HomeMy Public PortalAbout2014-34 Approving the CIP 2015-2019RESOLUTION NO. 2014-34 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, APPROVING THE 5 YEAR CAPITAL IMPROVEMENTS PLAN FOR FISCAL YEARS 2015-2019 ATTACHED AS EXHIBIT "A;" PROVIDING FOR VILLAGE MANAGER AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Village Manager has recommended the five year Capital Improvements Plan (the "Plan") for fiscal years 2015-2019, attached as Exhibit "A," in order to provide for a long term plan of proposed capital expenditures, the means and methods of financing the projects, and an action plan for the implementation of the projects; and WHEREAS, the Village Council recognizes the need to adopt the Plan to address beautification, parks, transportation, drainage, and infrastructure improvements in order to create a desirable high quality of life for the residents; and WHEREAS, the Village Council has reviewed the Plan and desires to adopt the Plan; and WHEREAS, the Village Council finds that this Resolution is in the best interest and welfare of the residents of the Village. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, AS FOLLOWS: Section 1. Recitals Adopted. Each of the above stated recitals are hereby adopted, confirmed and incorporated herein. Section 2. Capital Improvements Plan Adopted. The Village Council hereby adopts the five year Capital Improvements Plan for fiscal years 2015-2019 attached as Exhibit "A" to this Resolution. In the event there is a surplus or deficit of funds from a capital improvement 1 project, the Village Manager shall have the authority to reallocate funds in order to implement the Capital Improvement Plan. Section 3. Village Manager Authorized. The Village Manager is hereby authorized to do any and all things necessary to carry out the provisions of this Resolution. Section 4. Effective Date. This Resolution shall be effective immediately upon adoption. PASSED AND ADOPTED this 23rd day of September , 2014. ATTEST: VILLAGE ATTORNEY APPROVED AS TO FORM AND LEGAL SUFFICIENCY: 2 NKLIN H. CA AN, MAYOR EXHIBIT "A" Village of Key Biscayne Approved Capital Improvement Plan Fiscal Years 2015 - 2019 Village of Key Biscayne Capital Improvement Plan - Summary FY2015-FY2019 Encumbered FUNDS Restricted/Commited Reserves Building Inspections Capital Lease Compensated Absences Emergencies Fire Code Violations Fire Grant Revenue (UASI) Fire Rescue Transport Fees Labor Negotiations Law Enforcement Seizures Prepalds Working Capital Land Acquisition/Open Space Land Trust Sub -Total Restricted Reserves Assigned Reserves Calusa Park Community Center Equip Reserve Community Center Expansion Developer Contribution Educational Initiatives Landscape Master Plan Maint Reserve- Community Center Maint Reserve- Fire Station Maint Reserve- Police/Adman Master Plan Initiatives Playing Fields Recreation Facilities Traffic Calming Plan Village Goes Green Sub -Total Assigned Reserves Total Restricted/Assigned $926,095 $604,672 5654,875 54,000,001 $199,368 $132,685 $975,439 590,000 5176,028 5272,330 53,110,904 $1,000,000 $12,142,397 Restricted -For Building Department expenditures only Assigned -25% of total Employee time banks Committed - For emegency expenses (i.e. natural disasters) Restricted- For Fire prevention expenditures (is used to pay p/t inspector and in 2015 p/t community outreach employee) Restricted -Urban Area Security Initiative Grant -Anti Terrorist Training & Equipment Committed -Used to offset costs of providing Fire Rescue transportation Committed -To cover costs resulting from labor negotiations that exceed budgeted amounts, such as back pay Restricted -May only be used for law