Loading...
HomeMy Public PortalAboutStorm Drain Manhole (2)Manhole frame & cover Street Grade 3/4' Round galvanized steel steps 16"o.c. SECTION N -M -P-0 Projected on P -P-0 Concrete ring & reducer. 6,E bars opti nal fillet 5'x2" F Di --"j F Pipe seat station Pt 3- D bars,3"o.c. continue 6"o.c 02 PLAN PLAN (Shaft not shown) F and T is shown hereon. Tie bars F bars 2'-10 i/2" with paved st. 3'-e" with unpaved st. 5'x 2" Pipe seat 0 bars Tie bars Fba Tie bars. 4, 18"o.c. both ways,to be used when 02 is 60' or over. 3- 4J bars, 4'-8"long,3"o.c., continue additional bars 6"o.c.to inside edge of material. Ang/e ,QRound to R=3" ,o ,9 c.ilvyQ PLAN SECTION G -G omit this step in paved baree 18'for pave st. 26" for unpaved st, r - NOTES' 0 iD Street Grade 4 optional outside toce of concrete 4 H bars 3'-0 long. Concrete rings 5xl ring seat For paved street g H bars variable E bars 0 bars DETAIL M (See note 5 1 5" Level „ Ac• to provide level pipe seat ]variable Seat for sha when top is not level Dbars — 5'k2"pipe seat. unpaved MIN TABLE OF VALUES FOR F 02,E F 07 F 39" 6 V2 12 l/3/2" 13 1/4" _ 14' 7 84" 42;, 45 ^T 4$' _ 511",,-8 _57 _9 6C," 69 —72 7 I/2 3/4" 8" _102;; 9 V4 IOV''qq _132" O 3/4"-144" II"— 9 0" — 96" _J5 —114„ 12Q I/?",_, I76 1% 17, — =17111/2 -- — 18" — Build up deck of manhole LONGITUDINAL SECTION TABLE OF BAR SIZES D9or B A 8,B bars Dor F bars 12- 39" +*56)3 4 6it 42"-84" -n6® 3 # 5& 6 90'-I44' #7C 3 wr 6@ 6 TABLE OF VALUES FOR T B T B T I2;' 4 60' 9 1/2— _15 _4 l/4'_ 63'r 10"_ 18 4 I/2'_ 6 6"_10 I/4'.__ 21" _ 5' _ 69" 10 VA' 24" 5 1/4' _ 72" — I I _27" _5 I/2" 78" —II 3/4"- _30 _ 6 84-12 1/2:- 33" 6 1/4"- 90' i3 I/4 —36,° l'T 96" T 14 — —39 _ 7 102"—f5 1/2"- —_42" _7 I/2" I OB"` 16' — 45" 7 3/4" 1 14' 16 12"— _ —48„ B 120" 17" _ 8 V2"_ 1 26" _ 17 - 54 9 132" 17 1/2 57" 9 14-138" 17 I/2'_ 144' 18" values for A,B,C,01i02, Elevation R, and Elevation S ore shown on the Plon. Table of values for 2. If laterals enter on both sides of manhole ,access shaft shall be located on side receiving the smaller lateral. 3. Center of manhole shaft shall be located over centerline of storm drain when DI is 48" or less, in which case place 4 E bars symetrically around shaft 45°with centerline. 4. Length of manhole may be increased to meet pipe ends, but any change in location of spur must be approved by the City Engineer. 5. when depth of manhole from street to top of box is less than Z-101/2" for paved street or 3'-6"tor unpaved street construct monolithic shaft as per Detail M. Construction of shaft as per Detoil M for any depth of manhole is optional .when D. 4 8" or less, center of shaft shall be located as per Note 3. 6. Reinforcing steel shall be straight bars i/2" clear from face of concrete unless shown otherwise. Tie bars shall be 3 and spaced 18"o.c. or less. Steel schedule detailed on plan. 7. Embedment P shall be 5" for 0- 96" or less and 8"for D over 96" 8. Steps shall be 3/4' round,galvatrrized steel and anchorednot less than 6"in the walls of structures. unless otherwise shown, the spacing shall be 16"o.c..The lowest step shall be not more than 2' above the invert. 9. Rings, reducer and pipe for access shaft shall be seated in 1:2 mix mortar and neatly pointed or wiped inside shaft. O. Floor of manhole shall be steel -troweled to spring line. I I. Body of manhole,including spur,shall be poured in one continuous operotion,except that a construction joint at the spring line with a longitudinal keyway is permitted. 12. Elevations applies at center of main line on prolongation of invert spur. 13. USE 560-8-3250 CONCRETE. • SAN MATEO STORM DRAIN MANHOLE CALIFORNIA DATE 1973 DRAWN BY RUJ CHIC. BY JEG APPROVED CITY ENGINEER PLAN CASE 3 DRAWER SHEET 128