Loading...
HomeMy Public PortalAboutThree Week Look Ahead Watertown RehabONYX - Three Week Look Ahead 3-23-20 through 4-10-20 Watertown Rehab Phase 1 and 2 CREWS: A. Onyx Crew B. Garitty Reclamation/Larusso C. Brox Week Of TASK CREW 3/23/20 through 3/27/20 A. Crew: Tree protection, silt sacks, and lowering of castings on Chandler St. A. Onyx Crew 3/30/20 through 4/3/20 A. Crew: Work with Garitty Reclamation on the pulverization of the streets./lower casting on Piermont St. and Tappen Ave. B. Crew: Pulverize Chandler St. A. Onyx Crew B. Garitty Reclamation/Larusso 4/6/20 through throug0 4/10/2 A. Crew: work with paving crew/ finish lower castings on Piermont St. and Tappen Avenue. A. Onyx Crew B. Crew: Pulverize Piermont St. and Tappen Ave. C. Brox: Pave Chandler St. 113. Garitty Reclamation/Larusso IC. Brox