Burnham St., and Bridgham St., Piermont St. and Tappen Ave. A. Onyx Crew D. Jemenez 4/20/20 through 4/24/20 A. Crew: Work on Drainage on Piermont St. and Tappen Ave. A. Onyx Crew B. Lazaro: Reclaim Chanler St., Burnham St., and Bridgham St. B. Lazaro Pulverizing and Grading