Loading...
HomeMy Public PortalAbout20190128 - Planning Board - AgendaHOPKINTON PLANNING BOARD Monday, January 28, 2019 7:30 P.M. Hopkinton Town Hall, 18 Main Street, Hopkinton, MA, Room 215/216 AGENDA 7:30 Continued Public Hearings – Bucklin St. & Leonard St. – 1) Stormwater Management Permit Application; 2) Petition to construct a paper street – Wall Street Development Corp. Proposed construction of a paper street entitled “Bucklin Street”; design and construction standards. Proposal to construct four single family homes with associated driveways, utilities, and related grading. 8:30 Scenic Road Public Hearing – 52 Spring Street - Neal Proposed 15 ft. wide opening in the stone wall. 8:45 Traffic Signal – Legacy Farms/East Main St. Intersection Review data and consultant reports relative to the installation of a traffic signal at the East Main St./Legacy Farms South/Legacy Farms North intersection. 9:15 2019 Annual Town Meeting Articles Discuss additional zoning articles recommended by the Zoning Advisory Committee and others; vote to submit articles into warrant, including for street acceptance. Business to be considered by the Board at any time during the meeting:  Approve Minutes (12/17/2018)  Trail Coordination and Management Committee – Review Committee Charge and discuss Planning Board designee  Planning Board member reports and future agenda items  Correspondence Town of Hopkinton Department of Land Use, Planning and Permitting 18 Main Street, Hopkinton MA 01748 508-497-9745 1 DATE: January 24, 2019 TO: Planning Board FROM: Elaine Lazarus, Director of Land Use and Town Operations RE: Items on Planning Board Agenda, January 28, 2019 1. Continued Public Hearings – Bucklin St. & Leonard St. – 1) Stormwater Management Permit; 2) Petition to Construct a Paper Street – Wall Street Development Corp.  An application for a stormwater management permit (SMP) was submitted to the Board on 11/1/18. A decision is due by 2/11/19 and a majority vote is required for approval. All members are eligible to vote.  A petition to construct a paper street was submitted to the Board on 7/25/18. The decision deadline was extended at the last hearing to 2/11/19. A majority vote is required for approval and all members are eligible to vote. Project: Proposal to construct a paper street entitled “Bucklin Street”; Proposal to construct 4 single family homes with driveways, utilities and associated grading. A SMP is required because the project will result in a land disturbance of one acre or more and it is not a “subdivision”. No additional materials have been submitted since the last hearing. Way in Existence: At this meeting, the Board wanted to focus on whether Bucklin Street was a “way in existence” in 1953. The submitted plans show the proposed lots having the required frontage on Bucklin Street and Leonard Street. However, because the proposed driveways for the lots connect only to Bucklin Street, under the definition of “lot frontage” in the Hopkinton Zoning Bylaws, the Applicant cannot rely on Leonard Street for the frontage and therefore must demonstrate that Bucklin Street provides the required frontage. In order for the lots to be approved under c. 41, §81P (ANR), the applicant would have to show that Bucklin Street is 1) a public way, 2) a way shown on an approved subdivision plan, or 3) a way that was in existence at the time that the Subdivision Control Law went into effect in Hopkinton (1953) and that, when the ANR plan is submitted, has “sufficient width, suitable grades and adequate construction to provide for vehicular traffic.” The applicant’s representative does not claim that Bucklin Street, which is covered by vegetation, is currently a way in existence. However, he has provided information to support Bucklin St. as being a way in existence in 1953 (including historic aerials and documentation of utility poles) and Town Counsel believes the factual question regarding the status of Bucklin Street in 1953 is a matter for determination by the Planning Board. The Planning Board will have to make this determination if and when the applicant submits an ANR plan for endorsement. Alternatively, Town Counsel has opined that the Planning Board may choose to make the determination as part of the roadway petition proceeding, if requested by the 2 Applicant. The Applicant has formally requested that the Board make a determination on the way in existence. Materials: The materials in the packet have all been provided to the Board before. The following large documents can be accessed via the links below. 1) Rackermann Ownership 1998 Memo 2) Bucklin St. Historic Photos and Aerials Way in Existence Request, Dec. 2018: https://drive.google.com/open?id=1nbueU7DAgiuzLRUq1HuKJNQYaze9IwJd Petition Process: The Applicant’s representative and Town Counsel have been in discussion about the status of Bucklin Street, whether the proposed subdivision will qualify for “Approval Not Required” endorsement, and how to approach reviewing the work needed to build out Bucklin Street and install utilities, as approval of roadway design is not part of the Stormwater Management Permit application review. As a result of these discussions, the Applicant has submitted a petition under the provision of M.G.L. c. 41, sec. 81FF for approval of the construction of Bucklin Street. In summary, c. 41, §81FF serves to protect lots, shown on a recorded plan, that were sold off and in existence prior to the Subdivision Control Law (1953) from having to comply with subdivision regulations. Town Counsel agrees that §81FF appears to apply to the subject parcel. However, there are two important caveats: First, case law has clearly established that planning boards have the authority to review and impose conditions on construction of roads and utilities associated with lots protected by §81FF. In the past, the Hopkinton Planning Board has required applicants claiming the §81FF exemption to petition for Planning Board approval of the roadway and utilities associated with the grandfathered lot. (The Applicant has now done so, consistent with the Planning Board’s past practice.) Second, the c. 41 §81FF exemption would be applicable to only the existing lot on Bucklin Street. Subdivision of that lot is fully subject to the Subdivision Control Law. If the applicant were to obtain approval of the roadway pursuant to c. 41 §81FF, endorsement of an ANR plan by the Board (or approval of a definitive subdivision plan) would still be required in order to divide the existing lot. Ownership of Bucklin Street: Town Counsel believes that the Applicant has made a sufficiently credible claim of ownership rights in Bucklin Street for the purpose of the roadway petition. Town Counsel notes that an approval by the Planning Board does not adjudicate property rights, and that the abutters may choose to contest the Applicant’s rights. Any property rights dispute would be a private matter between the parties, not involving the Town. Stormwater Management Criteria: The project is subject to the Stormwater Management Standards in General Bylaws Chapter 172. The following are the 10 standards, what is proposed, and BETA’s comments to date. Stormwater Standard Proposed BETA comment #1 – No untreated stormwater – No new stormwater conveyances (e.g. outfalls) may discharge untreated stormwater directly to or The project does not provide new untreated stormwater conveyances to wetlands. Complies – standard has been met. 3 Stormwater Standard Proposed BETA comment cause erosion in wetlands or waters of the Commonwealth. #2 – Post-development peak discharge rates – Stormwater management systems must be designed so that post- development peak discharge rates do not exceed pre- development peak discharge rates. Provided calculations demonstrating that the proposed development will not increase peak discharge rates. Provide mitigation to keep proposed peak runoff flow to Pleasant St. at or below existing condition. (SW4) #3 – Recharge to groundwater – Loss of annual recharge to groundwater should be minimized through the use of infiltration measures to the maximum extent practicable. Groundwater recharge calculation were provided. 1) Provide addit. test pit in SW corner of basin to confirm 2’ of separation from bottom of basin to groundwater elevation. (SW7) 2) Board should discuss if seeding meets the intent of the requirement. (SW12) #4 – 80% TSS removal – For new development, stormwater management systems must be designed to remove 80% of the annual load of total suspended solids. Project includes a new infiltration basin (with sediment forebay) and calculations to demonstrate 80% TSS removal. Complies – standard has been met. #5 – Higher Potential Pollutant Loads – Stormwater discharges from land uses with Higher Potential Pollutant Loads required the use of specific stormwater management BMP’s. Not Applicable Not Applicable #6 – Critical Areas – Stormwater discharges to critical areas must utilize certain stormwater BMP’s approved for critical areas. Not Applicable Not Applicable #7 – Redevelopment – Redevelopment of previously developed sites must meet the Stormwater Management Standards to the maximum extent practicable. Not Applicable Not Applicable #8 – Construction Period Erosion and Sediment Controls – Erosion and sediment controls must be A Stormwater Pollution Prevention Plan (SWPPP) and an Erosion Control Plan were submitted. Recommend including the following conditions of approval: 4 Stormwater Standard Proposed BETA comment implemented to prevent impacts during construction of land disturbance activities.  Town or agent observe excavation of basin prior to loam and seed. (SW16)  Provisions to protect infiltration basin from sediment during construction noted on final plans. (SW17)  Provide a final signed SWPPP prior to construction. (SW18) #9 – Operations/Maintenance Plan – A long-term operation and maintenance plan shall be developed and implemented to ensure that stormwater management systems function as designed. A Long Term Operation and Maintenance (O&M) Plan was included. 1) Provide provisions for PB or its designee to enter the property at reasonable times to inspect the O+M plan. (SW21) 2) Provide estimated operations and maintenance budget. (SW23) #10 – Illicit Discharges – All illicit discharges to the stormwater management systems are prohibited. A signed Illicit Discharge Statement was provided. Complies – standard has been met. Other outstanding BETA comments are: 1. Provide additional spot grades to show positive drainage between house at 62 Pleasant St. and new road. (G1) 2. BETA defers to the Board on this issue: Provide location of proposed private utilities. (G4) 3. Provide truck turning plan to demonstrate that emergency vehicles have adequate space within Bucklin St. to turn around. BETA recommends evaluating alternatives to relying on a private driveway for the turnaround. (T2) 4. Provide truck turns at intersection and adjust curb radii as necessary, relative to turning radii at the intersection of Bucklin and Pleasant. (T3) The standard for approving the paper street design and construction details is that the Board must apply the current Subdivision Regulations to the greatest extent practicable. Thinking ahead, the Board’s votes on what has been submitted to date would consist of: 1. Determination as to whether Bucklin St. was a way in existence in 1953, for the purposes of ANR endorsement. 2. Vote on the petition relative to the design and construction of Bucklin St., approving or disapproving the submitted plans. Approval may be with conditions. Include votes on waiver requests. 3. Vote on the application for a Stormwater Management Permit. 5 4. Scenic Road Public Hearing – 52 Spring Street – Neal An application requesting a Scenic Road permit from the Board has been submitted. A decision is due 21 days from date of the hearing and a majority vote is required for approval. The application requests a 15 ft. wide opening in the stone wall for a new driveway. The owners plan to demolish an existing barn and garage and add an attached garage to the house which would be oriented to the side and not to the front. The new entrance would accommodate the new garage orientation. The applicants propose to use the stones to close up an existing driveway opening. The criteria for granting a scenic road permit is below (§160-6 of the General Bylaws). The Planning Board’s decision on any application for proposed work affecting scenic roads shall be based on consideration of the following criteria: A. The degree to which the proposed work would adversely affect the scenic and aesthetic values upon which the scenic road designation was originally based. B. The necessity for the proposed work in terms of public safety, welfare, or convenience. C. Compensatory action proposed, such as replacement of trees or walls. D. Availability of reasonable alternatives to the proposed work which could reduce or eliminate anticipated damage to trees or stone walls. E. Whether the proposed work would compromise or harm other environmental or historical values. F. Consistency of the proposed work with previously adopted Town plans and policies. The Board may impose conditions on its approval, including the manner of construction of the relocated wall. 5. Traffic Signal – East Main St./Legacy Farms North and South Intersection Condition #54 of the Master Plan Special Permit (MPSP) for Legacy Farms is as follows: 54. As part of each application for Site Plan Review, the Applicant shall submit, in a format acceptable to the Planning Board, current data from the traffic monitoring plan described in the Application and a warrant analysis for a traffic signal at the intersection of Legacy Farms Road Creation of Lot Lines •Determination of way in existence in 1953 in order for ANR Plan to be endorsed. Design and Construction of Road •Petition to approve design and construction details. Apply Subdivision Regulations to the extent practicable. Stormwater Management Permit •Act on application for SMP. 6 (North and South) and East Main Street (Route 135); provided, however, that the Applicant shall not be required to submit such information more often than once in a calendar year. The most recent data was submitted to the Board with the Site Plan Review application for The Trails at Legacy Farms. In the Board’s 2018 decision, it included condition #31 as follows: 31. A traffic signal warrant analysis was conducted by the Applicant pursuant to MPSP Condition #54. After review of the analysis, the Board’s consultant recommended that another traffic monitoring assessment and warrant analysis be conducted in 6 months, because the warrant is close to being met and due to the ongoing fast pace of residential development off Legacy Farms North. Therefore, the Applicant shall conduct another assessment in October, 2018, the results of which shall be submitted to the Board and peer-reviewed by the Board’s consultant. The additional data was collected after the 6 months and analyzed by VHB, the developer’s consultant, which submitted a report. The report did not recommend the installation of a traffic signal at this time. BETA conducted a peer review and disagrees, recommending that the signal be installed. Both reports are included in the meeting packet. Representatives of Legacy Farms and BETA will be present to discuss the matter. If the Board determines that the signal should be installed, MPSP conditions #55 and 56 address what happens next: 55. If, pursuant to any Site Plan Approval, the Planning Board finds that a traffic signal at the intersection of Legacy Farms Road (North and South) and East Main Street (Route 135) is warranted, the Applicant shall have six (6) months to complete such signalization to the satisfaction of the Department of Public Works; provided, however, that the Planning Board shall grant an extension of up to six (6) additional months to complete such signalization if it determines that, despite diligent efforts, the Applicant is unable to complete work during the initial six (6) month period. 56. Concurrent with the installation of a traffic signal at the intersection of Legacy Farms Road and East Main Street (Route 135), the Applicant shall install a sign or signs, to be approved by the Planning Board, at the intersection of Clinton Street and Legacy Farms Road (South), directing traffic to Route 135 West via Legacy Farms Road (South). 6. 2019 Annual Town Meeting Articles Proposed Zoning Bylaw Amendments - Zoning Advisory Committee At its meeting on Jan. 22, the Zoning Advisory Committee voted to recommend two amendments to the Open Space Mixed Use Development (OSMUD) Overlay District, which covers Legacy Farms. The May, 2019 annual town meeting warrant is now open, and closes on February 5. I brought the proposed changes to the ZAC, which were in response to a few items that have come up over the last year. Both amendments are to Section 210-166, Intensity of Uses. The first change relates to the Heritage Properties age-restricted development project now under construction off Legacy Farms North, adjacent to Wilson Street. When the bylaw was amended in 2015 to allow the 180-unit age-restricted component in the place of a commercial development, the master developer, in response to concerns expressed by the Town, proposed language which states in the bylaw that “no child under the age of 18 may be a resident in any 7 such Dwelling Unit”. This language is fine, but a problem has arisen because 18 of the 180 units must be affordable (§210-167.C), and in order for the units to count as affordable on the State’s Subsidized Housing Inventory, they must be approved by the Dept. of Housing and Community Development (DHCD). DHCD will not approve the units if the zoning, condominium documents and other restrictions prohibit children. However, they will approve age-restricted units as affordable as long as the restrictions state that one resident of the unit must be 55 or over – and this is actually consistent with the definition of “Senior Housing Development” elsewhere in the OSMUD. So the Town has at least 2 choices – 1) change the zoning bylaw to remove the requirement for affordable units, or 2) change the zoning bylaw to replace the objectionable phrase with an acceptable restriction. If the Town does nothing, the developer will be in violation of the zoning bylaw (at a minimum) because the affordable housing units can’t be provided. So while there may be the desire to do something else, the zoning bylaw needs to be amended in some manner. I presented the ZAC with language that would remove the objectionable phrase and replace it with one that is consistent with the definition of Senior Housing Development already in the bylaw. It doesn’t change the intent, which is that the project is age-restricted, but the extra language that would guarantee it would be removed. The Town’s desire to remain above the 10% affordable housing goal is extremely important, and it will not be possible without new units coming online as the residential growth already underway continues. Therefore, I recommend an option where affordable units can be created within the development itself. While there might be an option where a developer can donate money to the Town to create units in the future, those would be 18 additional units that didn’t exist before, and it doesn’t help the overall percentage. The ZAC voted to recommend the modification to the first paragraph of §210-166.A, which has also been reviewed by Town Counsel, as follows: A. Dwelling Uses within the OSMUD District shall be limited to 940 new Dwelling Units constructed after May 5, 2008, plus 180 Dwelling Units in Senior Housing Developments constructed after May 4, 2015, provided, however, that the owner or owners of any such additional Dwelling Unit in Senior Housing Developments shall require, through deed restrictions, condominium documents, leases, rental agreements or other appropriate instruments, the form and adequacy of which has been approved by the Planning Board, that no child under the age of 18 may be a resident in any such at least one resident of every Dwelling Unit be 55 years of age or older. No more than 50 of the 1120 new Dwelling Units so constructed may be single-family dwellings, and the remainder shall be multi-family dwellings, including attached dwellings, garden apartments, units in mixed-use buildings and Senior Housing Developments. The second change would address an issue raised by the owners of Fairview Estates, the retirement community on East Main St. When the facility was under construction, it was determined by the Town that the on-site apartments for live-in managers would count toward the total number of dwelling units allowed in Legacy Farms if they were constructed to function as separate dwelling units. Therefore, the two units were constructed without kitchens. The owners have been operating the facility for a few years, and it has been difficult to attract and retain the 8 live-in managers because they do not have a full apartment in which to live. The apartment is their residence. They are not tenants in the sense that the other residents are, who pay rent that includes meals, transportation, housekeeping, etc. They are employees who are responsible for facility and resident management, and they must live on-site. A change to the zoning bylaw appears to be the only way that the desired result can be accomplished, and the proposed language would exempt the units from the dwelling unit cap. The ZAC reviewed draft language at its meeting, and voted to recommend that the following new paragraph be added to the end of §210-166.A as follows: No on-site apartment which provides a permanent live-in residence for 24-hour on-site responsible staff of a Continuing Care Retirement Community or Assisted Living Facility shall be deemed a Dwelling Unit for the purposes of this Intensity of Use limitation, provided that such apartment is located within the Facility, one occupant of the apartment is a full- time employee of the Facility, and that there shall be no more than two such apartments per Community/Facility. The request is that the Board submit these amendments into the ATM warrant, with the Board’s specific recommendations to be made after the public hearing. Proposed Zoning Bylaw Amendment It is possible that there may be another proposed change to the OSMUD, which would be coming from Town Counsel in advance of the Planning Board meeting. Street Acceptance It is my understanding that the Board has discussed recommending Hunters Ridge Way and Penny Meadow Lane for acceptance as public ways. In both cases, as built/street acceptance plans and draft deeds have been submitted to the Town. If the Board proposes acceptance, then it should vote to submit an article into the warrant for that purpose. Other Articles Are there any other articles that the Board would like to submit? PUBLIC HEARING OUTLINE Bucklin Street Stormwater Management Permit (SWMP) & Roadway Petition 10/29/18, 12/3/18, 12/17/18, 1/28/19 1. ✔ Project introduction and review – Applicant 2. ✔Principal Planner Comments 3. ✔ Consultant Review – BETA Group 4. ✔Planning Board members and Public – Add to outline 5. Detailed Discussion (a) Site visit follow up (b) Road design i. Dead end (c) Lot layout design (d) Public safety i. Fire department access ii. Traffic impacts from development (e) Stormwater management i. Impact on abutters on Pleasant St. ii. Impact on abutters on Maple Street Extension iii. Soil testing iv. Compliance with standards (f) Utilities; Municipal water & sewer (g) Legal issues: i. Right to make improvements ii. Way in existence in 1953 (h) Historic Preservation i. Stone walls (i) Waiver requests (j) Conservation Commission review/wetland impacts 6. Public comment/discuss standards and plan revisions to be made 7. Discuss SWMP and Roadway Petition conditions of approval with applicant 8. Public comment 9. Vote on determination relative to Way in Existence in 1953 10. Vote on the Roadway Petition 11. Vote on the Stormwater Management Permit 12. Close public hearing \\vhb\proj\Wat-TS\14444.00\docs\memos\November 2018 Monitoring\2018 Traffic Monitoring.docx 101 Walnut Street PO Box 9151 Watertown, MA 02472-4026 P 617.924.1770 To:Mr. Roy S. MacDowell, Jr. Legacy Farms, LLC c/o Baystone Development 21 Center Street Weston, MA 02493 Date:November 27, 2018 Project #: 14440.00 From:Robert L. Nagi, PE Principal/Transportation Planning & Operations Re:Legacy Farms Special Condition #54 2018 Signal Warrant Analysis On behalf of our Client (Heritage Properties), VHB, Inc has conducted a signal warrant assessment for the Legacy Farms project, located in Hopkinton, Massachusetts. This signal warrant is required by the Town of Hopkinton’s Planning Board as a follow-up to the traffic monitoring assessment conducted by VHB in the spring 2018. Specifically, the Board noted the following: A traffic signal warrant analysis was conducted by the Applicant pursuant to the MPSP Condition #54. After review of the analysis, the Board’s consultant recommended that another traffic monitoring assessment and warrant analysis be conducted in 6 months, because the warrant is close to being met and due to the ongoing fast pace of residential development off Legacy Farms North. Therefore, the Applicant shall conduct another assessment in October, 2018, the results of which shall be submitted to the Board and peer reviewed by the Board’s consultant. The results of the signal warrant analysis are presented in this memorandum and are submitted to the City Traffic Engineer for review and commentary. 