Loading...
HomeMy Public PortalAboutProposed Flood Hazard Zones and Recent Flood Control ProjectsLaurel Creek Dam /969 REVISION NO. DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE CITY OF Proposed Recent SAN MATEO CALIFORNIA Flood Hazard Zones and Flood Control Projects SCALE In= 1200' BOOK NO. DRAWN BY This CHK. BY SURVEY BY DATE OCT. /974 APPROVED APPROVED DATE CITY ENGINEER DATE TRAFFIC ENGINEER APPROVED PLAN CASE 4 DRAWER 8 SHEET 45 DIRECTOR OF PUBLIC WORKS DATE Fernwood St. Culvert 740 cfs I J • ,/\, i/ \ \ . / . \/ i \ i t .` �__'' I �� /�� • `l i �JN / S� %a`• / \ 41. 44. s® r i r r I .� � 1.411. SIMMER r I i-, \, Orinda Dr. Culvert and ' Channel Improvements ' r i . i • • Marina Lagoon Dredging increased tide gate efficiency i / • / • v �+ 1/( A ♦s %, ea 1 t r\ Borel Creek upgrading to /400 cfs Marina Lagoon Dredging to elev. 91' (CSM datum) San Mateo Village Storm Drain • Repair or replace all storm sewers / / • / Marina Lagoon Pump Sta. pumping capacity increased to 500 cfs • 0 411. J Area not subject to structural flooding in a 100 year storm Proposed flood hazard zone boundary where different from the existing boundary Existing flood hazard zone boundary OFFICIAL MAP THE CITY OF MATEO CALIFORNIA 4