HomeMy Public PortalAboutWeek of 1019 Work PlanAnticioated Work —Week of October 19. 2020 • Annual catch basin cleaning (BMC Corporation) • Water Main Flushing Program Week 5 o Evening work, 7 PM to midnight o http://www.watertowndpw.org/DocumentCenter/View/1070/Flushing-week-of- 1013?bidld= • Annual Town -wide water main leak detection survey (Liston Utility Services) o http://www.watertowndpw.org/DocumentCenter/View/1061/Hydrant-Leak-Detection- Survey-Sept-28?bidld= • Line Painting (K5 Corporation) o NIGHT WORK, dates TBD: Arlington Street, Maplewood Street, School Street, Waverley Ave. and various other locations • Common Street (Onyx Corporation) o Street light installation pending Eversource connections o Install resin crosswalks and line painting o Adjust substandard castings • Road Program (Onyx Corporation) o Continue curb and sidewalk installation on Downey Street o Continue curb and sidewalk installation on Frank Street and Louise Street o Raise castings on Kimball Road and Bellevue Road • Complete Streets Project (Onyx Corporation) o No work planned • Sewer System Rehabilitation (Commonwealth Construction) o Continue Wheeler Lane sewer repairs o Install drain manhole on School Street near #181-183 and #185-187 (pending delivery of structure) • National Grid Utility companies are responsible for notifying residents prior to conducting work, but planned work is listed below: o Continue gas service installations on Sheldon Road o Continue gas main relays on Forest Street o Continue gas service installations on Grandview Ave. Note: All work is weather -dependent and subject to change.