DOT permits are in
process. Requires more
historic impact study.
GDNR application
4 Highway 80 Bike Trail Recreation Infrastructure Comm 2015 submitted on 10.10.14
Architects for the North
Beach Restrooms were
interviewed on 10.16.14.
DPW has scheduled
upgrades to Memorial
Park restroom during
4 Public Restroom Upgrades Recreation Infrastructure Comm the winter months.
Jones water lines in
process/#6  Sewer
4 Complete w/s upgrades Infrastructure W/S Dept. lines in process.
Completed first week in
August-Site Plan in
process- Ribbon cutting
Public Safety scheduled for December
4 Public Safety Building Complete Public Safety Committee 11,2014
Possible solar panels at
4 Upgrade Lighting (buildings, street lights, occupancy sensors) Energy Use Reduction CRC YMCA with savings
3 Review 11 items on existing CIP List Public Safety Completed.
Dan Parrott is almost
complete with the
document for city
3 Long range Beach Management Plan Beach Re-nourishment Funding BTF council review.
Mayor Buelterman and
CM met with county
manager, staff and
3 Get county to agree to provide Tybee with $6M in SPLOST 2014 Beach Re-nourishment Funding Mayor Buelterman commissioner on 9.3.14
Contract for architectual
services on the 11.13.14
3 Public restrooms, North Beach (rebuild/restore/increase) Tourism Infrastructure Comm city council agenda.
Money in budget. RFP in
3 Update the Tybee Island Master Plan Quality of Life Planning Commission fall (Rob taking lead)
Public Safety Ongoing; presence of
3 Positive police presence Quality of Life Committee foot and bike patrols
Ongoing; Veteran's Drive
2 Follow DPW's paving schedule Infrastructure Infrastructure Comm completed
Ongoing; to be
completed Winter
2014/15 -Traffic calming
2 Paving of Jones Infrastructure Infrastructure Comm study is in process.
Public Safety
2 Certified State level of Police Force Public Safety Committee Ongoing.
Letter of authorization
received from GDNR for
Savannah side dune
restoration matenance
project. Mayor
Buelterman is pursueing
2 Add dune building to future re-nourishment Beach Re-nourishment Funding BTF state funding for project.
Ongoing; CRC
2 Renewable generation (public safety bldg., YMCA, gym, school) Energy Use Reduction responsibility
Location for single
stream; possible location
behind Huc-a-poos-on
unopened Laurel Avenue
- other locations should
2 Recycle program north end business Tourism be evaluated.
Ongoing; working with
GA Power for placement
on their poles/Jackie
Cary is in contact with a
vendor for stainless steel
2 Trash/cigarette butts Tourism containers.
Currently- planting in
progress this November
2 Finish median Island's Appearance 2014