HomeMy Public PortalAbout5th Avenue Streetlight Project - Phase II, Project No. 463305GENERAL NOTES
ALL WORK SHALL BE DONE IN CONFORMANCE WITH THE CALIFORNIA DEPARTMENTOF
TRANSPORTATION (CALTRANS) STANDARD SPECIFICATIONS AND STANDARD PLANS
FOR CONSTRUCTION OF LOCAL STREETS AND ROADS, JULY 2002.
2. CITY SHALL SUPPLY THE STREETLIGHT POLES, LUMINAIRES WITH PHOTO CONTROL,
AND LAMPS AS SHOWN ON PLANS.
3. EACH LIGHTING POLE SHALL HAVE A WATERPROOF, TWO POLE, IN -LINE FUSE HOLDER
DISCONNECT WITH 5 AMP FUSES INSTALLED IN THE PULL -BOX LOCATED ADJACENT TO
THE ELECTROLIER BASE.
4. NEW POLE FOUNDATIONS SHALL BE 560-C-3250 CONCRETE OF SIZE INDICATED.
ANCHORBOLTS SHALL BE GALVANIZED STEEL, 1" DIA. BY 40" LONG WITH 4" BEND.
5. PULL -BOXES SHALL BE #3-1/2 SIZE. COVERS SHALL BE CONCRETE.
6. ALL NEW CONDUIT SHALL BE 1-1/2" IN DIA., PVC SCHEDULE 40 FROM #3-1/2 PULL -BOX TO
#2 PG&E PULL -BOX, AND 211 IN DIA. PVC SCHEDULE 40 FROM #2 PG&E PULL -BOX TO PG&E
SERVICE POLE.
7. ELECTRICAL CONDUCTORS SHALL BE 2 #8 THW FROM #3-1/2 PULL -BOX TO #2 PG&E PULL
-BOX, AND 2 #10 THW FROM #3-1/2 PULL -BOX TO STREETLIGHT.
8. DUE TO CLOSE PROXIMITY OF OTHER UTILITIES, NEW STREET LIGHT FOUNDATIONS TO
BE INSTALLED ALONG THE SIDEWALK SHALL BE HAND -DUG. CONTACT UNDERGROUND
SERVICE ALERT (U.S.A.) 48 HOURS PRIOR TO ANY EXCAVATION WORK AT 1-800-642-2444.
9. THE EXACT LOCATION OF THE STREETLIGHTS, FOUNDATIONS, PULL -BOXES, AND
TRENCHES SHALL BE FIELD MARKED AT THE DIRECTION OF THE ENGINEER.
10. CONTRACTOR SHALL RESTORE ANY DAMAGE DONE TO STOP BARS, LIMIT LINES AND
X -WALKS AND OTHER PAVEMENT MARKINGS DURING CONSTRUCTION.
1 1. ALL STREETS WHTHIN CONSTRUCTION LIMITS ARE CONCRETE BASE STREETS. ANY
DAMAGE TO THE CONDITION OF STREET'S AC AS WELL AS STREETS BASE DURING
CONSTRUCTION SHALL BE REPAIRED AND RESTORED BY CONTRACTOR TO ORIGINAL
OR BETTER CONDITION.
5TH
ITY OFSAN MATEDAVEd J O 1J STREET ]LIGHT
PHASE II
CITY PROJECT NO. 463305
EXISTING SITE CONDITION AT
STREETLIGHT LOCATION
SL -1
SL -2
SL -3
SL -4
SL -5
SL -6
SL -7
SL -8
SL -9
SL -10
SL -11
SL -12
SL -13
SL -14
SL -15
ON DIRT / PLANTER STRIP
ON GRASS / PLANTER STRIP
ON GRASS / PLANTER STRIP
ON CONCRETE SIDEWALK
ON GRASS / PLANTER STRIP
ON GRASS / PLANTER STRIP
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ON DIRT / PLANTER STRIP
ON GRASS / PLANTER STRIP
ON GRASS / PLANTER STRIP
ON GRASS / PLANTER STRIP
ON DIRT / PLANTER STRIP
ON GRASS / PLANTER STRIP
ON GRASS / PLANTER STRIP
BEFORE EXCAVATING
CALL U.S.A.
(UNDERGROUND SERVICE ALERT)
1-800.642.2444
48 HOURS BEFORE ALL
PLANNED WORK OPERATIONS
PROJ
ECT
LEGEND
SL-
NEW POST -TOP STREETLIGHT (100 W).
SL EXISTING POST -TOP STREETLIGHT (100 W).
NEW CONDUITS AND CONDUCTORS.