enforcement purposes. (Investigations, training, equipment, drug and gang awareness programs) Nonspendable-Prepaid insurance Assigned -To fund proposed capital improvement needs Committed- By Council action for Land Acquistion FY2015 FY2016 FY2017 FY2018 FY2019 Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed $547,582 $0 $0 $10,317 520,000 $20,000 5115,193 $o $0 50 50 50 $42,187 50 $0 5250,000 $0 $0 5228,354 5100,000 5100,000 $126,013 $0 $0 50 $0 50 51,694,757 $0 $0 $613,433 5309,641 $0 $335,713 575,000 575,000 5129,875 55,500 $5,500 546,211 $15,000 $15,000 $4,139,635 $0 $20,000 $0 $0 $0 $0 5100,000 50 50 50 50 575,000 $5,500 515,000 $0 $0 520,000 520,000 $0 $0 $0 $0 $0 $0 $0 $0 5100,000 5100,000 $0 $0 50 $0 $0 $0 $0 $0 $75,000 $75,000 $5,500 $5,500 515,000 515,000 516,282,032 5525,141 5215,500 5215,500 5215,500 5215,500 Capital Improvement Plan- SEE/ATTACHED LIST OF PROJECTS FOR EACH CATEGORY LISTED BELOW Cultural Information Technology Maintenance Public Safety- Fire Public Safety- Police Building, Zoning,Planning & Public Works Recreation and Open Space Sub -Total CIP Encumbrances 5131,523 $200,000 $0 5272,272 $159,900 5241,400 5376,004 $680,300 $40,300 5204,801 5104,657 $141,137 $17,205 $5,000 55,000 $2,671,539 $2,617,000 572,000 51,861,452 $674,529 $5,000 $0 $20,290 540,300 525,637 55,000 $72,000 55,000 $0 $0 $15,400 59,900 $40,300 540,300 $25,637 $25,637 55,000 55,000 $72,000 512,000 55,000 55,000 55,534,797 54,441,386 5504,837 5168,227 $163,337 $97,837 Total $21,816,829 54,966,527 5720,337 5383,727 $378,837 $313,337 Cultural *Funding Total Project Encumbered FY2015 FY2016 FY2017 FY2018 FY2019 Description: Non -operational Source(s) Cost FUNDS Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed VILLAGE ARTWORK- ARTWORK THROUGHOUT THE VILLAGE ONGOING CULTURAL PARK FACILITY CONSTRUCTION- MATCHING GRANT Total Cultural Holies: New Project Funding Source(s): *CIP- Capital Improvement Plan CP $155,953 $131,523 $0 $0 $0 $0 $0 CIP $400,000 $0 $200,000 $0 $0 $0 $0 5131,523 $200,000 $0 $0 $0 $0 Project Manager: Jud Kurlancheek, Building, Zoning and Planning Director Todd Hofferberth, Parks and Recreation Director Information Technology ONGOING PROJECT *Funding Total Project Encumbered FY2015 FY2016 FY2017 FY2018 FY2019 Description: Operational/Restricted Source(s) Cost FUNDS Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed ADMIN SERVER REPLACEMENT CIP $17,901 $0 $0 $0 $0 $0 $0 ADMIN/FIRE NOTEBOOKS CIP $26,400 $2,988 $0 $0 $2,500 $5,500 $0 ADMIN/FIRE WORK STATION REPLACEMENT CIP $32,939 $4,287 $3,900 $7,800 $3,900 $3,900 $3,900 BUILDING PERMIT SOFTWARE ONGOING MAINTENANCE GFRB $440,000 $0 $0 $0 $0 $0 $0 COMMUNITY CENTER- COMPUTER LAB CIP $51,522 $16,993 $6,000 $6,000 $6,000 $6,000 $6,000 NETWORK INFRASTRUCTURE CIP $33,000 $0 $0 $0 $0 $0 $0 POLICE NOTEBOOKS CIP $25,916 $8,004 $0 $9,000 $0 $0 $0 POLICE OPERATING SYSTEMS UPGRADES CIP $81,590 $0 $0 $9,000 $0 $0 $0 POLICE SERVER AND FIREWALL REPLACEMENT CIP $7,890 $0 $0 $0 $7,890 $0 $0 POLICE WORK STATION REPLACEMENT CIP $28,800 $0 $0 $9,600 $0 $0 $0 VILLAGEWIDE PHONE SYSTEM UPGRADE CIP $150,000 $150,000 $0 $0 $0 $0 $0 COUNCIL CHAMBER UPGRADE AUDIO AND VISUAL CIP $150,000 $0 $150,000 $0 $0 $0 $0 Description: Non -Operational 1. EMERGENCY MANAGEMENT- COOP DATA STORAGE 2. FINANCE/HUMAN RESOURCES/CIP SOFTWARE Total Information Technology Funding Source(s): *CIP- Capital Improvement Plan *GFRB- General Fund Reserves- Building Inspections *Funding Total Project Encumbered FY2015 FY2016 FY2017 FY2018 FY2019 Source(s) Cost FUNDS Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed CIP $90,000 $90,000 $0 $0 $0 $0 $0 CIP $200,000 $0 $0 $200,000 $o $0 $0 51,335,958 5272,272 5159,900 5241,400 520,290 515,400 59,900 Project Managers: Michael Fleming, Information Technology Administrator Charles R. Press, Police Chief Eric Lang, Fire Chief ELECTRIC REPLACEMENT: RECYCABLE TRASH CANS 150) Maintenance ONGOING PROJECTS *Funding Total Project Description: Operational/Restricted Source(s) Cost MAINTENANCE- COMMUNITY CENTER EXTERIOR FACADE CIP $49,500 MAINTENANCE- COMMUNITY CENTER LIFT STATION CIP $4,500 MAINTENANCE- FIRE EXTERIOR FACADE CIP $32,500 MAINTENANCE- OTHER FACILITIES CIP $167,340 MAINTENANCE- SIDEWALK REPAIRS CIP $75,000 MAINTENANCE- TRAFFIC CIRCLES CIP $160,000 MAINTENANCE- VILLAGE HALL CAMERAS AND CARD SYSTEM CIP $26,500 MAINTENANCE- VILLAGE HALL EXTERIOR FACADE CIP $43,000 REPLACEMENT- TREES CIP $140,000 REPLACEMENT- CRAN DON SPRINKLER _TIMERS FROM BATTERY TO CIP $50,000 CIP $25,000 REPLACEMENT: DOG STATIONS (50) CIP $15,000 REPLACEMENT: CHANNEL 77 EQUIPMENT CIP 515,000 REPLACEMENT: COMMUNITY CENTER WEIGHT ROOM EQUIP CIP 5450,000 REPLACEMENT: VILLAGEWIDE ELECTRICAL PANELS CIP $45,000 Encumbered FUNDS $49,500 $4,500 $9,746 $121,434 $0 $104,590 $0 543,000 $43,234 $0 $0 $0 $0 $0 $0 FY2015 Funds Needed FY2016 FY2017 FY2018 FY2019 Funds Needed Funds Needed Funds Needed Funds Needed so $0 $0 $0 $0 $o $0 $o $o $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 515,000 $15,000 $15,000 515,000 515,000 $10,000 510,000 $10,000 $10,000 $10,000 $5,300 $5,300 55,300 $5,300 $5,300 $0 $0 $0 $0 $0 $50,000 $10,000 $10,000 $10,000 $10,000 $50,000 $0 $0 $0 $0 $25,000 $0 $0 $0 $0 515,000 $0 $0 $0 $0 515,000 $0 $0 $0 $0 $450,000 $0 $0 $0 $0 $45,000 $0 $0 $0 $0 Total Maintenance 51,298,340 5376,004 5680,300 540,300 540,300 540,300 540,300 Italics: New Project Funding Source(s): 'CIP- Capital Improvement Plan Project Manager: Paul Abbott, Building Manager Jud Kurlancheek, Building, Zoning and Planning Director Public Safety- Fire ONGOING PROJECTS Description: Operational/Restricted *Funding Total Project Encumbered FY2015 FY2016 FY2017 FY2018 FY2019 Source(s) Cost FUNDS Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed EMERGENCY COMMUNICATION SYSTEM (RDA) CIP $100,000 $0 $100,000 $0 $0 $0 $0 FIRE BUILDING FIXTURES AND EQUIPMENT- LIGHTS, DOORS, ETC. CIP $23,285 $4,657 $4,657 $4,657 $4,657 $4,657 $4,657 FIRE HOSE CIP $28,592 $14,296 $0 $3,574 $3,574 $3,574 $3,574 FIRE RESCUE EQUIPMENT- ROPE KITS, DEFIBILLATATORS, ETC. CIP $93,630 $93,630 $0 $0 $0 $0 $0 TURNOUT GEAR -PANTS, JACKETS, BOOTS, HELMETS CIP $121,842 $52,218 $0 $17,406 $17,406 $17,406 $17,406 Description: Non -Operational *Funding Total Project Encumbered FY2015 FY2016 FY2017 FY2018 FY2019 Source(s) Cost FUNDS Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed 1. AEDs 2. STATION ALERTING SYSTEM CIP $40,000 $40,000 $0 $0 $0 $0 $0 CIP $115,500 $0 $0 $115,500 $0 $0 $0 Total Public Safety -Fire $522,849 $204,801 $104,657 $141,137 $25,637 $25,637 $25,637 Italics: New Project Funding Source(s): *CIP- Capital Improvement Plan *CL- Capital Lease Project Manager: Eric Lang, Fire Chief Building, Zoning, Planning and Public Works ONGOING PROJECTS `Funding Total Project Description: Operational/Restricted Source(s) Cost BANNERS- HOLIDAYS, LIGHTHOUSE, SNOW, ART SHOW, STARS AND STRIPS CIP $24,000 BEACH RENOURISHMENT- ANNUAL MONITORING (FY13-FY15) CIP $99,000 BEACH RENOURISHMENT- RENOURISHMENT FEMA/CIP $3,100,000 DUNE RESTORATION CIP $90,000 MAINTENANCE VEHICLE- BEACH MONITORING CIP $12,000 NEW PUBLIC WORKS YARD CIP $250,000 SEAGRASS RESTORATION- ANNUAL MONTORING (FY12-FY15) CIP $121,201 SEAGRASS RESTORATION- BISCAYNE NATIONAL PARK CO,GFR $500,000 SMALL/MID-SIZE LANDSCAPING PROJECTS CIP $500,000 STREET SIGNS- REPLACE