2018 Traffic Volumes Traffic movement data for the study area were collected for VHB in November 2018. As part of this effort, manual turning movement and classification (TMC) counts were conducted at the study area intersections during a weekday from 7:00 AM to 7:00 PM on November 8, 2018. A comparison of November 2018 traffic volumes and the February 2018 traffic volumes at the intersection of E Main Street at Legacy Farms Road North / Legacy Farms Road South was conducted. The weekday morning and evening peak periods were collected during both counts, and the overall intersection volumes for each hour was compared. The results are provided in Table 1. Ref: 14440.00 November 27, 2018 Page 2 \\vhb\proj\Wat-TS\14444.00\docs\memos\November 2018 Monitoring\2018 Traffic Monitoring.docx  Table 1 Traffic Volume Comparison Time Period Observed February 2018 Volumes a Observed November 2018 Volumes b Net Difference Between February and November c 7:00 – 8:00 AM 1,202 1,343 141 (6%) 8:00 – 9:00 AM 1,213 1,224 11 (1%) 4:00 – 5:00 PM 1,109 1,140 31 (3%) 5:00 – 6:00 PM 1,262 1,275 13 (1%) a Observed volumes in February 2018, seasonally adjusted to account for lower than average volumes in February. b Observed volumes in November 2018. c Volume increase in the November 2018 volumes as compared to the February 2018 volumes. As shown in Table 1, when comparing the November 2018 volumes to the February 2018 volumes, the November volumes are between 1- and 6-percent higher than the February volumes. Traffic Signal Warrant Analysis Consideration of a potential traffic signal has been given to the intersection of East Main Street at Legacy Farms South Drive. The Manual on Uniform Traffic Control Devices (MUTCD)1 lists specific criteria, or warrants, for the consideration of installation of a traffic signal at an intersection. The MUTCD also notes that, “the satisfaction of a traffic signal warrant or warrants shall not, in itself, require the installation of a traffic control signal.” However, failure to meet at least one of the traffic signal warrants precludes the installation of a traffic signal at a given location. The traffic signal warrant analysis provides guidance as to locations where signals would not be appropriate and locations where they could be considered further. VHB performed a traffic signal warrant analysis at the unsignalized intersection of E Main Street at Legacy Farms Road North / Legacy Farms Road for the following warrants:  Warrant 1, 8-Hour Vehicular Volume  Warrant 2, 4-Hour Vehicular Volume  Warrant 3, Peak Hour Vehicular Volume  Warrant 4, Pedestrian Volume Vehicular Volume Warrants A traffic signal warrant analysis was performed of the volume-based eight-hour (Warrant 1), four-hour warrant (Warrant 2) and the peak hour warrant (Warrant 3) using existing November 2018 volumes. 1 MUTCD, Part 4 – Highway Traffic Signals, USDOT/FHWA, December 2009. Ref: 14440.00 November 27, 2018 Page 3 \\vhb\proj\Wat-TS\14444.00\docs\memos\November 2018 Monitoring\2018 Traffic Monitoring.docx Based on the speed data collected by the ATR along East Main Street in February 2018, the 85th percentile speed is 45mph and 46mph in the eastbound and westbound direction, respectively. An 85th percentile speed on a major street which exceeds 40mph triggers the use of the 70% volume for Warrants 1 and 2. As such, the 70% volume warrants were utilized for Warrants 1 and 2. The location does not meet Warrants 1 and 2 based on existing vehicular volumes but does meet Warrant 3 (peak hour warrant) for two hours of the morning, as shown in Table 1. The signal warrant analyses are included in the Appendix to this document. Pedestrian Volume Warrants A traffic signal warrant analysis was performed for the pedestrian volume-based peak hour warrant (Warrant 4) for the November 2018 existing hourly vehicular and pedestrian volumes. There are very few pedestrian volumes at this location and therefore, the traffic signal warrants based on pedestrian volumes is not met. The signal warrant analyses are included in the Appendix to this document.  Table 2 Summary of Traffic Signal Warrant Analysis1 Location Warrant 1: Eight Hour Vehicular Volume Warrant 2: Four Hour Vehicular Volume Warrant 3: Peak Hour Vehicular Volume Warrant 4: Pedestrian Volume E Main Street at Legacy Farms Road North / Legacy Farms Road No No Yes No 1 MUTCD, Part 4 – Highway Traffic Signals, USDOT/FHWA, December 2009. As shown in Table 2, the eight-hour (Warrant 1), four-hour (Warrant 2) and pedestrian (Warrant 4) warrants have not been met based on the November 2018 observed volumes at the intersection. The peak hour (Warrant 3) warrant has been met for two hours of the day. The MUTCD states that the “peak hour signal warrant is intended for use at a location where traffic conditions are such that for a minimum of 1 hour of an average day, the minor-street traffic suffers undue delay when entering or crossing the major street.” The MUTCD goes on to explain that “this signal warrant shall be applied only in unusual cases, such as office complexes, manufacturing plants, industrial complexes, or high-occupancy vehicle facilities that attract or discharge large numbers of vehicles over a short time.” Given the standards provided in the MUTCD, a signal should not be installed at this location to accommodate just two hours of the day. Ref: 14440.00 November 27, 2018 Page 4 \\vhb\proj\Wat-TS\14444.00\docs\memos\November 2018 Monitoring\2018 Traffic Monitoring.docx Conclusions This memorandum has been prepared for the Town of Hopkinton’s Planning Board on behalf of Legacy Farms LLC to fulfill Special Condition #54. It provides an updated signal warrant analysis for the intersection of E Main Street at Legacy Farms Road North and Legacy Farms Road South. As part of this assessment, VHB collected new traffic volumes in November 2018 during a typical weekday. These volumes, when compared to traffic counts conducted at the same location back in February 2018, demonstrate a slight increase in overall traffic volume, but not a substantial increase. Visual observations at the intersection noted minor delays on the side streets which should be considered typical for side streets on arterial roadways during peak hour conditions. During off-peak hours, traffic delays were observed to be minimal and would not be well served by the installation of a traffic signal. Based on the newly collected volumes, it is VHBs recommendation that a traffic signal not be introduced at this location at this time. This recommendation is based on the findings of the Traffic Signal assessment which follow the process and procedures outlined in the Manual on Uniform Traffic Control Devices. In almost all cases, the need for a traffic signal does not meet the prescribed warrants outlined in the manual. In the one case where the volumes do meet the warrant, the MUTCD suggests that the installation of a traffic signal should only be considered for unique situations, which this is not one of. Appendix Appendix  Traffic Volume Count Data  Signal Warrant Analysis Appendix Traffic Volume Count Data VHBC.TrearchisThursday 11/8/18186609Hopkinton, MACity, State:PDI Job Number:Date:Client: Engineer: Site Code:83956.18 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 16140218940010284260385171160192353 814013118800991471503621182230226374 111301568020886670191181110193315 9220131576509646190292150110163301 44 5 13 0 62 40 338 7 0 385 32 23 67 0 122 29 684 61 0 774 1343 152201910901010126120205146180169309 1124017111022011588150315129180152315 167202588230934916029213090141288 1021013117420871212150399154100173312 52 13 9 0 74 40 348 8 0 396 26 35 58 0 119 21 559 55 0 635 1224 734014175508165160275134150154276 1131015477008111714032510380116244 81601567410813290141879097207 11020134572063429015189120102193 37 7 13 0 57 15 283 8 0 306 24 16 48 0 88 12 413 44 0 469 920 53201056310693460133799091183 9030125663074124073656074167 92201356200674270131838092185 110101236230683250107757190180 3458047182537027811102204314302301347715 72401337220773180128704183185 1425021174107644120206852093210 9040135853093216096708084199 122501938520909140146746086209 42 6 18 0 66 12 316 8 0 336 18 7 30 0 55 26 299 20 1 346 803 1016017489509830801147612092218 711097922010151901513586077202 150602157760886212020895120115244 9240153772082321001587113092204 41 4 17 0 62 19 335 15 0 369 17 5 39 0 61 33 300 43 0 376 868 72401358230902260106633173186 9451193904097204065755085207 72201109430976160139806095216 30205265507201607983130105189 26 8 13 1 48 10 331 15 0 356 10 4 22 0 36 29 301 27 1 358 798 1601017194409931601097312094220 930012375107921100134747085189 101101231053011143401113824099233 1142017289109271901759080103229 46840589363903811662905131319310381871 12330188127401394190144878099270 13250200115401194490171276170105261 1439026610840118214072097120129280 142902531332013850110161183100104283 53 10 26 0 89 17 483 14 0 514 15 6 33 0 54 47 343 47 0 437 1094 123502031262013112901216715092255 939021412160131315091310260121282 152802531454015232140191489160119315 18411033013130134112041690110117288 54 12 33 0 99 10 523 15 0 548 8 6 30 0 44 59 352 38 0 449 1140 204100348118501315750171390110114296 10914033914712016885301614102140130347 7 11 10 0 28 5 116 10 0 131 6 5 11 0 22 19 117 12 0 148 329 1511503121166012422601019106130138303 52 35 39 0 126 24 497 33 0 554 21 19 25 0 65 65 415 50 0 530 1275 34801510137110158236011229470123307 106402069650107339015129880118260 16760295110100125231001514607081250 87101611059011532601110699088230 37 24 19 0 80 22 448 35 0 505 10 11 31 0 52 58 321 31 0 410 1047 518 137 212 1 868 236 4518 174 0 4928 208 148 434 0 790 424 4608 477 3 5512 12098 59.7 15.8 24.4 0.1 4.8 91.7 3.5 0.0 26.3 18.7 54.9 0.0 7.7 83.6 8.7 0.1 4.3 1.1 1.8 0.0 7.2 2.0 37.3 1.4 0.0 40.7 1.7 1.2 3.6 0.0 6.5 3.5 38.1 3.9 0.0 45.6 862 5028 735 5473 12098 453 132 193 1 779 218 4215 170 0 4603 205 144 411 0 760 404 4292 413 3 5112 11254 87.5 96.4 91.0 100.0 89.7 92.4 93.3 97.7 0.0 93.4 98.6 97.3 94.7 0.0 96.2 95.3 93.1 86.6 100.0 92.7 93.0 776 4690 706 5082 11254 65 5 19 0 89 18 303 4 0 325 3 4 23 0 30 20 316 64 0 400 844 12.5 3.6 9.0 0.0 10.3 7.6 6.7 2.3 0.0 6.6 1.4 2.7 5.3 0.0 3.8 4.7 6.9 13.4 0.0 7.3 7.0 86 338 29 391 844  Cars and Heavy Vehicles (Combined) PDI File #: Location: Location: City, State: Client: Site Code: Count Date: Start Time: End Time: Class: 186609 A N: Legacy Farm Road North S: Legacy Farm Road   E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Hopkinton, MA VHB/ C. Trearchis 83956.18 Thursday, November 8, 2018 7:00 AM 7:00 PM 5:45 PM Total Exiting Leg Total % Heavy Vehicles     Exiting Leg Total Total Total % 6:00 PM 6:15 PM 6:30 PM 6:45 PM Total 11:15 AM 11:00 AM 7:00 AM 7:15 AM 7:30 AM Total 2:15 PM 2:30 PM 1:00 PM 1:15 PM 1:30 PM 1:45 PM 12:00 PM 12:15 PM 12:30 PM 12:45 PM Total Total 2:00 PM 11:30 AM 11:45 AM Total 8:15 AM 8:30 AM 10:45 AM Total 4:30 PM 4:45 PM Total 3:30 PM 3:45 PM Total 4:00 PM 2:45 PM Total 3:00 PM 3:15 PM 5:15 PM 5:30 PM 10:15 AM Heavy Vehicles Exiting Leg Total % Cars Cars 10:30 AM 4:15 PM 8:00 AM 8:45 AM Total 9:00 AM 9:15 AM 9:30 AM 9:45 AM Total 10:00 AM 5:00 PM Approach % Grand Total E. Main Street (Rt 135)Legacy Farm RoadLegacy Farm Road North E. Main Street (Rt 135) 7:45 AM  from North from East  from South from West Page 1 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Cars and Heavy Vehicles (Combined) PDI File #: Location: Location: City, State: Client: Site Code: Count Date: Start Time: End Time: Class: 186609 A N: Legacy Farm Road North S: Legacy Farm Road   E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Hopkinton, MA VHB/ C. Trearchis 83956.18 Thursday, November 8, 2018 7:00 AM 7:00 PM   Total E. Main Street (Rt 135)Legacy Farm RoadLegacy Farm Road North E. Main Street (Rt 135)  from North from East  from South from West Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 16140218940010284260385171160192353 814013118800991471503621182230226374 111301568020886670191181110193315 9220131576509646190292150110163301 44 5 13 0 62 40 338 7 0 385 32 23 67 0 122 29 684 61 0 774 1343 71.0 8.1 21.0 0.0 10.4 87.8 1.8 0.0 26.2 18.9 54.9 0.0 3.7 88.4 7.9 0.0 0.688 0.625 0.813 0.000 0.738 0.667 0.899 0.350 0.000 0.944 0.571 0.821 0.644 0.000 0.803 0.345 0.940 0.663 0.000 0.856 0.898 40 5 12 0 57 37 302 6 0 345 32 23 67 0 122 27 648 59 0 734 1258 90.9 100.0 92.3 0.0 91.9 92.5 89.3 85.7 0.0 89.6 100.0 100.0 100.0 0.0 100.0 93.1 94.7 96.7 0.0 94.8 93.7 40105336104000000236204085 9.1 0.0 7.7 0.0 8.1 7.5 10.7 14.3 0.0 10.4 0.0 0.0 0.0 0.0 0.0 6.9 5.3 3.3 0.0 5.2 6.3 40 5 12 0 57 37 302 6 0 345 32 23 67 0 122 27 648 59 0 734 1258 40105336104000000236204085 44 5 13 0 62 40 338 7 0 385 32 23 67 0 122 29 684 61 0 774 1343 119 692 38 409 1258 5  37 3 40 85 124 729 41 449 1343 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 122501938520909140146746086209 1016017489509830801147612092218 711097922010151901513586077202 150602157760886212020895120115244 44 4 18 0 66 19 343 15 0 377 23 4 33 0 60 31 303 36 0 370 873 66.7 6.1 27.3 0.0 5.0 91.0 4.0 0.0 38.3 6.7 55.0 0.0 8.4 81.9 9.7 0.0 0.733 0.500 0.750 0.000 0.786 0.679 0.932 0.625 0.000 0.933 0.639 0.500 0.688 0.000 0.750 0.596 0.797 0.750 0.000 0.804 0.894 38 4 13 0 55 15 313 14 0 342 22 4 31 0 57 30 278 27 0 335 789 86.4 100.0 72.2 0.0 83.3 78.9 91.3 93.3 0.0 90.7 95.7 100.0 93.9 0.0 95.0 96.8 91.7 75.0 0.0 90.5 90.4 605011430103510203125903584 13.6 0.0 27.8 0.0 16.7 21.1 8.7 6.7 0.0 9.3 4.3 0.0 6.1 0.0 5.0 3.2 8.3 25.0 0.0 9.5 9.6 38 4 13 0 55 15 313 14 0 342 22 4 31 0 57 30 278 27 0 335 789 605011430103510203125903584 44 4 18 0 66 19 343 15 0 377 23 4 33 0 60 31 303 36 0 370 873 46 313 48 382 789 13  31 2 38 84 59 344 50 420 873 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 10914033914712016885301614102140130347 7 11 10 0 28 5 116 10 0 131 6 5 11 0 22 19 117 12 0 148 329 1511503121166012422601019106130138303 34801510137110158236011229470123307 35 35 37 0 107 26 516 39 0 581 18 15 26 0 59 74 419 46 0 539 1286 32.7 32.7 34.6 0.0 4.5 88.8 6.7 0.0 30.5 25.4 44.1 0.0 13.7 77.7 8.5 0.0 0.583 0.795 0.661 0.000 0.811 0.650 0.878 0.813 0.000 0.865 0.563 0.750 0.591 0.000 0.670 0.841 0.895 0.821 0.000 0.910 0.927 33 35 37 0 105 26 508 39 0 573 17 15 24 0 56 74 406 46 0 526 1260 94.3 100.0 100.0 0.0 98.1 100.0 98.4 100.0 0.0 98.6 94.4 100.0 92.3 0.0 94.9 100.0 96.9 100.0 0.0 97.6 98.0 200020800810203013001326 5.7 0.0 0.0 0.0 1.9 0.0 1.6 0.0 0.0 1.4 5.6 0.0 7.7 0.0 5.1 0.0 3.1 0.0 0.0 2.4 2.0 33 35 37 0 105 26 508 39 0 573 17 15 24 0 56 74 406 46 0 526 1260 200020800810203013001326 35 35 37 0 107 26 516 39 0 581 18 15 26 0 59 74 419 46 0 539 1286 87 460 148 565 1260 0  14 0 12 26 87 474 148 577 1286  Heavy Exiting Leg Heavy Enter Leg Heavy Exiting Leg Heavy Enter Leg MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at:     Heavy Vehicles Heavy Vehicles % Cars Enter Leg Total Entering Leg Cars Exiting Leg AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at:       Total Exiting Leg 11:45 AM Legacy Farm Road North Total Volume % Approach Total PHF Cars Cars % Heavy Exiting Leg from North from East Total Exiting Leg 5:15 PM 5:30 PM 5:45 PM 6:00 PM  from South from West Total % Approach Total PHF Cars Cars % Cars Enter Leg Total Entering Leg Cars Exiting Leg Heavy Vehicles Heavy Vehicles %    Total Exiting Leg 5:15 PM Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) from West Total  from South 11:45 AM 12:00 PM 12:15 PM 12:30 PM Total Volume from North from East  E. Main Street (Rt 135) from North from East  from South from West Legacy Farm Road North E. Main Street (Rt 135)Legacy Farm Road Total 7:00 AM 7:15 AM 7:30 AM 7:45 AM Cars Cars % Total Volume % Approach Total PHF Cars Enter Leg Heavy Enter Leg Total Entering Leg Cars Exiting Leg Heavy Vehicles Heavy Vehicles %   7:00 AM E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Page 2 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 1514020877008584260385167160188331 71401298300921471503621175220218358 111301557420816670190165100175290 7210101568408746190291141110153279 40 5 12 0 57 37 302 6 0 345 32 23 67 0 122 27 648 59 0 734 1258 14220181081109225120195139160160289 112401710942010688140305120130138291 145102087630874915028212670135270 102101310682080121214038813180147278 49 11 8 0 68 38 319 8 0 365 26 34 55 0 115 20 516 44 0 580 1128 734014168507465160275113130131246 63101047400781161403149240100219 51401056610723270121774082176 80201035220574290151808089171 26 7 11 0 44 13 260 8 0 281 24 15 46 0 85 11 362 29 0 402 812 2310645910643440112758085166 503085563064124073605068147 82201255800634270131804085173 7010825630613250105716183162 2257034162297025211102004111286231321648 52301036720723170115633172165 132401917000714390166830089195 8030115803088216096695080188 122301737920849140146676079194 38 6 13 0 57 12 296 7 0 315 18 6 26 0 50 23 282 14 1 320 742 71301137940863070104718083190 61108484209041801313535071182 13060195716082621202078780102223 6230113722077321001576611084187 32 4 13 0 49 15 306 14 0 335 16 5 37 0 58 31 277 32 0 340 782 7240135743082216096553165169 7351163694076204063725080178 6120907630796140119746089188 302052605067014059768093170 23 6 13 1 43 10 279 15 0 304 10 3 18 0 31 27 277 22 1 327 705 140101518240873150986710085196 7200927010731190114747085178 8110102983010343401112694085209 104201618510877180165828095214 39740506335903501562604729292290350797 10330167116401274190144808092249 1323018011040114449017106716093242 1238023610040110214071989110119259 1328023212720131501101611719091261 48 10 22 0 80 15 453 14 0 482 15 6 33 0 54 44 307 44 0 395 1011 113501931202012512901216605081237 93802041196012931509139550113271 132802331394014632140191486160116304 18411033013030133112041690110117287 51 12 32 0 95 10 508 15 0 533 8 6 30 0 44 59 331 37 0 427 1099 184100328112401245740161288100110282 1091403391451201667520141498140126339 6 11 10 0 27 5 112 10 0 127 6 5 10 0 21 19 115 12 0 146 321 1511503121146012222601019103130135298 49 35 39 0 123 24 483 32 0 539 20 19 22 0 61 64 404 49 0 517 1240 24801410137110158236011229070119302 106402069550106339015129680116257 16760295110100125231001514597080249 87101611039011332601110659084224 36 24 19 0 79 22 445 35 0 502 10 11 31 0 52 58 310 31 0 399 1032 453 132 193 1 779 218 4215 170 0 4603 205 144 411 0 760 404 4292 413 3 5112 11254 58.2 16.9 24.8 0.1 4.7 91.6 3.7 0.0 27.0 18.9 54.1 0.0 7.9 84.0 8.1 0.1 4.0 1.2 1.7 0.0 6.9 1.9 37.5 1.5 0.0 40.9 1.8 1.3 3.7 0.0 6.8 3.6 38.1 3.7 0.0 45.4 776 4690 706 5082 11254 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 1514020877008584260385167160188331 Total  7:00 AM from North from East  from South from West AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: 7:00 AM Legacy Farm Road North E. Main Street (Rt 135)Legacy Farm Road E. Main Street (Rt 135) Grand Total Approach % Total % Exiting Leg Total Total Total 6:00 PM 6:15 PM 6:30 PM 6:45 PM Total 5:00 PM 5:15 PM 5:30 PM 5:45 PM Total 4:00 PM 4:15 PM 4:30 PM 4:45 PM Total 3:00 PM 3:15 PM 3:30 PM 3:45 PM Total 2:00 PM 2:15 PM 2:30 PM 2:45 PM Total 1:00 PM 1:15 PM 1:30 PM 1:45 PM Total 12:00 PM 12:15 PM 12:30 PM 12:45 PM Total 11:00 AM 11:15 AM 11:30 AM 11:45 AM Total 10:00 AM 10:15 AM 10:30 AM 10:45 AM Total 9:00 AM 9:15 AM 9:30 AM 9:45 AM Total 8:00 AM 8:15 AM 8:30 AM 8:45 AM 7:00 AM 7:15 AM 7:30 AM 7:45 AM  from North from East  from South from West Total Class:Cars‐Combined (Motorcycles, Cars, Light Goods) Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Count Date:Thursday, November 8, 2018 Start Time:7:00 AM Page 3 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total  from North from East  from South from West Total Class:Cars‐Combined (Motorcycles, Cars, Light Goods) Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Count Date:Thursday, November 8, 2018 Start Time:7:00 AM 71401298300921471503621175220218358 111301557420816670190165100175290 7210101568408746190291141110153279 40 5 12 0 57 37 302 6 0 345 32 23 67 0 122 27 648 59 0 734 1258 70.2 8.8 21.1 0.0 10.7 87.5 1.7 0.0 26.2 18.9 54.9 0.0 3.7 88.3 8.0 0.0 0.667 0.625 0.750 0.000 0.713 0.617 0.910 0.375 0.000 0.938 0.571 0.821 0.644 0.000 0.803 0.321 0.926 0.670 0.000 0.842 0.878 40 5 12 0 57 37 302 6 0 345 32 23 67 0 122 27 648 59 0 734 1258 119 692 38 409 1258 176 1037 160 1143 2516 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 122301737920849140146676079194 71301137940863070104718083190 61108484209041801313535071182 13060195716082621202078780102223 38 4 13 0 55 15 313 14 0 342 22 4 31 0 57 30 278 27 0 335 789 69.1 7.3 23.6 0.0 4.4 91.5 4.1 0.0 38.6 7.0 54.4 0.0 9.0 83.0 8.1 0.0 0.731 0.500 0.542 0.000 0.724 0.750 0.932 0.583 0.000 0.950 0.611 0.500 0.646 0.000 0.713 0.577 0.799 0.844 0.000 0.821 0.885 38 4 13 0 55 15 313 14 0 342 22 4 31 0 57 30 278 27 0 335 789 46 313 48 382 789 101 655 105 717 1578 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 1091403391451201667520141498140126339 6 11 10 0 27 5 112 10 0 127 6 5 10 0 21 19 115 12 0 146 321 1511503121146012222601019103130135298 24801410137110158236011229070119302 33 35 37 0 105 26 508 39 0 573 17 15 24 0 56 74 406 46 0 526 1260 31.4 33.3 35.2 0.0 4.5 88.7 6.8 0.0 30.4 26.8 42.9 0.0 14.1 77.2 8.7 0.0 0.550 0.795 0.661 0.000 0.795 0.650 0.876 0.813 0.000 0.863 0.607 0.750 0.600 0.000 0.667 0.841 0.883 0.821 0.000 0.901 0.929 33 35 37 0 105 26 508 39 0 573 17 15 24 0 56 74 406 46 0 526 1260 87 460 148 565 1260 192 1033 204 1091 2520 Entering Leg Exiting Leg Total 5:30 PM 5:45 PM 6:00 PM Total Volume % Approach Total PHF from West Total  5:15 PM Legacy Farm Road E. Main Street (Rt 135) from North from East  from South Entering Leg Exiting Leg Total PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at: 5:15 PM Legacy Farm Road North E. Main Street (Rt 135) Total Volume % Approach Total PHF from West Total  11:45 AM 12:00 PM from North from East  from South 12:15 PM 12:30 PM Exiting Leg Total MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: 11:45 AM Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Total Volume % Approach Total PHF Entering Leg 7:15 AM 7:30 AM 7:45 AM Page 4 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 100010170017000000400422 1000125007000000710816 000001600700000116101825 20103081090000019001022 40105336104000000236204085 1000109009010010720920 00000180090010109501424 2210506006001010420618 000001600700101123202634 321062290031013041431105596 000000700700000021202330 500050300301001111401625 302051800900202010501531 30003150060000009401322 110201322300250120315115067108 3010414005002021410617 400040100010000000510620 1000104004000000340712 4000416007000002410718 1201013224002600202316702667 20103050050010137101120 1010204105013040220415 1010205005000000130411 0020206006000000700715 40509020102101405317602661 303061101012001010540928 10001380011101020510620 20002060060000018401321 3010405005000001520817 9040134291034102032231103686 0000008008010010800817 210030210021000002300529 110020180018002020600628 00000050050020207501219 32005052005201405224503193 200020120012001011620924 2100315006101020000011 200021700800000113001424 1000114005001010800815 71008328003110304227203174 200021110012000000700721 00202050050000029101219 20103080080000018101021 101021600700000012101322 50409230003200000336304283 100010600600000011001118 0010102002000000710811 2000206006000000300311 000000100100000000001 30104015001500000021102241 2000206107001011210414 000000200210102040048 100010400400101020028 000000200200000030035 30003014101510304111101335 100010000000000040045 000000100100000020023 000000000000000010011 000000200200000040046 100010300300000011001115 65 5 19 0 89 18 303 4 0 325 3 4 23 0 30 20 316 64 0 400 844 73.0 5.6 21.3 0.0 5.5 93.2 1.2 0.0 10.0 13.3 76.7 0.0 5.0 79.0 16.0 0.0 7.7 0.6 2.3 0.0 10.5 2.1 35.9 0.5 0.0 38.5 0.4 0.5 2.7 0.0 3.6 2.4 37.4 7.6 0.0 47.4 86 338 29 391 844 601071541056003034870091157 9.2 0.0 5.3 0.0 7.9 5.6 17.8 25.0 0.0 17.2 0.0 0.0 13.0 0.0 10.0 20.0 27.5 0.0 0.0 22.8 18.6 1 88 5 63 157 42 3 16 0 61 13 184 3 0 200 3 1 13 0 17 7 167 45 0 219 497 64.6 60.0 84.2 0.0 68.5 72.2 60.7 75.0 0.0 61.5 100.0 25.0 56.5 0.0 56.7 35.0 52.8 70.3 0.0 54.8 58.9 Total PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)    Legacy Farm Road North E. Main Street (Rt 135) Class:Heavy Vehicles‐Combined (Buses, Single‐Unit Trucks, Articulated Trucks) Count Date:Thursday, November 8, 2018 Start Time: E. Main Street (Rt 135) from East  from South from West Legacy Farm Road  from North 7:00 AM End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 7:45 AM Total 8:00 AM 8:15 AM 8:30 AM 7:00 AM 7:15 AM 7:30 AM 9:45 AM Total 10:00 AM 10:15 AM 10:30 AM 8:45 AM Total 9:00 AM 9:15 AM 9:30 AM 11:45 AM Total 12:00 PM 12:15 PM 12:30 PM 10:45 AM Total 11:00 AM 11:15 AM 11:30 AM 1:45 PM Total 2:00 PM 2:15 PM 2:30 PM 12:45 PM Total 1:00 PM 1:15 PM 1:30 PM 3:45 PM Total 4:00 PM 4:15 PM 4:30 PM 2:45 PM Total 3:00 PM 3:15 PM 3:30 PM 5:45 PM Total 6:00 PM 6:15 PM 6:30 PM 4:45 PM Total 5:00 PM 5:15 PM 5:30 PM 6:45 PM Total Grand Total Approach % Total % % Single‐Unit Exiting Leg Total Buses % Buses Exiting Leg Total Single‐Unit Trucks Page 5 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Total PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)    Legacy Farm Road North E. Main Street (Rt 135) Class:Heavy Vehicles‐Combined (Buses, Single‐Unit Trucks, Articulated Trucks) Count Date:Thursday, November 8, 2018 Start Time: E. Main Street (Rt 135) from East  from South from West Legacy Farm Road  from North 7:00 AM End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 59 186 13 239 497 1722021465006903701096219090190 26.2 40.0 10.5 0.0 23.6 22.2 21.5 0.0 0.0 