HomeMy Public PortalAboutWeek of 0928 Work PlanAnticipated Work —Week of September 28, 2020
• Annual catch basin cleaning (BMC Corporation)
• Water Main Flushing Program Week 2
o http://www.watertowndpw.org/DocumentCenter/View/1064/Flushing-week-of-
0928?bidld=
o Evening work, 7 PM to midnight
• Annual Town -wide water main leak detection survey (Liston Utility Services)
o http://www.watertowndpw.org/DocumentCenter/View/1061/Hydrant-Leak-Detection-
S u rvey-S e pt-28? b i d l d=
• Line Painting (K5 Corporation)
o NIGHT WORK, Sunday and Monday night: Arlington Street, Maplewood Street, School
Street, Waverley Ave. and various other locations
• Common Street (Onyx Corporation)
o Street light installation pending Eversource connections
o Landscaping work throughout project area
o Punch list work throughout project area
• Road Program (Onyx Corporation)
o Continue curb and sidewalk installation on Bellevue Road
o Continue sidewalk repairs on Everett Ave. and Malden Street
o Continue curb and sidewalk on Kimball Road
• Complete Streets Project (Onyx Corporation)
o Complete line painting on Watertown Street
• Sewer System Rehabilitation (Commonwealth Construction)
o Depending on crew availability, begin Wheeler Lane sewer repairs
• 2020 Water Main Replacement (Commonwealth Construction)
o Site restoration on Pine Street, Nash Street, and Essex Street
o Begin installation of water services on Oak Street
• National Grid
Utility companies are responsible for notifying residents prior to conducting work, but planned work
is listed below:
o Irving Street and Riverside Ave. gas main relays are complete
o Templeton Parkway at Mt. Auburn Street work is complete
o Continue gas service installations on Sheldon Road
o Continue gas main relays on Forest Street
o Complete gas main connections and abandonment of old gas main on Lexington Street
o Begin gas service installations on Grandview Ave.