Loading...
HomeMy Public PortalAboutWeek of 1206 Work PlanAnticipated Work —Week of December 6. 2021 • Fall 2021 Complete Streets Work (Lorusso Corporation) o Continue pedestrian crossing improvements at Casey Park • 2020 Sanitary Sewer Investigations (Umbra Construction) o Inland Waters will perform warranty inspections in the work area • 2021 Sanitary Sewer Investigations (National Water Main) o Contractor will be cleaning and inspecting various sewer lines (7:00 AM — 4:00 PM) within the Protect 2, Project 3 and 4 work areas. No interruption of water or sewer service is anticipated, however there may be temporary road closures and/or parking restrictions • Sanitary Sewer Rehabilitations Contract 21-01S (National Water Main) o Contractor will continue cleaning and inspection of various sewer and drain mains within the project area • Survey crews will be performing surveys of Highland Ave., Morse Street and Fifth Avenue. Note that street surveys may include also include survey within 25-feet of the street layout. • Test pits are scheduled on Boylston Street (Fairfield Street to Porter Street), Chester Street, and Locke Street • National Grid Gas Work Utility companies are responsible for notifying residents prior to conducting work, but planned work is listed below: o Continue gas main replacement on Lovell Road o Continue gas main replacement on Winter Street o Continue gas main replacement on Pine Street and Nash Street o Continue replacement of sidewalk panels damaged during gas main installation • Eversource Utility companies are responsible for notifying residents prior to conducting work, but planned work is listed below: o Continue conduit installation on Forest Street (Main Street to Linear Park) Note: All work is weather -dependent and subject to change.