21.2 0.0 75.0 30.4 0.0 33.3 45.0 19.6 29.7 0.0 22.5 22.5 26 64 11 89 190  Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 000001600700101123202634 000000700700000021202330 500050300301001111401625 302051800900202010501531 80201022400260130426513080120 80.0 0.0 20.0 0.0 7.7 92.3 0.0 0.0 0.0 25.0 75.0 0.0 2.5 81.3 16.3 0.0 0.400 0.000 0.250 0.000 0.500 0.500 0.750 0.000 0.000 0.722 0.000 0.250 0.375 0.000 0.500 0.500 0.707 0.650 0.000 0.769 0.882 000000100100000029002930 0.0 0.0 0.0 0.0 0.0 0.0 4.2 0.0 0.0 3.8 0.0 0.0 0.0 0.0 0.0 0.0 44.6 0.0 0.0 36.3 25.0 702091140015001010271203964 87.5 0.0 100.0 0.0 90.0 50.0 58.3 0.0 0.0 57.7 0.0 0.0 33.3 0.0 25.0 0.0 41.5 92.3 0.0 48.8 53.3 100011900100120329101226 12.5 0.0 0.0 0.0 10.0 50.0 37.5 0.0 0.0 38.5 0.0 100.0 66.7 0.0 75.0 100.0 13.8 7.7 0.0 15.0 21.7 000000100100000029002930 702091140015001010271203964 100011900100120329101226 80201022400260130426513080120 0290130 13  29 0 22 64 3 9 2 12 26 16 67 2 35 120 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 210030210021000002300529 110020180018002020600628 00000050050020207501219 200020120012001011620924 520070560056005053227032100 71.4 28.6 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 100.0 0.0 9.4 68.8 21.9 0.0 0.625 0.500 0.000 0.000 0.583 0.000 0.667 0.000 0.000 0.667 0.000 0.000 0.625 0.000 0.625 0.375 0.786 0.350 0.000 0.667 0.862 100010230023001011400530 20.0 0.0 0.0 0.0 14.3 0.0 41.1 0.0 0.0 41.1 0.0 0.0 20.0 0.0 20.0 33.3 18.2 0.0 0.0 15.6 30.0 31004029002900202014501954 60.0 50.0 0.0 0.0 57.1 0.0 51.8 0.0 0.0 51.8 0.0 0.0 40.0 0.0 40.0 0.0 63.6 71.4 0.0 59.4 54.0 1100204004002022420816 20.0 50.0 0.0 0.0 28.6 0.0 7.1 0.0 0.0 7.1 0.0 0.0 40.0 0.0 40.0 66.7 18.2 28.6 0.0 25.0 16.0 100010230023001011400530 31004029002900202014501954 1100204004002022420816 520070560056005053227032100 0 4 1 25 30 5  14 1 34 54 243716 7 22 5 66 100 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 200021110012000000700721 00202050050000029101219 20103080080000018101021 101021600700000012101322 50409230003200000336304283 55.6 0.0 44.4 0.0 6.3 93.8 0.0 0.0 0.0 0.0 0.0 0.0 7.1 85.7 7.1 0.0 0.625 0.000 0.500 0.000 0.750 0.500 0.682 0.000 0.000 0.667 0.000 0.000 0.000 0.000 0.000 0.375 0.750 0.750 0.000 0.808 0.943 101021500600000115001624 Exiting Leg Total Articulated Trucks % Articulated Exiting Leg Total 8:45 AM Legacy Farm Road North E. Main Street (Rt 135) AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: Total  8:45 AM Legacy Farm Road E. Main Street (Rt 135)  from North from East  from South 9:00 AM 9:15 AM 9:30 AM Total Volume % Approach Total PHF from West Articulated % Buses Single‐Unit Trucks Articulated Trucks Total Entering Leg   Buses Buses % Single‐Unit Trucks Single‐Unit % Articulated Trucks 1:15 PM Legacy Farm Road North E. Main Street (Rt 135) Buses Single‐Unit Trucks Articulated Trucks Total Exiting Leg MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: Total 1:15 PM Legacy Farm Road E. Main Street (Rt 135)  from North from East  from South 1:30 PM 1:45 PM 2:00 PM Total Volume % Approach Total PHF from West Articulated %   Buses Single‐Unit Trucks Articulated Trucks Total Entering Leg   Buses Buses % Single‐Unit Trucks Single‐Unit % Articulated Trucks 3:00 PM Legacy Farm Road North E. Main Street (Rt 135) Buses Single‐Unit Trucks Articulated Trucks Total Exiting Leg PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at: Total 3:00 PM Legacy Farm Road E. Main Street (Rt 135)  from North from East  from South 3:15 PM 3:30 PM 3:45 PM Total Volume % Approach Total PHF from West   Buses Page 6 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Total PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)    Legacy Farm Road North E. Main Street (Rt 135) Class:Heavy Vehicles‐Combined (Buses, Single‐Unit Trucks, Articulated Trucks) Count Date:Thursday, November 8, 2018 Start Time: E. Main Street (Rt 135) from East  from South from West Legacy Farm Road  from North 7:00 AM End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 20.0 0.0 25.0 0.0 22.2 50.0 16.7 0.0 0.0 18.8 0.0 0.0 0.0 0.0 0.0 33.3 41.7 0.0 0.0 38.1 28.9 40307117001800000012101338 80.0 0.0 75.0 0.0 77.8 50.0 56.7 0.0 0.0 56.3 0.0 0.0 0.0 0.0 0.0 0.0 33.3 33.3 0.0 31.0 45.8 00000080080000029201321 0.0 0.0 0.0 0.0 0.0 0.0 26.7 0.0 0.0 25.0 0.0 0.0 0.0 0.0 0.0 66.7 25.0 66.7 0.0 31.0 25.3 101021500600000115001624 40307117001800000012101338 00000080080000029201321 50409230003200000336304283 1161624 2  15 0 21 38 292821 5 40 3 35 83  Articulated %  Buses Single‐Unit Trucks Articulated Trucks Total Entering Leg Buses % Single‐Unit Trucks Single‐Unit % Articulated Trucks Buses Single‐Unit Trucks Articulated Trucks Total Exiting Leg Page 7 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 1414019765007284250375136130154282 61301097100801471503621158200199325 8130125652072667019014450149252 621091158407335190271118110130239 34 5 11 0 50 32 259 6 0 297 31 22 66 0 119 27 556 49 0 632 1098 1321016866007423120174120150139246 9130131077208988140304103110118250 105101666320714915028211350120235 10210139592070121213037811250125245 42 10 6 0 58 33 265 6 0 304 26 32 54 0 112 18 448 36 0 502 976 53301115850646516027594100109211 520074640068116130304844092197 3130735710613270121673071151 6010734720524290151716078152 1967032112268024524154508411316230350711 1200315000513430102585065129 502073453051113053542059122 6110845000544260121672070144 400042463051312065573166127 163302210191602071181403311236121260522 3230835320583170115471053130 101201315700583290146700076161 602084653072216095594068157 72301217120749130134564064163 26 5 10 0 41 9 246 7 0 262 17 5 25 0 47 20 232 9 0 261 611 512083624069205074597070154 51107471007531801210444058152 1003013563607452110187736086191 62109259106231100146568070155 2647037142551102801343405127232250284652 6240124643071016076492158148 5250122584064204063684075157 5120806030636140119684081163 301041545060013049705084152 19 5 12 0 36 7 236 15 0 258 8 3 17 0 28 27 255 15 1 298 620 11010121694074315097629078173 5200726110641190114637074156 51006285208933401011544069174 104201617000716180154698081183 31730416285702981362604526248280302686 8220125102401114080124698081216 10220140924096447015105115076201 92601768240922140719709098214 1125018111020113501001511569076222 38 8 15 0 61 12 386 14 0 412 15 5 29 0 49 44 246 41 0 331 853 11340183982010312901215504069202 5270142986010621508138550103231 92601721164012222140181379150107264 1841003201202012210203158380106263 43 11 27 0 81 7 432 14 0 453 6 5 30 0 41 56 297 32 0 385 960 15410029810740119572014118470102264 1091203191371201587510131495140123325 6 10 10 0 26 5 107 10 0 122 6 5 10 0 21 17 108 11 0 136 305 14115030211150118216091999120130287 45 34 37 0 116 24 462 31 0 517 20 18 19 0 57 61 386 44 0 491 1181 23701210130110151236011228570114288 9640196874097239014129470113243 15660274102100116231001514597080238 8710161969010632501010659084216 34 22 18 0 74 21 415 34 0 470 9 11 30 0 50 58 303 30 0 391 985 373 120 156 0 649 186 3658 159 0 4003 193 134 389 0 716 386 3755 344 2 4487 9855 57.5 18.5 24.0 0.0 4.6 91.4 4.0 0.0 27.0 18.7 54.3 0.0 8.6 83.7 7.7 0.0 3.8 1.2 1.6 0.0 6.6 1.9 37.1 1.6 0.0 40.6 2.0 1.4 3.9 0.0 7.3 3.9 38.1 3.5 0.0 45.5 664 4104 665 4422 9855 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 1414019765007284250375136130154282 from North from East  from South from West 8:15 AM 8:30 AM 8:45 AM Total Total 12:00 PM 12:15 PM 12:30 PM 12:45 PM Total 11:00 AM 11:15 AM 11:30 AM 11:45 AM Total Legacy Farm Road North E. Main Street (Rt 135) 8:00 AM 186609 A N: Legacy Farm Road North S: Legacy Farm Road   E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Hopkinton, MA VHB/ C. Trearchis 83956.18 Thursday, November 8, 2018 7:00 AM 7:00 PM E. Main Street (Rt 135)Legacy Farm RoadLegacy Farm Road North Cars PDI File #: Location: Location: City, State: E. Main Street (Rt 135) Client: Site Code: Count Date: Start Time: End Time: Class:   7:00 AM 7:15 AM 7:30 AM 7:45 AM Total 10:00 AM 10:15 AM 10:30 AM 10:45 AM 9:00 AM 9:15 AM 9:30 AM 9:45 AM Total 2:45 PM Total 1:00 PM 1:15 PM 1:30 PM 1:45 PM Total 4:00 PM 4:15 PM 2:00 PM 2:15 PM 2:30 PM 4:30 PM 4:45 PM Total 3:00 PM 3:15 PM 3:30 PM 3:45 PM Total 6:00 PM 6:15 PM 6:30 PM 6:45 PM Total 5:00 PM 5:15 PM 5:30 PM 5:45 PM Total Grand Total Approach % Total % Exiting Leg Total Total 7:00 AM Total from East  from South Legacy Farm Road E. Main Street (Rt 135) AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: from Westfrom North   7:00 AM Page 8 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total from North from East  from South from West 186609 A N: Legacy Farm Road North S: Legacy Farm Road   E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Hopkinton, MA VHB/ C. Trearchis 83956.18 Thursday, November 8, 2018 7:00 AM 7:00 PM E. Main Street (Rt 135)Legacy Farm RoadLegacy Farm Road North Cars PDI File #: Location: Location: City, State: E. Main Street (Rt 135) Client: Site Code: Count Date: Start Time: End Time: Class:   Total 61301097100801471503621158200199325 8130125652072667019014450149252 621091158407335190271118110130239 34 5 11 0 50 32 259 6 0 297 31 22 66 0 119 27 556 49 0 632 1098 68.0 10.0 22.0 0.0 10.8 87.2 2.0 0.0 26.1 18.5 55.5 0.0 4.3 88.0 7.8 0.0 0.607 0.625 0.688 0.000 0.658 0.727 0.912 0.375 0.000 0.928 0.554 0.786 0.660 0.000 0.804 0.321 0.880 0.613 0.000 0.794 0.845 34 5 11 0 50 32 259 6 0 297 31 22 66 0 119 27 556 49 0 632 1098 103 598 38 359 1098 153 895 157 991 2196 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 72301217120749130134564064163 512083624069205074597070154 51107471007531801210444058152 1003013563607452110187736086191 2749040132671202921942705025232210278660 67.5 10.0 22.5 0.0 4.5 91.4 4.1 0.0 38.0 8.0 54.0 0.0 9.0 83.5 7.6 0.0 0.675 0.500 0.750 0.000 0.769 0.650 0.940 0.500 0.000 0.973 0.528 0.500 0.614 0.000 0.694 0.625 0.795 0.750 0.000 0.808 0.864 2749040132671202921942705025232210278660 38 260 41 321 660 78 552 91 599 1320 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 1091203191371201587510131495140123325 6 10 10 0 26 5 107 10 0 122 6 5 10 0 21 17 108 11 0 136 305 14115030211150118216091999120130287 23701210130110151236011228570114288 32 33 34 0 99 26 485 38 0 549 17 14 23 0 54 72 387 44 0 503 1205 32.3 33.3 34.3 0.0 4.7 88.3 6.9 0.0 31.5 25.9 42.6 0.0 14.3 76.9 8.7 0.0 0.571 0.750 0.708 0.000 0.798 0.650 0.885 0.792 0.000 0.869 0.607 0.700 0.575 0.000 0.643 0.818 0.896 0.786 0.000 0.925 0.927 32 33 34 0 99 26 485 38 0 549 17 14 23 0 54 72 387 44 0 503 1205 84 438 143 540 1205 183 987 197 1043 2410 MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at: Total Volume % Approach Total 5:15 PM   5:15 PM 5:30 PM E. Main Street (Rt 135) from North from East  from South from West 5:45 PM 6:00 PM 12:15 PM 12:30 PM Entering Leg Exiting Leg Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road North Total Total 11:45 AM   11:45 AM 12:00 PM Total Volume % Approach Total PHF from North from East Total  from South from West Legacy Farm Road PHF E. Main Street (Rt 135) Legacy Farm Road Entering Leg Exiting Leg Total Entering Leg Exiting Leg Total Total Volume % Approach Total PHF 7:15 AM 7:30 AM 7:45 AM E. Main Street (Rt 135) Page 9 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 10001112001300101031303449 10102012001200000017201933 300030900900000021502638 10001310001311002023002339 60107443004711103092100102159 10102215101802002119102143 21104017001700000117202041 40004213101600000013201535 0000019001000101019302233 7120105542061021032688078152 20103010001000000019302235 111030100010001010800822 2010329001100000010101125 20103050050000009201119 7140122340036001010466052101 1110339101300101017302037 001012110013011020630925 211041800900101013201529 30104010001001304014301735 62401263810450260805011061126 20002014001400000016211935 31206013001311002013001334 2010311500160000019101130 5000528001000101211201531 12130163500053111033495158130 20103017001710203012101336 1000101320151000139101330 303060800810102014201632 00202113101501001110301432 6060121513055313074457056130 100011100011200020610721 210141110012000000410521 100010130013000000620822 0010116007001010630918 41117340004320103022702982 300030130013000001510723 200020900900000011001122 30104013101410001115001635 00000014101510001113001430 801090492051200023441048110 21104214001601102011001133 30104018001800202016101741 31206018001800000019202145 20305117001800101014001438 10270193670070014050603063157 00101022002200000110101235 41106221002310001010001040 402061230024100011710940 0010101010110100117301124 8150143761080210033345042139 3000305005002021430818 0020208008001010300314 01001050050000027101016 1000103104000000410510 41207021102200303318502658 0110207007000000400413 1000108109100010210314 1100218009000000000011 000000700700101000008 221051301032101020610746 80 12 37 1 130 31 553 11 0 595 12 9 22 0 43 18 534 69 1 622 1390 61.5 9.2 28.5 0.8 5.2 92.9 1.8 0.0 27.9 20.9 51.2 0.0 2.9 85.9 11.1 0.2 5.8 0.9 2.7 0.1 9.4 2.2 39.8 0.8 0.0 42.8 0.9 0.6 1.6 0.0 3.1 1.3 38.4 5.0 0.1 44.7 110 583 41 656 1390 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 300030900900000021502638 Total  7:30 AM from North from East  from South from West AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: 7:30 AM Legacy Farm Road North E. Main Street (Rt 135)Legacy Farm Road E. Main Street (Rt 135) Grand Total Approach % Total % Exiting Leg Total Total Total 6:00 PM 6:15 PM 6:30 PM 6:45 PM Total 5:00 PM 5:15 PM 5:30 PM 5:45 PM Total 4:00 PM 4:15 PM 4:30 PM 4:45 PM Total 3:00 PM 3:15 PM 3:30 PM 3:45 PM Total 2:00 PM 2:15 PM 2:30 PM 2:45 PM Total 1:00 PM 1:15 PM 1:30 PM 1:45 PM Total 12:00 PM 12:15 PM 12:30 PM 12:45 PM Total 11:00 AM 11:15 AM 11:30 AM 11:45 AM Total 10:00 AM 10:15 AM 10:30 AM 10:45 AM Total 9:00 AM 9:15 AM 9:30 AM 9:45 AM Total 8:00 AM 8:15 AM 8:30 AM 8:45 AM 7:00 AM 7:15 AM 7:30 AM 7:45 AM  from North from East  from South from West Total Class:Light Goods Vehicle Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Count Date:Thursday, November 8, 2018 Start Time:7:00 AM Page 10 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total  from North from East  from South from West Total Class:Light Goods Vehicle Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Count Date:Thursday, November 8, 2018 Start Time:7:00 AM 10001310001311002023002339 10102215101802002119102143 21104017001700000117202041 7120105511057130042808090161 70.0 10.0 20.0 0.0 8.8 89.5 1.8 0.0 25.0 75.0 0.0 0.0 2.2 88.9 8.9 0.0 0.583 0.250 0.500 0.000 0.625 0.417 0.750 0.250 0.000 0.792 0.250 0.375 0.000 0.000 0.500 0.500 0.870 0.400 0.000 0.865 0.936 7120105511057130042808090161 16 83 4 58 161 26 140 8 148 322 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 30104010001001304014301735 20002014001400000016211935 31206013001311002013001334 2010311500160000019101130 10140151520053123061526160134 66.7 6.7 26.7 0.0 1.9 98.1 0.0 0.0 16.7 33.3 50.0 0.0 1.7 86.7 10.0 1.7 0.833 0.250 0.500 0.000 0.625 0.250 0.867 0.000 0.000 0.828 0.250 0.500 0.250 0.000 0.375 0.250 0.813 0.500 0.250 0.789 0.957 10140151520053123061526160134 9 57 2 66 134 24 110 8 126 268 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 30104018001800202016101741 31206018001800000019202145 20305117001800101014001438 00101022002200000110101235 8170161750076003031594064159 50.0 6.3 43.8 0.0 1.3 98.7 0.0 0.0 0.0 0.0 100.0 0.0 1.6 92.2 6.3 0.0 0.667 0.250 0.583 0.000 0.667 0.250 0.852 0.000 0.000 0.864 0.000 0.000 0.375 0.000 0.375 0.250 0.776 0.500 0.000 0.762 0.883 8170161750076003031594064159 5 66 2 86 159 21 142 5 150 318 Entering Leg Exiting Leg Total 3:30 PM 3:45 PM 4:00 PM Total Volume % Approach Total PHF from West Total  3:15 PM Legacy Farm Road E. Main Street (Rt 135) from North from East  from South Entering Leg Exiting Leg Total PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at: 3:15 PM Legacy Farm Road North E. Main Street (Rt 135) Total Volume % Approach Total PHF from West Total  10:45 AM 11:00 AM from North from East  from South 11:15 AM 11:30 AM Exiting Leg Total MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: 10:45 AM Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Total Volume % Approach Total PHF Entering Leg 7:45 AM 8:00 AM 8:15 AM Page 11 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 000000400400000010015 000000000000000020022 000000000000000120033 100010100100000010013 1000105005000001600713 000000000000000020022 000000100100101020024 100010100100000010013 000000000000000015001515 100010200200101020002024 000000000000000012001212 000000000000000020022 000000100100000000001 000000000000000010011 000000100100000015001516 000000000000000000000 000000000000000000000 000000100100000000001 000000000000000010011 000000100100000010012 000000000000000010011 000000000000000000000 000000100100000000001 000000000000000010011 000000100100000020023 000000010100000000001 000000100100000000001 000000200200000000002 000000000000000010011 000000310400000010015 000000600600000000006 000000120012000000000012 000000800800000000008 000000200200000000002 000000280028000000000028 100010100100101140058 000000100100000000001 100010200200000110025 100010000000101020024 3000304004002022700918 000000400400000010015 000000000000000010011 000000100100000140056 1010210001000000900912 101021500600000115001624 000000200200000010001012 000000000000000050055 000000000000000000000 000000000000000000000 000000200200000015001517 000000000000000000000 000000100100000010012 000000000000000010011 000000000000000020022 000000100100000040045 000000000000000000000 000000000000000010011 000000000000000000000 000000100100000000001 000000100100000010012 601071541056003034870091157 85.7 0.0 14.3 0.0 1.8 96.4 1.8 0.0 0.0 0.0 100.0 0.0 4.4 95.6 0.0 0.0 3.8 0.0 0.6 0.0 4.5 0.6 34.4 0.6 0.0 35.7 0.0 0.0 1.9 0.0 1.9 2.5 55.4 0.0 0.0 58.0 1 88 5 63 157 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total  from North from East  from South from West AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: from West Total  E. Main Street (Rt 135) from North from East  from South 8:15 AM Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road Exiting Leg Total Grand Total Approach % Total % 6:45 PM Total 5:45 PM Total 6:00 PM 6:15 PM 6:30 PM 4:45 PM Total 5:00 PM 5:15 PM 5:30 PM 3:45 PM Total 4:00 PM 4:15 PM 4:30 PM 2:45 PM Total 3:00 PM 3:15 PM 3:30 PM 1:45 PM Total 2:00 PM 2:15 PM 2:30 PM 12:45 PM Total 1:00 PM 1:15 PM 1:30 PM 11:45 AM Total 12:00 PM 12:15 PM 12:30 PM 10:45 AM Total 11:00 AM 11:15 AM 11:30 AM 9:45 AM Total 10:00 AM 10:15 AM 10:30 AM 8:45 AM Total 9:00 AM 9:15 AM 9:30 AM 7:45 AM Total 8:00 AM 8:15 AM 8:30 AM 7:00 AM 7:15 AM 7:30 AM Total Class:Buses  Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Count Date:Thursday, November 8, 2018 Start Time:7:00 AM Page 12 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total  from North from East  from South from West Total Class:Buses  Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Count Date:Thursday, November 8, 2018 Start Time:7:00 AM 000000100100101020024 100010100100000010013 000000000000000015001515 000000000000000012001212 100010200200101030003034 100.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 0.250 0.000 0.000 0.000 0.250 0.000 0.500 0.000 0.000 0.500 0.000 0.000 0.250 0.000 0.250 0.000 0.500 0.000 0.000 0.500 0.567 100010200200101030003034 0300434 1 32 1 34 68 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 000000120012000000000012 000000800800000000008 000000200200000000002 100010100100101140058 100010230023001011400530 100.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 100.0 0.0 20.0 80.0 0.0 0.0 0.250 0.000 0.000 0.000 0.250 0.000 0.479 0.000 0.000 0.479 0.000 0.000 0.250 0.000 0.250 0.250 0.250 0.000 0.000 0.250 0.625 100010230023001011400530 0 4 1 25 30 1 27 2 30 60 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 000000100100000140056 1010210001000000900912 000000200200000010001012 000000000000000050055 101021300400000128002935 50.0 0.0 50.0 0.0 25.0 75.0 0.0 0.0 0.0 0.0 0.0 0.0 3.4 96.6 0.0 0.0 0.250 0.000 0.250 0.000 0.250 0.250 0.375 0.000 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.250 0.700 0.000 0.000 0.725 0.729 101021300400000128002935 1291435 3 33 1 33 70 MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at: PHF Entering Leg Exiting Leg Total 3:30 PM 3:45 PM 4:00 PM 4:15 PM Total Volume % Approach Total  from South from West Total  Legacy Farm Road E. Main Street (Rt 135) from North from East Total 3:30 PM Legacy Farm Road North E. Main Street (Rt 135) Total Volume % Approach Total PHF Entering Leg Exiting Leg Total  1:15 PM 1:30 PM 1:45 PM 2:00 PM from North from East  from South from West E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Entering Leg Exiting Leg Total 1:15 PM Legacy Farm Road North 8:45 AM 9:00 AM Total Volume % Approach Total PHF 8:15 AM 8:30 AM Page 13 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 0000007007000000300310 1000123005000000400410 000000400400000010101115 0000006107000001500613 10001220102300000122102448 1000107007010010220413 0000003003000000540912 011020300300101012039 0000004004001010720914 111030170017012030151002548 0000004004000000610711 4000401001000000540914 30205150060000009501425 3000313004000000630916 10020122130015000000261303966 2010314005002021210414 3000307007000000210313 1000103003000000330610 3000315006000002200413 90101021900210020239501750 2010304004001011510715 001010210300101011027 001010400400000010016 0020205005000000600613 20507015101600202113201641 1020317008001010310416 1000125007101020310414 1000104004000000530813 2010305005000001320614 50308321002410203114702257 000000200200000070079 1000109009000000300313 1100209009000000300314 00000020020020206401014 21003022002200202019402350 1000109009000000210313 010011200310102000006 1000114005000000900915 0000014005000000600611 21003319002210102017101845 2000217008000000400414 002020100100000031047 2010306006000000300312 000000300300000020025 40307117001800000012101338 000000400400000010015 001010200200000011025 200020400400000030039 000000100100000000001 201030110011000000510620 200020310400101110029 000000100110102020025 100010300300000010015 000000200200000010013 30003091010102031500622 100010000000000040045 000000000000000010011 000000000000000010011 000000100100000040045 100010100100000010001012 42 3 16 0 61 13 184 3 0 200 3 1 13 0 17 7 167 45 0 219 497 68.9 4.9 26.2 0.0 6.5 92.0 1.5 0.0 17.6 5.9 76.5 0.0 3.2 76.3 20.5 0.0 8.5 0.6 3.2 0.0 12.3 2.6 37.0 0.6 0.0 40.2 0.6 0.2 2.6 0.0 3.4 1.4 33.6 9.1 0.0 44.1 59 186 13 239 497 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total  from North from East  from South from West PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: Count Date:Thursday, November 8, 2018 Start Time:7:00 AM End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 Class:Single‐Unit Trucks  Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Total 7:00 AM 7:15 AM 7:30 AM 8:45 AM Total 9:00 AM 9:15 AM 9:30 AM 7:45 AM Total 8:00 AM 8:15 AM 8:30 AM 10:45 AM Total 11:00 AM 11:15 AM 11:30 AM 9:45 AM Total 10:00 AM 10:15 AM 10:30 AM 12:45 PM Total 1:00 PM 1:15 PM 1:30 PM 11:45 AM Total 12:00 PM 12:15 PM 12:30 PM 2:45 PM Total 3:00 PM 3:15 PM 3:30 PM 1:45 PM Total 2:00 PM 2:15 PM 2:30 PM 4:45 PM Total 5:00 PM 5:15 PM 5:30 PM 3:45 PM Total 4:00 PM 4:15 PM 4:30 PM 6:45 PM Total 5:45 PM Total 6:00 PM 6:15 PM 6:30 PM Exiting Leg Total Grand Total Approach % Total % from West Total  E. Main Street (Rt 135) from North from East  from South 9:15 AM Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road Page 14 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total  from North from East  from South from West PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Count Date:Thursday, November 8, 2018 Start Time:7:00 AM End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 Class:Single‐Unit Trucks  Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Total 4000401001000000540914 30205150060000009501425 3000313004000000630916 2010314005002021210414 12030153130016002021221303669 80.0 0.0 20.0 0.0 18.8 81.3 0.0 0.0 0.0 0.0 100.0 0.0 2.8 61.1 36.1 0.0 0.750 0.000 0.375 0.000 0.750 0.750 0.650 0.000 0.000 0.667 0.000 0.000 0.250 0.000 0.250 0.250 0.611 0.650 0.000 0.643 0.690 12030153130016002021221303669 16 25 1 27 69 31 41 3 63 138 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 1020317008001010310416 1000125007101020310414 1000104004000000530813 2010305005000001320614 50308321002410203114702257 62.5 0.0 37.5 0.0 12.5 87.5 0.0 0.0 33.3 0.0 66.7 0.0 4.5 63.6 31.8 0.0 0.625 0.000 0.375 0.000 0.667 0.375 0.750 0.000 0.000 0.750 0.250 0.000 0.500 0.000 0.375 0.250 0.700 0.583 0.000 0.688 0.891 50308321002410203114702257 10 18 1 28 57 18 42 4 50 114 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 1000114005000000900915 0000014005000000600611 2000217008000000400414 002020100100000031047 30205316001900000022102347 60.0 0.0 40.0 0.0 15.8 84.