VILLAGEWIDE RI,CIP $240,000 WHITEFLY PEST CONTROL CIP $63,000 Description: Non -Operational *Funding Total Project Source(s) Cost 1. VILLAGEWIDE CROSSWALK SAFETY IMPROVEMENTS CIP $50,000 2. CRANDON BLVD LED FLASHER AT E. HEATHER DR CIP $45,000 3. RESURFACING EAST OF CRANDON EXCEPT HOLIDAY COLONY CIP $390,000 4. UPLIGHTING LED REPLACEMENT PROGRAM CIP $45,000 5. STREET LIGHTING PHASE III- HARBOR DR FROM SUNSET CR TO W MASHTA CIP $105,000 6. STREET LIGHTING PHASE IV- MASHTA DR FROM HARBOR DR CR TO CRANDON CIP $150,000 7. OCEAN LANE DRIVE STREETSC4PE MASTER PLAN CIP $65,000 8, OCEAN DRIVE AND E.HAEATHER ADDITIONAL GOLF CART PARKING CIP $41,000 Total Public Works 56,133,201 italics: New Project Funding Source(s): *CIP- Capital Improvement Plan *CO- Capital Outlay *GFR- General Fund Reserves *RI- Roadway Improvement Project Manager: Jud Kurlancheek, Building, Zoning and Planning Director Encumbered FUNDS $24,000 $0 $1,062,119 $50,000 $4,000 $69,525 $58,734 $450,358 5198,288 $85,245 $62,745 Encumbered FUNDS $10,000 $45,000 $292,920 $28,605 $80,000 $150,000 $0 50 52,671,539 FY2015 FY2016 FY2017 FY2018 FY2019 Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed $0 $0 $0 $0 $0 $33,000 $0 $0 $0 $0 $2,000,000 $0 $0 $0 $0 $10,000 $10,000 $10,000 $10,000 $0 52,000 $2,000 $2,000 52,000 $2,000 $180,000 $0 $0 $0 $0 $36,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,000 $50,000 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 FY2015 FY2016 FY2017 FY2018 FY2019 Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed $10,000 $10,000 510,000 510,000 $10,000 $0 $0 $0 $0 $0 $90,000 $0 $0 $0 $0 $45,000 $0 $0 $0 $0 $25,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $65,000 $0 $0 $0 $0 $41,000 52,617,000 $72,000 572,000 572.000 512,000 Public Safety- Police ONGOING PROJECTS *Funding Total Project Encumbered FY2015 FY2016 FY2017 FY2018 FY2019 Description: Operational/Restricted Sources) Cost FUNDS Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed POLICE FLOOR FIXTURES AND EQUIPMENT- DOORS, LIGHTS, ETC. CIP $35,000 $17,205 $5,000 $5,000 $5,000 $5,000 $5,000 Total Public Safety- Police $35,000 $17,205 $5,000 $5,000 $5,000 $5,000 $5,000 Italics: New Project Funding Source(s): *CIP- Capital Improvement Plan *CL- Capital Lease Project Manager: Charles R. Press, Police Chief Recreation and Open Space ONGOING PROJECTS *Funding Total Project Description: Operational/Restricted Source(s) Cost 530 CRANDON BLVD SAMPLING CIP $15,000 COMMUNITY CENTER EXPANSION- CONSTRUCTION DEV $1,500,000 COMMUNITY CENTER GENERATOR CIP $75,000 VILLAGE GREEN IMPROVEMENTS CIP $188,364 VILLAGE RECREATION BUS CIP $82,644 Description: Non -Operational *Funding Total Project Source(s) Cost 1. 530 CRANDON BLVD DESIGNATED USE CIP $100,000 2. 530 CRANDON PARK CONSTRUCTION CIP $1,000,000 3. CALUSA PARK DESIGN -FROM HARBOR DRIVE EASEMENT TO PARK CIP $28,000 4. CALUSA PARK PATHWAY DESIGN -TRAIL FROM EASEMENT TO PARKING LOT CIP $33,000 Encumbered FUNDS $11,708 $1,500,000 $75,000 $64,100 $82,644 Encumbered FUNDS $100,000 $0 $28,000 $0 Total Recreation and Open Space 52,961,008 51,861,452 italics: New Project Funding Source(s): *CIP- Capital Improvement Plan *DEV- Developer Contribution- Consultatio Resolution provides for Land Acquistion and/or Community Center Expansion Project Manager: Todd Hofferberth, Parks and Recreation Director FY2015 FY2016 FY2017 FY2018 FY2019 Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $0 $0 $0 $0 FY2015 FY2016 FY2017 FY2018 FY2019 Funds Needed Funds Needed Funds Needed Funds Needed Funds Needed $0 $0 $0 $0 $0 $669,529 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 5674,529 $5,000 $5,000 55,000 $5,000