NEW NO. 3 1/2 PULL -BOX. (EXISTING SHOWN IN GRAY)
O NEW NO. 2 PG&E PULL -BOX. (EXISTING SHOWN IN GRAY)
Si
0
bTS
EXISTING STREETLIGHT WITH COBRA HEAD. ENTIRE
ASSEMBLY TO BE REMOVED IF MARKED ON THE PLAN.
EXISTING JOINT POLE TO REMAIN.
EXISTING TRAFFIC SIGNAL WITH SIGNAL ARM AND
LUMINAIRE ARM. ENTIRE ASSEMBLY TO REMAIN.
EXISTING JOINT POLE WITH BRACKET ARM STREETLIGHT
(BRACKET ARM STREETLIGHT TO BE REMOVED).
EXISTING FIRE HYDRANT TO REMAIN.
EXISTING TYPE 1 TRAFFIC SIGNAL TO REMAIN.
EXISTING TRAFFIC SIGNAL WITH SIGNAL ARM
TO REMAIN.
SHEET INDEX
SHEET 1 LIGHTING PLAN
JP
V / N,
—
N.N.
4Ct,
r00
�\
70
'C)'
.L
)
REMO
E BRACKET '
RM STREET
`'!
60
N.
�.
LIGHT
ROM EXISTI
G JOINT POL:.
.
I
N.
`
J0
`--� �
L-%
M
Vi�
-N
!
)r
H -J
SL
-5
'•
B
fJ
SL-
1T
� :,
6F
—
� _ ---)
.
091
2
•�•(150W)
•�11
<1
LO
r._, L11
—
5� 1----
-
-
�82i'�
_1
1
_;
-
�
�1
._,
J
1_c-�
'� ;
L
( X71 18091
_.
SL
-9
(81 l�
_
[819
3 :_��
L._
J
s
3 903!
L ,
(907
0911?
c3
L'
c327I
_.---....
i 00�
1
110v�
I 101 �.
10.7
I
102!
10�°�
!�--
q Q
1 1
-_:_!._!
dO:S
dolg
-----..�
_
_ .-I
i `------- --- '
-�
___,
....._ ---
I ._i
�_._
SL -7
JP
SL-13 �.-.
\.
}
SL -1 - .'
_
- -
—
—FIFTH TI I
I
n
.��
N
i•
-
�JP(100W)
c
-
E)
a
P(100W)
JP(150W)
rn
o
ii•.
,
o
=
�
-,
so
d
JPp
FH
JP
FH J
JP
SL 8 JP
SL -2
P
JP JP II- FH
:,
JP
—
Till
v
z. 1 6,
rn
cf
I
GI
STOP
I901ri
SL
12
'
L�j(� I
[8 81
1_810-
r81 2
MI
N
S
6
EXISTI
a #2 PG:
EPUL
B
TO BE
[1 002
1006
1010
0 1 8
102-21
ill 030
1100
110��
(1108
;1
EMOVE B •
CKET AR
STREET
I
I
REMOVE B
ACKET ARM
.TREET
USED
OR SL -1•
I
��
—
IGHTFRO
EXISTING
JOINT POL
I
LIGHT FRO
EXISTING JOINT
POLE
�02L
(32.61
r—
190/21
8�
[9%Uj
� � I
-
tri
a ,%
I
-
e.
_—
-
0 cH
���CI�,1 -�i, I
r
,�
cn
F,
-
I
I
I(PI
I
I
�r
g,..
I
«I1
HI
L
I
I
_7
JP
Iy:
I _` 0 I
JP 100V)
y
I
,!
a
6
_
IC.Tt1
0-
[Cp
---
•
-0 to
oil
,,_I
1 S
-10
C1��
IC.",II
(ill
--Ni II`„�
�ChL
S
-4 -`
CP
__.e
-
Ltd
PI
c-i
C_.
n
CT
_�
co..
(It
-
l
C ,i
'
_
s
`�.
c; !.
C ,1
cJ�
----I
` c -T; i
(1P 1
DI I
1
(1,
N
I
(s,
N(�1
1
N) (
-�
cri
W
0
In
DESCRIPTION
z
0
(/) 0
Ir
0,
o
I-4
Z-11 z
Q
a.
%1 0
0 z
FlEi
0
:74h'''1 w
W_
g
�� W O
en w
H
t
SURVEYED BY:
w
0 0
0
0
m
DESIGNED/DRAWN BY: H.A DATE: 6/2004
DATE: 6/2004
CHECKED BY: O.C.
SCALE: 1 "=50'
PROJECT NO.: 463305
CASE
2
DRAWER
20
SET
34
SHEET_1 OF 1
C W OMAYOUNIPIgeclebnne015,hAveSlreeM1ighB50, Ave Street UGMdwgZ h Ave Steel Ugt, 0,6/07/2004