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 95.7 4.3 0.0 0.375 0.000 0.250 0.000 0.625 0.750 0.571 0.000 0.000 0.594 0.000 0.000 0.000 0.000 0.000 0.000 0.611 0.250 0.000 0.639 0.783 30205316001900000022102347 4 24 0 19 47 9 43 0 42 94 MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: 9:15 AM 9:30 AM Entering Leg Exiting Leg Total 12:00 PM Legacy Farm Road North 9:45 AM 10:00 AM Total Volume % Approach Total PHF Total  12:00 PM 12:15 PM 12:30 PM 12:45 PM from North from East  from South from West E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Total 2:30 PM Legacy Farm Road North E. Main Street (Rt 135) Total Volume % Approach Total PHF Entering Leg Exiting Leg PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at:  from South from West Total  Legacy Farm Road E. Main Street (Rt 135) from North from East PHF Entering Leg Exiting Leg Total 2:30 PM 2:45 PM 3:00 PM 3:15 PM Total Volume % Approach Total Page 15 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 100010600600000000007 000000200200000011024 000001200300000040047 101020100100000030036 201031110012000000810924 000000200200000030035 000001400500000021038 110020200200000020026 000001200300000110025 1100221000120000018101024 000000300300000031047 100010200201001140059 000000200200202010015 000000200200000021035 100010900901203110201326 100010000000000020023 100010300300000030037 000000000000000001011 100010100100000011024 3000304004000000620815 000000100100000210034 100010200201203011028 100010000000000003034 000000100100000000001 2000204004012032240817 2010303003000000230511 000001200300000020025 100010000000000131056 100010000000000010012 40105150060000018401324 000000000001001010012 110020000000000200024 000000100100202030036 000000100100000011023 1100202002012032510815 000000200200000001013 200020200200000000004 000000100100000030034 000000000000000000000 2000205005000000310411 000000000000000020022 0000004004000002500711 000000100100000011023 000000300300000011025 00000080080000029201321 100010000000000000001 000000000000000010011 000000200200000000002 000000000000000000000 100010200200000010014 000000300300000011025 000000000000000010011 000000100100101000002 000000000000000000000 000000400400101021038 000000000000000000000 000000100100000000001 000000000000000000000 000000000000000000000 000000100100000000001 1722021465006903701096219090190 81.0 9.5 9.5 0.0 5.8 94.2 0.0 0.0 0.0 30.0 70.0 0.0 10.0 68.9 21.1 0.0 8.9 1.1 1.1 0.0 11.1 2.1 34.2 0.0 0.0 36.3 0.0 1.6 3.7 0.0 5.3 4.7 32.6 10.0 0.0 47.4 26 64 11 89 190 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total  from North from East  from South from West PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: Count Date:Thursday, November 8, 2018 Start Time:7:00 AM End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 Class:Articulated Trucks  Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Total 7:00 AM 7:15 AM 7:30 AM 8:45 AM Total 9:00 AM 9:15 AM 9:30 AM 7:45 AM Total 8:00 AM 8:15 AM 8:30 AM 10:45 AM Total 11:00 AM 11:15 AM 11:30 AM 9:45 AM Total 10:00 AM 10:15 AM 10:30 AM 12:45 PM Total 1:00 PM 1:15 PM 1:30 PM 11:45 AM Total 12:00 PM 12:15 PM 12:30 PM 2:45 PM Total 3:00 PM 3:15 PM 3:30 PM 1:45 PM Total 2:00 PM 2:15 PM 2:30 PM 4:45 PM Total 5:00 PM 5:15 PM 5:30 PM 3:45 PM Total 4:00 PM 4:15 PM 4:30 PM 6:45 PM Total 5:45 PM Total 6:00 PM 6:15 PM 6:30 PM Exiting Leg Total Grand Total Approach % Total % from West Total  E. Main Street (Rt 135) from North from East  from South 8:30 AM Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road Page 16 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total  from North from East  from South from West PDI File #:186609 A Location:N: Legacy Farm Road North S: Legacy Farm Road   Location:E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Count Date:Thursday, November 8, 2018 Start Time:7:00 AM End Time:7:00 PM City, State:Hopkinton, MA Client:VHB/ C. Trearchis Site Code:83956.18 Class:Articulated Trucks  Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Total 110020200200000020026 000001200300000110025 000000300300000031047 100010200201001140059 2100319001001001210101327 66.7 33.3 0.0 0.0 10.0 90.0 0.0 0.0 0.0 100.0 0.0 0.0 15.4 76.9 7.7 0.0 0.500 0.250 0.000 0.000 0.375 0.250 0.750 0.000 0.000 0.833 0.000 0.250 0.000 0.000 0.250 0.500 0.625 0.250 0.000 0.650 0.750 2100319001001001210101327 3 10 3 11 27 6 20 4 24 54 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 100010200201203011028 100010000000000003034 000000100100000000001 2010303003000000230511 40105060060120303701024 80.0 0.0 20.0 0.0 0.0 100.0 0.0 0.0 0.0 33.3 66.7 0.0 0.0 30.0 70.0 0.0 0.500 0.000 0.250 0.000 0.417 0.000 0.500 0.000 0.000 0.500 0.000 0.250 0.250 0.000 0.250 0.000 0.375 0.583 0.000 0.500 0.545 40105060060120303701024 8 4 0 12 24 13 10 3 22 48 Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total Right Thru Left U‐Turn Total 000000000000000020022 0000004004000002500711 000000100100000011023 000000300300000011025 00000080080000029201321 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 15.4 69.2 15.4 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.500 0.000 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.250 0.450 0.500 0.000 0.464 0.477 00000080080000029201321 292821 2 17 2 21 42 MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: 8:30 AM 8:45 AM Entering Leg Exiting Leg Total 11:15 AM Legacy Farm Road North 9:00 AM 9:15 AM Total Volume % Approach Total PHF Total  11:15 AM 11:30 AM 11:45 AM 12:00 PM from North from East  from South from West E. Main Street (Rt 135) Legacy Farm Road E. Main Street (Rt 135) Total 3:00 PM Legacy Farm Road North E. Main Street (Rt 135) Total Volume % Approach Total PHF Entering Leg Exiting Leg PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at:  from South from West Total  Legacy Farm Road E. Main Street (Rt 135) from North from East PHF Entering Leg Exiting Leg Total 3:00 PM 3:15 PM 3:30 PM 3:45 PM Total Volume % Approach Total Page 17 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com   Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total 0000000000000000000000100001 1 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000100001 1 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000001000001 1 0000000000000000000000000000 0 0000000000000000000001000001 1 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000100001 1 0000000000000000000000100001 1 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000001100010010000000 2 0000000000001100010010000000 2 0000000000000000000000000000 0 0100001000000000000000000000 1 0000000000000000000000000000 0 0000000000000000000000000000 0 0100001000000000000000000000 1 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0100001000001100010011200003 6 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0 0.0 0.0 33.3 66.7 0.0 0.0 0.0 0.0 0.0 16.7 0.0 0.0 0.0 0.0 16.7 0.0 0.0 0.0 0.0 0.0 16.7 16.7 0.0 0.0 0.0 16.7 0.0 0.0 16.7 16.7 33.3 0.0 0.0 0.0 0.0 50.0 03306 Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total from North from East from South from West     Class: 186609 A N: Legacy Farm Road North S: Legacy Farm Road   E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Hopkinton, MA VHB/ C. Trearchis 83956.18 Thursday, November 8, 2018 7:00 AM 7:00 PM Bicycles (on Roadway and Crosswalks) PDI File #: Location: Location: City, State: Client: Site Code: Count Date: Start Time: End Time: from West   Legacy Farm Road E. Main Street (Rt 135) from North from East from South 7:00 AM Legacy Farm Road North E. Main Street (Rt 135) AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: Grand Total Approach % Total % Exiting Leg Total Total 6:00 PM 6:15 PM 6:30 PM 6:45 PM Total 4:45 PM Total 5:00 PM 5:15 PM 5:30 PM 5:45 PM 3:30 PM 3:45 PM Total 4:00 PM 4:15 PM 4:30 PM 2:15 PM 2:30 PM 2:45 PM Total 3:00 PM 3:15 PM 1:00 PM 1:15 PM 1:30 PM 1:45 PM Total 2:00 PM Total 12:00 PM 12:15 PM 12:30 PM 12:45 PM Total 10:45 AM Total 11:00 AM 11:15 AM 11:30 AM 11:45 AM 9:30 AM 9:45 AM Total 10:00 AM 10:15 AM 10:30 AM 8:15 AM 8:30 AM 8:45 AM Total 9:00 AM 9:15 AM 7:00 AM 7:15 AM 7:30 AM 7:45 AM Total 8:00 AM Total Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road Total E. Main Street (Rt 135) Page 18 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com   Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total from North from East from South from West   Class: 186609 A N: Legacy Farm Road North S: Legacy Farm Road   E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Hopkinton, MA VHB/ C. Trearchis 83956.18 Thursday, November 8, 2018 7:00 AM 7:00 PM Bicycles (on Roadway and Crosswalks) PDI File #: Location: Location: City, State: Client: Site Code: Count Date: Start Time: End Time: Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road Total E. Main Street (Rt 135) 0000000000000000000000100001 1 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000100001 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0.250 0.250 0000000000000000000000100001 1 01001 01012 Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000001000001 1 0000000000000000000001000001 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0.000 0.250 0.250 0000000000000000000001000001 1 00101 00112 Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total 0000000000000000000000000000 0 0000000000001100010010000000 2 0000000000000000000000000000 0 0100001000000000000000000000 1 0100001000001100010010000000 3 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.250 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0.000 0.250 0.250 0.000 0.000 0.000 0.250 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.375 0100001000001100010010000000 3 01203 12306 Entering Leg Exiting Leg Total % Approach Total PHF from West   3:30 PM 3:45 PM from North from East from South 4:00 PM 4:15 PM Total Volume Entering Leg Exiting Leg Total 3:30 PM Legacy Farm Road North E. Main Street (Rt 135) 11:15 AM 11:30 AM Total Volume % Approach Total PHF PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at: Legacy Farm Road E. Main Street (Rt 135) from West   10:45 AM 11:00 AM Legacy Farm Road E. Main Street (Rt 135) from North from East from South Entering Leg Exiting Leg Total 10:45 AM Legacy Farm Road North E. Main Street (Rt 135) 7:30 AM 7:45 AM Total Volume % Approach Total PHF MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: 7:00 AM 7:15 AM Total Total Page 19 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000010100000000000000 1 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000010100000000000000 1 0000000000031400000000000000 4 0000000000000000000000000000 0 0000000000002200000000000000 2 0000000000001100000000000000 1 0000000000034700000000000000 7 0000000000000000000000000000 0 0000000000001100000000000000 1 0000000000020200000000000000 2 0000000000000000000000000000 0 0000000000021300000000000000 3 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000021300000000000000 3 0000000000012300000000000000 3 0000000000033600000000000000 6 0000000000030300000000000000 3 0000000000000000000000000000 0 0000000000001100000000000000 1 0000000000000000000000000000 0 0000000000031400000000000000 4 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000004400000000000000 4 0000000000010100000000000000 1 0000000000012300000000000000 3 0000000000010100000000000000 1 0000000000036900000000000000 9 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000001100000000000000 1 0000000000001100000000000000 1 0000000000010100000000000000 1 0000000000002200000000000000 2 0000000000000000000000000000 0 0000000000020200000000000000 2 0000000000032500000000000000 5 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000000000000000000000 0 0000000000018183600000000000000 36 000000 00005050 000000 000000 00000000000505010000000000000000 0360036 Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total from South from West AM Peak Hour Analysis from 07:00 AM to 10:00 AM begins at: 7:45 AM Total 8:00 AM 9:30 AM 9:45 AM Total 10:00 AM 10:15 AM 10:30 AM 8:15 AM 8:30 AM 8:45 AM Total 9:00 AM 9:15 AM Count Date: Start Time: End Time: Class: 186609 A N: Legacy Farm Road North S: Legacy Farm Road   E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Hopkinton, MA VHB/ C. Trearchis 83956.18 Thursday, November 8, 2018 7:00 AM 7:00 PM Pedestrians PDI File #: Location: Location: City, State: Client: Site Code: Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road Total E. Main Street (Rt 135)  from North from East 7:00 AM 7:15 AM 7:30 AM Total 12:00 PM 12:15 PM 12:30 PM 12:45 PM Total 10:45 AM Total 11:00 AM 11:15 AM 11:30 AM 11:45 AM 2:15 PM 2:30 PM 2:45 PM Total 3:00 PM 3:15 PM 1:00 PM 1:15 PM 1:30 PM 1:45 PM Total 2:00 PM 4:45 PM Total 5:00 PM 5:15 PM 5:30 PM 5:45 PM 3:30 PM 3:45 PM Total 4:00 PM 4:15 PM 4:30 PM Total 6:00 PM 6:15 PM 6:30 PM 6:45 PM Total Grand Total Approach % Total % Exiting Leg Total 9:00 AM Legacy Farm Road North E. Main Street (Rt 135) Total  Legacy Farm Road E. Main Street (Rt 135) from North from East from South from West Page 20 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total from South from West Count Date: Start Time: End Time: Class: 186609 A N: Legacy Farm Road North S: Legacy Farm Road   E: E. Main Street (Rt 135) W: E. Main Street (Rt 135)   Hopkinton, MA VHB/ C. Trearchis 83956.18 Thursday, November 8, 2018 7:00 AM 7:00 PM Pedestrians PDI File #: Location: Location: City, State: Client: Site Code: Legacy Farm Road North E. Main Street (Rt 135) Legacy Farm Road Total E. Main Street (Rt 135)  from North from East 0000000000031400000000000000 4 0000000000000000000000000000 0 0000000000002200000000000000 2 0000000000001100000000000000 1 0000000000034700000000000000 7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 42.9 57.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.500 0.438 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.438 0000000000034700000000000000 7 07007 0140014 Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total 0000000000000000000000000000 0 0000000000021300000000000000 3 0000000000012300000000000000 3 0000000000030300000000000000 3 0000000000063900000000000000 9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 66.7 33.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.500 0.375 0.750 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.750 0000000000063900000000000000 9 09009 0180018 Right Thru Left U‐Turn CW‐EB CW‐WB Total Right Thru Left U‐Turn CW‐SB CW‐NB Total Right Thru Left U‐Turn CW‐WB CW‐EB Total Right Thru Left U‐Turn CW‐NB CW‐SB Total 0000000000004400000000000000 4 0000000000010100000000000000 1 0000000000012300000000000000 3 0000000000010100000000000000 1 0000000000036900000000000000 9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 33.3 66.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.750 0.375 0.563 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.563 0000000000036900000000000000 9 09009 0180018 MidDay Peak Hour Analysis from 10:00 AM to 2:00 PM begins at: PM Peak Hour Analysis from 2:00 PM to 07:00 PM begins at: 9:00 AM 9:15 AM 9:30 AM 9:45 AM Total Volume % Approach Total PHF Entering Leg Exiting Leg Total 11:15 AM Legacy Farm Road North E. Main Street (Rt 135) Total  11:15 AM Legacy Farm Road E. Main Street (Rt 135) from North from East from South 11:30 AM 11:45 AM 12:00 PM Total Volume % Approach Total PHF from West Entering Leg Exiting Leg Total 2:00 PM Legacy Farm Road North E. Main Street (Rt 135) Total  2:00 PM Legacy Farm Road E. Main Street (Rt 135) from North from East from South 2:15 PM 2:30 PM 2:45 PM Total Volume % Approach Total PHF from West Entering Leg Exiting Leg Total Page 21 PRECISION D A T A INDUSTRIES, LLC 46 Morton Street, Framingham, MA 01702 Office: 508-875-0100 Fax: 508-875-0118 Email: datarequests@pdillc.com Appendix Signal Warrant Analysis 2003 MUTCD TRAFFIC SIGNAL WARRANT ANALYSIS (VOLUME BASED) Intersection:E Main Street at Legacy Farms Road North / Legacy Farms Road Major Street Direction:2 Year:2018 Condition:Existing Operating speed on major roadway:45 mph Required Number of approaches:4 approach volumes Adjusted Warrant 1 EIGHT-HOUR VEHICULAR VOLUME Minimum*Minimum** Warrant 1A MINIMUM VEHICULAR VOLUME (8 hours of day) Major Street :2 Lane(s) on each approach 600 420 Minor Street :1 Lane(s) on each approach 150 105 Warrant 1B INTERRUPTION OF CONTINUOUS TRAFFIC (8 hours of day) Major Street : 2 Lane(s) on each approach 900 630 Minor Street : 1 Lane(s) on each approach 75 53 80 PERCENT SATISFACTION OF WARRANT 1A AND WARRANT 1B Warrant 1A Warrant 1B Major Street : 2 Lane(s) on each approach 480 720 Minor Street :1 Lane(s) on each approach 120 60 Warrant 2 FOUR HOUR VEHICULAR VOLUME Major Street : 2 Lane(s) on each approach If "verify" indicated, see Figure 4C-1 or 4C-2. Minor Street :1 Lane(s) on each approach 25 = accuracy of regression equations Warrant 3 PEAK HOUR VOLUME Major Street : 2 Lane(s) on each approach If "verify" indicated, see Figure 4C-3 or 4C-4. Minor Street :1 Lane(s) on each approach 25 = accuracy of regression equations Entering Vol. Entering Vol. on Major Road Tot. Ent. Vol. Meets the following volume-based warrants? Hour Minor Road+Eastbound Westbound On Major Rd 1A 1B 80%(1A&1B) 2 3 6:00 - 7:00 AM 0 No No No No No 7:00 - 8:00 AM 122 774 385 1159 Yes Yes Yes Yes Yes 8:00 - 9:00 AM 119 635 396 1031 Yes Yes No Yes Verify 9:00 - 10:00 AM 88 469 306 775 No Yes No Verify No 10:00 - 11:00 AM 43 347 278 625 No No No No No 11:00 - 12:00 AM 55 346 336 682 No Yes No No No 12:00 - 1:00 PM 61 376 369 745 No Yes No No No 1:00 - 2:00 PM 36 358 356 714 No No No No No 2:00 - 3:00 PM 51 381 381 762 No No No No No 3:00 - 4:00 PM 54 437 514 951 No Yes No No No 4:00 - 5:00 PM 44 449 548 997 No No No No No 5:00 - 6:00 PM 65 530 554 1084 No No No No No 6:00 - 7:00 PM 52 410 505 915 No No No No No No No No No Yes 2 3 No Yes *From the criteria described for the warrant in the MUTCD. **If the operating speed is higher than 40mph then the volumes can be adjusted to 70%. (If no adjusted minimum, the minimum from the previous column is shown) +If more than one approach, report the approach that has the higher volume. NON-VOLUME-BASED WARRANTS Warrant 4, Minimum Pedestrian Volume:No Warrant 5, School Crossing: Peak Four Hour Pedestrian Volumes:7 See MUTCD for details. (non-concurrent)6 9 5 Warrant 7, Crash Experience:No # of accidents "correctable by Warrant 6, Coordinated Signal System:signalization" occuring in the last 12 months:0 See MUTCD for details. Warrant 8, Roadway Network: See MUTCD for details. Source:Manual on Uniform Traffic Control Devices (MUTCD); 2003 Edition [2003] Warrants Met? 1 NO Note: The minor roadway volumes for 4:00 - 5:00 PM & 5:00 - 6:00 PM reflect the southbound Legacy Farms Road North approach; and therefore, the thresholds for these hours are based on a two lane minor roadway appraoch. last updated: 08/05/05 [version] BETA GROUP, INC. 315 Norwood Park South, 2nd Floor, Norwood, MA 02062 P:781.255.1982 | F:781.255.1974 | W:www.BETA-Inc.com January 8, 2019 Town of Hopkinton Planning Board Land Use, Planning and Permitting Department 18 Main Street Hopkinton, MA 01748 Attn: Ms. Elaine Lazarus, Director of Land Use and Town Operations Re: Legacy Farms: Special Condition #54 – 2018 Signal Warrant Analysis Review Dear Ms. Lazarus: BETA Group, Inc. (BETA) has reviewed the traffic signal warrant assessment of the Legacy Farms project in Hopkinton, Massachusetts. This traffic signal warrant assessment is required by the Town of Hopkinton’s Planning Board (the Board) as part of a traffic monitoring assessment as noted in Special Condition #54. BASIS OF REVIEW The following document was received by BETA and formed the basis of the review: •Legacy Farms Special Condition #54 2018 Signal Warrant Analysis Memorandum, dated November 27, 2018 by VHB, Inc. (VHB) of Watertown, MA BETA reviewed this project previously and provided traffic review comments letters to the Board dated April 10, 2018 and April 23, 2018. Please refer to those documents for further information. 2018 TRAFFIC VOLUMES Turning Movement Counts were collected at the intersection of East Main Street at Legacy Farms Road North and Legacy Farms Road South on Thursday, November 8, 2018 from 7:00 AM to 7:00 PM. VHB found the November data to be 1-6% higher than seasonally adjusted data collected in February 2018 at the same intersection. BETA finds the data collection to be appropriate. TRAFFIC SIGNAL WARRANT ANALYSIS A traffic signal warrant was evaluated for the intersection based on the volume data collected in November 2018. The following warrants were evaluated: Warrant 1 – 8-Hour Vehicular Volume; Warrant 2 – 4-Hour Vehicular Volume; Warrant 3 – Peak Hour Vehicular Volume; and Warrant 4 – Pedestrian Volume. BETA finds the evaluation of these four warrants to be applicable for this location. It was noted that vehicle speeds collected in February 2018 represent 85th percentile speeds of approximately 45 miles per hour (mph). Speeds of greater than 40 mph trigger the use of a 70% threshold for Warrant 1, Warrant 2, and Warrant 3. BETA concurs with this statement. Based on the Traffic Signal Warrant Analysis and Calculation Sheets provided in the Memorandum and its Appendix, VHB determined that the intersection only satisfies Warrant 3 – Peak Hour Vehicular Town of Hopkinton, Planning Board January 8, 2019 Page 2 of 2 Volume. Based on this result, a traffic signal was not recommended for installation. BETA has provided the following comments: T1.The traffic signal warrant should utilize vehicular volume for both minor street approaches. The warrant evaluated in the Appendix only examines volume for the northbound Legacy Farms Road South approach which is lower (for most of the period) than the southbound Legacy Farms Road North approach. See Paragraph 04 in Section 4C.02 and Paragraph 02 in Section 4C.03 of the Manual on Uniform Traffic Control Devices (MUTCD) which states, “On the minor street, the higher volume shall not be required to be on the same approach during each of these 8(4) hours.” T2.Paragraph 09 in Section 4C.01 of the MUTCD discusses Guidance for intersection approaches with left turn or right turn lanes. The paragraph suggests that approaches with a left turn or right turn lane be evaluated as a single lane approach unless the turning volume is greater than 50% of the total approach volume and sufficient storage is provided for the lane. Based on the November 2018 turning volumes, BETA suggests these approaches be evaluated as Single Lane approaches. T3.BETA evaluated the traffic signal warrant with methodology noted in Comment T1 and Comment T2, and found the intersection to satisfy Warrant 1B (70%) for 10 Hours, Warrant 2 (70%), and Warrant 3 (70%). T4.BETA concurs that the observed pedestrian volume in November 2018 does not satisfy Warrant 4. As a result of the traffic signal warrant evaluation and the higher than 40 mph speeds along Route 135, BETA recommends the installation of a traffic signal at the intersection of East Main Street (Route 135) at Legacy Farms Road North and Legacy Farms Road South. If we can be of any further assistance regarding this matter, please contact us at our office. Very truly yours, BETA Group, Inc. Tyler de Ruiter, PE Project Engineer cc: File Job No: 5929 O:\5900s\5929 - Hopkinton PB - Trails at Legacy Farms\Engineering\Reports\Trails at Legacy Farms Planning Board Traffic Review 1-8-19.docx Amendments Recommended by ZAC 1-22-19 (See pages 7 & 8) ARTICLE XXVI Open Space Mixed Use Development Overlay District § 210-162. Development and Design Objectives The purposes of the Open Space Mixed Use Development Overlay District (OSMUD District) are to balance conservation and development goals and to protect and enhance the character of the natural and cultural resources of the Town, while promoting planned development and appropriate use of land in accordance with community goals and design guidelines. Toward that end, the OSMUD District is intended to permit the clustering of residential and commercial uses on large tracts of land that have open space as an integral characteristic, and to ensure quality site planning to accommodate a site's physical characteristics, including its topography, vegetation, water bodies, wetlands, open spaces, historic resources and major scenic views. § 210-163. District and Sub-District Delineations; Applicability A. The OSMUD District is shown on the Official Zoning Map. The OSMUD District is divided into Residential Subdistricts (R), Commercial Subdistricts (C), and a Village Center Subdistrict (VC), as shown on the Official Zoning Map. The OSMUD District is an overlay district that is superimposed over the underlying zoning districts. Development of land within the OSMUD District may be undertaken either pursuant to this Article or pursuant to the provisions of this Chapter applicable to the corresponding underlying zoning district except as otherwise provided in § 210-172. B. Notwithstanding any provision of this Chapter to the contrary, development undertaken pursuant to this Article shall not be subject to the following provisions: (1) § 210-125 (Conversion of Residential Property); and (2) § 210-126.1 (Residential Subdivisions of 10 acres or more). C. Development undertaken pursuant to this Article shall be subject to the following provisions of this Chapter only to the extent provided for, and as modified by, the provisions of this Article:. (1) Article XI, Flexible Community Development Bylaw; (2) Article XII, Water Resources Protection Overlay District; (3) Article XVIII, Supplementary Regulations; (4) Article XIX, Nonconforming Uses; and (5) Article XX, Site Plan Review. 