HomeMy Public PortalAbout150_021_Manager's Report - Update on 2014 Goals i- z w w z w 0 < ° <i— In C9 a z 0 w_ �2 Q cc H V) O in 0 < 0 - 2 a N a z cc H C9 < a vii a u = DOT permits are in process. Requires more historic impact study. GDNR application 4 Highway 80 Bike Trail Recreation Infrastructure Comm 2015 submitted on 10.10.14 Architects for the North Beach Restrooms were interviewed on 10.16.14. DPW has scheduled upgrades to Memorial Park restroom during 4 Public Restroom Upgrades Recreation Infrastructure Comm the winter months. Jones water lines in process/#6 &#7 Sewer 4 Complete w/s upgrades Infrastructure W/S Dept. lines in process. Completed first week in August-Site Plan in process- Ribbon cutting Public Safety scheduled for December 4 Public Safety Building Complete Public Safety Committee 11,2014 Possible solar panels at 4 Upgrade Lighting (buildings, street lights, occupancy sensors) Energy Use Reduction CRC YMCA with savings 3 Review 11 items on existing CIP List Public Safety Completed. Dan Parrott is almost complete with the document for city 3 Long range Beach Management Plan Beach Re-nourishment Funding BTF council review. Mayor Buelterman and CM met with county manager, staff and 3 Get county to agree to provide Tybee with $6M in SPLOST 2014 Beach Re-nourishment Funding Mayor Buelterman commissioner on 9.3.14 RFP for architect is on 3 Public restrooms, North Beach (rebuild/restore/increase) Tourism Infrastructure Comm 9.18.14 for review by CC. Money in budget. RFP in 3 Update the Tybee Island Master Plan Quality of Life Planning Commission fall (Rob taking lead) Public Safety Ongoing; presence of 3 Positive police presence Quality of Life Committee foot and bike patrols Ongoing; Veteran's Drive 2 Follow DPW's paving schedule Infrastructure Infrastructure Comm completed Ongoing; to be completed Winter 2014/15 -Traffic calming 2 Paving of Jones Infrastructure Infrastructure Comm study is in process. Public Safety 2 Certified State level of Police Force Public Safety Committee Ongoing. Contacted Eric Olsen who directed CM to the COE for assistance with 2 Add dune building to future re-nourishment Beach Re-nourishment Funding BTF RFP Ongoing; CRC 2 Renewable generation (public safety bldg.,YMCA, gym, school) Energy Use Reduction responsibility Location for single stream; possible location behind Huc-a-poos-on unopened Laurel Avenue - other locations should 2 Recycle program north end business Tourism be evaluated. Ongoing; working with GA Power for placement on their poles/Jackie Cary is in contact with a vendor for stainless steel 2 Trash/cigarette butts Tourism containers. On schedule for planting 2 Finish median Island's Appearance in November 2014