HomeMy Public PortalAboutWeek of 1019 Work PlanAnticioated Work —Week of October 19. 2020
• Annual catch basin cleaning (BMC Corporation)
• Water Main Flushing Program Week 5
o Evening work, 7 PM to midnight
o http://www.watertowndpw.org/DocumentCenter/View/1070/Flushing-week-of-
1013?bidld=
• Annual Town -wide water main leak detection survey (Liston Utility Services)
o http://www.watertowndpw.org/DocumentCenter/View/1061/Hydrant-Leak-Detection-
Survey-Sept-28?bidld=
• Line Painting (K5 Corporation)
o NIGHT WORK, dates TBD: Arlington Street, Maplewood Street, School Street, Waverley Ave.
and various other locations
• Common Street (Onyx Corporation)
o Street light installation pending Eversource connections
o Install resin crosswalks and line painting
o Adjust substandard castings
• Road Program (Onyx Corporation)
o Continue curb and sidewalk installation on Downey Street
o Continue curb and sidewalk installation on Frank Street and Louise Street
o Raise castings on Kimball Road and Bellevue Road
• Complete Streets Project (Onyx Corporation)
o No work planned
• Sewer System Rehabilitation (Commonwealth Construction)
o Continue Wheeler Lane sewer repairs
o Install drain manhole on School Street near #181-183 and #185-187 (pending delivery of
structure)
• National Grid
Utility companies are responsible for notifying residents prior to conducting work, but planned work
is listed below:
o Continue gas service installations on Sheldon Road
o Continue gas main relays on Forest Street
o Continue gas service installations on Grandview Ave.
Note: All work is weather -dependent and subject to change.