2 § 210-164. Definitions Except as otherwise provided in this section, the definition set forth in § 210-4 shall be applicable to all terms used in this Article. Notwithstanding the forgoing, the following terms, as used in this Article, shall have the meanings indicated: AFFORDABLE HOUSING – Any Dwelling Units qualifying as low or moderate income housing as defined by regulations of the Department of Housing and Community Development. APARTMENT BUILDING – See definition of Garden Apartment. ATTACHED DWELLING – A dwelling consisting of two or more dwelling units, each of which has a building element such as a wall, floor, ceiling or roof in common with or other Structure attached to another dwelling unit. Attached dwellings include Garden Apartments. BUILDABLE AREA – All area of a Development Project that is not Restricted Land. COMMERCIAL USES – All uses other than Dwelling Uses and Restricted Land Uses. COMMON OWNERSHIP – Common ownership shall mean ownership by the same person or persons or legal entities or ownership by any two or more persons or entities, when there is active or pervasive control of those legal persons or entities by the same controlling person and there is an intermingling of activity among those persons while engaging in a common enterprise. Common Ownership can include a Condominium or Landowners’ Association. COMMUNITY CENTER – A facility for a social, educational, or recreational purpose, intended primarily for the occupants of the Development Project or the OSMUD District, in which food and beverages may be served and live entertainment may be provided, and which may include performance and assembly space and indoor and outdoor recreational facilities. CONSTRUCTION ACTIVITY – The construction of new structures or site work associated with the construction of new structures. The term does not include site work not associated with the construction of new structures, the construction of roadways, installation of utilities, restoration and improvement of Restricted Land, additions and improvements to existing structures, or activities involving uses and structures referred to in M.G.L. c.40A §3, to the extent allowed under said section of the General Laws. CONTINUING CARE RETIREMENT COMMUNITY OR ASSISTED LIVING FACILITY – A facility providing living accommodations and communal facilities for persons over age 62 and that includes at least: a) 24-hour on-site responsible staff; b) a common dining area in which at least one main full meal is served each day; c) optional laundry, housekeeping and personal services available to residents; d) transportation services; and e) common indoor and outdoor passive or active recreational areas. Such a facility may include: a) a medical or nursing home component; and b) retail sales and services for the convenience of residents, accessible only from inside the facility. 3 CULTURAL USES – Art gallery; art use; museum; public art display space; arts studio, arts; production studio; or ticket sales undertaken in connection with a cultural use. DESIGN GUIDELINES – The Design Guidelines for the OSMUD District adopted by the Planning Board as part of the Master Plan Special Permit to govern Site Plan Review within the OSMUD District. DEVELOPMENT PROJECT – A development undertaken pursuant to this Article, as shown on a site plan submitted to the Planning Board for Site Plan Review. A Development Project may consist of one or more lots and may be located in more than one subdistrict, as long as the applicable requirements of this Article are satisfied with respect to each subdistrict. DUPLEX – An Attached Dwelling consisting of two dwelling units located on a lot in Common Ownership. DWELLING USE – Use as Dwelling Units as defined in § 210-4, but specifically not including residential units that may be part of a Continuing Care Retirement Community, Assisted Living Facility or similar institution. GARDEN APARTMENT – A multifamily residential land use consisting of two or more dwelling units each of which is on a single level, at least some of which have a floor or ceiling in common with another unit. GREENHOUSE – A building made of a material transparent or partially transparent to light, in which the temperature and humidity can be regulated, and which is used primarily for the cultivation of plants. HEALTH AND FITNESS CLUB – A private club, whether or not operated for profit, solely for the purpose or providing physical fitness, exercise therapy, rehabilitation or health-related services. HEIGHT – The vertical distance from the mean finished grade of all sides of building or structure to the highest point of the roof for flat roofs, to the deck line for mansard roofs and to the mean height between eaves and ridge for gable, hip and gambrel roofs, excluding chimneys, spikes, towers, wireless communication facilities, screens, parapet walls, and other structures, equipment, or projections not used for human occupancy. In determining the height of buildings within the area designated “OSMUD District Height Zone” on the Official Zoning Map, the area above the mean finished grade and below the floor of the first occupiable story, not to exceed 10 feet, shall be excluded from measurement of height and of stories. LANDOWNERS’ ASSOCIATION – A corporation, trust or other legal entity owned or controlled by the owners of all lots within the OSMUD District, or by owners of all lots within a specified area within the OSMUD District, as the context permits or requires. MASTER PLAN – The Master Plan for the OSMUD District as submitted to the Planning Board for approval in a Master Plan Special Permit to be issued pursuant to § 210-172. 4 MULTIFAMILY DWELLING OR PROJECT – A collective term referring to any dwelling units other than a Single Family Dwelling located on an individual lot, including an Attached Dwelling, Simplex Dwelling, Duplex Dwelling, Townhouse, Garden Apartment or Apartment Building. NEIGHBORHOOD RESTAURANT – A restaurant or eating establishment intended for the use and convenience of the residents of the immediate neighborhood, not to exceed 1,500 square feet of indoor seating, which may also include outdoor seating. RESTRICTED LAND – Land devoted to uses permitted by § 210-170A, which may include (1) open space land left substantially in its natural state; (2) open space land that is restored or landscaped, including irrigation, detention and/or retention ponds or stormwater catchment areas and subsurface utilities; (3) open space land used for agricultural purposes; (4) open space land improved for active and passive recreational uses, including pedestrian, bicycle and equestrian trails; (5) land improved for other municipal uses; (6) food preparation and sales areas, restrooms, parking and access areas, and similar uses, structures or portions thereof, operated in association with other Restricted Land uses; and (7) A total of no more than 30 acres of land, which may be restricted for the benefit of landowners within a particular area of the OSMUD District. Restricted Land shall not include land set aside for road and/or parking uses that are not accessory to other Restricted Land Uses. RESTRICTED LAND COVENANT – A legally enforceable restriction or covenant, recorded in the Registry of Deeds and enforceable by the Town, providing that the land subject thereto will remain as Restricted Land in perpetuity. RETAIL NEIGHBORHOOD STORE – A store, other than a restaurant or eating establishment, not to exceed 2,000 square feet, located in a neighborhood in which merchandise is sold or services provided for the convenience of the occupants of the immediate neighborhood, such as groceries, prepared take-out food, toilet articles, cosmetics, candy, sundries, medications, newspapers, magazines and ice cream. SENIOR HOUSING DEVELOPMENT - A multifamily residential land use consisting of multiple dwelling units on one single contiguous parcel, operated with the intent that at least one resident of every unit be 55 years of age or older. SIMPLEX DWELLING – A detached dwelling separated from another dwelling unit by not more than 25 feet and located on a lot in Common Ownership. SINGLE FAMILY DWELLING – A detached dwelling unit on an individual lot or a detached dwelling unit separated from another dwelling unit by more than 25 feet, but not including a mobile home or trailer. STRUCTURE – A man-made combination of materials assembled in a fixed location to give support or shelter or for any other purpose, including buildings, frameworks, platforms, sheds, 5 carports, porte-cocheres, covered walkways and the like; provided, however, that signs, fences, tents, poles, swing sets and the like are not to be considered structures. TOWNHOUSE – One of a row of three or more dwelling units, each of which has a wall in common with another dwelling unit, with each dwelling unit having a separate entrance and located on a lot in common ownership. § 210-165. Uses No land, structure or building shall be used for any purpose in the OSMUD District, other than as set forth in this section, except as otherwise set forth in this Chapter or otherwise permitted by law.  A use is permitted by right in any subdistrict that is denoted by the letter “Y”.  A use is prohibited in any subdistrict that is denoted by the letter “N”.  A use denoted by the letters “SP” may be permitted by Special Permit from the Planning Board. Use Residential Subdistrict Commercial Subdistrict Village Center Subdistrict Single-family dwellings Y SP SP Multifamily Dwellings other than Senior Housing Developments Y Y Y Attached dwellings including garden apartments Y Y Y Senior Housing Development Y Y Y Home occupations Y Y Y Licensed home day care providers Y Y Y Renting of rooms and/or the furnishing of table board in a dwelling occupied as a private residence Y Y Y Bed-and-breakfast establishments and inns with a maximum of 12 guest rooms SP Y Y Business or professional offices and banks N Y Y Community Centers Y Y Y Conference centers, with or without a residential dormitory component N SP SP Drive-in, drive-through or drive-up uses, but excluding the dispensing of food or drink N Y Y Health clubs SP Y Y Hotels, motels, and inns with greater than 12 guest rooms N SP SP Light manufacturing and/or assembly with associated professional, administrative and/or clerical offices for uses permitted in the Professional Office (P) District under Article IX N Y Y Recreational Uses of buildings, structures or land, not limited to occupants of the SP Y SP 6 Use Residential Subdistrict Commercial Subdistrict Village Center Subdistrict Development Project or OSMUD District, but excluding recreational uses which are part of the Restricted Land Research centers and laboratories not involving noxious or hazardous substances and processes N Y Y Research centers and laboratories with a biosafety Level of Level 1 or Level 2 N SP N Restaurants N Y Y Neighborhood Restaurants SP Y Y Retail businesses including retail services involving manufacturing, if clearly incidental and accessory to a retail use on the same premises N Y Y Retail Neighborhood Stores SP Y Y Retail stores and retail service shops, including take-out food establishments exclusive of drive- in, drive-up or drive-through take-out food N Y Y Cultural Uses SP Y Y Cinemas, concert halls, theaters, auditoriums N SP SP Adult day care SP Y Y Continuing care retirement communities, assisted living facilities, or similar institutions SP Y SP Group homes Y Y Y Nursing homes, extended care facilities, or physical rehabilitation facilities N Y SP Health services facility N SP SP Out-patient surgery N SP SP Medical offices N Y Y Veterinary clinics N SP SP Municipal Cemeteries SP N N Places of worship and other religious uses Y Y Y Funeral homes and mortuaries SP Y SP Public or semipublic institutions of a philanthropic or charitable character SP Y Y Child care centers Y Y Y Municipal uses Y Y Y Public and private educational uses (including schools for scholastic and non-scholastic subjects) and public libraries Y Y Y Telecommunication and telephone facilities (if located within a building with another allowed primary use, not to exceed 20% of such building) Y Y Y 7 Use Residential Subdistrict Commercial Subdistrict Village Center Subdistrict Public transportation facilities, limited to 1) shuttle bus stop facilities and 2) park and ride parking facilities intended for occupants of the OSMUD District Y Y Y Facilities used for water supply or sewage treatment, or associated with the provision of electrical, telephone, gas or cable services within the OSMUD District Y Y Y Alternate power generation and co-generation facilities serving other uses within the OSMUD District SP SP SP Agricultural and horticultural uses, including farms of all kinds, nurseries, gardens, greenhouses and livestock, except fur farms Y Y Y Equestrian facilities, public or private SP SP N Farm stands Y Y Y Landscaping business and storage/staging facilities SP Y Y Mixed use buildings consisting of commercial space or retail space on the first floor and a different category of use on one or more upper floors N Y Y Uses customarily associated with any permitted use on a lot within a Development Project, which may be on a different lot within the same Development Project Y Y Y Accessory uses Y Y Y Restricted Land uses Y Y Y § 210-166. Intensity of Use Limitations A. Dwelling Uses within the OSMUD District shall be limited to 940 new Dwelling Units constructed after May 5, 2008, plus 180 Dwelling Units in Senior Housing Developments constructed after May 4, 2015, provided, however, that the owner or owners of any such additional Dwelling Unit in Senior Housing Developments shall require, through deed restrictions, condominium documents, leases, rental agreements or other appropriate instruments, the form and adequacy of which has been approved by the Planning Board, that no child under the age of 18 may be a resident in any suchat least one resident of every Dwelling Unit be 55 years of age or older. No more than 50 of the 1120 new Dwelling Units so constructed may be single-family dwellings, and the remainder shall be multi-family dwellings, including attached dwellings, garden apartments, units in mixed-use buildings and Senior Housing Developments. 8 Neither the dwellings located at 80, 82, 83 nor 90 East Main Street or 26 Clinton Street, nor the Group Home located at 44 Wilson Street, all of which were in existence as of the effective date of this Article, shall be deemed to be a Dwelling Unit for the purposes of this Intensity of Use limitation. However, in the event that any such dwelling is converted to or reconstructed as a multi-family dwelling use, the resulting number of Dwelling Units in excess of one (1) on any such property shall be counted towards the Intensity of Use limitation. No Accessory Family Dwelling Unit for which the Board of Appeals grants a Special Permit pursuant to § 210-126 shall be deemed to be a separate Dwelling Unit for purposes of this Intensity of Use limitation. No on-site apartment which provides a permanent live-in residence for 24-hour on-site responsible staff of a Continuing Care Retirement Community or Assisted Living Facility shall be deemed a Dwelling Unit for the purposes of this Intensity of Use limitation, provided that such apartment is located within the Facility, one occupant of the apartment is a full-time employee of the Facility and that there shall be no more than two such apartments per Community/Facility. B. Commercial Uses within the OSMUD District shall be limited to 450,000 square feet of Gross Floor Space in the aggregate, which shall be allocated among the Subdistricts as authorized by a Master Plan Special Permit issued pursuant to § 210-172. C. Commercial uses within the VC Subdistrict shall not exceed 150,000 square feet of Gross Floor Area in the aggregate. No single building within the VC Subdistrict shall exceed 25,000 square feet of Gross Floor Area except for a single building which may contain up to 38,000 square feet of Gross Floor Area; provided, however, that, notwithstanding the foregoing, the Planning Board may, by Special Permit, approve a single building in the VC Subdistrict which may contain up to 45,000 square feet of Gross Floor Area. The following shall be excluded from the calculation of Gross Floor Area for purposes of this Intensity of Use limitation: (i) The building at 83 East Main Street, in existence as of the effective date of this Article, in the event such building is converted to Commercial Use, and the building at 97 East Main Street (the Pearson House); (ii) structures accessory to or commonly associated with a Dwelling Use, such as a clubhouse, recreational amenity or management or marketing space; (iii) uses, structures or portions thereof, operated in association with Restricted Land uses; (iv) structures accessory to agricultural and horticultural use, including greenhouses, except that 40% of the area of a greenhouse that is associated with a retail use in the same or an adjacent building shall be included in the calculation of Gross Floor Area; (v) structures or portions thereof located at 0 East Main Street, the athletic fields parcel/recreational parcel. § 210-167. Affordable Housing Affordable Housing shall be provided within the OSMUD District in accordance with the following requirements: 9 A. Except as otherwise provided in the following paragraph of this Section, not fewer than sixty (60) Dwelling Units within the OSMUD District shall be Affordable Housing, which shall be located within one or more Development Projects containing, in the aggregate, not fewer than two hundred forty (240) Dwelling Units eligible for inclusion in the Massachusetts Department of Housing and Community Development’s Subsidized Housing Inventory. These requirements shall be in addition to the Affordable Housing requirements provided in Subsection C of this Section. Notwithstanding the foregoing, if, prior to the issuance of a building permit for a Development Project that contains Affordable Housing, either (i) M.G.L. c. 40B, §§ 20 through 23 is no longer in effect, or (ii) the rules, regulations or guidelines of the Massachusetts Department of Housing and Community Development issued pursuant to M.G.L. c. 40B, §§ 20 through 23 no longer provide that all of the units in a rental development that contains at least 25% affordable housing units are eligible for inclusion on the Subsidized Housing Inventory, then not fewer than ninety-four (94) Dwelling Units within the OSMUD District shall be developed as Affordable Housing, in addition to the Affordable Housing requirements provided in Subsection C of this Section. B. All Affordable Housing shall be integrated with the rest of the Development Project in which it is located, and shall be comparable in design, exterior appearance, construction, and quality of exterior materials with other units in such Development Project. The mean number of bedrooms in Affordable Housing Dwelling Units shall be no greater than the mean number of bedrooms in the market-rate Dwelling Units in the Development Project in which they are located. C. In addition to the Affordable Housing requirements provided in Subsection A of this Section, to the extent that the Senior Housing Developments create a total number of Dwelling Units within the OSMUD District in excess of 940, those Senior Housing Developments shall require the provision of, in the aggregate, one Dwelling Unit of Affordable Housing for every 10 Dwelling Units in Senior Housing Developments, but not to exceed twenty (18) Dwelling Units of Affordable Housing in the aggregate. The additional Dwelling Units of Affordable Housing required under this section may be provided anywhere within the OSMUD District. § 210-168. Dimensional Requirements A. The following size and setback requirements shall apply to each lot within the applicable Subdistrict, and between Subdistricts: Residential Subdistrict (R) and Commercial Subdistrict (C) [Dwelling Uses] Commercial Subdistrict (C) [Commercial Uses] Village Center Subdistrict (VC) Minimum lot frontage 25 feet 100 feet 100 feet Minimum lot area* 4,000 square feet 30,000 square feet 30,000 square feet Minimum setback from street line 10 feet 25 feet 25 feet 10 Minimum side yard width 0 0 0 Minimum rear yard depth 10 feet 10 feet 10 feet Maximum building height 35 feet or 3 stories, whichever is less; provided, however, that buildings within the area designated OSMUD District Height Zone on the Official Zoning Map, may be 40 feet or 3 stories, whichever is less 35 feet or 3 stories, whichever is less; provided, however, that buildings within the area designated OSMUD District Height Zone on the Official Zoning Map, may be 40 feet or 3 stories, whichever is less 35 feet or 3 stories, whichever is less * Notwithstanding the definition of Lot Area in §210-4, the surface area of man-made ponds, retention ponds and irrigation ponds shall be included in the area needed to satisfy Minimum Lot Area requirements within the OSMUD District. When a Commercial Subdistrict abuts a Residential Subdistrict within the OSMUD District, a setback of at least 50 feet between buildings in the Commercial Subdistrict used for commercial purposes and the boundary of the Residential Subdistrict shall be provided B. The following setback requirements shall apply to any lot within the OSMUD District that abuts land outside the OSMUD District: Residential Subdistrict (R) and Commercial Subdistrict (C) [Dwelling Uses] Commercial Subdistrict (C) [Commercial Uses] Minimum setback from street line 50 feet 50 feet 50 feet Minimum side yard width 25 feet 25 feet 25 feet Minimum rear yard 20 feet 25 feet 25 feet C. All buildings in the Commercial Subdistrict used for commercial purposes shall be located a minimum of 100 feet from any lot outside the OSMUD District used for residential purposes at the time of the Site Plan Review application. Such setback area shall be left undeveloped but landscaped; provided, however, that such setback area may contain access ways. This Subsection shall not be deemed to require a minimum setback from lots that are located across any street or right of way from the OSMUD District boundary. 11 D. All buildings in the Village Center Subdistrict shall be located a minimum of 100 feet from any lot outside the OSMUD District used for residential purposes at the time of Site Plan Review application. Such setback area shall be left undeveloped but landscaped; provided, however, that such setback area may contain access ways and parking areas, if screening of such parking areas is provided in a manner approved by the Planning Board. The Master Plan Special Permit may authorize the Planning Board to approve, pursuant to § 210-173, a setback of a lesser width than is set forth in this Subsection upon a finding that such a lesser setback is sufficient to screen and/or separate the building from the lot outside of the OSMUD District. This Subsection shall not be deemed to require a minimum setback from lots that are located across any street or right of way from the OSMUD District boundary. § 210-169. Parking A. The requirements of § 210-124(B) (1) relating to the minimum number of parking spaces shall apply in the OSMUD District, with the following additions and exceptions: Uses Requirement Single family dwelling 2 spaces per dwelling unit Dwelling units other than single family dwelling and those within mixed use buildings Dwellings with up to 1 bedroom: 1.5 spaces Dwellings with more than 1 bedroom: 2.0 spaces Residential Component of a Mixed Use Building 1 space per dwelling unit Hotel, motel, and inns 1 space for each unit available for occupancy Adult day care 1 space for each full time employee on the largest shift Continuing care retirement community or assisted living facility, or similar institutions 3 spaces for each 4 units available for occupancy Funeral homes and mortuaries 5 spaces per 1,000 square feet of gross floor area, not including corridors and other service areas B. Structures accessory to agricultural and horticultural use, including greenhouses, shall not be included in the calculation of Gross Floor Area for purposes of the minimum parking requirements, except that 40% of the area of a greenhouse that is associated with a retail use in the same or an adjacent building shall be included in such calculation of Gross Floor Area. C. Where parking uses have peak user demands at different times or where different uses are accommodated by a shared parking space, as certified by a registered traffic engineer, the Planning Board, by Special Permit may approve shared parking facilities, designed and intended to serve more than a single use shown on a Site Plan, in satisfaction of the applicable minimum parking requirements of § 210- 124(B) (1), as modified by this Section. D. The Planning Board may, by Special Permit, approve an amount of parking less than applicable minimum parking requirements of § 210- 124(B) (1), as modified by this Section, if it finds that the lesser amount of parking will not cause excessive congestion or endanger 12 public safety, and that the lesser amount of parking will provide positive environmental or other benefits. E. The Planning Board may, by Special Permit, approve a combination of on-lot and on-street parking, as is appropriate to a pedestrian-oriented environment, in satisfaction of the applicable minimum parking requirements of § 210- 124(B)(1), as modified by this Section. F. No Special Permit shall be granted pursuant to Subsection C, D, or E above, unless the Planning Board determines that the provision of parking spaces proposed will be in harmony with the general purpose and intent of this Chapter and adequate for all parking needs, and that all parking spaces associated with a use are within practical walking distance thereof. The Planning Board may grant such approvals with conditions, which may include, but need not be limited to, the following: (1) A requirement that shared and off-site parking arrangements between property owners be formalized in an instrument that runs with the land and is recorded at the Registry of Deeds; (2) A requirement that adequate space shall be set aside within the Development Project to construct additional parking spaces in the future should the mix of uses and peak demand times change and require additional parking. § 210-170. Restricted Land A. Restricted Land may be used for active and passive recreation, conservation, forestry, agriculture, natural buffers, underground utilities, municipal purposes and other similar purposes necessary for the convenience and enjoyment of the OSMUD District or the Town, as well as other purposes customarily associated with a use authorized by this Subsection. B. The Planning Board shall not issue a Master Plan Special Permit pursuant to §210-172 unless the Master Plan includes not less than 500 acres of Restricted Land consistent with the development and design objectives set forth in §210-162 and planned as large contiguous parcels wherever possible. C. Prior to the commencement of a Construction Activity, the North Parcel, consisting of not less than 68 acres, and the South Parcel, consisting of not less than 35 acres, both as shown on the Official Zoning Map, shall be made subject to a Restricted Land Covenant designating such land as open space Restricted Land to be left in substantially its natural state, restored or landscaped, in perpetuity. Thereafter, land designated as Restricted Land shall be subject to a Restricted Land Covenant in accordance with the provisions of Subsection E below. D. Except with respect to the North Parcel and the South Parcel, which may not be released from their Restricted Land Covenants, the Restricted Land Covenants applicable to any Restricted Land may provide that such Restricted Land may be released from a Restricted Land Covenant by an instrument executed by the owner, the Planning Board and the Board of Selectmen, and recorded, provided that not less than an equivalent area of land is made 13 subject to a Restricted Land Covenant and substituted therefor, subject to the approval of the Planning Board. The forms of Restricted Land Covenants appropriate for particular Restricted Land uses shall be approved by Town Counsel and included in the Master Plan Special Permit. E. Applications for Site Plan Review of Development Projects shall designate 1.80 acres of area to remain as Restricted Land for every 1 acre of Buildable Area within the Development Project. The Restricted Land so designated may be located within the Development Project for which Site Plan Review is being sought or may be located elsewhere within the OSMUD District, and may consist of an entire lot or of a portion of a lot. The North Parcel and the South Parcel may be designated to meet the Restricted Land requirement for Development Projects within the OSMUD District. In the event that less than 500 acres have been made subject to a Restricted Land Covenant at the expiration of fifteen (15) years from the filing of a Notice pursuant to the provisions of §210-172, the owner or owners of such additional land as is required to achieve the 500-acre total shall subject such land to Restricted Land Covenants. In the event that such owner or owners have not made such additional land as is required to achieve the 500-acre total subject to Restricted Land Covenants within 60 days of the expiration of such period, the Planning Board may designate one or more parcels as are required to achieve such 500-acre total, and such parcels shall forthwith be made subject to a Restricted Land Covenant by the owner or owners thereof. The Planning Board shall have the authority to extend such deadline to a later date upon a finding that the holder or holders of the Master Plan Special Permit are continuing to pursue development of the OSMUD District and have not yet achieved substantial completion notwithstanding good faith efforts. The foregoing obligation shall be binding and enforceable pursuant to the provisions of Article XXIV only upon the owner of the parcels required to be restricted at the expiration of such period, as it may be extended, and shall not affect the compliance with this Chapter of any lot in a Development Project which has received Site Plan Approval prior to the expiration of such period, as it may be extended. F. Restricted Land may be (i) owned by a Landowners’ Association, (ii) owned by a non-profit entity, a principal purpose of which is land conservation or the provision of recreational facilities, (iii) conveyed to the Town, or (iv) owned by, made subject to easement rights benefiting, or leased to third parties. In all such cases the uses permitted by such deeds, easements or leases of required Restricted Land shall be consistent with the provisions of this §210-170, the Master Plan Special Permit and the applicable Restricted Land Covenant. A Landowners’ Association or other party responsible for Restricted Land may adopt reasonable rules and regulations to govern the use of the Restricted Land under its control and to prevent encroachment thereon. G. Restricted Land Covenants shall specify the permitted uses of specific parcels of Restricted Land; the responsible party to be charged with maintenance and stewardship of the Restricted Land in perpetuity; and a required program for such maintenance and stewardship. Applications for Site Plan Review of Development Projects shall include an agreement authorizing the Town to perform maintenance or stewardship of areas designated as 14 Restricted Land in connection with the approval of such Development Project in the event of any failure to comply with the required program for maintenance and stewardship of the Restricted Land, after thirty (30) days notice to the Landowners’ Association or other responsible party and failure of the Landowners’ Association or such party to cure such failure; provided, however, that, if the Town elects to perform any maintenance or stewardship work, the responsible party therefor shall pay the cost thereof, which cost shall constitute a lien, subordinate to any mortgage or other statutory lien, upon the properties in connection with which the Restricted Land was originally designated, until the cost has been paid. H. Nothing in this Section shall be interpreted to preclude the owner of Restricted Land from imposing additional restrictions on the Restricted Land or a Conservation Restriction or Agricultural Preservation Restriction under M.G.L. c. 184 §31-33 which are not inconsistent with the applicable Restricted Land Covenant. § 210-171. Administration A. The Planning Board shall be the Special Permit Granting Authority for any Special Permit authorized by this Article. The Planning Board may adopt and file with the Town Clerk Regulations governing Submission Requirements and Procedures for any such Special Permit. B. In all matters in which it has jurisdiction to issue a use Special Permit pursuant to § 210-165, the Planning Board may issue such Special Permits only upon a finding that the proposed use is in harmony with the general purpose and intent of this Chapter. Any such Special Permit shall be subject to such conditions and safeguards as the Planning Board may prescribe. In reviewing any application for such Special Permit, the Planning Board shall give due consideration to promoting the public health, safety, convenience and welfare; shall encourage the most appropriate use of land and shall permit no building or use that is injurious, noxious, offensive or detrimental to its neighborhood. C. After the initial issuance of a Master Plan Special Permit, uses that require a Special Permit pursuant to § 210-165 may be authorized either by an amendment of the Master Plan Special Permit pursuant to an application filed by or on behalf of the owners of all land covered by the Master Plan Special Permit or by a separate use Special Permit pursuant to an application filed by or on behalf of the owners of the land upon which such use is proposed to be located; provided, however, that all use Special Permits shall be consistent with and subject to all provisions of the Master Plan Special Permit applicable to the OSMUD District as a whole. § 210-172. Master Plan Special Permit A. Except as otherwise provided in this Section, no Construction Activity for any development project to be located on land within the OSMUD District may commence unless authorized by a Master Plan Special Permit issued pursuant to the provisions of this Chapter. 15 B. Prior to the commencement of any Construction Activity for any Development Project approved under an OSMUD District Master Plan Special Permit, the applicant may continue to exercise its rights under the underlying zoning and may elect not to exercise the rights granted in the OSMUD District Master Plan Special Permit. If the applicant elects to exercise the rights granted in the OSMUD District Master Plan Special Permit and pursue development as shown on the approved Master Plan, a Notice to such effect shall be filed with the Town Clerk, Planning Board and Department of Municipal Inspections prior to the issuance of any building permit pursuant to such Master Plan Special Permit. From and after the filing of such Notice, all Construction Activity within the OSMUD District shall be in accordance with the approved Master Plan Special Permit. Activities that do not constitute Construction Activity may be undertaken prior to the filing of the Notice under this Section. C. Application for Master Plan Special Permit (1) A record owner desiring an OSMUD District Master Plan Special Permit shall file with the Planning Board an application therefor in accordance with any applicable regulations adopted pursuant to §210-171. (2) At a minimum, the application for the Master Plan Special Permit shall contain the following information relating to development of the OSMUD District: (a) Identification of the entire area of land to be developed; (b) The existing topography of the land, vegetative cover, soil types, wetlands and water bodies, roads and ways, the general location, size and shape of structures to be removed and the location, size and shape of structures to remain; (c) The general proposed location within which structures will be constructed, including a schedule of various land use types including Dwelling Uses, Commercial Uses, mixed use buildings, and/or buildings accessory to Restricted Land uses; (d) The general proposed location, size and intended use of all Restricted Land, including pedestrian, bicycle and equestrian trails, and the Landowners’ Association or other entity intended to own, operate and/or maintain such Restricted Land; (e) The general proposed location of all existing and proposed roads, water supply systems, wastewater systems, storm water drainage, utilities, and connections to existing infrastructure, and the Landowners’ Association or other entity intended to own, operate and/or maintain such facilities; (f) An analysis of the impact of implementing the Master Plan on surface and ground water quality, groundwater recharge, wildlife habitat and corridors, wetlands and bodies of water, including streams and rivers, both localized and general, and an evaluation of pre-development conditions and post-development conditions; 16 (g) A traffic impact and access study on the impact of implementing the Master Plan on the operation, safety and overall convenience of the roadway system providing access to the OSMUD District, including impacts on both vehicular and pedestrian travel, and proposed mitigation and trip reduction techniques, if applicable; (h) An analysis of the projected economic impact of implementing the Master Plan on the Town, prepared by a qualified independent economic research consultant; (i) A phasing projection indicating the general proposed times within which construction of improvements within the OSMUD District in accordance with the Master Plan is anticipated, which schedule may be subject to variation depending on market forces; (j) Proposed Design Guidelines for the OSMUD District; and (k) Proposed forms of the Restricted Land Covenants. (3) Within seven (7) days of receipt of the application, the Planning Board shall transmit copies of the application material to the Board of Selectmen, Director of Public Works Conservation Commission, Fire Department, Police Department, Board of Health, Design Review Board, and Director of Municipal Inspections for review and comment. The Planning Board shall not approve any such application until the final reports of such departments have been submitted to it or until 35 days have elapsed after the transmittal of the application without such report being submitted. (4) The Planning Board shall hold a public hearing and file its decision with the Town Clerk in conformance with the requirements of this Chapter. D. Master Plan Special Permit Approval Criteria No Master Plan Special Permit shall be granted unless the Planning Board finds that: (1) The Master Plan complies with the provisions of this Article and of the Design Guidelines. (2) The Master Plan shall serve the purposes of the OSMUD District as described in § 210- 162. (3) The impact of the development activities shown on the Master Plan is anticipated to be of benefit to the Town. (4) The major intersections and roadways providing access to the OSMUD District will continue to operate at an acceptable level of service (LOS) based on the anticipated impact of vehicular traffic from any previously approved uses within the OSMUD District that will remain plus all new proposed development within the OSMUD District. 17 (5) The Master Plan provides adequately for the convenience and safety of vehicular and pedestrian movement within the OSMUD District and in relation to streets, property or improvements outside of the OSMUD District. (6) The Master Plan provides for the adequacy of the methods of disposal of sewage, refuse, and other wastes, provision of utilities, and the methods of drainage for surface water and seasonal flooding, if any, and protection of water sources for the Town. E. Master Plan Special Permit Amendment (1) Amendment of the Master Plan Special Permit shall require approval of the Planning Board. An application to amend the Master Plan Special Permit may be submitted separately or together with an application to the Planning Board for Site Plan Review. If the Board determines that such amendment is significant, it shall hold a public hearing in conformance with M.G.L. c. 40A §9. If the Board determines, at a noticed public meeting of the Board but without a public hearing in conformance with MGL c. 40A §9, that such amendment is minor, it may amend the Master Plan Special Permit without a public hearing, and a copy of the amendment shall be filed with the Town Clerk. (2) Applications for amendment to the Master Plan Special Permit may be filed by the owners of the affected land, and shall not be required to be filed by the owners of all land within the OSMUD District. F. Duration of Approval The issuance of a building permit within two (2) years of the date of the filing of the decision with the Town Clerk (or the date of the final resolution of any appeal of such decision) and the commencement of a Construction Activity within six (6) months of issuance of a building permit for such Construction Activity shall be deemed to constitute substantial use of rights under the OSMUD District Master Plan Special Permit. § 210-173. Site Plan Review A. Construction of all Development Projects within the OSMUD District shall be subject to Site Plan Review by the Planning Board in accordance with the provisions of Article XX, with the following additions and exceptions: (1) Construction of Development Projects for Residential Uses shall be subject to Site Plan Review, notwithstanding any provision of §210-133 or § 210-134 to the contrary. However Site Plan Review shall not apply to the alteration, reconstruction or enlargement of residential buildings. For the purposes of this Section, a mixed-use building shall be considered a commercial building, and shall not be considered a residential building. (2) Construction of all Development Projects for Commercial Uses shall be considered a Major Project with respect to the procedures contained in Article XX. 18 (3) The Decision Criteria in this Article shall supersede the Site Plan Standards listed in §210-136.1 and referred to in §210-136.2.A. B. As part of the Site Plan Review process, the applicant and/or licensed professionals engaged by the applicant also shall file with the Planning Board a certification indicating the manner in which the Development Project complies with the provisions of this Article, the Master Plan Special Permit and the Design Guidelines. C. Permissible Building Areas: A Site Plan may show proposed construction within a Permissible Building Area, where the mix of uses and related construction details are subject to change, and shall specify the maximum square feet of Gross Floor Area to be constructed within such Permissible Building Area. Although the Site Plan may show a proposed building in a specific location, the Site Plan approval shall authorize the construction of the Development Project if the structures therein and other site features thereof are located within the Permissible Building Area indicated. After the issuance of a Certificate of Occupancy for a building, the amount by which such building is less than the maximum square footage of Gross Floor Area allocated thereto or the amount by which the number of Dwelling Units constructed is less than the Dwelling Units proposed shall be available for reallocation to other proposed buildings or Dwelling Units within the OSMUD District, subject to further site plan review of the buildings to which such intensity of uses is reallocated, if required. D. Decision Criteria. The Planning Board shall approve an application for Site Plan review if it finds that: (1) The Site Plan complies with the Master Plan Special Permit; (2) The Site Plan meets all of the requirements and standards set forth in this Article, the Master Plan Special Permit, and applicable Design Guidelines; (3) The convenience and safety of vehicular and pedestrian movement within the Development Project and in relation to adjacent areas and public ways is ensured; (4) Substantial adverse potential impacts of the Development Project have been adequately mitigated. (5) Adequate mitigation has been provided with respect to any conditions impacting on-site safety, whether such conditions are created on-site or off-site. E. Minor Modifications: After the filing of a Decision of Site Plan Review, the Planning Board shall have the authority to approve minor modifications to the Site Plan. Minor modifications shall include changes that involve minor Permissible Building Area adjustments, utility or building orientation adjustments; minor adjustments to parking, landscaping, Restricted Land or other building or site details; or other changes that do not significantly increase the square footage of Gross Floor Area of Commercial Uses within a Development Project or the 19 number of Dwelling Units in a Development Project. Minor modifications may be approved by the Planning Board at any regularly scheduled public meetings, without the need to hold a public hearing. F. Duration of Approval: Site Plan approvals under this Article shall remain in effect as to a Development Project as long as a building permit for not less than one (1) building in the Development Project is issued within two (2) years of issuance of the Site Plan approval (or the date of final resolution of any appeal of such issuance). § 210-174. Design Guidelines A. To ensure that Development Projects shall be of quality design, the Site Plans for Development Projects within the OSMUD District shall be based on Design Guidelines adopted for the OSMUD District under the Master Plan Special Permit, which shall supersede any inconsistent provisions of design guidelines adopted under Article XXI. B. The Design Guidelines shall implement the following principles: (1) The design shall consider the natural resources of the land, including topographic, geologic and natural features, and the historical character of the Town, where applicable. (2) Restricted Land and landscaped areas shall complement, enhance or screen the building and parking areas. Natural features shall be incorporated within Restricted Land areas where possible. (3) A network of trails shall provide access to various points of interest, including recreation areas, unique vistas, and historic sites both within and outside of the OSMUD District and shall link Restricted Land areas. (4) The design of the OSMUD District shall incorporate stormwater practices consistent with low impact development techniques in addition to Best Stormwater Management Practices. (5) Buildings within the OSMUD District shall utilize energy efficient design and execution and low impact development techniques and principles, to the extent feasible. (6) The design shall be respectful of existing neighborhood settings. C. The Master Plan Special Permit may provide that the provisions of the Design Guidelines may be waived by the Planning Board as part of the Site Plan Review process based on a finding that such modifications are necessary or appropriate to meeting the development and design objectives of this Article. § 210-175. Modifications of zoning provision, applicability 20 A. Modifications to Article XII, Water Resources Protection Overlay District. In the OSMUD District, the following modifications to the provisions generally applicable to the Water Resources Protection Overlay District shall apply: (1) For purposes of § 210-70(C) (2), the term “Development Project” shall be substituted for the term “lot.” (2) In § 210-70(D) (5), the words “except for excavations related to site work” shall be inserted at the end of the clause. B. Modifications to Article XVIII, Supplementary Provisions. In an OSMUD District, the following modifications to the Supplementary Provisions shall apply: (1) The provisions of the Design Guidelines shall supersede the provisions of § 210-119.1 pertaining to the width of driveways. (2) The provisions of the Design Guidelines shall supersede the provisions of § 210-124 pertaining to the design of parking facilities. C. All land within the OSMUD District shall be subject to the provisions of this Chapter as in effect on the effective date of the amendments added to this Chapter by the 2015 Annual Town Meeting. 1 HOPKINTON PLANNING BOARD Monday, December 17, 2018 7:30 P.M. Town Hall, 18 Main St., Hopkinton, MA MINUTES MEMBERS PRESENT: Muriel Kramer, Chairwoman, Fran DeYoung, Vice Chairman, David Paul, Deborah Fein-Brug, Mary Larson-Marlowe, Gary Trendel, Frank D’Urso, Carol DeVeuve, Amy Ritterbusch Present: Georgia Wilson, Principal Planner, Cobi Wallace, Permitting Assistant Ms. Kramer opened the meeting. 1. Approval-Not-Required Plan – 21 South Mill St. – Equestrian Building Company Ms. Wilson described the plan which proposes the creation of a 176 sq. ft. parcel to be conveyed from Lot 22A (#21) to Lot 21 (#17) South Mill St. She noted there may have been an error with respect to the lot line during construction and the plan is entitled to endorsement. Mr. Trendel arrived at this time. Ms. Fein-Brug asked for clarification, and Ms. Wilson noted the 176 sq. ft. parcel has been labeled non-buildable. Ms. DeVeuve moved to endorse the plan as not requiring approval under the Subdivision Control Law, Mr. DeYoung seconded the motion, and the Board voted 7 in favor, 1 abstention (Trendel). 2. Legacy Farms North & Frankland Rd. – Lot A-2-2, Form K Request for Lot Release Roy MacDowell, Legacy Farms LLC, appeared before the Board. Mr. MacDowell noted he is asking the Board to release Lot A-2-2 from the conditional approval agreement for the Legacy Farms Road North & Frankland Road Relocation definitive subdivision as part of the upcoming closing to convey the lot to Pulte Homes. After discussion, Mr. Trendel moved to release Lot A-2-2 from the conditional approval agreement, Ms. Fein-Brug seconded the motion, and the Board voted unanimously in favor. 3. Legacy Farms North Villages – Restricted Land Covenant Mr. MacDowell referred to the Open Space Mixed Use Development (OSMUD) overlay district regulations which require the developer at each closing to set aside 1.8 acres of restricted land for every 1 acre of buildable land to eventually accumulate a total of 500 acres for the entire Legacy Farms development. He noted they have about 115 acres in reserve, and therefore there is enough land available for this particular document. Ms. Kramer referred to a comment in Ms. Wilson’s memo to the Board pointing out the potential complications for the developer during construction because portions of the restricted land now will be open to the public and certain activities, such as stockpiling for instance, are prohibited. Mr. MacDowell stated in this case it concerns small previously disturbed areas to be restored and/or landscaped, and they are fairly well delineated on the plan. Ms. Kramer asked about the risk to the Town, and Ms. Wilson noted there could be a problem because public access will be allowed as soon as the covenant is signed. Mr. MacDowell stated it was done this way for the last 6 or 7 years, and it worked out just fine. Ms. Fein-Brug stated she would like to get a better overall vision, or map, of the other restricted land areas, and Mr. 2 MacDowell stated he plans to work on this with Elaine Lazarus, Director of Land Use & Town Operations, and the Board, hopefully at the next closing. Mr. Trendel asked about the meaning of private restricted land. Mr. MacDowell stated the concept was developed by the Planning Board 10 years ago, and it is essentially just another category of restricted land, typically a very small area between groupings of homes and more for the use of the residents there. After further discussion Ms. DeVeuve moved to authorize the Chairwoman to sign the document on behalf of the Board, and Mr. Trendel seconded the motion. Ms. Ritterbusch noted she would like the record to show that signing the restricted land covenant at this point is against the recommendation of the staff. The Board voted 6 in favor of the motion, with 2 abstentions (Ritterbusch, Fein-Brug). Mr. D'Urso arrived at this time. 4. Administrative Business – Minutes The Board reviewed the draft minutes of November 19, 2018. Ms. Larson-Marlowe moved to approve the minutes of November 19, 2018 as written, and Mr. D’Urso seconded the motion. Ms. Fein-Brug stated she would like some clarification regarding the frequency of water quality testing in connection with the Wilson St. LNG facility as discussed at the meeting, but she will bring it up with the applicants later this evening. After further discussion, the Board voted unanimously in favor of the motion. 5. Liaison Reports Community Preservation Committee (CPC) – Mr. Trendel noted the CPC did not quite close out the public hearing yet but approved $150,000 for a dog park at Fruit St. He noted a small amount of this funding will be for design and engineering so that they will be able to reapply for a $250,000 grant. He noted Fruit St. was chosen as the preferred location, and the associated parking lot could also be used for overflow parking for the athletic fields. 6. Continued Public Hearings – 52 and 55 Wilson St. – Eversource Energy – Stormwater Management Permit Application & Earth Removal Permit Application James Blackburn, LNG Hopkinton, project manager, Tracy Adamski and Jean Christy, Tighe & Bond, engineers, appeared before the Board. Mr. Trendel moved to open the public hearings, Mr. DeYoung seconded the motion, and the Board voted unanimously in favor. Shaun McAuliffe, Board of Health Director, joined the discussion. He noted they discussed the project and he completed the review based on the submitted material and essentially agrees with the findings made by BETA, the Planning Board’s consultant engineer. He noted he believes the stormwater design meets the standards required of the Town’s own DPW, and he has no concerns about moving forward with it. Mr. DeYoung asked about the timing and location of the recent water quality testing, and Ms. Adamski noted the sample was taken in the middle of a storm event right at the outlet where the pipes come up and over the impoundment area. Ms. Fein-Brug asked if there is any benefit in repeating the test in 6 months or a year to assure there is no contamination, and Mr. McAuliffe stated they discussed periodic sampling. Mr. Blackburn suggested handling it via a condition of approval requiring sampling to be done at a certain frequency for a couple of years to make sure the results are consistent. Mr. McAuliffe noted it was suggested this be done for up to 3 years, and that is acceptable based on his understanding of the project. He noted this concerns rain/stormwater and the facility would have to address any problems in accordance with its stormwater prevention and other contingency plans. Ms. Ritterbusch asked whether testing should be done at specific times of 3 the year, and Ms. Wilson noted testing is proposed to take place between March and June. Ms. Adamski noted she feels the time of the year is less important than the season and how much rain has fallen previously. It was noted a draft condition to that effect has been included. Ms. DeVeuve asked if the applicant agrees to extend the testing if the results do not meet standards, and Mr. Blackburn noted they can certainly do that. Ms. Kramer asked if there is any recourse, and Mr. McAuliffe noted he has not really considered this but in theory there is nothing going on there that would cause a problem. Mr. Blackburn suggested they submit data on a yearly basis and perform additional testing if anything is found to be out of specification, and, if needed, decide on a course of action in consultation with the Board of Health. Ms. DeVeuve stated she assumes the LNG facility would be the source, and Mr. McAuliffe noted there could be other reasons, such as the activities of a flock of geese landing in the impoundment area the day before. Mr. McAuliffe stated they would verify whether the facility is following protocol and identify a potential source of the problem, but it would really have to be something unusual to throw off the results. Ms. Kramer stated the facility will be required to present the results to the Board of Health on an annual basis and if needed come up with an action plan within 60 days, and it was determined this is acceptable to both the Board of Health and the applicant. In response to a question of Mr. D’Urso, Mr. McAuliffe noted they are trying to see how the different Town boards can work together on a regular basis and collaborate on future developments with respect to potential issues. Mr. McAuliffe noted for the most part they already have a system in place that involves Board of Heath review when an application is submitted, and Ms. Wilson noted the boards communicate on a regular basis. Mr. Paul asked for clarification of some of the test results, and it was noted for instance the presence of a flock of geese could affect the coliform/e coli results and no surfactants were detected. Ms. Kramer asked about the distance to the nearest private well. Mr. McAuliffe stated it would be in the Kruger Rd. neighborhood, and Ms. Adamski noted that is about ¼ mile. Ms. Kramer asked about the protocol in place with respect to protection of private wells in the vicinity of an industrial facility. Mr. McAuliffe noted private wells are required to be tested when the property is sold. Ms. Christy noted if there is any type of spill, Eversource has a 24/7 response team, and any potential discharge would be addressed immediately. Mr. McAuliffe stated the Board of Health would also be involved in that case. Ms. Fein-Brug noted there was a discharge in the 1990’s and she asked if that would have made it necessary to test a nearby private well immediately, and Mr. McAuliffe stated it depends on the nature of the discharge. Ms. Fein-Brug noted the discharge made its way into a stream and an outfall at least ¼ mile away. Ms. Kramer asked how this type of event is handled these days. Ms. Christy noted she believes the DEP has some reportable threshold for chemicals or other pollutants mandating cleanup within a limited time. Mr. McAuliffe stated the system is kept up like a cookbook, with specific time limits and DEP review at each step, as well as communication with the responsible party and the DEP, but it depends on the type of spill and there are some products and components where there are no standards. Mr. Trendel asked whether Mr. McAuliffe feels the abutters are adequately protected with the protocol in place at the facility, and Mr. McAuliffe stated yes. Mr. McAuliffe noted to his knowledge every release has been addressed and closed out by Eversource to the satisfaction of the DEP. Mr. D’Urso asked if there is Town water and sewer in that area, and the answer was no. He noted there is a home on Cedar St. within a ¼ mile radius. Mr. McAuliffe stated in case of a release the DEP looks at the location, hydrology, soil conditions and geological formations in the area, and they take all that into consideration as part of their response. He added that if the DEP thought that any of the prior releases at the facility warranted retesting they would have required it. Ms. Kramer stated the DEP is not responsible for private wells, so she would be more comfortable with Board of Health review of relatively close 4 private wells. Mr. McAuliffe noted the Board of Health is in regular contact with the DEP and based on the information regarding a number of incidents they have not identified anything that would have an effect on the local residents. Ms. Kramer thanked Mr. McAuliffe for his input, and stated she understands residents should contact him with any concerns, and Mr. McAuliffe stated that is correct. Kathleen Towner, 9 Kruger Rd., noted her comments tonight relate to the water quality testing performed on November 21 as described in Tighe & Bond’s memo to the Board. She noted she had been at the site a couple of days earlier and for the first time observed a large plastic sediment fence erected around the outfall. She noted it is the kind of fence one sees around construction sites and in this case would prevent sediments from traveling from the outfall invalidating the test results. She stated she would like to know why the fence is there and whether it is permanent. Mr. D’Urso asked if Ms. Towner took pictures of the silt fence, and, if so, suggested sending them to Ms. Wilson. Ms. Towner stated yes, and she also has a lot of pictures of Rafferty Rd. Mr. Blackburn noted there is a black fence throughout the facility, including one within the containment area but he is not sure whether it has any bearing on the test results. Ms. Larson-Marlowe noted a silt fence can hold large particulate matter and she asked if that is what the area was being tested for. Mr. McAuliffe noted it depends on the size of construction and structure of the fence but it is typically there to limit the discharge. Ms. Larson-Marlowe stated she is asking about pollutants, such as chemicals, and Mr. McAuliffe noted there would be soil particles, no chemicals, and essentially only precipitation, sediments and animal droppings are going into the impoundment area. He noted he believes the fence is part of the facility’s overall standard operational procedure plan. Ms. Kramer asked if there are any other questions for the Board of Health. Ms. Fein-Brug expressed concerns about the potential of wetlands being created as a result of the pipe not being able to handle the flow, with oily substances being absorbed into the earth and increased mosquito problems. She asked if the Board of Health can help create a better environment. Mr. McAuliffe noted increased mosquito activity because of standing water can be looked at through the regional Mosquito Control project. Ms. Fein-Brug asked if the Board of Health will work with private property owners, and Mr. McAuliffe noted they will work with the Conservation Commission or other agencies. The Board paused the conversation pending a scheduled discussion of the Hayden Woods/Davenport condominium development. 7. Hayden Woods/Davenport Village – Crosswinds Hopkinton, LLC John Parsons and Victor Galvani, SVN Parsons Commercial Group, developers, and Joe Marquedant, J.D. Marquedant & Assoc., Inc., surveyor, appeared before the Board. Mr. Galvani noted he wrote to the Planning Board via Ms. Wilson, requesting 1) approval for a modification to the approved site plan, and 2) partial release of the performance guarantee held by the Town. He noted he submitted a photometric plan for the 3 additional light poles as well as a revised as-built plan for the detention basin certified by their engineer. Ms. Wilson explained the developer did not follow the approved plan and installed additional lighting and an impervious sidewalk, but the detention basin was designed above standard. She noted the Board previously discussed the issue but did not specifically approve the change, rather directed the developer to either fix the issue or ask for a modification of the plan. Ms. Ritterbusch asked if as-built lighting levels are dark sky compliant. Mr. Galvani referred to the photometric plan prepared by Bohler Engineering, and the Board asked for clarification regarding the specific design of the lighting fixtures. Mr. Galvani stated he is not sure if BETA has pointed out any additional issues, and Ms. Wilson stated at the last bond reduction hearing at the beginning of the year, BETA noted that landscaping, soil absorption system, and access drives to the basin and swale had been installed in accordance with the approved 5 plan. Mr. Galvani stated they added some landscaping on the south side of the development. Ms. Kramer asked what will be left to be done if the Board approves the changes to the plan. Mr. Marquedant noted the current as-built plan is essentially complete, and they should be able to add the items identified by BETA within a couple of weeks. In response to a question of Mr. DeYoung, Mr. Marquedant noted they installed an asphalt sidewalk, just on one side. Mr. Trendel asked why the developer decided to install an impervious sidewalk, and Mr. Galvani stated it was a matter of conflicts between the plan and the written decision. Ms. Ritterbusch asked if the stormwater management design is adequate, and Mr. Marquedant noted the basin as originally designed is large enough to handle the situation. Mr. Galvani stated they bought the project from the original developer, fully permitted. Ms. Wilson stated the Board can vote on the proposed changes and address the bond release later. Tom Garabedian, 5 Davenport Ln., stated he supports what Mr. Galvani and Mr. Parsons are doing. He noted the developers just about fulfilled all their obligations, and the residents are looking forward to taking over the homeowners association. Mr. D’Urso referred to the 3 additional light poles installed without prior approval, and asked for BETA’s thoughts on eliminating at least the one closest to Hayden Rowe. Phil Paradis, BETA Group, noted he did not review the plans when they first came before the Board and would have to look at them again to answer the question although he is not sure why there should be 2 in that location. It was noted having lights on both sides works, and they could be capped if so desired even though they are not overly bright. Ms. Ritterbusch stated it is not the type of lights they would ordinarily have approved but she understands it was a matter of safety and they are there now. Ms. Fein-Brug noted it would be nice to see these places built in compliance with the approved plan, but she is willing to consider the changes and it would be helpful to hear from the residents. Mr. Garabedian stated there definitely was a need for additional light poles, but, although he does not mean to confuse the issue, he would like the Board to know that the residents intend to change the structures on the top once they take over the homeowners association. Ms. Fein-Brug suggested requiring the developers to make the changes before they turn the association over to the homeowners. Ms. Ritterbusch stated she just wanted to mention her opinion, and Mr. D’Urso noted he does not want to set a precedent. Ms. Kramer noted conditioning a developer on the future actions of a homeowners association would be setting a precedent. Ms. Kramer stated she is confident the homeowners association will follow through, but the town bylaws are clear on this issue and having 3 unauthorized additional lights that are not dark sky compliant on top of that would add to the insult. Mr. Paul stated they will have to rely on the good faith of the developer and the homeowners association. Mr. DeYoung moved to approve the modifications to the approved plan, Ms. Larson-Marlowe seconded the motion, and vote on the motion was 5 in favor with 2 opposed (Fein-Brug, Trendel) and 2 abstentions (Ritterbusch, D’Urso). Mr. Trendel stated he really appreciates the input from Mr. Garabedian, but feels in general the Board needs to find better ways to make sure developers do what they are supposed to do. 8. Continued Public Hearings – Bucklin St./Leonard St. – Wall Street Development Corp. - 1) Stormwater Management Permit Application; 2) Petition to Construct Bucklin St. Mr. Paul moved to open the public hearings, Mr. D’Urso seconded the motion, and the Board voted unanimously in favor. Louis Petrozzi, Wall Street Development Corp., applicant, and Robert Truax, GLM Engineering, engineer, appeared before the Board. Mr. Petrozzi noted he has revised the plans to address BETA’s comments and submitted a new letter to the Board. He noted they met with the Fire Chief about a week ago to discuss some of the parameters from a safety standpoint, 6 including road design and turning radius for fire trucks. He noted they have a template but it has not yet been incorporated into the plan. Peter Barbieri, Fletcher Tilton, attorney, joined the discussion. Ms. Kramer noted she would like to focus on the Petition/paper street question, noting she has not yet read Mr. Barbieri's latest letter. Mr. Barbieri stated he represents the owners of #60 and #62 Pleasant St. and talked to Mr. Petrozzi before tonight. He stated his clients have significant concerns about stormwater drainage conditions after construction. He stated he understands the plan only shows cross-sections of the roadway in front of the proposed 4 houses, and he would like to see them for the 300 ft. section off of Pleasant St. as well because from the plan as drawn it is difficult to see what is going on. Mr. Paul stated he would like to focus on the issue of whether Bucklin St. is a “way in existence”. Mr. Barbieri referred to his letter dated December 12, 2018 to Rebekah Lacey at Town Counsel’s office, and stated he does not feel the applicants ever had deeded rights to the first 300 ft. of roadway off of Pleasant St. because it was never held in common ownership. Ms. Kramer noted it appears Mr. Barbieri only disputes ownership of the section of road between #60 and #62 Pleasant St., and Mr. Barbieri stated yes. Ms. Wilson noted Town Counsel has reviewed Mr. Barbieri’s letter but chose not to respond, however, in conversation with her their opinion still stands and they find that the applicants have credible rights to ownership. Ms. Fein-Brug asked about research to determine when the utility poles were installed. Mr. Barbieri noted he was not able to find any information on utility easements in the Registry of Deeds, and Mr. Petrozzi stated there is nothing in the utility company's data base about these specific poles. Ms. Ritterbusch noted one of the photos in the meeting packet shows a utility pole. Ms. Kramer noted she needs more time to review Mr. Barbieri's letter, and suggested shifting to stormwater drainage especially since BETA is here to answer questions. She suggested Board members submit questions to Ms. Wilson to be forwarded to Town Counsel regarding the legal issues. Mr. D’Urso stated he would be more comfortable with the Board discussing this issue in executive session. Ms. Kramer stated the Town is not in litigation with anybody and there is no reason to convene in executive session. Mr. Paul asked if they can get input from the Selectmen, and Ms. Kramer stated he can ask members privately but the Board of Selectmen has no jurisdiction in this matter. In response to a question of Mr. Paul, Ms. Kramer stated she is not sure what the owners of #60 and #62 Pleasant St. knew or did not know, and it is possible they did not know about the potential of a street to be constructed between their homes. She noted the Planning Board in this case has to rely heavily on Town Counsel's advice and there is no opportunity to talk about this in executive session. Mr. Trendel noted from his perspective based on Town Counsel's opinion the legal matters are a separate issue. He noted he feels a Planning Board approval of the Petition however does not mean the applicant can start building houses, and he assumes there are other things the abutters can do if they oppose the project. Ms. Kramer stated Town Counsel's recommendation is one thing but the Board can decide it does not agree based on other evidence. Ms. DeVeuve suggested everyone prepare their arguments for the next meeting, preferably in laymen's terms, and Mr. Petrozzi and Mr. Barbieri stated they have submitted their documentation already. Mr. Petrozzi noted Mr. Barbieri is talking about deeded rights, but the other issue is whether the way existed on the ground in July of 1953 at the time zoning was adopted, and that determination is up to the Board. Ms. Ritterbusch suggested getting input from the other residents in that respect because Mr. Barbieri only represents 2 of them. Mr. Paul asked if it is possible for the Board to determine Bucklin St. is a way in existence but not vote to allow any improvements, and Ms. Kramer stated she believes it is. Ms. Larson-Marlowe stated she only wants to hear from Town Counsel with respect to the terminology of a way in existence vs. a way on the ground as she is not clear those are the same 7 thing. It was noted the Board will have to continue the hearings to January 28, 2019. The Board suspended the discussion to open and continue a scheduled public hearing. 9. Continued Public Hearing – Whisper Way – Definitive OSLPD Subdivision – 20th Century Homes Ms. Ritterbusch moved to continue the public hearing to January 14, 2019 at 9:25 P.M. and extend the deadline to file the decision with the Town Clerk to January 24, 2019. Mr. D’Urso seconded the motion and the Board voted unanimously in favor. 10. Continued Public Hearings – Bucklin St./Leonard St. – Wall Street Development Corp. - 1) Stormwater Management Permit Application; 2) Petition to Construct Bucklin St. Ms. Ritterbusch stated the photo of Bucklin St. in the meeting packet partially obscures the part of the plan most in question. Mr. Petrozzi explained the photos don't come with labels and he was the one who inserted the white strip. He stated he will be happy to bring a clearer photo to the next meeting. Mr. Paradis noted BETA has reviewed the initial and supplemental submissions, but he will not address the waiver requests at this point and instead will focus on his December 12, 2018 letter report to the Board. He noted the roadway profile comes up from Pleasant St., and the topography slopes to the north so there is concern about water being captured in between the new road and #62 Pleasant St. Mr. Paradis noted the applicant also obviously will have to work with the property owner of #62 as his driveway will be impacted by the proposed construction. It was noted that parking on Pleasant St. is not an option. Mr. Paradis stated BETA will review the turning radii for emergency vehicles when they come in, and this applies to the proposed entrance on Pleasant St. and the end of Bucklin St. It was noted the proposed road will be approximately 600 ft. long. Mr. Paul asked if this means the applicant will need a waiver for a dead end street, and Ms. Kramer stated yes. Mr. Paradis noted BETA has asked for an additional test pit in the southwest corner of the proposed infiltration basin to avoid groundwater breakout once the basin is constructed. He referred to BETA’s comment with respect to the landscape plan. He noted they recommend the Board provide guidance to the applicant and determine whether just loaming and seeding without specific screening meets the requirements. Mr. Paradis referred to outstanding issues regarding the Operations & Maintenance plan, including the requirement for provisions for the Planning Board or a designee to have access for inspection purposes as well as an estimated operations and maintenance budget. He stated BETA recommends resolving both issues now. He referred to BETA’s comment regarding proposed work within the 50 and 100 ft. buffer zones of two isolated wetlands. He noted they want to make sure that GLM understands that the berm to be created on the north will cause the flow to be redirected. He noted there will probably be high groundwater issues as well, and they want to avoid having to put in foundation drains. He stated this is probably more a conservation item, and it was noted the applicant is going back before the Commission tomorrow night. There was additional discussion, and Mr. Paradis stated he has no further comments at this point. Tom Terry, 17 Maple St., stated he owns property to the west of this parcel and the proposed berm will redirect water in that direction. He stated Mr. Petrozzi mentioned that he talked to the Fire Chief and noted he believes they will rely on Maple St. Ext. for emergency access. Ms. Kramer stated they have a template but it has not been analyzed yet. Mr. Paradis noted he understands it is an option, and Mr. Petrozzi noted it has not been determined yet. Mr. Paul stated it will have to be shown on a plan. Ms. Kramer asked Mr. Paradis to address Mr. Terry’s question about the flow. 8 Mr. Paradis noted BETA is concerned about that issue as well, and they have asked the applicant’s engineer to break up the watershed area under the existing conditions so they can analyze that issue. He stated that even though more water will be going in this direction under the proposed design there will be an infiltration basin at the end designed so as not to increase the peak flow. Mr. DeYoung moved to continue the public hearings to January 28, 2019 at 7:30 P.M., and extend the decision deadline to February 11, 2019, by mutual agreement. Mr. D’Urso seconded the motion and the Board voted unanimously in favor. 11. Hayden Woods/Davenport Village – Request for Bond Reduction Mr. Parsons and Mr. Galvani appeared before the Board. The Board continued the discussion of the Hayden Woods development focusing on the proponents' request for a performance bond reduction. It was noted the developers would like the Board to release the performance guarantee except for $5,000. Ms. DeVeuve questioned whether $5,000 would be sufficient to cover the remaining items as discussed earlier in the evening. Mr. Galvani stated all major infrastructure has been completed and Mr. Marquedant feels it should be adequate to cover outstanding items. Ms. Larson-Marlowe stated the request for bond reduction seems to be linked to the homeowners association being turned over to the residents, and Mr. Galvani noted they will not turn it over until the majority of the performance guarantee is released. Ms. Ritterbusch asked how long it will take to finish up the remaining items, and Mr. Galvani noted about 3 weeks. Ms. Ritterbusch suggested holding off until then, and Mr. Galvani stated he prefers to have the money now as there are contractors involved. Ms. Kramer agreed it may be better to wait, and Mr. D'Urso noted there may be year-end benefits to the developers' request. Mr. Parsons noted it would be better from a tax standpoint and he suggested leaving more than $5,000 in the account. After further discussion, Mr. Trendel moved to reduce the bond to $25,000, Mr. DeYoung seconded the motion, and the Board voted unanimously in favor. 12. Continued Public Hearings – 52 & 55 Wilson St. - Liquefaction Equipment Replacement Project - 1) Stormwater Management Permit Application; 2) Earth Removal Application - Eversource Energy Jim Blackburn, LNG Facility Project Manager, Tracy Adamski and Jean Christy, Tighe & Bond, engineers, and Shaun McAuliffe, Town of Hopkinton Board of Health Director, returned before the Board. Mr. D’Urso noted the Kruger Rd. neighborhood as well as people on Cedar St. have private wells, and he asked how proactive the Board of Health is in its efforts to make sure there are no issues as a result of the Eversource facility. Mr. McAuliffe noted he makes it a habit to go up Legacy Farms North on a weekly basis to keep an eye on everything and they are in open communication with the DEP and the Fire Dept. He noted residents are welcome to report any evidence of excessive runoff to the Board of Health. Mr. D’Urso stated he is glad everyone is working together. Ms. Towner stated she still does not have an answer to her questions regarding the silt fence in front of the outfall. Ms. Kramer noted that is more a question for the applicant, not the Board of Health, and it is reasonable to know whether the fence was installed as part of the testing and whether it is there to stay. Mr. Blackburn stated they have multiple other projects going on at the facility, and he believes this particular feature is part of Eversource Energy’s overall best management practices. Ms. Kramer asked if the fence would impact testing, and Ms. Adamski stated no - based on its location shown in the pictures. Mr. DeYoung suggested removing the fence for testing purposes 9 post construction, and Mr. Blackburn stated that would be fine. Mr. DeYoung noted he just wants to make sure water quality tests are not affected by the silt fence. Mr. Blackburn stated testing is proposed to be extended for another 3 years, probably starting at the approval of the Stormwater Management Permit for this project. He would like the Board to provide guidance with respect to the timing of the next sampling, for instance 90 days or 6 months from today. Ms. Kramer stated the Board wants to know if the barrier is there permanently so that they know whether they are dealing with typical conditions. Ms. Adamski and Mr. Blackburn noted the fence is set back about 1 ft. from the outfall and is certainly not stopping the flow, but they can remove it altogether for subsequent tests. Reference was made to the earth removal application and the associated request for a waiver of the 100 ft. buffer requirement. Ms. Adamski noted they will maintain a 75 ft. buffer at the rear on Wilson St. and they are working in a previously disturbed area. Ms. Kramer asked if there are concerns about this waiver, and there were none expressed. Mr. D’Urso asked about the possibility of planting some arborvitae along Wilson St. to soften the look, and Mr. Blackburn stated there will be a requirement for additional screening as part of the DPU zoning exemption currently under review. Ms. Fein-Brug asked if the DCR has been notified of the project. It was noted all abutters within 300 ft. of the property lines have been notified, and that includes DCR. After further discussion it was determined they are getting close to wrapping up the process but will need an additional continuation of the public hearings. Ms. DeVeuve asked about outstanding BETA issues, and Ms. Adamski stated she believes they have signed off on the project, and 2 outstanding issues (SW18 and SW19) will be addressed through additional conditions of approval. Ms. DeVeuve stated she believes there were some other outstanding items. Mr. DeYoung moved to continue the public hearings to January 14, 2019 at 7:00 P.M. and extend the decision deadlines by mutual agreement to January 24, 2019. Ms. DeVeuve seconded the motion and the Board voted 8 in favor, 1 opposed (D’Urso). Other Business The Board set the meeting schedule for 2019. Mr. Paul moved to adjourn the meeting, Mr. D’Urso seconded the motion, and the Board voted unanimously in favor. Adjourned: 10:10 P.M. Submitted by: Cobi Wallace, Permitting Assistant Approved: ___________________ Documents used at the Meeting:  Agenda for the December 17, 2018 Planning Board meeting  Memo from Georgia Wilson, Principal Planner, to Planning Board, dated December 13, 2018, re: Items on December 17, 2018 Planning Board Agenda  Draft Planning Board Minutes – November 19, 2018  Bucklin Street/Leonard Street: Public Hearing Outline – Bucklin St. SWMP & Roadway Petition, 10/29/18, 12/3/18, 12/17/18; Letter to Hopkinton Planning Board c/o Georgia Wilson, Principal Planner, from Rebekah Lacey, Miyares & Harrington, dated December 14, 2018, re: Wall Street Development Corp. Assessors’ Parcel ID U19 52 0 (off Leonard Street) Request for Determination: “Way in Existence”; Letter from Peter Barbieri, Fletcher Tilton PC, to Muriel Kramer, Chair, Planning Board, dated December 14, 2018, re: Bucklin Street; Letter to 10 Rebekah Lacy, Esquire, Miyares and Harrington LLP, from Peter Barbieri, Fletcher Tilton PC, re: Wall Street Development, Assessor’s Map U19, Lot 52 (off Pleasant/Leonard Street) (the “Property”); Letter to Department of Land Use, Planning, and Permitting, Attn: Ms. Georgia Wilson, Principal Planner, and Mr. Don MacAdam, M.S., Conservation Administrator, dated December 12, 2018, re: Bucklin Street Construction, Stormwater Management Permit and Notice of Intent, Peer Review Update; Plan of Land “Parcel A – Bucklin & Leonard St.”, Hopkinton, Massachusetts, dated March 29, 2018, revised through Dec. 6, 2018, prepared by GLM Engineering Consultants, Inc.  Legacy Farms North: Restricted Land Covenant (Restored or Landscaped – Lot A-2-2); Form K Usual Form of Release of Conditions of Planning Board Approval, Hopkinton Planning Board, Lot A-2-2  Approval-Not-Required Plan of Land for Lot 22A South Mill Street, Hopkinton, MA, dated Nov. 12, 2018, prepared by Connorstone Consultant Civil Engineers and Land Surveyors  52&55 Wilson Street: Stormwater Management/Earth Removal Permit, Public Hearing Outline, 52&55 Wilson Street – LNG Replacement Project, for 12/17/18; Memorandum to Shaun McAuliffe, R.S., Hopkinton Health Director, from Tracy J. Adamski, AICP, Tighe & Bond, dated December 11, 2018, re: LNG Liquefaction Replacement Project, Stormwater Management Permit and Earth Removal Permit - Water Sampling Results; Letter to Department of Land Use, Planning, and Permitting, Attn: Ms. Georgia Wilson, Principal Planner, and Mr. Don MacAdam, M.S. Conservation Administrator, dated November 14, 2018, re: LNG Liquefaction Project, Stormwater Management Permit and Earth Removal Permit, Peer Review Update; Plans entitled LNG Liquefaction Replacement Project, Hopkinton, Massachusetts, Permit Drawings Revised November 2018, prepared by Tighe & Bond  Hayden Woods/Davenport Village: Letters from Victor Galvani, SVN Parsons Commercial Group/Boston, to Ms. Georgia P. Wilson, Principal Planner, dated December 11, 2018, 1) re: Modifications to the approved site plan at Hayden Woods (Davenport Development), Hopkinton, MA and 2) re: Partial Bond Release for work completed at Hayden Woods (Davenport Development), Hopkinton, MA; Photometric Lighting Plan for Davenport Village Condominiums, dated 03/29/2018, prepared by Bohler Engineering; Planting Plan for Davenport Village, dated May 2016, designed by Steven G. Cosmos; Plan entitled “Condominium Site Plan of Davenport Village Condominiums, Davenport Lane, Basin #50 Asbuilt Plan”, dated Nov. 26, 2018, prepared by J.D. Marquedant & Associates, Inc.; Memorandum to Ms. Georgia Wilson, Principal Planner, from Matt Crowley, PE, Senior Project Engineer (BETA), dated December 07, 2018, Subject: Hayden Woods As-built Review Trail Coordination and Management Committee Committee Charge Approved by Board of Selectmen: January 15, 2019 Town of Hopkinton Overarching Vision​: Hopkinton is a vibrant welcoming community centrally located in New England and nestled 26.2 miles west of Boston. We are endowed with open spaces, natural resources, facilities and programs that promote a well educated and healthy community. We are respectful of our past, engaged in our present, and actively preparing for our future. Vision Theme​: In 2025, Hopkinton has protected additional lands for ensuring water quality, and for active and passive open space; created more recreational opportunities for a variety of age groups; and conserved additional natural resources and view sheds that help define the rural quality that is characteristic of much of the town. Pursuant to the powers granted to the Board of Selectmen by Section 3-1 of the Town Charter, the Board of Selectmen hereby charges the Trail Coordination and Management Committee (TCMC) as follows: PURPOSE​: The Town has a wealth of open spaces available for public enjoyment, and various public and private entities that work concurrently to provide and maintain public trails. The purposes of the TCMC are: ●To be advisory to the Board of Selectmen and serve as an “umbrella” over the various entities, ●To coordinate trail planning, management and maintenance, ●To coordinate the planning of trail networks, ●To provide a sounding board for residents and others with respect to trails, and ●To function as a liaison between the Board of Selectmen and the public and private entities which work to provide, manage and maintain public trails. The TCMC will serve as a reference point for trails groups and the public, foster a user-friendly and open/transparent process, establish branding, promotion and public education, foster community engagement, and achieve sustainability. The TCMC will support and facilitate a coordinated approach to trail planning and management, comply with town plans, rules and regulations, and ensure the implementation of Town Meeting votes, adopted plans, regulations, regulatory decisions and board/committee actions. CHARGE​: The TCMC will: 1 1.Make recommendations to the Board of Selectmen, the Town Manager, and other boards, committees and organizations relative to the planning, development, implementation and management of a townwide trail network and connections to regional trail networks. Areas of consideration shall include public safety, environmental impacts and environmental resources, financial impacts, public access and use, accessibility, sustainability, and mitigation of impacts to abutters. 2.Advise the Board of Selectmen as to the management of specific parcels of land under the care, custody and control of the Board of Selectmen. 3.Participate in the preparation and implementation of the Town’s Open Space and Recreation Plan, pursuant to the requirements of the Mass. Dept. of Conservation and Recreation. 4.Establish a transparent process for managing problems and conflicts; encourage cooperation in addressing problems and conflicts; manage problems and conflicts and seek solutions. 5.Make recommendations to the Board of Selectmen and the Town Manager as to the measures necessary and appropriate to maintain and administer the townwide trail system and program, including recommending an annual operating budget which includes trash and debris removal, repairs, mowing, resurfacing, and restoration. Prepare an annual management plan for guidance. 6.Recommend to the Board of Selectmen for approval, town standards for signage, access and accessibility, trail marking, parking, mapping, vegetation and wildlife management, viewshed mitigation, trail design and surface, and trail location as it relates to natural resources, topography, and proximity to residential abutters. The draft standards shall be developed in coordination with the Town boards/committees and organizations involved with developing and maintaining trails on Town land. 7.Promote and encourage partnerships with other Town and Commonwealth agencies and boards/committees to make Hopkinton a more walkable community. 8.Coordinate and oversee the publication of trail maps and trail guides for use by the public. 9.Encourage public involvement and engagement in the planning, management and use of trails. Hold at least one public forum annually to solicit public input, ideas and concerns. 10.Meet at least annually with public and private trail groups to discuss proposed trail development and maintenance plans. 11.Coordinate and manage an adopt-a-trail program, if appropriate, and coordinate volunteer driven projects. COMPOSITION​: The TCMC shall consist of 7 members who are Hopkinton residents and appointed by the Board of Selectmen. Initial members shall be appointed to 1, 2 and 3 year 2 terms to achieve staggered terms, and all members appointed thereafter will serve 3 year terms. No member may serve more than three consecutive terms. The membership shall be as follows: ●Four members at large; ●One member who is recommended by the Parks and Recreation Commission; ●One member who is recommended by the Conservation Commission; ●One member who is recommended by the Planning Board. Committees/organizations recommending members may recommend more than one for consideration, and those recommended need not be members of the recommending body. All members shall have a demonstrated interest in the development, management and use of public trails. One member (or associate member) who also has expertise in facilitation and communication is desirable. The Board of Selectmen may appoint up to 5 associate (non-voting) members if desired, in order to broaden the perspective, representation or to facilitate the Charge of the committee. No associate members shall be appointed until one year after a quorum of full members has been appointed, so as to allow for time for the Committee to fully consider and clarify its purpose and charge. RELATIONSHIP TO EXISTING TOWN BOARDS: The existing authority of an appointed or elected board/committee is not intended to be modified by the Charge to the TCMC. While issues, concerns and questions may be reviewed and recommendations issued by the TCMC, the final decision rests with the entity with jurisdiction. However, a board/committee with jurisdiction may formally delegate a matter or specific project to the TCMC, provided that the TCMC agrees to handle the matter or undertake the specific project. KEY REFERENCES​: Hopkinton Master Plan (2017); Hopkinton Open Space and Recreation Plan (2013); ​Trails Guidelines and Best Practices Manual​, Mass. Department of Conservation and Recreation. OPEN MEETING LAW & PUBLIC RECORDS LAW​: The TCMC shall comply with the Open Meeting Law, Public Records Law, Procurement Law, and any other laws and regulations relative to public officials and public processes, as applicable. 3 December 21, 2015; revised January 22, 2019 1 Special Permits – Voting and Motion Guide (Planning Board) The grant of a special permit requires a 2/3 vote of the entire Board membership (6 votes) MGL – Massachusetts General Laws ZBL – Hopkinton Zoning Bylaw Voting Order: (1) Vote to make Findings and vote on waiver requests (2) Vote on grant of special permit, based on the Findings Special Permit/Zoning Bylaw Article Applicable Criteria & Standards/Findings Needed Reference All Special Permits 1. All applicable criteria and standards set forth in the Zoning Bylaw have been satisfied; 2. Grant of the special permit will be in harmony with the general purpose and intent of the Zoning Bylaw. MGL c.40A § 9 ZBL §210-223 AND Drive-in, drive-through, or drive-up uses, excluding the dispensing of food or drink, in B, BD, BR Districts An adequate dedicated area for at least 4 vehicles to queue shall be provided on the premises ZBL §210-19 ZBL §210-20.3 ZBL §210-24 Off street parking between principal building and streets (but not on Main St.) in the BD District 1. The proposed parking will not be detrimental to the surrounding neighborhood; and 2. The proposed location and design of the parking will enhance the downtown streetscape. ZBL §210-20.4 Garden Apartments in Residential Districts 1. The proposed development constitutes a desirable development in the neighborhood and the town; 2. The proposed development will not be detrimental to the neighborhood or the town; 3. The plans generally provide adequately for convenience and safety of vehicular and pedestrian movement within the site and in relation to adjacent streets, property or improvements, with the understanding that review of such items will be more detailed at the site plan stage; ZBL § 210-75 December 21, 2015; revised January 22, 2019 2 Special Permit/Zoning Bylaw Article Applicable Criteria & Standards/Findings Needed Reference 4. The plans appear to provide adequate methods of disposal of sewerage, refuse and other wastes, adequate methods for drainage for surface water and seasonal flooding, if any, and adequate provision of water for domestic purposes, with the understanding that review of such items will be more detailed at the site plan stage. 5. The plan complies with the Master Plan; 6. The provisions of § 210-72A & B have been met; 7. That the Town of Hopkinton has not met the statutory goal to provide 10% of its housing stock as affordable housing pursuant to Sections 20 through 23 of Chapter 40B of the Massachusetts General Laws. Campus Style Development 1. The development meets the development and design objectives of a campus style development contained in the bylaw; 2. The development standards in the bylaw have been met; 3. The site development is consistent with the Master Plan; 4. The Planning Board has determined that due regard has been given to the preservation and attractive utilization of the natural features of the development site, including trees, woods, streams and ponds. ZBL§ 210-86 Open Space and Landscape Preservation Development (OSLPD) 1. The development meets the purpose of an OSLPD as described in § 210- 106; 2. The development standards contained in § 210-112A (1) through (4) have been met; 3. The common open space is designed in accordance with the standards set forth in § 210-113B; 4. The common open space is designed in accordance with the standards set forth in § 210-113C; 5. The parcel could be developed as a conventional subdivision under existing local, state and federal land use regulations; 6. The OSLPD provides for efficient use and delivery of municipal and other services and infrastructure. ZBL§ 210-115 December 21, 2015; revised January 22, 2019 3 Lot with Historic Structure 1. The lot to be created will contain an Historic Structure; 2. The Historic Structure which will be located on the lot is either: (a) Presently situated on a lot for which an application has been submitted to the Town for approval of any single or multi-family residential development, an approval-not-required plan pursuant to MGL c.41 § 81P, or a construction project subject to Article XX, Site Plan Review, and the Historic Structure will remain in its present location; OR (b) Planned to be moved from a lot or within a lot for which an application has been submitted to the Town for approval of any single or multi-family residential development, an approval-not-required plan pursuant to MGL c.41 § 81P, or a construction project subject to Article XX, Site Plan Review. ZBL § 210-117.2 Common Driveways 1. The common driveway will provide safe and reasonable access for fire, police and emergency vehicles; 2. The common driveway meets the purpose and requirements of the bylaw; 3. The common driveway will minimize the environmental impacts; 4. The common driveway will not serve more than two single family dwellings. ZBL § 210-120 Shared and Off-Site Parking All parking spaces are associated with a use are within practical walking distance. ZBL § 210-124 Parking Space Reduction The provision of parking spaces proposed will be adequate for all parking needs. ZBL § 210-124 Lighting (Site Plan Review) 1. The exterior lighting will be consistent with the Purposes of the bylaw (Site Plan Review) OR there are other demonstrable community, health, safety or welfare benefits that will be served by the exterior lighting. 2. The proposed exterior lighting is appropriate for the size and use of the property, any buildings thereon, and the neighborhood setting. ZBL § 210-136.1 Hotel Overlay District (HOD) 1. The proposed use complies with the provisions of the HOD bylaw; 2. The major intersections and roadways providing access to the use will operate at an acceptable level of service based on the anticipated impact of vehicular traffic; ZBL § 210-194 December 21, 2015; revised January 22, 2019 4 3. There will be adequate methods for the disposal of sewage and refuse, provision of utilities, and water supply; 4. The design of the site and the architecture of the buildings will be compatible with surrounding structures and landscape features. The Planning Board shall deny an application if the number of hotels within the HOD would exceed one on the east side of Rt. 495 and one on the west side of Rt. 495, even if the application would meet the special permit criteria. Commercial Solar Photovoltaic Installations 1. The commercial solar photovoltaic installation conforms to the provisions of the bylaw; 2. The commercial solar photovoltaic installation will not be detrimental to the neighborhood or the town; 3. Environmental features of the site and surrounding areas are protected, and specifically surrounding areas will be protected from the proposed use by provision of adequate surface water drainage. ZBL § 210-203 Registered Marijuana Dispensary (RMD) The RMD is designed so as to minimize any adverse visual or economic impacts on the abutters or other parties in interest, as defined in MGL c.40A, § 11. ZBL § 210-222 December 21, 2015; revised January 22, 2019 5 Legacy Farms Master Plan Special Permit Special Permit/Zoning Bylaw Article Applicable Criteria & Standards Reference All Special Permits 1. All applicable criteria and standards set forth in the Zoning Bylaw have been satisfied; 2. Grant of the special permit will be in harmony with the general purpose and intent of the Zoning Bylaw. MGL c.40A § 9 ZBL §210-223 AND Article XXVI, Open Space Mixed Use Development (OSMUD) Overlay District (1) The Master Plan complies with the provisions of Article XXVI and of the Design Guidelines. (2) The Master Plan shall serve the purposes of the OSMUD District as described in § 210-162. (3) The impact of the development activities shown on the Master Plan is anticipated to be of benefit to the Town. (4) The major intersections and roadways providing access to the OSMUD District will continue to operate at an acceptable level of service (LOS) based on the anticipated impact of vehicular traffic from any previously approved uses within the OSMUD District that will remain plus all new proposed development within the OSMUD District. (5) The Master Plan provides adequately for the convenience and safety of vehicular and pedestrian movement within the OSMUD District and in relation to streets, property or improvements outside of the OSMUD District. (6) The Master Plan provides for the adequacy of the methods of disposal of sewage, refuse, and other wastes, provision of utilities, and the methods of drainage for surface water and seasonal flooding, if any, and protection of water sources for the Town. § 210-172.D December 21, 2015; revised January 22, 2019 6 Neighborhood Mixed Use Development Master Plan Special Permit Special Permit/Zoning Bylaw Article Applicable Criteria & Standards Reference All Special Permits 1. All applicable criteria and standards set forth in the Zoning Bylaw have been satisfied; 2. Grant of the special permit will be in harmony with the general purpose and intent of the Zoning Bylaw. MGL c.40A § 9 ZBL §210-223 AND Article XXXV, Neighborhood Mixed Use District (NMU) (a) The Master Plan complies with the provisions of Article XXXV. (b) The impact of the development activities shown on the Master Plan is anticipated to be of benefit to the Town. (c) The intersections and roadways providing access to the NMU District will operate at an acceptable level of service based on the anticipated impact of vehicular traffic from all proposed development within the NMU District. (d) The Master Plan provides adequately for the convenience and safety of vehicular and pedestrian movement within the NMU District and in relation to streets, property or improvements outside the NMU District. (e) The Master Plan provides for the adequacy of the methods of disposal of sewage, refuse and other wastes, provision of utilities, and the methods of drainage for surface water and seasonal flooding, if any, and adequate provision of water for domestic purposes. § 210-247.F (2)